SlideShare a Scribd company logo
1 of 2
Mark Dimmitt
dimmitt.m@gmail.com
(760)891-0126
Construction Management And Leader
SUMMARY:
 Extensive general construction management experience who holds a vast amount of knowledge that
benefits the organization or company to help reduce costs and improve ROI.
 In-depth knowledge of many different construction design methods: 2D & 3D BIM, Conventional
Construction Design, Design Build GMP, Hard Bid Build. Adaptability to conform to any building contract.
Experienced with managing design build methods in Structural, Mechanical, Electrical, Fire-life Safety and
IT integration.
 Hands on trade experience of coordination and implementation of a construction site, ability to analyze
projects and make recommendations for cost effectiveness.
 Management experience ranging from Design Consultant Team Leader, Company Representative,
Construction Manager of CM/ multiple prime contract and design, Build Sr. Superintendent. Supervise and
oversee large numbers of sub-trade contractors, design consultants and main point of contact with
governing agencies.
 Managed and coordinated projects with both large and small scopes including, tenant improvements to
existing commercial space, ground up commercial building, mixed use high-rise buildings.
 Liaison between Owners, General Contractors, Architects, Engineers and Sub-Contractors. Engineered the
ability to communicate between all entities to ensure effective communication between all parties.
 Trade sequencing and ability to schedule projects utilizing LEAN practices and outside
manufacturing commitments for ROJ (required on job) drop dead dates.
 Able to understand and work within budget constraints while maintaining quality control and
required design intent for the end-user.
 Extensive experience processing ASI's, RFI's, PCO's and complete documentation of all actions during the
progression of a project.
 Experienced managing and issue RFP's and follow the progression through the impact analysis to a fully
issued change order.
 Mindfully protects future projects that will benefit from low insurance and bond rates which translate into
lower bids and new contract awards. Protects the contractors bond and MOD rate through good business
practices and full implementation of a safety program. Compliant with all of OSHA standards and best
practices.
 Understanding of all the various aspects of contracts and the different levels of inclusion that increase
profitability.
SPECIALTIES:
 Effective Leader, Construction Manager, Sr. Superintendent, Owner’s representative of a variety large
design build projects. BIM Team leader conflict resolution and field implementation.
 Poured in place high-rises, structural steel, CMU buildings and type 5 structures.
 Responsible for all LEED coordination and documentation for LEED silver and gold projects. LEED coordinator for
the general contractor points (LEED on line). Presently working toward LEED accreditation.
 Fully versed in all Microsoft Office programs proficient in Microsoft Projects, Primavera, Prolog
 Experienced in contract implementation and enforcement of contractual obligations.
 Construction of design build projects including working knowledge of Structural, Mechanical,
Electrical systems including BMS, Server rooms and LEED start-up, Fire-life safety, and IT integration.
 Well versed in the latest codes and requirements as mandated by local and state jurisdictions by utilizing a
variety of resources
 Effective leader and mentor, ability to lead employees and sub-contractors.
Employment History:
Cormorant Construction Management 10/12- Present
Sr. Construction Management Consultant
 Lead development project consultant; advises on project planning and construction evaluation,
pre-construction planning, master schedule development, general contractor selection.
 Oversees budget and ensures projects are completed in a timely manner and stays within the budget
parameters.
 Liaison as development representative between project developer and city building and planning committees
 Value engineering and cost analysis, phasing and sequencing development.
Highland Partnership, Inc. ($30 million to $75 million) 4/07 – 10/12
Senior Superintendent
 Oversee high-rise projects and large scale projects including; on and off site development ranging up to
10 acres.
 Implementation coordination and control of offsite utilities in close proximity to down town traffic and
installations main infrastructure of lengths of up to 1/2 mile in distance. Coordinate with City and obtained
proper permits as needed.
 Team Leader who motivated and effectively managed employees to complete building time lines which
saved in costs and resulted in bonus funds from clients for project completion on time or early.
 Team Leader who oversaw the interviews of general contractor elimination and selection.
 Pre-contract negotiations with subcontractors during contract negotiations and consultation with Sr. Project
manager during selection and elimination.
 On site construction management of all team members.
 LEED coordinator, BIM team leader of various projects and building consultant representing contractor in
various meetings.
 Clash detection and resolution, design build detection and implementation of missed scope, CD design
development, develop master schedule for project with scheduling programmer.
 Update scheduling as needed and ensured information was communicated to the client to ensure client
awareness of project completion dates.
 Oversaw a team of 150 employees and sub-contractors.
Swinerton Management/ Pointe of View Development ($250 million) 02/06 – 04/07
On-site Construction Manager
 Site Manager of a 42 story poured in place high-rise (Vantage Pointe) mixed use high-rise, additionally
installation of a 6 story parking structure below grade one city block square.
 Owner’s representative tasked with managing of design build development and coordination of all MEP and Fire
systems as well as structural and architectural coordination. Worked directly with the architects, clients and city
officials to ensure compliance.
 Managed any conflict resolution with the architect and construction team.
 Liaison between different agencies of the City of San Diego and project team, obtained proper permits and
permissions from city entities.
 Oversaw a construction team of over 300 employees and sub-contractors.
R.D. Olson Construction ($20 million to $65 million) 08/02 -01/06
Construction Manager/Superintendent
 Oversee ground up multilevel hotels, resorts and student housing/ senior living facilities.
 On-site Construction Manager /Superintendent of type 5, steel framed and poured in place concrete post tension
multilevel and mid-level high-rises for the purposes of hospitality, student housing, resort, hotel and residential
living complexes, oversee day to day on site and off site construction.

More Related Content

What's hot

Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
What, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near meWhat, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near memarwoodconstruction
 
Construction difficulties
Construction difficultiesConstruction difficulties
Construction difficultiesNahid0521
 
Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Estimating Experience
Estimating ExperienceEstimating Experience
Estimating ExperienceJeff Schletty
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an ArchitectClara Lee
 
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Ashraf Khan
 
Castellanos Castro
Castellanos CastroCastellanos Castro
Castellanos Castroguest16da28
 
Castellanos Castro Arquitectura We Bingles
Castellanos Castro Arquitectura We BinglesCastellanos Castro Arquitectura We Bingles
Castellanos Castro Arquitectura We Binglesguest4b8b4e8
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 

What's hot (20)

Maulik_Mistri_1
Maulik_Mistri_1Maulik_Mistri_1
Maulik_Mistri_1
 
resume
resumeresume
resume
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
Role of an architect
Role of an architect Role of an architect
Role of an architect
 
What, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near meWhat, when, and why of commercial general contractors near me
What, when, and why of commercial general contractors near me
 
Construction difficulties
Construction difficultiesConstruction difficulties
Construction difficulties
 
Construction management cm
Construction management cmConstruction management cm
Construction management cm
 
Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16Juan Carlos Garcia Resume PM_16
Juan Carlos Garcia Resume PM_16
 
ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )ACH 121 Lecture 02 (Arch. Basic Services )
ACH 121 Lecture 02 (Arch. Basic Services )
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Estimating Experience
Estimating ExperienceEstimating Experience
Estimating Experience
 
The role of an Architect
The role of an ArchitectThe role of an Architect
The role of an Architect
 
Resume RJD
Resume RJDResume RJD
Resume RJD
 
Final building-team
Final building-teamFinal building-team
Final building-team
 
ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)
 
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
 
Castellanos Castro
Castellanos CastroCastellanos Castro
Castellanos Castro
 
Castellanos Castro Arquitectura We Bingles
Castellanos Castro Arquitectura We BinglesCastellanos Castro Arquitectura We Bingles
Castellanos Castro Arquitectura We Bingles
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)
 

Viewers also liked

New Media Middle branding concepts FINAL
New Media Middle branding concepts FINALNew Media Middle branding concepts FINAL
New Media Middle branding concepts FINALMissViolet69
 
участь педагогів добропілля у всеукраїнських читаннях
участь педагогів добропілля у всеукраїнських читанняхучасть педагогів добропілля у всеукраїнських читаннях
участь педагогів добропілля у всеукраїнських читанняхАлександр Дрон
 
7-S's To Success in Addiction Recovery
7-S's To Success in Addiction Recovery7-S's To Success in Addiction Recovery
7-S's To Success in Addiction RecoveryJC's Recovery Center
 
Final-presentation-KTH-RedQual
Final-presentation-KTH-RedQualFinal-presentation-KTH-RedQual
Final-presentation-KTH-RedQualDejan Koren
 

Viewers also liked (7)

New Media Middle branding concepts FINAL
New Media Middle branding concepts FINALNew Media Middle branding concepts FINAL
New Media Middle branding concepts FINAL
 
участь педагогів добропілля у всеукраїнських читаннях
участь педагогів добропілля у всеукраїнських читанняхучасть педагогів добропілля у всеукраїнських читаннях
участь педагогів добропілля у всеукраїнських читаннях
 
7-S's To Success in Addiction Recovery
7-S's To Success in Addiction Recovery7-S's To Success in Addiction Recovery
7-S's To Success in Addiction Recovery
 
документ Microsoft word (2)
документ Microsoft word (2)документ Microsoft word (2)
документ Microsoft word (2)
 
SPSY
SPSYSPSY
SPSY
 
Final-presentation-KTH-RedQual
Final-presentation-KTH-RedQualFinal-presentation-KTH-RedQual
Final-presentation-KTH-RedQual
 
Riff rock
Riff rockRiff rock
Riff rock
 

Similar to Word Version for Resume Mark Dimmitt 2.5.15

Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler
 
Bryan Butler Resume B
Bryan Butler Resume BBryan Butler Resume B
Bryan Butler Resume BBryan Butler
 
Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)vinay sinha
 
Idris Oladipo - LinkedIn Profile - Nov2014
Idris Oladipo - LinkedIn Profile - Nov2014Idris Oladipo - LinkedIn Profile - Nov2014
Idris Oladipo - LinkedIn Profile - Nov2014Idris Oladipo, LEED® AP
 
Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher Walsh
 
Richard O'Neill Resume
Richard O'Neill ResumeRichard O'Neill Resume
Richard O'Neill Resumerichard oneill
 
Johnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)Robert Palac
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)DEEPINDER WALIA
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)DEEPINDER WALIA
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMEChip Wedekind
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume CopyLori Mitchell
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
Project Manager and Contracting Officer 1
Project Manager and Contracting Officer 1Project Manager and Contracting Officer 1
Project Manager and Contracting Officer 1Corey Hamilton
 

Similar to Word Version for Resume Mark Dimmitt 2.5.15 (20)

Bryan Butler Resume A1
Bryan Butler Resume A1Bryan Butler Resume A1
Bryan Butler Resume A1
 
Bryan Butler Resume B
Bryan Butler Resume BBryan Butler Resume B
Bryan Butler Resume B
 
Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)
 
Idris Oladipo - LinkedIn Profile - Nov2014
Idris Oladipo - LinkedIn Profile - Nov2014Idris Oladipo - LinkedIn Profile - Nov2014
Idris Oladipo - LinkedIn Profile - Nov2014
 
Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016
 
towerst-resume-2a
towerst-resume-2atowerst-resume-2a
towerst-resume-2a
 
Richard O'Neill Resume
Richard O'Neill ResumeRichard O'Neill Resume
Richard O'Neill Resume
 
Johnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clientsJohnna Domino Resume 2016 - with clients
Johnna Domino Resume 2016 - with clients
 
Dobbins resume - new
Dobbins resume - newDobbins resume - new
Dobbins resume - new
 
2016 Bob resume (003)
2016 Bob resume (003)2016 Bob resume (003)
2016 Bob resume (003)
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
RESUME MODIFIED 05 JUNE 2016 (1)
RESUME MODIFIED 05 JUNE  2016 (1)RESUME MODIFIED 05 JUNE  2016 (1)
RESUME MODIFIED 05 JUNE 2016 (1)
 
RESUME3.3.2016
RESUME3.3.2016RESUME3.3.2016
RESUME3.3.2016
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
CHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUMECHIP WEDEKINDFINALRESUME
CHIP WEDEKINDFINALRESUME
 
Construction Project Manager_RE
Construction Project Manager_REConstruction Project Manager_RE
Construction Project Manager_RE
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
DJT Linkedin
DJT LinkedinDJT Linkedin
DJT Linkedin
 
Project Manager and Contracting Officer 1
Project Manager and Contracting Officer 1Project Manager and Contracting Officer 1
Project Manager and Contracting Officer 1
 

Word Version for Resume Mark Dimmitt 2.5.15

  • 1. Mark Dimmitt dimmitt.m@gmail.com (760)891-0126 Construction Management And Leader SUMMARY:  Extensive general construction management experience who holds a vast amount of knowledge that benefits the organization or company to help reduce costs and improve ROI.  In-depth knowledge of many different construction design methods: 2D & 3D BIM, Conventional Construction Design, Design Build GMP, Hard Bid Build. Adaptability to conform to any building contract. Experienced with managing design build methods in Structural, Mechanical, Electrical, Fire-life Safety and IT integration.  Hands on trade experience of coordination and implementation of a construction site, ability to analyze projects and make recommendations for cost effectiveness.  Management experience ranging from Design Consultant Team Leader, Company Representative, Construction Manager of CM/ multiple prime contract and design, Build Sr. Superintendent. Supervise and oversee large numbers of sub-trade contractors, design consultants and main point of contact with governing agencies.  Managed and coordinated projects with both large and small scopes including, tenant improvements to existing commercial space, ground up commercial building, mixed use high-rise buildings.  Liaison between Owners, General Contractors, Architects, Engineers and Sub-Contractors. Engineered the ability to communicate between all entities to ensure effective communication between all parties.  Trade sequencing and ability to schedule projects utilizing LEAN practices and outside manufacturing commitments for ROJ (required on job) drop dead dates.  Able to understand and work within budget constraints while maintaining quality control and required design intent for the end-user.  Extensive experience processing ASI's, RFI's, PCO's and complete documentation of all actions during the progression of a project.  Experienced managing and issue RFP's and follow the progression through the impact analysis to a fully issued change order.  Mindfully protects future projects that will benefit from low insurance and bond rates which translate into lower bids and new contract awards. Protects the contractors bond and MOD rate through good business practices and full implementation of a safety program. Compliant with all of OSHA standards and best practices.  Understanding of all the various aspects of contracts and the different levels of inclusion that increase profitability. SPECIALTIES:  Effective Leader, Construction Manager, Sr. Superintendent, Owner’s representative of a variety large design build projects. BIM Team leader conflict resolution and field implementation.  Poured in place high-rises, structural steel, CMU buildings and type 5 structures.  Responsible for all LEED coordination and documentation for LEED silver and gold projects. LEED coordinator for the general contractor points (LEED on line). Presently working toward LEED accreditation.  Fully versed in all Microsoft Office programs proficient in Microsoft Projects, Primavera, Prolog  Experienced in contract implementation and enforcement of contractual obligations.  Construction of design build projects including working knowledge of Structural, Mechanical, Electrical systems including BMS, Server rooms and LEED start-up, Fire-life safety, and IT integration.  Well versed in the latest codes and requirements as mandated by local and state jurisdictions by utilizing a variety of resources  Effective leader and mentor, ability to lead employees and sub-contractors.
  • 2. Employment History: Cormorant Construction Management 10/12- Present Sr. Construction Management Consultant  Lead development project consultant; advises on project planning and construction evaluation, pre-construction planning, master schedule development, general contractor selection.  Oversees budget and ensures projects are completed in a timely manner and stays within the budget parameters.  Liaison as development representative between project developer and city building and planning committees  Value engineering and cost analysis, phasing and sequencing development. Highland Partnership, Inc. ($30 million to $75 million) 4/07 – 10/12 Senior Superintendent  Oversee high-rise projects and large scale projects including; on and off site development ranging up to 10 acres.  Implementation coordination and control of offsite utilities in close proximity to down town traffic and installations main infrastructure of lengths of up to 1/2 mile in distance. Coordinate with City and obtained proper permits as needed.  Team Leader who motivated and effectively managed employees to complete building time lines which saved in costs and resulted in bonus funds from clients for project completion on time or early.  Team Leader who oversaw the interviews of general contractor elimination and selection.  Pre-contract negotiations with subcontractors during contract negotiations and consultation with Sr. Project manager during selection and elimination.  On site construction management of all team members.  LEED coordinator, BIM team leader of various projects and building consultant representing contractor in various meetings.  Clash detection and resolution, design build detection and implementation of missed scope, CD design development, develop master schedule for project with scheduling programmer.  Update scheduling as needed and ensured information was communicated to the client to ensure client awareness of project completion dates.  Oversaw a team of 150 employees and sub-contractors. Swinerton Management/ Pointe of View Development ($250 million) 02/06 – 04/07 On-site Construction Manager  Site Manager of a 42 story poured in place high-rise (Vantage Pointe) mixed use high-rise, additionally installation of a 6 story parking structure below grade one city block square.  Owner’s representative tasked with managing of design build development and coordination of all MEP and Fire systems as well as structural and architectural coordination. Worked directly with the architects, clients and city officials to ensure compliance.  Managed any conflict resolution with the architect and construction team.  Liaison between different agencies of the City of San Diego and project team, obtained proper permits and permissions from city entities.  Oversaw a construction team of over 300 employees and sub-contractors. R.D. Olson Construction ($20 million to $65 million) 08/02 -01/06 Construction Manager/Superintendent  Oversee ground up multilevel hotels, resorts and student housing/ senior living facilities.  On-site Construction Manager /Superintendent of type 5, steel framed and poured in place concrete post tension multilevel and mid-level high-rises for the purposes of hospitality, student housing, resort, hotel and residential living complexes, oversee day to day on site and off site construction.