SlideShare a Scribd company logo
1 of 1
Download to read offline
North
Project
Drawing Title
Drawn
Designed
Date
Project No.
Scale Q.A. Check
Dwg No.
Date
Issue
A1
This drawing has been assigned an electronic code that signifies the drawing has been checked and
approved by:
10cm
1cm at full size
0
-1
Design Consultant
Approver
Key Plan
REGULATED DESIGN RECORD
Project Address:
Project Title:
Consent Number:
Drawing Title:
Body Corporate Reg No:
Drawing Number:
Revision Date dd.mm.yyyy Description DP Full Name Registration
Number
GENERAL NOTES
(A) ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION
WITH ALL OTHER CONSULTANTS DETAILED DRAWINGS,
SPECIFICATIONS AND EXISTING REPORTS, SUCH AS:
1. PROJECT FACADE ENGINEERING DOCUMENTATION
(REFERENCE CADIGAL DOCUMENT SUITE +
DATE/VERSION)
2. EXISTING FIRE ORDER (REFERENCE NUMBER +
DATE/VERSION)
3. CURRENT FACADE INVESTIGATION REPORT DATED
03.02.2023/ REV A PREPARED BY VAN DER MEER (NSW)
PTY LTD. (JOB NO. SY225009 [HY - 136])
(B) BRIEF MATERIALS TAKE-OFF SCHEDULE WITH
ESTIMATES OF THE SURFACE AREA BY ELEMENT/
MATERIAL TYPE (I.E. SOFFIT CLADDING TYPE 1 WITH
APPROX, WALL CLADDING TYPE 1 WITH APPROX, WALL
CLADDING TYPE 2 WITH APPROX. ETC.)
- REFER TO THE QS FOR ESTIMATED QUANTITY
(C) DIMENSIONS ARE SUBJECT TO VERIFICATION FROM
POINT CLOUD SURVEY (TO BE UNDERTAKEN). PLEASE
DO NOT SCALE THIS DRAWING AND VERIFY ALL
DIMENSIONS ON SITE- REFER ALL DISCREPANCIES TO
BECOME BEFORE COMMENCING ANY WORK.
####
W
ORK
IN
PROGRESS
20/04/2023
ISSUE DESCRIPTION DATE DRAWN APPROVED
01 - WIP ISSUE FOR COORDINATION
Work in
Progress
FIGGIS + JEFFERSON TEPA PTY LTD
220 Willoughby Road, Crows Nest, NSW 2065 Australia
Nominated Architect:
Stephen Figgis NSW ARB No. 3565
T 02 9438 5555
E studio@figgis.com.au
W www.figgis.com.au
105 105 - FJ - AR- DWG 2001
ELEVATIONS (2)
12 PARK AVENUE, WAITARA, NSW
2077
20/04/2023
01 - WIP
JC
CL
TRUE NORTH
This drawing is protected under the Copyright Act 1968 and is the
copyright of Figgis and Jefferson TEPA. Do not reproduce, modify or
transmit this drawing without the permission of Figgis and Jefferson TEPA.
Do not scale this drawing. Use figured dimensions only. Confirm all
dimensions and levels on site prior to commencement of any work,
preparation of shop drawings or fabrication of components.
LEGEND
REMEDIAL WALL CLADDING SURFACE (PLANS)
REMEDIAL WALL CLADDING SURFACE
(ELEVATIONS)
EXISTING BUILDING PROFILE
ASSUMED CLADDING BEHIND PARAPET
(EXTENT TO BE CONFIRMED)
105 FJT - AR- DWG 2001
+173.450
GROUND FLOOR
+176.360
LEVEL 1
+179.270
LEVEL 2
+182.180
LEVEL 3
+185.090
LEVEL 4
+187.940
MEZZANINE
+190.640
ROOF
BUILDING A BUILDING A
+173.450
GROUND FLOOR
+176.360
LEVEL 1
+179.270
LEVEL 2
+182.180
LEVEL 3
+185.090
LEVEL 4
+187.940
MEZZANINE
+190.640
ROOF
BUILDING B BUILDING B
1
-
EAST ELEVATION - BUILDING A
1:100
2
-
WEST ELEVATION - BUILDING A
1:100
3
-
EAST ELEVATION - BUILDING B
1:100
4
-
WEST ELEVATION - BUILDING B
1:100
PANEL 1
PANEL 2
PANEL 3
PANEL 5
PANEL 10
PANEL 11
PANEL 7
A A
B B
C C
D
D
E
E
F
F

More Related Content

Similar to Panel Cladding.pdf

House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
Terence Botha
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
Hai Nguyen
 
Michael H. Madison Résumé_ 01_2016
Michael H. Madison Résumé_ 01_2016Michael H. Madison Résumé_ 01_2016
Michael H. Madison Résumé_ 01_2016
Michael Madison
 
Multi Town House Current Projects
Multi Town House Current ProjectsMulti Town House Current Projects
Multi Town House Current Projects
Tom Softa
 
Prefarbrication Partner
Prefarbrication PartnerPrefarbrication Partner
Prefarbrication Partner
Graeme Simmers
 
Clive Goodacre AS Built Residential
Clive Goodacre AS Built ResidentialClive Goodacre AS Built Residential
Clive Goodacre AS Built Residential
Grant Hepburn
 

Similar to Panel Cladding.pdf (20)

sn-ladakh.pdf
sn-ladakh.pdfsn-ladakh.pdf
sn-ladakh.pdf
 
Loading Hopper
Loading HopperLoading Hopper
Loading Hopper
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
27 Hurst Ave
27 Hurst Ave27 Hurst Ave
27 Hurst Ave
 
Michael H. Madison Résumé_ 01_2016
Michael H. Madison Résumé_ 01_2016Michael H. Madison Résumé_ 01_2016
Michael H. Madison Résumé_ 01_2016
 
Multi Town House Current Projects
Multi Town House Current ProjectsMulti Town House Current Projects
Multi Town House Current Projects
 
Degotardi_Portfolio
Degotardi_PortfolioDegotardi_Portfolio
Degotardi_Portfolio
 
THIET KE XAY DUNG CAC LO DIEN HINH DAT GIA GARDEN (TÂN XUÂN)
THIET KE XAY DUNG CAC LO DIEN HINH DAT GIA GARDEN (TÂN XUÂN)THIET KE XAY DUNG CAC LO DIEN HINH DAT GIA GARDEN (TÂN XUÂN)
THIET KE XAY DUNG CAC LO DIEN HINH DAT GIA GARDEN (TÂN XUÂN)
 
Prefarbrication Partner
Prefarbrication PartnerPrefarbrication Partner
Prefarbrication Partner
 
Resume of jeonghoon woo
Resume of jeonghoon wooResume of jeonghoon woo
Resume of jeonghoon woo
 
DAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHTDAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHT
 
Steven Vukusic Resume
Steven Vukusic ResumeSteven Vukusic Resume
Steven Vukusic Resume
 
Haatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdfHaatso Residential Constuction Drawings.pdf
Haatso Residential Constuction Drawings.pdf
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
James Harrison Portfolio
James Harrison PortfolioJames Harrison Portfolio
James Harrison Portfolio
 
Clive Goodacre AS Built Residential
Clive Goodacre AS Built ResidentialClive Goodacre AS Built Residential
Clive Goodacre AS Built Residential
 
Gold Room
Gold Room Gold Room
Gold Room
 
Guilford Centre
Guilford CentreGuilford Centre
Guilford Centre
 
High Rise Roof Structure
High Rise Roof StructureHigh Rise Roof Structure
High Rise Roof Structure
 

Recently uploaded

electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 

Recently uploaded (20)

Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 

Panel Cladding.pdf

  • 1. North Project Drawing Title Drawn Designed Date Project No. Scale Q.A. Check Dwg No. Date Issue A1 This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by: 10cm 1cm at full size 0 -1 Design Consultant Approver Key Plan REGULATED DESIGN RECORD Project Address: Project Title: Consent Number: Drawing Title: Body Corporate Reg No: Drawing Number: Revision Date dd.mm.yyyy Description DP Full Name Registration Number GENERAL NOTES (A) ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS DETAILED DRAWINGS, SPECIFICATIONS AND EXISTING REPORTS, SUCH AS: 1. PROJECT FACADE ENGINEERING DOCUMENTATION (REFERENCE CADIGAL DOCUMENT SUITE + DATE/VERSION) 2. EXISTING FIRE ORDER (REFERENCE NUMBER + DATE/VERSION) 3. CURRENT FACADE INVESTIGATION REPORT DATED 03.02.2023/ REV A PREPARED BY VAN DER MEER (NSW) PTY LTD. (JOB NO. SY225009 [HY - 136]) (B) BRIEF MATERIALS TAKE-OFF SCHEDULE WITH ESTIMATES OF THE SURFACE AREA BY ELEMENT/ MATERIAL TYPE (I.E. SOFFIT CLADDING TYPE 1 WITH APPROX, WALL CLADDING TYPE 1 WITH APPROX, WALL CLADDING TYPE 2 WITH APPROX. ETC.) - REFER TO THE QS FOR ESTIMATED QUANTITY (C) DIMENSIONS ARE SUBJECT TO VERIFICATION FROM POINT CLOUD SURVEY (TO BE UNDERTAKEN). PLEASE DO NOT SCALE THIS DRAWING AND VERIFY ALL DIMENSIONS ON SITE- REFER ALL DISCREPANCIES TO BECOME BEFORE COMMENCING ANY WORK. #### W ORK IN PROGRESS 20/04/2023 ISSUE DESCRIPTION DATE DRAWN APPROVED 01 - WIP ISSUE FOR COORDINATION Work in Progress FIGGIS + JEFFERSON TEPA PTY LTD 220 Willoughby Road, Crows Nest, NSW 2065 Australia Nominated Architect: Stephen Figgis NSW ARB No. 3565 T 02 9438 5555 E studio@figgis.com.au W www.figgis.com.au 105 105 - FJ - AR- DWG 2001 ELEVATIONS (2) 12 PARK AVENUE, WAITARA, NSW 2077 20/04/2023 01 - WIP JC CL TRUE NORTH This drawing is protected under the Copyright Act 1968 and is the copyright of Figgis and Jefferson TEPA. Do not reproduce, modify or transmit this drawing without the permission of Figgis and Jefferson TEPA. Do not scale this drawing. Use figured dimensions only. Confirm all dimensions and levels on site prior to commencement of any work, preparation of shop drawings or fabrication of components. LEGEND REMEDIAL WALL CLADDING SURFACE (PLANS) REMEDIAL WALL CLADDING SURFACE (ELEVATIONS) EXISTING BUILDING PROFILE ASSUMED CLADDING BEHIND PARAPET (EXTENT TO BE CONFIRMED) 105 FJT - AR- DWG 2001 +173.450 GROUND FLOOR +176.360 LEVEL 1 +179.270 LEVEL 2 +182.180 LEVEL 3 +185.090 LEVEL 4 +187.940 MEZZANINE +190.640 ROOF BUILDING A BUILDING A +173.450 GROUND FLOOR +176.360 LEVEL 1 +179.270 LEVEL 2 +182.180 LEVEL 3 +185.090 LEVEL 4 +187.940 MEZZANINE +190.640 ROOF BUILDING B BUILDING B 1 - EAST ELEVATION - BUILDING A 1:100 2 - WEST ELEVATION - BUILDING A 1:100 3 - EAST ELEVATION - BUILDING B 1:100 4 - WEST ELEVATION - BUILDING B 1:100 PANEL 1 PANEL 2 PANEL 3 PANEL 5 PANEL 10 PANEL 11 PANEL 7 A A B B C C D D E E F F