SlideShare a Scribd company logo
1 of 7
Basheer Ahmed
Contact Details: B.E - Civil
RiyadhKSA (Transferable Iqama)
Mobile:+966 (0) 542412672 , (0)567651972
Email:basheer_pak2@yahoo.com ,basheer.nahiyoon@saudiparsons.com
Qualification
1989 – 1993
Bachelor of Engineering (Civil) from
Mehran University of Engineering and
Technology Nawab Shah, Pakistan.
www.muet.edu.pk
Professional membership
Registered member of Pakistan
Engineering Council.
PEC No.Civil / 15694
Registered member of SaudiCouncilof
Engineers.
SCE No.Civil / 47001
Essential responsibilities
Project Management, Execution,
Supervision of Infrastructure,Roads ,
RCC Structure, Treatment Plants &
BuildingConstruction works Review
technical & material submittal, Shop
drawings, Asbuiltdrawings.Quality
controland qualityassurance
(QA/QC), attend meetings,prepare
reports.
Key Skills
Strong decision-making skills.
Excellent communication skills.
Organization &managementskills
Ability to priorities & plan effectively.
Ability to explain design ideasclearly.
Ability to lead the team or individual.
Ability to analyses complex problems.
Ability to assesspossiblesolution.
Ability to meet aggressivedeadlines.
 Brief Profile:
 I haveabout22 years of in-depth and well-demonstrated
experiencesin the field of Civil Engineering. I haveinvolved
in Construction field,Roads construction, Effluent
Treatmentplant,InfrastructurePowerPlant,Load Bearing
Building Construction,Waterand SewerNetwork,Culverts
and ConduitsConstruction and otherjobswhich related
with Civil engineering.
 Also familiar with Computerfield to thesoftware’s like; MS
Windows,MSOfficeand locate Standard Construction
codesfromWEB Site and test equipmentlikely have
excellent knowledgeof local and internationalcivil codes
like; American NationalStandardsInstitute(ANSI),British
standards(BS),SaudiArabia Standard organization
(SASO),NationalWaterCompany (NWC) &Ministry of
Water and Electricity.
 I haveworked with the both privateand government
clients including, Ministry of Housing (MOH) National
Water Company (NWC), Riyad,SandozPharamLakhra
Power Plant,National Highway Authority,during my
professionalcareerin Kingdomof SaudiArabia and
Pakistan.
 Projects:
 DammamNorth Housing Project,KSA.
 NWC Waternet work new location of Riyadh City.
 Ministry of Water and Electricity AL Qassim.
 Infrastructure Buredah ALQassim
 TreatmentPlantPakistan
 InfrastructureLAKHRA PowerHousePakistan
 Hyderabad BypassPakistan.
 Housing ProjectKW&SB,Pakistan.
 Highway Project52 km.
 WORK EXPERIENCE IN KSA
 July 2014 – to 7th
Feb 2016
 Working as SeniorInfrastructure Engineer with Saudi
Arabian ParsonsLimited Dammam,SaudiArabia.
 Project: DammamNorth Housing Project.
 Owner: Ministry of Housing (MOH).
 Consultant: SaudiArabian ParsonsLimited (SAPL).
 Contractor: MAPA forconstruction and trading Co.Inc.
 Project cost: 669 Million SAR.
Basheer Ahmed
Civil Engineer
Page2 of 7
Employmenthistory:
July 2014 – To date
SeniorInfrastructureEngineer
At SaudiArabian ParsonsLimited
Dammam,SaudiArabia.
(www.parsons.com)
Apr 2013 – July 2014
Senior engineer
ALRAWD Construction Company,
Riyadh,SaudiArabia.
(www.Aljazirah.com)
Feb 2008 – April 2013
SeniorEngineer Infrastructure Project
AL QassimUniversity
MASCO(Pvt.)Ltd RIYADH
Riyadh,SaudiArabia.
(www.masco.com.)
Feb 2002 – Feb 2008
ProjectManagerAlJazirah Co
Water meter, Water network
Riyadh/Kharj and Buredah City Al
Qasim District Saudi Arabia.
(www.aljazirah.com.)
 Project summary:
 The purposeof thisprojectis the construction of houses,
worksincludes:Infrastructure,road works,sewernetwork,
stormwaternetwork, potablewaterpump station,
Irrigation waterpump station, watertreatmentplant,
SewerTreatment Plant landscaping, telecommunication
network,Electro-Mechanical(MEP) works, substations and
MV/LV powerdistribution.
 Responsibilities included:
 Assisting the Construction Manager to manage site and
office works in accordance with contract documents and
approved drawings.
 Safety CommitteeChairman Responsibilitiesfrom Jan
2015 till last day 7th
Feb 2016
 Monitoring work progress in accordance with approved
programof workand preparedaily progressreport (DPR).
 Ensuring proper documentation of all relevant inspection
reports, correspondence, design drawings, shop drawings
and transferof as-builtinformation to theIFCdrawings.
 Reviewing technical submittals for design drawings, shop
drawings (SD), project method statement, material
submittals (MS), Inspection & testing plan submittal (ITP),
sub-contractors pre- qualification submittal(SPQ) etc.
 Monitor site inspection to ensure that all the construction
activities are being executed in accordance with the
contractual agreement, specifications and approved
drawings.
 Assigning site duties to site Engineer/ Inspectors to ensure
thatall activities of contractorare covered and recorded.
 Attending weekly meetings with office staff regarding work
progress, QA/QC and HSE issues to identify problems and
recommend instantsolutions.
 Prepare comment sheet and draft letter regarding
submittals & site problems and forward to Construction
Manager.
 Responsible for maintaining project records including
acceptance/rejection of request for information (RFI), work
inspection request (WIR), approved shop drawings, logs,
daily, weekly,monthly progressreports.
Basheer Ahmed
Civil Engineer
Page3 of 7
Dec 1993 – Jan 2002
Trainee Engineer to Project
Manager
SEW/China Co NHA , Pakistan.
(www.sew.com.pk)
Multiple projects like Roads,
Housing, Treatment Plant and
Infrastructure of Power Plant.
Personal Details:
Date ofBirth
15th
- 07 -1968
Father’s Name
GhulamIshaque
Religion
Islam
Nationality
Pakistani
Marital status
Married
Languages
English,Urdu,Sindhi,Arabic.
DrivingLicense
SaudiArabia & Pakistan
CountryExperience
Pakistan & SaudiArabia
 April 2013 – July 2014
 Worked as a Senior Engineer Riyadh, KSA.
 Project: Construction and Maintenance.
 Owner: MOI/NWC/Ministry of Education/Riyadh
Dev Co/Municipality RuralAffairs/MODAKhashmulAan
Riyadh
 Consultant: Client Direct.
 Project cost: 750 Million SAR.
 Project summary:
 The Purposeof theseprojects Construction/Maintenance
which related with Water network,Replacementof Wet
and Dry Utilities, Building Construction,Supply thematerial
as perContractCondition providetechnicalstaff asper Site
requirement.Main Transmission Waternetwork Kharj City
 Responsibilitiesincluded:
 Developed the projectsstrategy thatmeetstheproject's
required performance,scheduleand budgetarytargets
 Manageand Solveall Technical Problem
 Arrange all Tendering and Bidding Document and
Submission to Client
 Managespeed up progresswith in minimumtime
 Arrange all Raw material with Competitive price from
Local marketand Abroad comply with Specification
 Managed and coordinated with allStaff
 Developed procurementasCustomerprocurement
department.
 Selected tradesuppliers,and coordinated theiractivities.
 Provided mentoring,coaching,and technicalguidance to
Construction team
 February 2008 – April 2013
 Worked as a SeniorEngineer with MASCO(Pvt.) Ltd.
 Riyadh, SaudiArabia.
 Project: InfrastructureWork KSA.
 Owner: Ministry of Higher Education.
 Consultant: Al NaeemConsultant.
 Contractor: MASCO (Pvt) Ltd.
 Project cost: 450 Million SAR
 Project summary:
 Worked as SeniorEngineer
 It’sPure Infrastructurewhich IncludeRoads,WetUtilities,
Dry Utilities Walkways,Parking Landscaping Gardens for
Children’s and All otherfacilities to providefor
Construction new HousesforUniversity Staff.
Basheer Ahmed
Civil Engineer
Page4 of 7
Permanent Address
B-7 Sunny BunglowsnearGovtGirls
College Qasimabad
Hyderabad,Sindh -71000, Pakistan.
Current Address
Flat No.4,LuLu Building ,
AL Atheer district, Dammam,
PermanentAddress:House#15 Behind
Al Falah Hospital AL Oud District
Riyadh
SaudiArabia.
References
Availableupon request
 Responsibilities included:
 Supervision of Minor Structures (RCC Culverts & Drains),
Sewerage Works (Laying of PVC, RCC pipe lines &
Manholes), Water Supply (Laying of PVC pipe lines), Civil
worksforunderground ElectricCable & TelephoneCable.
 Provide technical advice to project team on civil and
structuralmatters
 Interface with other functional disciplines i.e Mechanical,
Electrical, telecommunication etc.
 Design amendmentsaspersite conditions.
 Checking of All Submittals, Method Statements & Payment
certificates.
 Correspondence&Meetingswith Client & Contractor.
 Dealing with ContractAgreement issues.
 Responsible for submission of deliverables/ reports to the
client asper the reporting schedule
 Jan 2004 – Feb 2008
 Worked as a ProjectMangerClientMOWE
 Consultanttechnicalteamof MOWE.
 Project: Water Network/InfrastructureWorkKSA.
 Owner: Ministry of Water and Electricity.
 Consultant: Ministry of Water and Electricity.
 Contractor: AL Jazirah (Pvt) Ltd.
 Project cost: 200 Million SAR
 Project: Water network Riyadh and Kharj to provide Water for
new construction areas in Riyadh simultaneously Main
transmission Line from Source to Pumping Station Kharj City,
Water network Distribution in AL Buredah City AL Qassim District
Saudi Arabia.
 Responsibilities included:
 Arranged worked and take permission from 13
departmentsfortheExcavation of requireplace.
 Managed the completion of the project within available
time for minimize the cost of project, initiation, planning,
forecasting and projectcloseout.
 Negotiated, prepared and executed the prime contract
throughout the design and construction phases of the
project.
 Responsible for quantity assurance and quality control
(QA/QC) of electrical equipment/materials delivered at site
as perthe drawingsapproved by theconsultant.
 Worked closely with clients, team members and other
stakeholders to identify, recommend, develop, implement,
and supportcost-effectiveprojectdelivery.
 Created scope, schedule and cost baseline, monitored and
Basheer Ahmed
Civil Engineer
Page5 of 7
tracked all baselinesduring all the projectphases.
 Managed and coordinated construction activities, reviews
and approved paymentapplications.
 Developed procurement and contracting strategies with
client’s procurementdepartment.
 Jan 2002 – Dec 2004
 Worked as a Project Managerwith Al JazirahCoRiyadh
City Saudi Arabia.
 Project: Water network/InfrastructureWorkKSA.
 Owner: Ministry of Water and Electricity.
 Consultant: Ministry of Water and Electricity.
 Contractor: AL JAZIRAH(Pvt) Ltd.
 Project cost: 75 Million SAR
 Project: Project management Infra Structure and Water
meter in Riyadh City 4000 meter have changed with in 1&
half yearswith differentlocation in Riyadh
 Responsibilities included:
 Attend project meetings with consultant, sub-contractor
and client regarding projectactivities.
 Responsibleforsubmission of clear & brief
activity/progress/timerecording reportsto project
managerforconsultantand client’ssatisfaction.
 Supervision and monitoring of alltype of Works
 Managed the completion of the project life cycle from
initiation,planning,forecasting and projectcloseout.
 Negotiated, prepared and executed the prime contract
throughout the design and construction phases of the
project.
 Worked closely with clients, team members and other
stakeholders to identify, recommend, develop, implement,
and supportcost-effectiveprojectdelivery.
 Created scope, schedule and cost baseline, monitored and
tracked all baselinesduring all the projectphases.
 Managed and coordinated construction activities, reviews
and approved paymentapplications.
 Developed procurement and contracting strategies with
client’s procurementdepartment.
 Selected trade contractors and suppliers, and coordinated
their activities.
 Provided mentoring, coaching, and technical guidance to
projectteam
 Responsible for quantity assurance and quality control
(QA/QC) of electrical equipment/materials delivered at site
as perthe drawingsapproved by theconsultant.
Basheer Ahmed
Civil Engineer
Page6 of 7
PakistanExperience from October 1993 to January 2002
 Launched in 1972, SachalEngineering Works (SEW) has
successfully executed a numberof projectsin Sewerage
and EffluentTreatmentPlant,Roads,bridges,airfields,and
Water treatmentplants.Thephenomenalsuccesseswithin
Pakistan and duerecognition of thequality of its work,
prompted SEWto lookbeyond thebordersof the count
Prepared and negotiated sub-contractsissued and
monitored changeordersof varioustrades.
 Monitored progressand costagainstbase-lineschedules
and budgets.
 Reviewed detailed construction work packagesfor
integration with engineering,procurementand
construction.
 Coordinated inspectionswith therelated municipal
building departmentand interacted with officialsfrom
multiple
 Section incharge
Period 2000 to 2002
 Responsibilitiesas Section In chargeon Road Section in
20km portion.
 Design By AAA Associats
 SachalEngineering Workswith China Construction Co
 Road Construction Projectwith 800 Meter lengthwith Big
Span Bridgeon IndusRiverto Connecttwo ProvincePunjab
an Pakhtoonkhwahnearly 150 RCC Structurelike Box
culverts, RCC and Steel pipe ConduitsUnderPasses,Fly
oversand many moreStructureinvolvein mention project
 Site Agent
Period 1997 to 2000
 Building Construction projectDesign by Load Bearing
Capacity underMottMacDonald Consultantand Designer
Total Quantity of Bungalows240 with fourtypes.
 Site Engineer
Period 1995 to 1997
 Lakhra Power plant Infrastructure, RCC Channel with 4
Stone Load Bearing Bridges and Sewerage Treatment plant
UnderWater and PowerMinistry of Pakistan
 FieldEngineer
Period 1993 to 1995
Effluent Treatment Plant Under Sandoz Chemical
Co mention Project treats the Waste and Chemical
Water and Re-cycling to use for Agriculture and
irrigation purpose mention project design by
EnvironmentdepartmentSwitzerland.
Basheer Ahmed
Civil Engineer
Page7 of 7

More Related Content

What's hot

Curriculum Vitae Renold Pereira Ptc
Curriculum Vitae Renold Pereira  PtcCurriculum Vitae Renold Pereira  Ptc
Curriculum Vitae Renold Pereira PtcTechint Group
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copyali haider
 
ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15Atiquzzaman Mohiuddin
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Omer
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.AZHAR QAZI
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor Danger Riyas
 
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...Project Technical Coordinator - Document Administrator-Engineering & Vendor /...
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...Techint Group
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyRp Singh
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil EngineerMohammad Sarowar
 

What's hot (19)

Infrastructure engineer. CV
Infrastructure engineer. CVInfrastructure engineer. CV
Infrastructure engineer. CV
 
Curriculum Vitae Renold Pereira Ptc
Curriculum Vitae Renold Pereira  PtcCurriculum Vitae Renold Pereira  Ptc
Curriculum Vitae Renold Pereira Ptc
 
NAEEM CV
NAEEM CVNAEEM CV
NAEEM CV
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15ATIQ Resume Civil-Str design Engineer_Oct 15
ATIQ Resume Civil-Str design Engineer_Oct 15
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
John CV
John CVJohn CV
John CV
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...Project Technical Coordinator - Document Administrator-Engineering & Vendor /...
Project Technical Coordinator - Document Administrator-Engineering & Vendor /...
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 

Viewers also liked

Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingHazem Mahdy
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC EngineerSushil Patel
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samplesgedihutes
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 

Viewers also liked (8)

Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC Engineer
 
Top 8 mep engineer resume samples
Top 8 mep engineer resume samplesTop 8 mep engineer resume samples
Top 8 mep engineer resume samples
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 

Similar to Basheer Ahmed

CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
Humayoon Hashmi Resume
Humayoon Hashmi ResumeHumayoon Hashmi Resume
Humayoon Hashmi ResumeHumayon Hashmi
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERKhaled mohamed
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16Saleem MD
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CVbaraa Mohammad
 
Ribishan Avunhipuram
Ribishan AvunhipuramRibishan Avunhipuram
Ribishan AvunhipuramRibishan Ap
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016Raed Ramahi
 
AutoCad Designer (1)
AutoCad Designer (1)AutoCad Designer (1)
AutoCad Designer (1)Abdul Hakeem
 
Anwar ME-12yrs
Anwar ME-12yrsAnwar ME-12yrs
Anwar ME-12yrsSyed Anwar
 
CV-ARCHITECT-kariim
CV-ARCHITECT-kariimCV-ARCHITECT-kariim
CV-ARCHITECT-kariimkarim reda
 
Eng yehya_sharifa
Eng  yehya_sharifaEng  yehya_sharifa
Eng yehya_sharifaYehya Sh
 
Eng yehya sharifa
Eng  yehya sharifa Eng  yehya sharifa
Eng yehya sharifa Yehya Sh
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 

Similar to Basheer Ahmed (20)

CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Humayoon Hashmi Resume
Humayoon Hashmi ResumeHumayoon Hashmi Resume
Humayoon Hashmi Resume
 
Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)Hossam Samir (Senior infrastructure Engineer) C (002)
Hossam Samir (Senior infrastructure Engineer) C (002)
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
 
Ahmad Khraisat CV (1)
Ahmad Khraisat CV (1)Ahmad Khraisat CV (1)
Ahmad Khraisat CV (1)
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
Cv 01
Cv 01Cv 01
Cv 01
 
Ribishan Avunhipuram
Ribishan AvunhipuramRibishan Avunhipuram
Ribishan Avunhipuram
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
 
AutoCad Designer (1)
AutoCad Designer (1)AutoCad Designer (1)
AutoCad Designer (1)
 
Anwar ME-12yrs
Anwar ME-12yrsAnwar ME-12yrs
Anwar ME-12yrs
 
Aathikesavan CV
Aathikesavan CVAathikesavan CV
Aathikesavan CV
 
CV-ARCHITECT-kariim
CV-ARCHITECT-kariimCV-ARCHITECT-kariim
CV-ARCHITECT-kariim
 
AHMAD ELSAYED
AHMAD ELSAYEDAHMAD ELSAYED
AHMAD ELSAYED
 
Eng yehya_sharifa
Eng  yehya_sharifaEng  yehya_sharifa
Eng yehya_sharifa
 
Eng yehya sharifa
Eng  yehya sharifa Eng  yehya sharifa
Eng yehya sharifa
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 

Basheer Ahmed

  • 1. Basheer Ahmed Contact Details: B.E - Civil RiyadhKSA (Transferable Iqama) Mobile:+966 (0) 542412672 , (0)567651972 Email:basheer_pak2@yahoo.com ,basheer.nahiyoon@saudiparsons.com Qualification 1989 – 1993 Bachelor of Engineering (Civil) from Mehran University of Engineering and Technology Nawab Shah, Pakistan. www.muet.edu.pk Professional membership Registered member of Pakistan Engineering Council. PEC No.Civil / 15694 Registered member of SaudiCouncilof Engineers. SCE No.Civil / 47001 Essential responsibilities Project Management, Execution, Supervision of Infrastructure,Roads , RCC Structure, Treatment Plants & BuildingConstruction works Review technical & material submittal, Shop drawings, Asbuiltdrawings.Quality controland qualityassurance (QA/QC), attend meetings,prepare reports. Key Skills Strong decision-making skills. Excellent communication skills. Organization &managementskills Ability to priorities & plan effectively. Ability to explain design ideasclearly. Ability to lead the team or individual. Ability to analyses complex problems. Ability to assesspossiblesolution. Ability to meet aggressivedeadlines.  Brief Profile:  I haveabout22 years of in-depth and well-demonstrated experiencesin the field of Civil Engineering. I haveinvolved in Construction field,Roads construction, Effluent Treatmentplant,InfrastructurePowerPlant,Load Bearing Building Construction,Waterand SewerNetwork,Culverts and ConduitsConstruction and otherjobswhich related with Civil engineering.  Also familiar with Computerfield to thesoftware’s like; MS Windows,MSOfficeand locate Standard Construction codesfromWEB Site and test equipmentlikely have excellent knowledgeof local and internationalcivil codes like; American NationalStandardsInstitute(ANSI),British standards(BS),SaudiArabia Standard organization (SASO),NationalWaterCompany (NWC) &Ministry of Water and Electricity.  I haveworked with the both privateand government clients including, Ministry of Housing (MOH) National Water Company (NWC), Riyad,SandozPharamLakhra Power Plant,National Highway Authority,during my professionalcareerin Kingdomof SaudiArabia and Pakistan.  Projects:  DammamNorth Housing Project,KSA.  NWC Waternet work new location of Riyadh City.  Ministry of Water and Electricity AL Qassim.  Infrastructure Buredah ALQassim  TreatmentPlantPakistan  InfrastructureLAKHRA PowerHousePakistan  Hyderabad BypassPakistan.  Housing ProjectKW&SB,Pakistan.  Highway Project52 km.  WORK EXPERIENCE IN KSA  July 2014 – to 7th Feb 2016  Working as SeniorInfrastructure Engineer with Saudi Arabian ParsonsLimited Dammam,SaudiArabia.  Project: DammamNorth Housing Project.  Owner: Ministry of Housing (MOH).  Consultant: SaudiArabian ParsonsLimited (SAPL).  Contractor: MAPA forconstruction and trading Co.Inc.  Project cost: 669 Million SAR.
  • 2. Basheer Ahmed Civil Engineer Page2 of 7 Employmenthistory: July 2014 – To date SeniorInfrastructureEngineer At SaudiArabian ParsonsLimited Dammam,SaudiArabia. (www.parsons.com) Apr 2013 – July 2014 Senior engineer ALRAWD Construction Company, Riyadh,SaudiArabia. (www.Aljazirah.com) Feb 2008 – April 2013 SeniorEngineer Infrastructure Project AL QassimUniversity MASCO(Pvt.)Ltd RIYADH Riyadh,SaudiArabia. (www.masco.com.) Feb 2002 – Feb 2008 ProjectManagerAlJazirah Co Water meter, Water network Riyadh/Kharj and Buredah City Al Qasim District Saudi Arabia. (www.aljazirah.com.)  Project summary:  The purposeof thisprojectis the construction of houses, worksincludes:Infrastructure,road works,sewernetwork, stormwaternetwork, potablewaterpump station, Irrigation waterpump station, watertreatmentplant, SewerTreatment Plant landscaping, telecommunication network,Electro-Mechanical(MEP) works, substations and MV/LV powerdistribution.  Responsibilities included:  Assisting the Construction Manager to manage site and office works in accordance with contract documents and approved drawings.  Safety CommitteeChairman Responsibilitiesfrom Jan 2015 till last day 7th Feb 2016  Monitoring work progress in accordance with approved programof workand preparedaily progressreport (DPR).  Ensuring proper documentation of all relevant inspection reports, correspondence, design drawings, shop drawings and transferof as-builtinformation to theIFCdrawings.  Reviewing technical submittals for design drawings, shop drawings (SD), project method statement, material submittals (MS), Inspection & testing plan submittal (ITP), sub-contractors pre- qualification submittal(SPQ) etc.  Monitor site inspection to ensure that all the construction activities are being executed in accordance with the contractual agreement, specifications and approved drawings.  Assigning site duties to site Engineer/ Inspectors to ensure thatall activities of contractorare covered and recorded.  Attending weekly meetings with office staff regarding work progress, QA/QC and HSE issues to identify problems and recommend instantsolutions.  Prepare comment sheet and draft letter regarding submittals & site problems and forward to Construction Manager.  Responsible for maintaining project records including acceptance/rejection of request for information (RFI), work inspection request (WIR), approved shop drawings, logs, daily, weekly,monthly progressreports.
  • 3. Basheer Ahmed Civil Engineer Page3 of 7 Dec 1993 – Jan 2002 Trainee Engineer to Project Manager SEW/China Co NHA , Pakistan. (www.sew.com.pk) Multiple projects like Roads, Housing, Treatment Plant and Infrastructure of Power Plant. Personal Details: Date ofBirth 15th - 07 -1968 Father’s Name GhulamIshaque Religion Islam Nationality Pakistani Marital status Married Languages English,Urdu,Sindhi,Arabic. DrivingLicense SaudiArabia & Pakistan CountryExperience Pakistan & SaudiArabia  April 2013 – July 2014  Worked as a Senior Engineer Riyadh, KSA.  Project: Construction and Maintenance.  Owner: MOI/NWC/Ministry of Education/Riyadh Dev Co/Municipality RuralAffairs/MODAKhashmulAan Riyadh  Consultant: Client Direct.  Project cost: 750 Million SAR.  Project summary:  The Purposeof theseprojects Construction/Maintenance which related with Water network,Replacementof Wet and Dry Utilities, Building Construction,Supply thematerial as perContractCondition providetechnicalstaff asper Site requirement.Main Transmission Waternetwork Kharj City  Responsibilitiesincluded:  Developed the projectsstrategy thatmeetstheproject's required performance,scheduleand budgetarytargets  Manageand Solveall Technical Problem  Arrange all Tendering and Bidding Document and Submission to Client  Managespeed up progresswith in minimumtime  Arrange all Raw material with Competitive price from Local marketand Abroad comply with Specification  Managed and coordinated with allStaff  Developed procurementasCustomerprocurement department.  Selected tradesuppliers,and coordinated theiractivities.  Provided mentoring,coaching,and technicalguidance to Construction team  February 2008 – April 2013  Worked as a SeniorEngineer with MASCO(Pvt.) Ltd.  Riyadh, SaudiArabia.  Project: InfrastructureWork KSA.  Owner: Ministry of Higher Education.  Consultant: Al NaeemConsultant.  Contractor: MASCO (Pvt) Ltd.  Project cost: 450 Million SAR  Project summary:  Worked as SeniorEngineer  It’sPure Infrastructurewhich IncludeRoads,WetUtilities, Dry Utilities Walkways,Parking Landscaping Gardens for Children’s and All otherfacilities to providefor Construction new HousesforUniversity Staff.
  • 4. Basheer Ahmed Civil Engineer Page4 of 7 Permanent Address B-7 Sunny BunglowsnearGovtGirls College Qasimabad Hyderabad,Sindh -71000, Pakistan. Current Address Flat No.4,LuLu Building , AL Atheer district, Dammam, PermanentAddress:House#15 Behind Al Falah Hospital AL Oud District Riyadh SaudiArabia. References Availableupon request  Responsibilities included:  Supervision of Minor Structures (RCC Culverts & Drains), Sewerage Works (Laying of PVC, RCC pipe lines & Manholes), Water Supply (Laying of PVC pipe lines), Civil worksforunderground ElectricCable & TelephoneCable.  Provide technical advice to project team on civil and structuralmatters  Interface with other functional disciplines i.e Mechanical, Electrical, telecommunication etc.  Design amendmentsaspersite conditions.  Checking of All Submittals, Method Statements & Payment certificates.  Correspondence&Meetingswith Client & Contractor.  Dealing with ContractAgreement issues.  Responsible for submission of deliverables/ reports to the client asper the reporting schedule  Jan 2004 – Feb 2008  Worked as a ProjectMangerClientMOWE  Consultanttechnicalteamof MOWE.  Project: Water Network/InfrastructureWorkKSA.  Owner: Ministry of Water and Electricity.  Consultant: Ministry of Water and Electricity.  Contractor: AL Jazirah (Pvt) Ltd.  Project cost: 200 Million SAR  Project: Water network Riyadh and Kharj to provide Water for new construction areas in Riyadh simultaneously Main transmission Line from Source to Pumping Station Kharj City, Water network Distribution in AL Buredah City AL Qassim District Saudi Arabia.  Responsibilities included:  Arranged worked and take permission from 13 departmentsfortheExcavation of requireplace.  Managed the completion of the project within available time for minimize the cost of project, initiation, planning, forecasting and projectcloseout.  Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.  Responsible for quantity assurance and quality control (QA/QC) of electrical equipment/materials delivered at site as perthe drawingsapproved by theconsultant.  Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and supportcost-effectiveprojectdelivery.  Created scope, schedule and cost baseline, monitored and
  • 5. Basheer Ahmed Civil Engineer Page5 of 7 tracked all baselinesduring all the projectphases.  Managed and coordinated construction activities, reviews and approved paymentapplications.  Developed procurement and contracting strategies with client’s procurementdepartment.  Jan 2002 – Dec 2004  Worked as a Project Managerwith Al JazirahCoRiyadh City Saudi Arabia.  Project: Water network/InfrastructureWorkKSA.  Owner: Ministry of Water and Electricity.  Consultant: Ministry of Water and Electricity.  Contractor: AL JAZIRAH(Pvt) Ltd.  Project cost: 75 Million SAR  Project: Project management Infra Structure and Water meter in Riyadh City 4000 meter have changed with in 1& half yearswith differentlocation in Riyadh  Responsibilities included:  Attend project meetings with consultant, sub-contractor and client regarding projectactivities.  Responsibleforsubmission of clear & brief activity/progress/timerecording reportsto project managerforconsultantand client’ssatisfaction.  Supervision and monitoring of alltype of Works  Managed the completion of the project life cycle from initiation,planning,forecasting and projectcloseout.  Negotiated, prepared and executed the prime contract throughout the design and construction phases of the project.  Worked closely with clients, team members and other stakeholders to identify, recommend, develop, implement, and supportcost-effectiveprojectdelivery.  Created scope, schedule and cost baseline, monitored and tracked all baselinesduring all the projectphases.  Managed and coordinated construction activities, reviews and approved paymentapplications.  Developed procurement and contracting strategies with client’s procurementdepartment.  Selected trade contractors and suppliers, and coordinated their activities.  Provided mentoring, coaching, and technical guidance to projectteam  Responsible for quantity assurance and quality control (QA/QC) of electrical equipment/materials delivered at site as perthe drawingsapproved by theconsultant.
  • 6. Basheer Ahmed Civil Engineer Page6 of 7 PakistanExperience from October 1993 to January 2002  Launched in 1972, SachalEngineering Works (SEW) has successfully executed a numberof projectsin Sewerage and EffluentTreatmentPlant,Roads,bridges,airfields,and Water treatmentplants.Thephenomenalsuccesseswithin Pakistan and duerecognition of thequality of its work, prompted SEWto lookbeyond thebordersof the count Prepared and negotiated sub-contractsissued and monitored changeordersof varioustrades.  Monitored progressand costagainstbase-lineschedules and budgets.  Reviewed detailed construction work packagesfor integration with engineering,procurementand construction.  Coordinated inspectionswith therelated municipal building departmentand interacted with officialsfrom multiple  Section incharge Period 2000 to 2002  Responsibilitiesas Section In chargeon Road Section in 20km portion.  Design By AAA Associats  SachalEngineering Workswith China Construction Co  Road Construction Projectwith 800 Meter lengthwith Big Span Bridgeon IndusRiverto Connecttwo ProvincePunjab an Pakhtoonkhwahnearly 150 RCC Structurelike Box culverts, RCC and Steel pipe ConduitsUnderPasses,Fly oversand many moreStructureinvolvein mention project  Site Agent Period 1997 to 2000  Building Construction projectDesign by Load Bearing Capacity underMottMacDonald Consultantand Designer Total Quantity of Bungalows240 with fourtypes.  Site Engineer Period 1995 to 1997  Lakhra Power plant Infrastructure, RCC Channel with 4 Stone Load Bearing Bridges and Sewerage Treatment plant UnderWater and PowerMinistry of Pakistan  FieldEngineer Period 1993 to 1995 Effluent Treatment Plant Under Sandoz Chemical Co mention Project treats the Waste and Chemical Water and Re-cycling to use for Agriculture and irrigation purpose mention project design by EnvironmentdepartmentSwitzerland.