SlideShare a Scribd company logo
1 of 4
Download to read offline
Mohammad. A. Abdullatif
MEP-Project Manager
SUMMERY:
13 Years of progressive experience in Electrical Engineering; Participated in Variety of MEP
construction Projects including Housing building, high-rise buildings, commercial buildings &
special projects (Air base, Hotels, Data Center …). Assignments varied from design, site
supervision, follow up and coordination of technical and commercial issues at various stages.
Uptime Certified engineer
EXPERINCE:
Aug 2015 to date, MEP Project Manager, THERMO L.L.C / Dubai, UAE.
Etisalat Khalifa ‘A’ City Data Center (PH#2), Abu Dhabi
Main Responsibilities:
 Interface with client representatives, A/E representatives, contractors, vendors, etc.
 Plan, coordinate and/or supervise activities of all company’s personnel on assigned
project.
 Coordinate pre-construction activities for projects.
 Ensure, all company, client, and project policies, procedures, standards, etc. is adhered to
and interpret policies as required.
 Keep management & project director informed on progress of project.
 Since the project is special, I have special task to take on other responsibilities as required
(Logistic Manger, Manage the job of Commissioning Management Company) and main
responsibilities as following :
 Developed system solutions (logistic program, Commissioning plan and procedures).
 Held meetings and discussions with the clients to assess their distribution channel and resources
as required to carry-out operations successfully.
 Coordinate with all vendors.
 Scheduled all site activities to ensure a seamless transition from construction to
operations
 Prepare all the presentation requested by the client.
APR 2012 to Jul 2015, MEP-Project Manager JV / (ACC-Thermo).
Five Star Hotel (Anjum), Abdullatif Jameel Real Estate Inv Co – Makkah. Saudi Arabia.
Manage All Remaining MEP Installations at the Building including of the followings:
 Resolve problems as they are anticipated or as they arise at own level, guide direct
reports to resolve problems proactively and/or promptly to ensure adherence to project
plan and avoid increase in time & cost.
 Oversee documentation and progress monitoring data and drawings required for required
reporting.
 Liaise and attend regular site meetings with the client and the project Management
/consultant to maintain a healthy relationship throughout the contract’s lifetime
 Supervise and coordinate all MEP activities in order to avoid rework, conflicts, delays or
undue costs.
 Manage all aspects of manpower resources (staff and labor) requirements for the project
including the initial labor forecast as well as weekly labor reports.
 Authorize delivery notes, material requisitions through Engineers and following material
requisition forms with client in order to ensure that the project’s material requirements are
delivered on time.
 Coordinate and all suppliers and Sub-contractors.
Jul.2010-Mar 2012, MEP-Project Manager, King Fahd Air Base (Al Taif) Saudi Arabia, JV (ESEC –THERMO)
Main Responsibilities includes The Following:
 Establishing Standard Operating Procedures for MEP project.
 Reviewed preliminary project concepts and schematics (drawings, specifications,
calculations).
 Monitored and evaluated the quality of planning, design, and construction activities
accomplished by PMC, vendors, designers, and contractors.
 Provided direction and leadership to assigned resources for effective and timely execution
of the project.
 Guided and supervised MEP staff, and following up with logistic team.
 Monitored construction/implementation for conformity with approved design, including
detailed scheduling and coordination.
 Ensured QHSE requirements are performed in job-related activities.
 Maintain a diary of all activities occurring on the project site in order to facilitate any
claims or extensions should they be required.
 Escalate major issues e.g. those impacting completion, delays, budget, quality or safety
which are anticipated or which arise, to Senior Management promptly and with full
information, preferably with detailed recommendations of the solutions.
 Liaise and attend regular site meetings with the client and the project Management
/consultant for solving of various issues during project period.
 Participated in QHSE audits and workplace inspections.
Dec 2007 – Jun 2010 - MEP Deputy Project Manager, THERMO L.L.C, UAE
Projects:
1. Twin tower for H.H Sheikh Khalifa Bin Zayed Al Nhyan / AD.
2. Luxurious Tower for H.H Sheikha Salama Bint Mohammad Al Nhyan / AD
3. Labor camps at (Musaffah , AlFaya , AlMafraq ) / AD
Main Responsibilities:
 Work with management to assign, perform, oversee and schedule work tasks and
meet cost objectives.
 Follow up of the project executes installation, testing, commissioning and closeout.
 Coordinate the progress of work with the main contractors.
 Responsible of managing the all Managers/Engineers/Sub-contractors and shall
cover complete MEP systems.
 Responsible for overall plan, design/engineering/coordination and
implementation/execution of respective services including control and monitoring of
progress.
 Leading construction & coordination team.
 Controlling cost, budget & preparing feasibility and preparing progress report.
 Develops projects plans specifying goals, strategy, and staffing, scheduling,
identification of risks contingency plans and allocation of available resources.
 Provides technical leadership to personnel supporting the assigned project.
 Provide technical approvals for the project’s material submittals, base design,
schematic design, technical data sheets, etc.
 Ensure optimized engineering solution to meet clients and end user requirements.
 Produce sufficient data for variation orders and timely communicate to client in
coordination with general manager / contract / estimation section.
 Follow up with purchasing until finalization of requested ISO and items deliver and
report any delay to the project director / general manager as needed beforehand.
 Make sure that the housekeeping issues were implemented in different locations in
the site.
 Prepare recovery schedule to meet the original plan if delay founds.
 Supervising daily log of construction and inspection activates and compares progress
reports.
 Ensuring QS/HSE Company polices.
 Develops quality assurance test plans and direct quality and assurance testing.
 Executing & supervising for all the MEP Infrastructure activities, including the
following systems drainage, storm water, water supply, firefighting & CHW, LV and
law current.
 Handing over all systems to government authority such as (ADDC, ADSSC, Civil
Defense, Etisalat …etc.).
Sep 2004 – Nov 2007-Construction Manager (Badi Trading & Contracting Company /Doha, Qatar).
Major Responsibilities:
Involved in all company projects such as (Private villas, General Buildings):
• Maintained good professional relationships with suppliers and sub-contractors.
 Evaluated and resolved all project technical problems.
 Tested system for discrepancies in construction projects and objectives.
 Ensured project completion within budget and on schedule.
 Tested all products for correct installation and operation.
Professional Qualifications:
 2003 Bachelor Degree in Electrical Engineering, Damascus, Syria
 2003 Certificate in Computer Science, Al-’Mamoun International Institute, Dam/ Syria.
 2007 Certificate in Auto CAD Skills Al Khwarizmi University (Alain-UAE).
 2015 ATD, Uptime Certified Eng (Reg#1484).
Skills:
 IT Skills : (Word, Excel , AutoCAD)
 Language : English, Arabic Native.
Personal Information:
Contact : Email: mhdabdullatif@gmail.com - Mobile: +97150-1137716
Address: Dubai –UAE
Date of Birth: DOB 7th
Jun 1977,
Marital Status: Married.
Nationality: Syrian.
Residence status: UAE, Valid

More Related Content

What's hot

MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JDericaeksander
 
Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Mark Dimmitt
 
Resume-L-Gen_Jim Benge 6-14r1
Resume-L-Gen_Jim Benge 6-14r1Resume-L-Gen_Jim Benge 6-14r1
Resume-L-Gen_Jim Benge 6-14r1Jim Benge
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionJaswin Sood
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Jimmy Crooks
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
Waleed moustafa alexandria-head of structural department
Waleed moustafa  alexandria-head of structural departmentWaleed moustafa  alexandria-head of structural department
Waleed moustafa alexandria-head of structural departmentWaleed Moustafa
 
Leo San Diego Resume
Leo San Diego ResumeLeo San Diego Resume
Leo San Diego ResumeLeo San Diego
 
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1Gene Malboeuf
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008HaythamZidan1
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
Building Construction and Tech. 3. Responsibilities of participants
Building Construction and Tech. 3. Responsibilities of participantsBuilding Construction and Tech. 3. Responsibilities of participants
Building Construction and Tech. 3. Responsibilities of participantsHamdija Velagic
 

What's hot (20)

MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JD
 
Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15Word Version for Resume Mark Dimmitt 2.5.15
Word Version for Resume Mark Dimmitt 2.5.15
 
Resume-L-Gen_Jim Benge 6-14r1
Resume-L-Gen_Jim Benge 6-14r1Resume-L-Gen_Jim Benge 6-14r1
Resume-L-Gen_Jim Benge 6-14r1
 
2014-2015
2014-20152014-2015
2014-2015
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Resume
ResumeResume
Resume
 
Waleed moustafa alexandria-head of structural department
Waleed moustafa  alexandria-head of structural departmentWaleed moustafa  alexandria-head of structural department
Waleed moustafa alexandria-head of structural department
 
David Jaworski Resume
David Jaworski ResumeDavid Jaworski Resume
David Jaworski Resume
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Leo San Diego Resume
Leo San Diego ResumeLeo San Diego Resume
Leo San Diego Resume
 
ALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAHALAA Y ABUGHAIDAH
ALAA Y ABUGHAIDAH
 
gene-malboeuf-resume.1
gene-malboeuf-resume.1gene-malboeuf-resume.1
gene-malboeuf-resume.1
 
Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008Haytham zidan, civil engineer, 2008
Haytham zidan, civil engineer, 2008
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Building Construction and Tech. 3. Responsibilities of participants
Building Construction and Tech. 3. Responsibilities of participantsBuilding Construction and Tech. 3. Responsibilities of participants
Building Construction and Tech. 3. Responsibilities of participants
 

Similar to CV (1) (20)

Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Haifa Resume
Haifa Resume Haifa Resume
Haifa Resume
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
C.V
C.VC.V
C.V
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
07-12-2014m
07-12-2014m07-12-2014m
07-12-2014m
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
Henry CV
Henry CVHenry CV
Henry CV
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Ahmed EL Gamal CV
Ahmed EL Gamal CVAhmed EL Gamal CV
Ahmed EL Gamal CV
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 

CV (1)

  • 1. Mohammad. A. Abdullatif MEP-Project Manager SUMMERY: 13 Years of progressive experience in Electrical Engineering; Participated in Variety of MEP construction Projects including Housing building, high-rise buildings, commercial buildings & special projects (Air base, Hotels, Data Center …). Assignments varied from design, site supervision, follow up and coordination of technical and commercial issues at various stages. Uptime Certified engineer EXPERINCE: Aug 2015 to date, MEP Project Manager, THERMO L.L.C / Dubai, UAE. Etisalat Khalifa ‘A’ City Data Center (PH#2), Abu Dhabi Main Responsibilities:  Interface with client representatives, A/E representatives, contractors, vendors, etc.  Plan, coordinate and/or supervise activities of all company’s personnel on assigned project.  Coordinate pre-construction activities for projects.  Ensure, all company, client, and project policies, procedures, standards, etc. is adhered to and interpret policies as required.  Keep management & project director informed on progress of project.  Since the project is special, I have special task to take on other responsibilities as required (Logistic Manger, Manage the job of Commissioning Management Company) and main responsibilities as following :  Developed system solutions (logistic program, Commissioning plan and procedures).  Held meetings and discussions with the clients to assess their distribution channel and resources as required to carry-out operations successfully.  Coordinate with all vendors.  Scheduled all site activities to ensure a seamless transition from construction to operations  Prepare all the presentation requested by the client. APR 2012 to Jul 2015, MEP-Project Manager JV / (ACC-Thermo). Five Star Hotel (Anjum), Abdullatif Jameel Real Estate Inv Co – Makkah. Saudi Arabia. Manage All Remaining MEP Installations at the Building including of the followings:  Resolve problems as they are anticipated or as they arise at own level, guide direct reports to resolve problems proactively and/or promptly to ensure adherence to project plan and avoid increase in time & cost.
  • 2.  Oversee documentation and progress monitoring data and drawings required for required reporting.  Liaise and attend regular site meetings with the client and the project Management /consultant to maintain a healthy relationship throughout the contract’s lifetime  Supervise and coordinate all MEP activities in order to avoid rework, conflicts, delays or undue costs.  Manage all aspects of manpower resources (staff and labor) requirements for the project including the initial labor forecast as well as weekly labor reports.  Authorize delivery notes, material requisitions through Engineers and following material requisition forms with client in order to ensure that the project’s material requirements are delivered on time.  Coordinate and all suppliers and Sub-contractors. Jul.2010-Mar 2012, MEP-Project Manager, King Fahd Air Base (Al Taif) Saudi Arabia, JV (ESEC –THERMO) Main Responsibilities includes The Following:  Establishing Standard Operating Procedures for MEP project.  Reviewed preliminary project concepts and schematics (drawings, specifications, calculations).  Monitored and evaluated the quality of planning, design, and construction activities accomplished by PMC, vendors, designers, and contractors.  Provided direction and leadership to assigned resources for effective and timely execution of the project.  Guided and supervised MEP staff, and following up with logistic team.  Monitored construction/implementation for conformity with approved design, including detailed scheduling and coordination.  Ensured QHSE requirements are performed in job-related activities.  Maintain a diary of all activities occurring on the project site in order to facilitate any claims or extensions should they be required.  Escalate major issues e.g. those impacting completion, delays, budget, quality or safety which are anticipated or which arise, to Senior Management promptly and with full information, preferably with detailed recommendations of the solutions.  Liaise and attend regular site meetings with the client and the project Management /consultant for solving of various issues during project period.  Participated in QHSE audits and workplace inspections. Dec 2007 – Jun 2010 - MEP Deputy Project Manager, THERMO L.L.C, UAE Projects: 1. Twin tower for H.H Sheikh Khalifa Bin Zayed Al Nhyan / AD. 2. Luxurious Tower for H.H Sheikha Salama Bint Mohammad Al Nhyan / AD 3. Labor camps at (Musaffah , AlFaya , AlMafraq ) / AD
  • 3. Main Responsibilities:  Work with management to assign, perform, oversee and schedule work tasks and meet cost objectives.  Follow up of the project executes installation, testing, commissioning and closeout.  Coordinate the progress of work with the main contractors.  Responsible of managing the all Managers/Engineers/Sub-contractors and shall cover complete MEP systems.  Responsible for overall plan, design/engineering/coordination and implementation/execution of respective services including control and monitoring of progress.  Leading construction & coordination team.  Controlling cost, budget & preparing feasibility and preparing progress report.  Develops projects plans specifying goals, strategy, and staffing, scheduling, identification of risks contingency plans and allocation of available resources.  Provides technical leadership to personnel supporting the assigned project.  Provide technical approvals for the project’s material submittals, base design, schematic design, technical data sheets, etc.  Ensure optimized engineering solution to meet clients and end user requirements.  Produce sufficient data for variation orders and timely communicate to client in coordination with general manager / contract / estimation section.  Follow up with purchasing until finalization of requested ISO and items deliver and report any delay to the project director / general manager as needed beforehand.  Make sure that the housekeeping issues were implemented in different locations in the site.  Prepare recovery schedule to meet the original plan if delay founds.  Supervising daily log of construction and inspection activates and compares progress reports.  Ensuring QS/HSE Company polices.  Develops quality assurance test plans and direct quality and assurance testing.  Executing & supervising for all the MEP Infrastructure activities, including the following systems drainage, storm water, water supply, firefighting & CHW, LV and law current.  Handing over all systems to government authority such as (ADDC, ADSSC, Civil Defense, Etisalat …etc.). Sep 2004 – Nov 2007-Construction Manager (Badi Trading & Contracting Company /Doha, Qatar). Major Responsibilities: Involved in all company projects such as (Private villas, General Buildings): • Maintained good professional relationships with suppliers and sub-contractors.  Evaluated and resolved all project technical problems.  Tested system for discrepancies in construction projects and objectives.  Ensured project completion within budget and on schedule.  Tested all products for correct installation and operation.
  • 4. Professional Qualifications:  2003 Bachelor Degree in Electrical Engineering, Damascus, Syria  2003 Certificate in Computer Science, Al-’Mamoun International Institute, Dam/ Syria.  2007 Certificate in Auto CAD Skills Al Khwarizmi University (Alain-UAE).  2015 ATD, Uptime Certified Eng (Reg#1484). Skills:  IT Skills : (Word, Excel , AutoCAD)  Language : English, Arabic Native. Personal Information: Contact : Email: mhdabdullatif@gmail.com - Mobile: +97150-1137716 Address: Dubai –UAE Date of Birth: DOB 7th Jun 1977, Marital Status: Married. Nationality: Syrian. Residence status: UAE, Valid