SlideShare a Scribd company logo
UP
UP
W40012
W4002
2
W4002
1
W4001 3
ABCDE
1
2
3
4
5
6
FG
7
HJ
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 200
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM
W1001
SITE PLAN
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
W4001 1 : 200
1 SITE PLAN
kerbing to new bitumen surface
new bituminous surface to existing access road
new staff car parking
pump & pipe rack storage
wash bay
UP
UP
W40022
W4002 1
A
B
C
D
E
1 2 3 4 5
5000500045004500
6000 6000 6000 6000
6
1
W5002 T E M P
2
W5002 T E M P
-
--- T E M P
-
--- T E M P
6000
7
6000
-
--- T E M P
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM
W2001
FLOOR PLAN - EXISTING
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
W4001 1 : 100
1 Floor Plan - Existing
lean to storage structure to be dismantled and
relocated elsewhere on site
section of existing cavity wall
to be removed shown dashed
remove existing crane ladder
UP
W40022
W4002 1
A
B
C
D
E
1 2 3 4 5 6
F
G
2
W5002 T E M P
-
--- T E M P
-
--- T E M P
7
1948011000
2966
H
60006000
J
6000
552 m²
Pump & Pipe
Storage
225 m²
Workshop
24.5 m²
Wash Bay
-
--- T E M P
6000 6000 6000 6000 6000 6000
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM
W2002
FLOOR PLAN - NEW
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
W4001 1 : 100
1 Floor Plan - New
Option to accomodate lunch room
office / changing area shown hatched
new brick cavity wall construction
rainwater
collection tank to
wash bay
new concrete floor slab
new crane stair
vertical rack storage to pumps
(12 catagories)
steel concertina doors to pump store
new roller shutter to replace existing
low level block wall to wash bay
new roller shutter to storage area
Ground Level
+21.20 m
12345
Measuring Pit
+20.00 m
Test Pit
+17.00 m
Level
+24.44 m
TOB
+26.28 m
6
1
W5002 T E M P
-
--- T E M P
7
-
--- T E M P
Ground Level
+21.20 m
Wall Plate
+25.78 m
Crane
+26.28 m
Level
+24.44 m
Level 8
+28.64 m
1
W5002 T E M P
-
--- T E M P
-
--- T E M P
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:21 AM
W4001
EXTERNAL ELEVATIONS
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
W1001 1 : 100
2 East
W1001 1 : 100
3 West
1000x1500 louvres
profiled wall cladding to new
and existing fascia
domed roof lights
steel mesh retractable doors
to pipe rack storage
external lighting
Ground Level
+21.20 m
Wall Plate
+25.78 m
A B C D E
Measuring Pit
+20.00 m
Test Pit
+17.00 m
Crane
+26.28 m
F G2
W5002 T E M P
-
--- T E M P
H J
Ground Level
+21.20 m
Wall Plate
+25.78 m
ABCDE
Test Pit
+17.00 m
Crane
+26.28 m
Level 8
+28.64 m
Level 9
+20.20 m
FG 2
W5002 T E M P
-
--- T E M P
HJ
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:23 AM
W4002
EXTERNAL ELEVATIONS
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
1 : 100W1001
1 North
W1001 1 : 100
2 South
lunch room / office / changing rm option
profiled sheeting fascia
low level block wall to wash bay
Ground Level
+21.20 m
Wall Plate
+25.78 m
A B C D E
Measuring Pit
+20.00 m
Crane
+26.28 m
Level 8
+28.64 m
F G2
W5002 T E M P
-
--- T E M P
H J
1 2 3 4 5
Measuring Pit
+20.00 m
6
1
W5002 T E M P-
--- T E M P
7
-
--- T E M P
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:24 AM
W5001
SECTIONS
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
1 : 100
1 Section A-A
1 : 100
2 Section B-B
new colorbond fascia cladding
new colorbond roof panels
existing truss to be dismantled and
relocated elsewhere on site
new fascia truss as per existing
Ground Level
+21.20 m
ABCDE
Crane
+26.28 m
Level 8
+28.64 m
FG 2
W5002 T E M P
-
--- T E M P
HJ
Ground Level
+21.20 m
Wall Plate
+25.78 m
1 2 3 4 5
Measuring Pit
+20.00 m
Crane
+26.28 m
Level
+24.44 m
Level 8
+28.64 m
6
1
W5002 T E M P
-
--- T E M P
7
-
--- T E M P
L2, 191 St Georges Terrace
Perth WA 6000
T +618 9481 3722
F +618 9226 4399
ABN 61 007 747 748
www.woodhead.com.au
Drawing Number Issue
ScaleDrawing Title
Project Number
Project Description
Drawing Coordinated
Checked
Architects
Client
Landscape Architect
BCA Consultant
Fire
Hydraulic
Electrical
Mechanical
Structural & Civil
Quantity Surveyor
Project Management
Issue Revision Description Date
Key Plan.
NOTES
This drawing is copyright and the property of WOODHEAD and must not be used
without written authorisation. Do not scale this drawing. All dimensions are to be
verified on site and any discrepancies reported before commencement of any work or
shop drawings.
Drawing Director Approval
Original Size
1 : 100
C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:26 AM
W5002
SECTIONS
CW00544
Pump Test Facility
Shenton Park
Checker
Water Corporation
210 Lemnos Street, Shenton Park
David Cooley
PGD Consulting
Shawn D'Cruz
PGD Consulting
Shawn D'Cruz
Ecoscape
Julain Croudace
PGD Consulting
Shawn D'Cruz
Robert Bird
Steve Chidgzey / Henri Steynberg
WT Partnership
S Parrott
Water Corporation
Tyrone Sun
Milstone
PRELIMINARY
W2001 1 : 100
1 Section D-D
W2001 1 : 100
2 Section C-C

More Related Content

Viewers also liked

Exposision de modulo (flor cecilia)...
Exposision de modulo (flor cecilia)...Exposision de modulo (flor cecilia)...
Exposision de modulo (flor cecilia)...
Nate Near Rivers
 
The battle of the sexes speach pwpnt
The battle of the sexes speach pwpntThe battle of the sexes speach pwpnt
The battle of the sexes speach pwpnt
femi17
 
The battle of the sexes speach pwpnt
The battle of the sexes speach pwpntThe battle of the sexes speach pwpnt
The battle of the sexes speach pwpnt
femi17
 
+
++
Laura Davidson Resume
Laura Davidson ResumeLaura Davidson Resume
Laura Davidson Resume
laurainlv
 
+
++
Karen africa trip short
Karen africa trip shortKaren africa trip short
Karen africa trip short
Ashmore Consulting
 
Política control de acceso
Política control de accesoPolítica control de acceso
Política control de acceso
Guido Reyes
 

Viewers also liked (15)

Exposision de modulo (flor cecilia)...
Exposision de modulo (flor cecilia)...Exposision de modulo (flor cecilia)...
Exposision de modulo (flor cecilia)...
 
The battle of the sexes speach pwpnt
The battle of the sexes speach pwpntThe battle of the sexes speach pwpnt
The battle of the sexes speach pwpnt
 
The battle of the sexes speach pwpnt
The battle of the sexes speach pwpntThe battle of the sexes speach pwpnt
The battle of the sexes speach pwpnt
 
+
++
+
 
+
++
+
 
Woodhead1
Woodhead1Woodhead1
Woodhead1
 
+
++
+
 
+
++
+
 
Laura Davidson Resume
Laura Davidson ResumeLaura Davidson Resume
Laura Davidson Resume
 
+
++
+
 
+
++
+
 
Karen africa trip short
Karen africa trip shortKaren africa trip short
Karen africa trip short
 
Política control de acceso
Política control de accesoPolítica control de acceso
Política control de acceso
 
+
++
+
 
Ikt 179
Ikt 179Ikt 179
Ikt 179
 

Similar to +

Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
Adrian Matejko
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
Mike Darwich
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
Mike Darwich
 
MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10
Vijay Kumar
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
Girish Ravikumar
 
LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORE
Liam Baines
 
Panel Cladding.pdf
Panel Cladding.pdfPanel Cladding.pdf
Panel Cladding.pdf
Mohamed828759
 
Final Plans
Final PlansFinal Plans
Final Plans
Ryan Wensel
 
List of CIP
List of CIPList of CIP
List of CIP
John Carmona
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
Damian Coetzee
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORK
Noel Carroll
 
P15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan ProposedP15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan Proposed
Sophie Christopher Bowes
 
Emma McMullan CV 2
Emma McMullan CV 2Emma McMullan CV 2
Emma McMullan CV 2
Emma McMullan
 
DAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHTDAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHT
Wium Van Der Post
 
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdf
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdfRegional-Sports-Compex-Siteworks-and-Strategies-web.pdf
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdf
SeanBolden1
 
portfolio small 66
portfolio small 66portfolio small 66
portfolio small 66
Silvia Pizzini
 
Water Outage Schedule
Water Outage ScheduleWater Outage Schedule
ProcContSite
ProcContSiteProcContSite
ProcContSite
Clyde Porter
 
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
Douglas Hart Snr
 
Degotardi_Portfolio
Degotardi_PortfolioDegotardi_Portfolio
Degotardi_Portfolio
Hannah Degotardi
 

Similar to + (20)

Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORE
 
Panel Cladding.pdf
Panel Cladding.pdfPanel Cladding.pdf
Panel Cladding.pdf
 
Final Plans
Final PlansFinal Plans
Final Plans
 
List of CIP
List of CIPList of CIP
List of CIP
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORK
 
P15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan ProposedP15921-1(22) ground Floor Plan Proposed
P15921-1(22) ground Floor Plan Proposed
 
Emma McMullan CV 2
Emma McMullan CV 2Emma McMullan CV 2
Emma McMullan CV 2
 
DAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHTDAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHT
 
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdf
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdfRegional-Sports-Compex-Siteworks-and-Strategies-web.pdf
Regional-Sports-Compex-Siteworks-and-Strategies-web.pdf
 
portfolio small 66
portfolio small 66portfolio small 66
portfolio small 66
 
Water Outage Schedule
Water Outage ScheduleWater Outage Schedule
Water Outage Schedule
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
DGI-CHT-ENC-B1-XX-ME-XX-0004-C01
 
Degotardi_Portfolio
Degotardi_PortfolioDegotardi_Portfolio
Degotardi_Portfolio
 

+

  • 1. UP UP W40012 W4002 2 W4002 1 W4001 3 ABCDE 1 2 3 4 5 6 FG 7 HJ L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 200 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM W1001 SITE PLAN CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY W4001 1 : 200 1 SITE PLAN kerbing to new bitumen surface new bituminous surface to existing access road new staff car parking pump & pipe rack storage wash bay
  • 2. UP UP W40022 W4002 1 A B C D E 1 2 3 4 5 5000500045004500 6000 6000 6000 6000 6 1 W5002 T E M P 2 W5002 T E M P - --- T E M P - --- T E M P 6000 7 6000 - --- T E M P L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM W2001 FLOOR PLAN - EXISTING CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY W4001 1 : 100 1 Floor Plan - Existing lean to storage structure to be dismantled and relocated elsewhere on site section of existing cavity wall to be removed shown dashed remove existing crane ladder
  • 3. UP W40022 W4002 1 A B C D E 1 2 3 4 5 6 F G 2 W5002 T E M P - --- T E M P - --- T E M P 7 1948011000 2966 H 60006000 J 6000 552 m² Pump & Pipe Storage 225 m² Workshop 24.5 m² Wash Bay - --- T E M P 6000 6000 6000 6000 6000 6000 L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:20 AM W2002 FLOOR PLAN - NEW CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY W4001 1 : 100 1 Floor Plan - New Option to accomodate lunch room office / changing area shown hatched new brick cavity wall construction rainwater collection tank to wash bay new concrete floor slab new crane stair vertical rack storage to pumps (12 catagories) steel concertina doors to pump store new roller shutter to replace existing low level block wall to wash bay new roller shutter to storage area
  • 4. Ground Level +21.20 m 12345 Measuring Pit +20.00 m Test Pit +17.00 m Level +24.44 m TOB +26.28 m 6 1 W5002 T E M P - --- T E M P 7 - --- T E M P Ground Level +21.20 m Wall Plate +25.78 m Crane +26.28 m Level +24.44 m Level 8 +28.64 m 1 W5002 T E M P - --- T E M P - --- T E M P L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:21 AM W4001 EXTERNAL ELEVATIONS CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY W1001 1 : 100 2 East W1001 1 : 100 3 West 1000x1500 louvres profiled wall cladding to new and existing fascia domed roof lights steel mesh retractable doors to pipe rack storage external lighting
  • 5. Ground Level +21.20 m Wall Plate +25.78 m A B C D E Measuring Pit +20.00 m Test Pit +17.00 m Crane +26.28 m F G2 W5002 T E M P - --- T E M P H J Ground Level +21.20 m Wall Plate +25.78 m ABCDE Test Pit +17.00 m Crane +26.28 m Level 8 +28.64 m Level 9 +20.20 m FG 2 W5002 T E M P - --- T E M P HJ L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:23 AM W4002 EXTERNAL ELEVATIONS CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY 1 : 100W1001 1 North W1001 1 : 100 2 South lunch room / office / changing rm option profiled sheeting fascia low level block wall to wash bay
  • 6. Ground Level +21.20 m Wall Plate +25.78 m A B C D E Measuring Pit +20.00 m Crane +26.28 m Level 8 +28.64 m F G2 W5002 T E M P - --- T E M P H J 1 2 3 4 5 Measuring Pit +20.00 m 6 1 W5002 T E M P- --- T E M P 7 - --- T E M P L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:24 AM W5001 SECTIONS CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY 1 : 100 1 Section A-A 1 : 100 2 Section B-B new colorbond fascia cladding new colorbond roof panels existing truss to be dismantled and relocated elsewhere on site new fascia truss as per existing
  • 7. Ground Level +21.20 m ABCDE Crane +26.28 m Level 8 +28.64 m FG 2 W5002 T E M P - --- T E M P HJ Ground Level +21.20 m Wall Plate +25.78 m 1 2 3 4 5 Measuring Pit +20.00 m Crane +26.28 m Level +24.44 m Level 8 +28.64 m 6 1 W5002 T E M P - --- T E M P 7 - --- T E M P L2, 191 St Georges Terrace Perth WA 6000 T +618 9481 3722 F +618 9226 4399 ABN 61 007 747 748 www.woodhead.com.au Drawing Number Issue ScaleDrawing Title Project Number Project Description Drawing Coordinated Checked Architects Client Landscape Architect BCA Consultant Fire Hydraulic Electrical Mechanical Structural & Civil Quantity Surveyor Project Management Issue Revision Description Date Key Plan. NOTES This drawing is copyright and the property of WOODHEAD and must not be used without written authorisation. Do not scale this drawing. All dimensions are to be verified on site and any discrepancies reported before commencement of any work or shop drawings. Drawing Director Approval Original Size 1 : 100 C:Projects11703807_A_Arch_Central_2013_fquinn.rvt28/05/2013 10:19:26 AM W5002 SECTIONS CW00544 Pump Test Facility Shenton Park Checker Water Corporation 210 Lemnos Street, Shenton Park David Cooley PGD Consulting Shawn D'Cruz PGD Consulting Shawn D'Cruz Ecoscape Julain Croudace PGD Consulting Shawn D'Cruz Robert Bird Steve Chidgzey / Henri Steynberg WT Partnership S Parrott Water Corporation Tyrone Sun Milstone PRELIMINARY W2001 1 : 100 1 Section D-D W2001 1 : 100 2 Section C-C