The document provides details of proposed renovations and additions to the NEDF Building. It includes floor plans and elevations with dimensions, notes about complying with regulations and copyright, and technical specifications. Dimensioned drawings show existing and proposed layouts for the building at different floors and aspects. Notes provide information on the design process, sustainability measures, structure, and landscaping considerations.
1. NEDF BuildingNEDF Building
Group 2
0F
0
1F
4275
ABCEF
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
G
BB
SE201
8590139502335
24001875182652335
20933
273318200
2133450
150
113216768300
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL300
04/08/59
SJ
MS
Elevations - Fully
Dimensioned - North
NEDF
University of Plymouth
20011 : 100
North - Elevation
0
Rev Description Date
0F
0
1F
4275
A B C E F
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
G
BB
SE201
43403001676811326003675
900400
450
2558100312043000127530001275300012753000113915001836
66001800198522901985229019852290198516654275
29150
DO NOT SCALE: ALL DIMENSIONS T
AND VERIFIED PRIOR TO COMMEN
WORKS/MANUFACTURE. ANY DISC
REPORTED.
THIS DRAWING IS PROTECTED BY C
BE REPRODUCED IN ANY FORM OR
PURPOSE WITHOUT THE WRITTEN
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL
04/08/60
SJ
MS
Elevations
Dimensioned
NEDF
University of
20011 : 100
South - Elevation
1
Rev Description
0F
0
1F
4275
1234567
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
900
29150
4275166519852290171027520152751710275201527517102751800215198518002600
213751100
26815
3340210042756003635708450733754275
4340
MarineBuilding
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL302
04/08/61
SJ
MS
Elevations - Fully
Dimensioned - East
NEDF
University of Plymouth
20011 : 100
East - Elevation
2
Rev Description Date
0F
0
1F
4275
1 2 3 4 5 6 7
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
29150
323533651046172294275
2335
900
400
450
255810037401217494033756003675
427517080
1120
3675600795060036756324223820300
22475
MarineBuilding
-
---
DO NOT SCALE: ALL DIMENS
AND VERIFIED PRIOR TO COM
WORKS/MANUFACTURE. AN
REPORTED.
THIS DRAWING IS PROTECTE
BE REPRODUCED IN ANY FO
PURPOSE WITHOUT THE WR
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORM
BUILDING REGULATIO
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
04/08/62
SJ
MS
Elevatio
Dimensio
NE
University
20011 : 100
West Elevation
3
Rev Descrip
East West
SouthNorth
Elevations
James Howe
Architectural Engineer -
Jack Long
Construction Manager -
Sam James
Architectural Engineer -
Dan Osborne
Building Surveyor -
Beth Bird
Construction Manager -
Matt Selleck
Architectural Technologist -
Professional Team
Floor Plan Example
1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
**PV ROUGH POSITIONS FACING SOUTH**
**PV ROUGH POSITIONS FACING SOUTH**
**PV ROUGH POSITIONS FACING SOUTH**
**PV ROUGH POSITIONS FACING SOUTH**
**PV ROUGH POSITIONS FACING SOUTH**
**6 no. staff disabled bays, 2 no.
visitor disabled bays and 1 no. enlarged bay
postioned in a row for easy access
to ramp and level entrance, all spaces
electric charging points**
Marine Building
1 : 200
Site Plan
1
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA211
04/08/51
SJ
MS
Site Plan
NEDF
University of Plymouth
2001
Rev Description Date
Site
Careful consideration of how our building interacts with the context of
the surrounding area has always been considered throughout the design
phase. Especially the interaction between how the building communi-
cates with the western approach into the campus has been taken. Land-
scaping has been effectively used to mould through the existing slope
to channel peoples view to the building as they walk up out through the
arch of the roundabout.
Existing footprint of babbage is finished with a natural cleft stone cladding from devon stone to tie in with other parts of the cam-
pus, a similar finish to elements of the roland levinsky building as a dark stone faced façade that is not imposing. Vertical timber
battens of 50mm x 25mm from any generic building supplier, used to conceal curtain walling being giving a clean elevation to
the east and west, fastened with a flexible point Nvelope NV6 system. Kingspan corten steel cladding sheets installed to northern
aspect as a striking new addition to make a statement. The cladding system has a rusted protective layer that weathers positive-
ly over time.
Design Philosophy
The arrangement of floors was dependent largely on being able to intro-
duce as much natural light as possible, being the reason for the large
double height space to south east of the forth and fifth floors, widely glazes
stairwell tower and double set of rooflights to atrium that cuts through the
centre of the new footprint.
The circulation spaces largely revolve around the atrium as the core of the
new building that all rooms feed off from. The atrium allows for the service
to each floor via strains a two passenger lifts, acting as this anchor allows
users to always know where there are inside the building.
DN
DN
DN
DN
1
2
3
4
5
6
7
A B C E F
28125 12666
5231 9327 8625 4942 4143 8331 192
1266647250
4921126790821622550255039196792
2091612467205083500
873413141301814974170774248420039393
By Room Name Legend
Cafe, Breakout
Disable WC
Emergency
Kitchen
Lift
Lobby
Plant Room
Reception Lobby
Service Void
STEAM Room
Teaching Room
WC
10 m²
Lift
18275
47477
47477
G
774 m²
STEAM Room
615 m²
Cafe, Breakout
38 m²
Kitchen
20 m²
WC
152 m²
Reception Lobby
194 m²
Teaching Room
BB
SE201
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA101
03/06/20
SJ
MS
First Floor
NEDF
University of Plymouth
2001
1 : 200
First Floor GA
Rev Description Date
1 Interim Presentation 12/03/20
1
2
3
4
5
6
7
A B C E F
194 m²
Teaching Room
10 m²
Lift
28125 12666
5257 9301 8625 9085 126662807518567608
3831209219215673750420037506003750135037506003750100818492683
51188
51238
2091636475
3832013040312417618491911500150015004183
By Room Name Legend
Breakout
Circulation
Control and Autonomous
Systems, Wood Workshops and
ancillary areas Materials
Workshop
Emergency
Lift
Lobby
Meeting Rooms and Offices
Plant
Quiet Room
Service Void
Specialist
Store/ plant
Teaching Room
WC
G
628 m²
Control and
Autonomous
Systems, Wood
Workshops and
ancillary areas
Materials Workshop
73 m²
Meeting Rooms and
Offices
104 m²
Specialist
76 m²
Teaching Room
36 m²
Quiet Room
150 m²
Teaching Room
20 m²
WC
3 m²
Store/ plant
20 m²
WC
19 m²
WC
19 m²
WC
790 m²
Breakout
BB
SE201
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA104
03/06/20
SJ
MS
Fourth Floor
NEDF
University of Plymouth
20011 : 200
Fourth Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
First Floor Fourth Floor
2. Section
Technical Details
Retained Wall DetailWall to Roof Detail
Structure
We have designed the structure so that the old concrete
frame ties in with the existing concrete structure has been
challenging. The use of a Glulam frame system has provided
to be the most effective solution while being far more sustaina-
ble than a steel or concrete alternative.
Having carried out an analysis on the soil structure piles were
decided to be the most appropriate method for foundations.
The basement and implementation of two lecture theatres to
the ground floor have provided several problems. Several re-
taining wall has been placed around the base of the building
to increase the structural performance of the basement struc-
ture. Several significant steel elements have been added to
reinforce where waffle slabs have been removed.
Energy Modelling
Energy modelling of the new building was undertaken to see
the energy consumption of the building. This could then be
analysed to reduce the consumption in different aspects.
The original value was 817 kwh/ m2 / yr but though a number
of methods further discussed bellow this was brought down to
just 82.4 kwh/ m2 / yr which is only 20 points off the very hard
target of 66 for architecture 2030. This could have been po-
tentially achieved through further optimisation however the
budget limited the building here. To reduce the points the
biggest impact was reducing the U-value of the fabric this
borough the overall consumption down significantly once
each façade was done. They are the first four drips seen on
the graph. The last graph shows several further measure that
brough the number down even lower.
Internal Images
4. The Team
ADAPTABUILD
Construction
Manager
Beth Bird
Team
Management &
Organisation
Cost Analysis
Jack Long
Construction
Strategy
Building
Surveyor
Dan Osborne
Desktop Survey
Condition
Survey
Feasibility
Study
Architectural
Engineer
James Howe
Feasibility
Study
Technical
Design
Proposal
Sam James
Feasibility
Study
Technical
Design
Proposal
Architectural
Technology
Matt Selleck
BIM Model
Feasibility
Study
Technical
Design
Proposal
6. Building Background
• Site became residential in early 19th century.
• Building construction began in 1978 and completed in 1979.
• It is named after the famous mathematician, philosopher
and mechanical engineer Charles Babbage.
• Currently used for lecture spaces, teaching rooms, breakout
areas and boasts the largest computer space on campus.
• Curtain Walling/Cladding/Windows replaced and solar
shading added in 1995.
Agricultural
Educational
Residential
BLDG609
Redevelopment
1890 1924 1930 1937 1950
7. Key Description
1 Numbers 3-10 and attached forecourt walls Grade 2 listed.
2 Portland Villa 15 Grade 2 listed.
3 Number 16, attached garden walls and gate piers to the front grade 2 listed.
4 Christedalpian hall, attached garden walls and gate piers to front grade 2 listed.
5 Number 18, attached garden walls and gate piers to front grade 2 listed.
6 Number 20-21, attached garden walls and gate piers to front grade 2 listed.
7 Number 19, attached garden walls and gate piers to front grade 2 listed.
Pollutant
Linkages
Mod/Low
Portland Villas
Grade II Listed
Low Flood
Risk
UoP Own
Freehold
Majority 3-5% (Corner 5-10%)
UXO Risk
Medium
Mod/High
Low
Potential
Huge
Amount
Low
Some RPZ’s Required
Saltash Formation
(SAH-SLTE)
Low
No. of
Issues
Desktop Survey
10. St Andrews Court
• St Andrews Court of Notte Street, Plymouth
represents a building with the same original
construction as Babbage.
• Currently at renovation/reuse stage in its lifecycle,
the building has stood the test of time better than
Babbage.
16. Final Design
Proposal
Walkthrough Video (with audio) Linked in Image Above
(separate backup copy in shared onedrive)
URL: https://1drv.ms/v/s!AnafEj9KfCDUnLMh0sevdEIg7PYkMA
17. Rendered Internals
5th Floor Double Height Space
Ground Floor Overlooking the entrance and CafeTop of Atrium with window lights
5th Floor Double Height Space
18. Rendered Internals
5th Floor Double Height Space
Ground Floor Overlooking the entrance
Third floor WorkshopFirst Floor Double Height Workshop
25. Structure- Concrete and Glulam
Revit Linked Structural Model Rendered Xray View of Structure
26. Key Selling Points
Plymouth University's Campus Masterplan
Sense of realm within wider context of Plymouth
Accommodate changing needs and future uses
Adaptability and flexibility now and into the future
Ultra-low energy
Focal Point to Western Gateway
Glulam – Post and Beam
28. Building Services
The New Engineering and Design Facility incorporates a highly efficient
services strategy alongside a sophisticated Building Energy Management
System. Sustainability was at the forefront of the design.
All Services will be controlled and managed by a BEMS control and
commissioning strategy.
Natural Ventilation & Integrated Mechanical
The building will primarily be naturally ventilated in conjunction
with a highly responsive control system. Actuators and Sensors
will determine ventilation rates throughout the building.
Mechanical Ventilation was sought to ventilate those spaces which
require extra flow such as Basement level rooms, Workshops, WC's
and Kitchen units.
Ground Source Heat Pump
Space Heating will be supplied by a new Bore Hole Ground Source
Heat Pump.
Lighting
Daylighting and Artificial lighting have been integrated to provide
occupant comfort. Glazing maximises natural light where sensors
controlled by the BEMS will ensure space achieve a setpoint lux
level.
Photo Voltaic
Power will be distributed via energy supplied by PV panels running
at 49.92kWp
29. Sustainability
Our Building obtains a clear sustainability strategy of which we have incorporated into
our design to reduce whole life economy.
Ground Source Heat Pump
Heat will be extracted via a bore hole GSHP from the ground. This system is a
clean form of renewable energy.
Solar Voltaic' s
By collecting energy from the sun and ensuring an efficient 23 degree placement
of Solar Panels power will be distributed throughout the building at an
extremely low carbon cost.
Rain Water Harvesting
High levels of down fall in the South-West will provide our building with
sufficient 'grey water' to be used for flushing, planting and other uses. This
system can reduce water usage by up to 80%.
Green Roof
A green roof system will be a hot spot for Bio Diversity and reduce the risks of
water irrigation and over stressed drainage systems. As well as absorbing
contaminants improving air quality.
Passive Design
Natural Ventilation and Passive Solar design will make the most of the earth
natural elements reducing the needs for over use of energy, thus reducing our
buildings carbon footprint.
32. Construction key points
All asbestos to be
removed
Prior to any further works
James Street road
closure
For the safety of operatives
and the public
Key challenges:
Live University campus
Large amount of demolition
Elements of M&E feeding
Marine building
Surrounding buildings
33. Construction key dates
Project duration: 20 months.
Road closure to section of James Street: 1st
June 2020.
Works start date: 8th June 2020.
Practical Completion date: 23rd December
2021.
Soft opening period: 23rd December 2021 –
02nd February 2022.
Full operation date: 02nd February 2022.
34. Road closure
Section of James Street:
From corner of Portland square road to John
Lane.
Access to Rolle, Brunel, Charles Seale-Hayne
Library and Portland Square car park
maintained.
Pedestrian access to be maintained by
Brunel Building.
Best way to ensure deliveries are kept in a
controlled environment.
Allows space for site offices and welfare.
Road
closure
Google, 2020
37. Waste and Environmental factors
ISO14001 series accredited.
Separated Waste skips to be used.
Inert stone to be recycled onsite as hardcore.
PCC working times to be used.
Local material to be used where relevant.
Noise monitoring and client quiet times will
be adhered to.
39. DN
DN
DN
DN
1
2
3
4
5
6
7
A B C E F
28125 12666
5231 9327 8625 4942 4143 8331 192
1266647250
4921126790821622550255039196792
2091612467205083500
873413141301814974170774248420039393
By Room Name Legend
Cafe, Breakout
Disable WC
Emergency
Kitchen
Lift
Lobby
Plant Room
Reception Lobby
Service Void
STEAM Room
Teaching Room
WC
10 m²
Lift
18275
47477
47477
G
774 m²
STEAM Room
615 m²
Cafe, Breakout
38 m²
Kitchen
20 m²
WC
152 m²
Reception Lobby
194 m²
Teaching Room
BB
SE201
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA101
03/06/20
SJ
MS
First Floor
NEDF
University of Plymouth
2001
1 : 200
First Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
40. DNDN
UP
1
2
3
4
5
6
7
A B C E F
2420 10 m²
Lift
368 m²
3D Printing, CNC
Machines, IT Suite,
Virtual Engineering &
Immersive
Visualisation
Laboratory
By Room Name Legend
3D Printing, CNC Machines, IT
Suite, Virtual Engineering &
Immersive Visualisation
Laboratory
Breakout ground floor open
events circulation
Emergency
Energy and Sustainability
Laboratory
Goods Lift
Lecture Theatre
Lift
Lobby
Plant/ Store
Projector Room
Service Void
Store
WC
4696712666
59633
646214438125034498169002608
236881282120899
18742 28125 12666
59558
G
972 m²
Breakout ground floor
open events
circulation
157 m²
Lecture Theatre
36 m²
Projector Room
26 m²
Store
14 m²
Plant/ Store
5 m²
Service Void
22 m²
Emergency
24 m²
WC
BB
SE201
23 m²
WC
2 m²
Lobby
2 m²
Lobby
9 m²
Lobby
783 m²
Energy and
Sustainability
Laboratory
4 m²
Goods Lift
6 m²
Lift
156 m²
Lecture Theatre
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA100
03/06/20
SJ
MS
Ground Floor
NEDF
University of Plymouth
20011 : 200
Ground Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
41. 1
2
3
4
5
6
7
A B C E F
10 m²
Lift
88 m²
Teaching Room
69 m²
Teaching Room
By Room Name Legend
Circulation
Disable WC
Emergency
Lift
Lobby
Plant
Room
Service Void
Teaching Room
Viewing Gallery
Void double height floor 1 and 2
WC
28125 12666
5231 9327 8625 9085 8331 192
126662807519175
38311375247537504200375060037501045818492683
48731
46830 1851
393201303932664211501500150015004183
2091636475
G
701 m²
Void double height
floor 1 and 2
84 m²
Viewing Gallery
20 m²
WC
71 m²
Teaching Room
20 m²
WC
19 m²
WC
194 m²
Teaching Room
BB
SE201
-
---
Teaching Room
150m²
Teaching Room
88m²
19 m²
WC
Teaching Room
88m²
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA102
03/06/20
SJ
MS
Second Floor
NEDF
University of Plymouth
20011 : 200
Second Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
42. 1
2
3
4
5
6
7
A B C E FG
88 m²
Teaching Room
194 m²
Teaching Room
10 m²
Lift
20 m²
WC
108 m²
Teaching Room
35 m²
Quiet Space
88 m²
Storage
88 m²
Teaching Room
803 m²
Structures and
Materials Testing,
Materials Analysis
and Characterisation
and Composites
Laboratory
BB
SE201
By Room Name Legend
Circulation
Disable WC
Emergency
Goods Lift
Lift
Lobby
Plant
Quiet Space
Room
Service Void
Storage
Structures and Materials Testing,
Materials Analysis and
Characterisation and Composites
Laboratory
Teaching Room
WC
149 m²
Teaching Room
519 m²
Circulation
88 m²
Teaching Room
4 m²
Goods Lift
6 m²
Lift
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA103
04/08/20
SJ
MS
Third Floor
NEDF
University of Plymouth
20011 : 200
3F
1
Rev Description Date
43. 1
2
3
4
5
6
7
A B C E F
194 m²
Teaching Room
10 m²
Lift
28125 12666
5257 9301 8625 9085
126662807518567608
3831209219215673750420037506003750135037506003750100818492683
51188
51238
2091636475
3832013040312417618491911500150015004183
By Room Name Legend
Breakout
Circulation
Control and Autonomous
Systems, Wood Workshops and
ancillary areas Materials
Workshop
Emergency
Lift
Lobby
Meeting Rooms and Offices
Plant
Quiet Room
Service Void
Specialist
Store/ plant
Teaching Room
WC
G
628 m²
Control and
Autonomous
Systems, Wood
Workshops and
ancillary areas
Materials Workshop
73 m²
Meeting Rooms and
Offices
104 m²
Specialist
76 m²
Teaching Room
36 m²
Quiet Room
150 m²
Teaching Room
20 m²
WC
3 m²
Store/ plant
20 m²
WC
19 m²
WC
19 m²
WC
790 m²
Breakout
BB
SE201
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA104
03/06/20
SJ
MS
Fourth Floor
NEDF
University of Plymouth
20011 : 200
Fourth Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
44. 1
2
3
4
5
6
7
A B C E F
10 m²
Lift
236 m²
Outdoor Terrace
28125 12666
28125 12666
12666156737504200375060037501350375060037501275
1266628342
38783
38516
24058490072172341
By Room Name Legend
Breakout IT Areas
Emergency
Lift
Lobby
Outdoor Terrace
Plant Room
Plant/ store
Service Void
Void Double Height
WC
G
20 m²
WC
19 m²
WC
16 m²
Plant/ store22 m²
Emergency
5 m²
Service Void
89 m²
Plant Room
BB
SE201
-
---
499 m²
Breakout IT Areas
131 m²
Breakout IT Areas
283 m²
Void Double Height
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1
1 : 200
GA105
03/06/20
SJ
MS
Fifth Floor
NEDF
University of Plymouth
20011 : 200
Fifth Floor GA
1
Rev Description Date
1 Interim Presentation 12/03/20
45. UP
BB
SE201
184 m²
Plant Room
156 m²
Lecture Theatre
155 m²
Lecture Theatre
34 m²
Store 22 m²
Stair
By Room Name Legend
Lecture Theatre
Plant Room
Stair
Store
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA106
04/08/20
SJ
MS
-1 Floor GA
NEDF
University of Plymouth
20011 : 200
Lower Ground One GA
1
Rev Description Date
46. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
185581768710401231
38516
40791
28055 12736
383249418345141751859812736
40776
10024 9038 19503
38566
Man Safe
Man Safe
Man Safe
Man Safe
Man Safe
Man Safe
Man Safe
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA107
04/08/21
SJ
MS
Roof Plan
NEDF
University of Plymouth
20011 : 200
Roof Plan
1
Rev Description Date
48. 0F
0
1F
4275
1 2 3 4 5 6 7
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
29150
323533651046172294275
2335
900
400
450
255810037401217494033756003675
427517080
1120
3675600795060036756324223820300
22475
MarineBuilding
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL303
04/08/62
SJ
MS
Elevations - Fully
Dimensioned - West
NEDF
University of Plymouth
20011 : 100
West Elevation
3
Rev Description Date
49. 0F
0
1F
4275
ABCEF
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
G
BB
SE201
8590139502335
24001875182652335
20933
273318200
2133450
150
113216768300
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL300
04/08/59
SJ
MS
Elevations - Fully
Dimensioned - North
NEDF
University of Plymouth
20011 : 100
North - Elevation
0
Rev Description Date
50. 0F
0
1F
4275
A B C E F
2F
8550
3F
12825
4F
17100
5F
21375
6F
25650
TOWER
28150
G
BB
SE201
43403001676811326003675
900400
450
2558100312043000127530001275300012753000113915001836
66001800198522901985229019852290198516654275
29150
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 100
EL301
04/08/60
SJ
MS
Elevations - Fully
Dimensioned - South
NEDF
University of Plymouth
20011 : 100
South - Elevation
1
Rev Description Date
51.
52.
53.
54.
55.
56.
57.
58. 159015
1 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
Single Timber Studs at 600
mm centres
90mm 33kg/m3 rock mineral wool
1 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
1515901515
2 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
Single Timber Studs at 600
mm centres
90mm 33kg/m3 rock mineral wool
2 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
150
15151001515
2 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
2 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
160
100mm Concrete Block
15152515
1 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
Single Timber Studs at 600
mm centres
25mm 33kg/m3 rock mineral wool
2 x 15mm Gyprock Wall Board
(Bathrooms: outer layer Gyprock Core
Board)
150mm Kool Therm K15 Insulation (or otherwise appropriate) (0.02W/mK)
90mm Bracket and Air Gap (0.18W/mK)
8mm Cladding Board (0.4W/mK)
12mm Cement Fibreboard (0.19W/mK)
100mm Thermafleece Ultra Wool Between Studs @ 600mm Centres (0.035W/mK)
10mm Dry Lining Board (0.19W/mK)
12.5 (13)mm Gyproc Plasterboard (0.19W/mK)
1 : 5
Wall Type 1
1
1 : 5
Wall Type 4
2
1 : 5
Wall Type 2
3
1 : 5
Wall Type 3
4
1 : 5
Exterior Wall Type
5
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 5
DE400
04/08/63
SJ
MS
Wall Type Drawings
NEDF
University of Plymouth
2001
Rev Description Date
59. DNDN
UP
1
2
3
4
5
6
7
A B C E FG
33m
13m
9m
19m
28m
17m
45m
24mD
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA120
04/08/20
SJ
MS
00 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
Ground Floor Fire Strategy
1
Rev Description Date
60. DN
DN
DN
1
2
3
4
5
6
7
A B C E FG
1545
400
37m
38m
38m
D
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA121
04/08/20
SJ
MS
01 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
First Floor Fire Strategy
1
Rev Description Date
61. 1
2
3
4
5
6
7
A B C E FG
31m
38m
D
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA122
04/08/20
SJ
MS
2 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
Second Floor Fire Strategy
1
Rev Description Date
62. 1
2
3
4
5
6
7
A B C E FG
D
22m
38m
38m
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA123
04/08/20
SJ
MS
3 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
Third Floor Fire Strategy
1
Rev Description Date
63. 1
2
3
4
5
6
7
A B C E FG
D
38m
38m
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA124
04/08/20
SJ
MS
4 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
Fourth Floor Fire Strategy
1
Rev Description Date
64. 1
2
3
4
5
6
7
A B C E FG
28m
D
60 min. FR Construction
30 min. FR Construction
30 min. FR Construction
60 min. Fire door with smoke seal
30 min. Fire door with smoke seal
Final Exit Door
Wheelchair Refuge Point
FIRE STRATEGY KEY
• D denotes position of Dry riser outlet in
accordance with BS 9990.
• The automatic fire detection and alarm
system will be designed, installed and
commissioned to an LD3 standard (minimum
Grade D) in accordance with
• BS 5839-6.
• All riser doors in the core are 60 minutes,
integrity / insulation and fitted (smoke seals
not required).
• All floor slabs to be 60 minutes integrity
/insulation resistant.
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA125
04/08/20
SJ
MS
5 Floor Fire Strategy
NEDF
University of Plymouth
20011 : 200
Fifth Floor Fire Strategy
1
Rev Description Date
65. DNDN
UP
1
2
3
4
5
6
7
A B C E FG
BB
SE201
By Room Name Legend
DiamondFlor CX Polished Concrete
Interface Employ Carpet Tiles 250mm x
1000mm
Noraplan Lona – 6902 - Rubber Flooring
10 m²
Lift
368 m²
3D Printing, CNC
Machines, IT Suite,
Virtual Engineering &
Immersive
Visualisation
Laboratory
972 m²
Breakout ground floor
open events
circulation
157 m²
Lecture Theatre
36 m²
Projector Room
26 m²
Store
14 m²
Plant/ Store
5 m²
Service Void
22 m²
Emergency
24 m²
WC
23 m²
WC
-
---
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA150
04/08/20
SJ
MS
00 Floor Finishes
NEDF
University of Plymouth
20011 : 200
Ground Floor Finishes
1
Rev Description Date
66. DN
DN
DN
1
2
3
4
5
6
7
A B C E FG
BB
SE201
3 m²
Disable WC
12 m²
Plant Room
88 m²
Teaching Room
88 m²
Teaching Room
19 m²
WC
2 m²
Lobby
2 m²
Lobby
20 m²
WC
38 m²
Kitchen
194 m²
Teaching Room
10 m²
Lift
774 m²
STEAM Room
5 m²
Service Void
22 m²
Emergency
615 m²
Cafe, Breakout
152 m²
Reception Lobby
-
---
By Room Name Legend
DiamondFlor CX Polished Concrete
Interface Employ Carpet Tiles 250mm x 1000mm
Noraplan Lona – 6902 - Rubber Flooring
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA151
04/08/20
SJ
MS
1 Floor Finishes
NEDF
University of Plymouth
20011 : 200
First Floor Floor Finishes
1
Rev Description Date
67. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
2 m²
Lobby
2 m²
Lobby
141 m²
Teaching Room
12 m²
Plant
2 m²
Room
2 m²
Room
19 m²
WC
88 m²
Teaching Room
3 m²
Disable WC
45 m²
Circulation
103 m²
Teaching Room
-
---
194 m²
Teaching Room
88 m²
Teaching Room
71 m²
TeachingRoom
69 m²
Teacing Room
By Room Name Legend
DiamondFlor CX Polished Concrete
Interface Employ Carpet Tiles 250mm x 1000mm
Noraplan Lona – 6902 - Rubber Flooring
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA152
04/08/20
SJ
MS
2 Floor Finishes
NEDF
University of Plymouth
20011 : 200
Second Floor Finishes
2
Rev Description Date
68. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
22 m²
Room
88 m²
Teaching Room
194 m²
Teaching Room
10 m²
Lift
20 m²
WC
108 m²
Teaching Room
35 m²
Quiet Space
88 m²
Storage
88 m²
Teaching Room
803 m²
Structures and
Materials Testing,
Materials Analysis
and Characterisation
and Composites
Laboratory
5 m²
Service Void
22 m²
Emergency
88 m²
Teaching Room
19 m²
WC
2 m²
Lobby
2 m²
Lobby
12 m²
Plant
3 m²
Disable WC
-
---
By Room Name Legend
DiamondFlor CX Polished
Concrete
Interface Employ Carpet Tiles
250mm x 1000mm
Noraplan Lona – 6902 -
Rubber Flooring
149 m²
Teaching Room
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA153
04/08/20
SJ
MS
3 Floor Finishes
NEDF
University of Plymouth
20011 : 200
Third Floor Finishes
3
Rev Description Date
69. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
By Room Name Legend
DiamondFlor CX Polished
Concrete
Interface Employ Carpet Tiles
250mm x 1000mm
Noraplan Lona – 6902 -
Rubber Flooring
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA154
04/08/20
SJ
MS
4 Floor Finishes
NEDF
University of Plymouth
20011 : 200
Fourth Floor Finishes
4
Rev Description Date
70. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
By Room Name Legend
DiamondFlor CX Polished Concrete
Noraplan Lona – 6902 - Rubber
Flooring
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
1 : 200
GA155
04/08/20
SJ
MS
5 Floor Finishes
NEDF
University of Plymouth
20011 : 200
Fifth Floor Finishes
5
Rev Description Date
71.
72.
73.
74.
75.
76.
77.
78. 53
45
54 4
5
76
49
8
52
50
37
21
36
39
38
42
44
41
40
18
51
43
46
48 47
9
10
111214
13
16
15
17
19
20
22
30
29
31
35
55
56
34
32
28
25
2726
2423
097N
097G
097A 097
001A
001B001
097L
097C
097B
098
099E
097I
012
009
011
098A
098B
097K
099F
097H
099H
099G
004
004A 099I
097D
002
003005097E
005A
006A
006
097F
007
008
010
013
019
097M
099D
099
099A
099B
099C
018
097J
017016
014015
7723.9
7444.7
5940.9
4345.2
Main
Entrance
7
23.4
18 58.1
8.1
6.315.3
2.3
11.9
4.5
14.3
1.3
44.1
10.9
13.4
13.2
19.1
2.6
1.5
1.8
21.3
2.4
2.2
36.6
1.5 3.1
35.3
81.6
89100.454.9
7.7
8.2
162.1
37
56.6
55.6
44.1
17
12.9
2.1
6.5
14.4
28.7
9
24.6
45.6
10.6
32.619.1
37.388.2
Storeroom
Stairway / Lift / Landing
Corridor / Foyer Corridor / Foyer
Storeroom
StoreroomOffice
Corridor / Foyer
Corridor / Foyer
Stairway / Lift / Landing
Toilet
Non-Usable Space - Ducting
Corridor / Foyer
Storeroom
Store
Interview Room
Toilet
Toilet
Corridor / Foyer
Cleaners Cupboard
Corridor / Foyer
Non-Usable Space - Ducting
Non-Usable Space - Ducting
Interview Room
Corridor / Foyer Storeroom
Corridor / Foyer
Teaching with Tables / Desks
Teaching with Tables / DesksLecture TheatreCorridor / Foyer
Projection Room
Projection Room
Lecture Theatre
Corridor / Foyer
Teaching with Tables / Desks
Teaching with Tables / Desks
Teaching with Tables / Desks
Storeroom
Storeroom
Corridor / Foyer
Plant Room
Plant Room
Plant Room
Plant Room
Plant Room
Interview Room
Corridor / Foyer
OfficeStoreroom
Terminal RoomMain Frame
Babbage
P002
P002
1571.4 1524.6
1472.4 846.4
Main Building
Ground Floor
Gross External Area:
Gross Internal Area:
Total Room Area:
Net Internal Area:
Site Area:
GEA: GIA:
TRA: NIA:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A: CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
190
183
1
2
3
4
5
A B C D E
450
450
190
190
175
190
118
190
190
100
190
190
190
290
150
1520
1200
1316
Demolition Key
To be Demolished
Floor Slab to be Demolished
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
110
11/05/2020
MS
SJ
Ground Floor Demolition
NEDF
University of Plymout
1 : 200
Ground Floor Demolition Plans
1
Rev Description Date
79. 058
090
087
066065
086
085
064
089
076075
073
074
072
071
070
079078
088
077
080
081
059
062063
061
083082
084
060
067
068
069
197D
197A
198
101A101
197H
197C
103
197
112111
199E
110
197G
109
197F
108A199D
199
108
199C
197I
197E
199A104A
104
199B198A
198B
102
105
106
107
23.6
25.3
14.2
6.010.4
1.8
11.6
11.9
50.0
91.990.3
3.7
51.8
26.3
94.0
61.9
1.94.5
2.6
33.7
1.8
1.4
34.5
4.51.8
34.2
2.019.7
2.7
420.9
93.1
87.6
86.7
Stairway / Lift / Landing
Stairway / Lift / Landing
Toilet
Social SpaceOffice
Corridor / Foyer
Corridor / Foyer
Office
Corridor / Foyer
Computer RoomComputer Room
Hub Room
Computer Room
Stairway / Lift / Landing
Computer Room
Corridor / Foyer
Electric CupboardNon-Usable Space - Ducting
Non-Usable Space - Ducting
Refreshment Area
Cleaners Cupboard
Corridor / Foyer
Corridor / Foyer
Non-Usable Space - DuctingOffice
Office
Non-Usable Space - DuctingToilet
Toilet
Computer Room
Computer Room
Computer Room
Computer Room
1480.9 1450.2
1408.3 1114.3
Main Building
First Floor
GEA: GIA:
TRA: NIA:
A:
A:
A:
A:A:
A:
A:
A:
A:
A:A:
A:
A:
A:
A:
A:
A:A:
A:
A:
A:
A:
A:
A:A:
A:
A:A:
A:
A:
A:
A:
A:
-
-
--
-
-
- -
1
2
3
4
5
A B C D E
Demolition Key
To be Demolished
Floor Slab to be Demolished
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
111
05/03/20
MS
SJ
First Floor Demolition
NEDF
University of Plymout
Rev Description Date
1 : 200
First Floor Demolition Plans
1
80. 110
107
092
093
095094
091
129
119118
117
120
121
124
122 123
219
127
126
125
116
96
97
98
99102103104
105
106
115
113
114112111
109
128
299E
297G
297D
201
299B221A
297E
297A
212A299D
212
299C
297I
298C
298A 299A
299
298
297J
297
221
202
203
297C
204207208209
210
211
216
297H
217215214
297F
213
3.3
65.6
88.2
34.0
4.51.8
23.8
23.6
1.94.5
33.7
1.9
1.3
2.7
19.5
1.9
2.5
14.2
1.9
19.5
52.5
58.7
50.0
3.5
95.290.389.792.9
85.9
86.1
86.5
4.4
45.543.651.6
31.2
93.4
Non-Usable Space - Ducting
Corridor / Foyer
Corridor / Foyer
Storeroom
Non-Usable Space - DuctingStoreroom
Stairway / Lift / Landing
Stairway / Lift / Landing
StoreroomNon-Usable Space - Ducting
Computer Room
Cleaners Cupboard
Corridor / Foyer
Toilet
ToiletNon-Usable Space - Ducting
Non-Usable Space - Ducting
Toilet
Corridor / Foyer
Corridor / Foyer
Project Office
Computer Room
Computer Room
Corridor / Foyer
Teaching RoomComputer RoomComputer RoomComputer Room
Computer Room
Computer Room
Teaching with Tables / Desks
Corridor / Foyer
Language LaboratoryTeaching with Tables / DesksTeaching with Tables / Desks
Stairway / Lift / Landing
Computer Room
1495.9 1466.8
166.0 145.2
Main Building
Second Floor
GEA: GIA:
TRA: NIA:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CONTROLS
1
2
3
4
5
A B C D E
Demolition Key
To be Demolished
Floor Slab to be Demolished
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
112
05/03/20
MS
SJ
Second Floor Demolition
NEDF
University of Plymout
Rev Description Date
1 : 200
Second Floor Demolition Plans
1
81. 131
160
155
138
169 170
167
164
165
166
168
171
172
173 174
175
130
135
137 136
133
134
132
143
146
148149150
147
152151
153
154
158
140139
163162
159
161
157156
397C
397D
321
302
399D 320A
397A
397G
398
399
320
399C
397H
398A 399B
398B
397B
307
307A 399A
310
309
301
308
313
314315A315B
316
318317
397F
319
397
304303
323322B
399E
322
321B321A
29.5
57.4
69.9
10.3
4.4 1.8
23.5
1.8
14.0
2.5
33.8
1.8
1.4
19.7
1.9
2.7
23.5
34.1
1.8 4.4
19.3
6.7
444.1
15.1
52.0
15.915.217.2
90.6
17.317.2
30.5
84.7
31.5
17.817.2
43.444.6
2.9
52.4
11.110.3
Corridor / Foyer
Corridor / Foyer
Office
Kitchen
Cleaners CupboardBoiler / Meter / Tank Room
Stairway / Lift / Landing
Corridor / Foyer
Toilet
Non-Usable Space - Ducting
Video Suite
Non-Usable Space - Ducting
Corridor / Foyer
ToiletNon-Usable Space - Ducting
Toilet
Stairway / Lift / Landing
Storeroom
Boiler / Meter / Tank RoomNon-Usable Space - Ducting
Conference Room
Interview Room
Office
Office
Office
OfficeOfficeOffice
Office
StoreroomConference Room
Corridor / Foyer
Teaching with Tables / Desks
Stairway / Lift / Landing
OfficeOffice
Computer RoomOffice
Non-Usable Space - Ducting
Computer Room
OfficeOffice
1531.5 1451.9
1397.2 1140.2
Main Building
Third Floor
GEA: GIA:
TRA: NIA:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
1
2
3
4
5
A B C D E
Demolition Key
To be Demolished
Floor Slab to be Demolished
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
113
05/03/20
MS
SJ
Third Floor Demolition
NEDF
University of Plymout
Rev Description Date
1 : 200
Third Floor Demolition Plan
1
82. 190
208
204
212
195
218
184
205
202203
201
178 177
176
179
213
214
216
215
217
207
206
209
187
188
211210
185
191
194
196
198
197
199
200180181
182
183
186
193192
189
409
499G
499E
499C
497E
499D
499A
401B
499H401A
401
499 497H
497I
497A
497K
498B
497J
498A
498C
499F
497F
407
406
497C
407A499B
497B
497D
412
413
414
497
415
416417402
403
404
405
411410
408
54.6
1.2
1.8
2.0
28.2
1.8
2.6
2.0
4.31.8
106.7
0.8 4.8
18.6
52.0
1.9
11.4
2.5
3.9
16.2
1.3
21.2
16.6
91.0
27.3
2.04.4
41.3
25.5
42.0
44.5
43.1
58.0
61.7
65.765.692.1
80.9
55.3
54.1
91.985.5
6.7
Teaching with Tables / Desks
Non-Usable Space - Ducting
Non-Usable Space - Ducting
Cleaners Cupboard
Stairway / Lift / Landing
Non-Usable Space - Ducting
Storeroom
Storeroom
StoreroomStoreroom
Dining Room
Non-Usable Space - DuctingStairway / Lift / Landing
Stairway / Lift / Landing
Corridor / Foyer
Corridor / Foyer
Toilet
Corridor / Foyer
Toilet
Toilet
Storeroom
Stairway / Lift / Landing
Kitchen
Conference Room
Stairway / Lift / Landing
StoreroomNon-Usable Space - Ducting
Corridor / Foyer
Corridor / Foyer
Teaching with Tables / Desks
Teaching with Tables / Desks
Teaching with Tables / Desks
Corridor / Foyer
Common Room
Teaching with Tables / DesksTeaching with Tables / DesksConference Room
Conference Room
Conference Room
Conference Room
Teaching with Tables / DesksTeaching with Tables / Desks
Hub Room
1531.5 1447.8
1396.8 1065.3
Main Building
Fourth Floor
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
GEA: GIA:
TRA: NIA:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
CH:
A:
CH:
A:
CH:
A:CH:
A:
CH:
A:
1
2
3
4
5
A B C D E
Demolition Key
To be Demolished
Floor Slab to be Demolished
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
114
05/03/20
MS
SJ
Fourth Floor Demolition
NEDF
University of Plymout
Rev Description Date
1 : 200
Fourth Floor Demolition Plan
1
83. DNDN
UP
1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA160
04/08/20
SJ
MS
00 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
Ground Floor Wall Types
0
Rev Description Date
84. DN
DN
DN
1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA161
04/08/20
SJ
MS
1 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
First Floor Wall Type
1
Rev Description Date
85. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA162
04/08/20
SJ
MS
2 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
Second Floor Wall Types
2
Rev Description Date
86. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA163
04/08/20
SJ
MS
3 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
Third Floor Wall Types
3
Rev Description Date
87. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA164
04/08/20
SJ
MS
4 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
Fourth Floor Wall Types
4
Rev Description Date
88. 1
2
3
4
5
6
7
A B C E FG
BB
SE201
-
---
Wall Type 1 - 120mm - Internal Partition - 30min Fire Rated
Wall Type 2 - 150mm - Lift Shaft - 60min Fire Rated
Wall Type 3 - 62.5mm - Riser Walls - 30min Fire Rated
Wall Type 4 - 140mm Internal Partition - 60min Fire Rated
Wall Type - Key
DO NOT SCALE: ALL DIMENSIONS TO BE CHECKED ON SITE
AND VERIFIED PRIOR TO COMMENCING
WORKS/MANUFACTURE. ANY DISCREPANCIES TO BE
REPORTED.
THIS DRAWING IS PROTECTED BY COPYRIGHT. IT MAY NOT
BE REPRODUCED IN ANY FORM OR BY ANY MEANS FOR ANY
PURPOSE WITHOUT THE WRITTEN PERMISSION.
DRAWING NO.
DRAWN BY:
DATE:
SCALE:
CHECKED BY:
ISSUE:
AS BUILT
PRODUCTION INFORMATION
BUILDING REGULATION
PLANNING
PRELIMINARY
FEASIBILITY STUDY
DRAWING TITLE:
PROJECT:
CLIENT:
As indicated
GA165
04/08/20
SJ
MS
5 Floor Wall Types
NEDF
University of Plymouth
20011 : 200
Fifth Floor Wall Types
5
Rev Description Date