Michael Mustered has over 30 years of experience in quality control inspection, construction management, and maintenance for nuclear power plants and fossil fuel power stations. He has held roles managing electrical and mechanical construction, performing quality inspections, supervising maintenance work, and implementing major modifications. Mustered has extensive experience coordinating construction activities and resolving issues between contractors and clients to ensure projects meet specification, schedule, cost, and quality requirements. He maintains several relevant certifications including MSHA Qualified, OSHA 30 Qualified, and Quality Control Inspector Level II.
7. Michael Mustered
1999 N 35th Road
Ottawa 61350
United States
Ph: 815-433-6339
mpjmustered@sbcglobal.net
REGISTRATIONS / CERTIFICATIONS:
MSHA Qualified, OSHA 30 Qualified
Quality Control Inspector Level II
Electrical, Mechanical, Civil, Structural Construction Management
Power Plant Maintenance
QA/QC Management & Inspection Overview
Welding Inspection & Testing
Construction Operations Coordination
EXPERIENCE:
S&L Construction Management, Dry Fork Station, Gillette Wyoming (2008 to 2010)
Electrical and mechanical construction management support to project
teams and clients,for new construction of a 420 MW fossil fuel power
plant. Responsible for monitoring and verifying contractor compliance
with specification scope, schedule, cost, and quality requirements.
Coordinated installation of 25kv construction power for the site, from
pre-construction throughout construction of the project. Provided
electrical/mechanical constructability input during the project pre-
construction phase. During the construction, monitored contractor
installation work for the switchyard and power plant construction,
responded to contractor design inquiries, performed contract
administration duties, and audited the quality of contractor
installation. Coordinated the removal of barriers to accomplish the
work, including providing responses to field construction questions.
Exelon Nuclear, LaSalle Station (1999 to 2007)
First line supervisor in electrical maintenance; performed daily
trouble-shooting and maintenance on plant equipment. Primary duties
were constructability review and implementation of major
Mike Mustered Resume
Nov. 2011
Page 1 of 3
8. modifications. Major rigging and installation of heavy equipment and
supervision of house electricians and contractors.
Raytheon Constructors, LaSalle Station (1996 to 1999)
Field engineer assigned to coordinate construction activities between
ComEd and contractor work groups on modifications to plant equipment.
Bechtel Construction, Dresden Station (1993 to 1996)
Work analyst/field engineer over major construction of diesel
generator installation and 4KV upgrade to the station blackout
modification, and for the Unit 1 decommissioning project.
Flour Constructors, Dresden Station (1992 to 1993)
Q.C. Inspector Level II; Weld inspection [AWS], CEA's, electrical
termination, cable pulls, equipment and support inspection, in
accordance with ComEd's N.S.W.P. Program. Work Analyst; preparation
of work packages and supervision of Craft in resolution of
installation issues.
G. N. Venture, Braidwood Station (1991-1992)
Q.C. Inspector Level II; Weld inspection [AWS], CEA's, Electrical
termination, cable pulls, equipment and support inspection, in
accordance with ComEd's N.S.W.P. Program. Work Analyst; preparation
of work packages and supervision of Craft in resolution of
installation issues. (1992)
Q.C. Inspector Level II; Weld inspection [AWS], CEA's, Electrical
termination, cable pulls, equipment and support inspection, in
accordance with ComEd's N.S.W.P. Program.
S. G. S. (1990 to 1991)
Contracted to qualify welders and perform weld inspections for boiler
tube replacement at ComEd's Crawford station.
Contracted to Amoco Oil Co. to develop isometric drawings and U.T.
testing of mechanical piping. Generated drawings to as-built field
conditions.
SPEC Consultants (1989 to 1990)
Contracted to perform overhead crane and structural steel inspections
for U.S. Steel Corp. Contracted to Bechtel at Zion Station to perform
Q.C. inspection. Contracted to P.C.I. Energy Services to perform U.T.
testing of weld overlay and qualify welders.
Gust K. Newberg, Braidwood Station (1988-1999)
Mike Mustered Resume
Nov. 2011
Page 2 of 3
9. Q.C. Inspector Level II; Weld inspection [AWS], CEA's, electrical
termination, cable pulls, equipment and support inspection, in
accordance with ComEd's N.S.W.P. Program. (1988 to 1989)
Q.C. Level II; performed Fire barrier inspections to determine type
and quality, during on-line testing.
Comstock Engineering, Beaver Valley Station (1984 to 1987)
Q.C. Level II; performed visual welding inspections and mechanical
inspections during re-fuel outage. (1987 to 1988)
Lead Supervisor, Q.C. Level II; Welding, configuration, CEA's and
Electrical Penetrations. Training and evaluation of new employees,
and supervision of all in-process inspections, during construction and
start-up.
Morrison Construction, LaSalle Station (1981 to 1983)
Q.C. Level II; Pipe fitter/craft. Fabrication and installation of
mechanical piping equipment during construction. Inspection and walk-
down of piping equipment prior to start-up.
Mike Mustered Resume
Nov. 2011
Page 3 of 3