SlideShare a Scribd company logo
1 of 4
Anthony Zangare
3711 37th
/ Way
West Palm BeachFlorida 33407
440-478-0376
Anthonyzangare12@gmail.com
Objective
Experience
To fill a position of Supervisor/Superintendent/Project Manager/ Operation
Manager
Exelon Corp:
Comed Illinois
One Lincoln Centre
Oak Brook Terrace IL 60181
January 21, 2016 to Current
Construction Manager: Manage the construction oftwo new feeders from substation
TSS80 to customer Enbridge.
The installation and tie into the new 60 MVA station transformer and buss work at
station to the new underground of 27 new manholes to the existing manholes to
sections of new overhead 34kv construction overto the existing to the customer.
This is a $55 project slated to energize section one feeder by June 1 and the second
by November 31.
BHI Energy
February 9, 2015 to January 21, 2016
Distribution Engineer
Working with Florida Power and Light on the Storm Harding Project for
substation and distribution equipment and lines to sustain Hurricane wind forces
of up to 145 mph.
Working with design engineers on the restructure of wood poles to concrete
poles described in the Storm Hardening package.
Randstad Engineering Group
February 20, 2014 to February 9, 2015
Superintendent Field Operations/Construction Manager
I held the position of Superintendent of Field Operations
Substations/Construction Manager for Randstad Engineering Group. I worked
on projects directly for Burns and McDonnell Engineering Firm on substation
projects in New Jersey for PSE&G, Ohio and Pennsylvania with Ohio Edison
and First Energy on transformer, switch gear changes,relay changes and all
related control house work. These project involves the installations of station
transformers, circuit breaker from 69kv to 500kv and new SEL relaying and
switch gear. I managed the construction ofall equipment in the substation
switchyard and control house area and the Testing and Commissioning for the
installation of the SEL relays at various substations.
Ibadrola USA New York State Electric & Gas
January 16, 2012 to January 2014
Manager of Regional Operations
Manage daily operations for the Brewster Region of NYSEG area. Oversee
major transmission and distribution projects.
Transmission voltages of 115kv,69kv and 46 kv
Distribution of 13.2 kv and 4800 kv.
SAP certified and OSHA certified.
I managed four supervisors oftransmission and distribution working under my
direct supervision along with the supervisorof engineering. Responsible for all
County interactions and meetings, training scheduling, and field planning.
I was Incident Commander for the Brewster Region Storm Restoration Team.
Manage the Brewster Fleet, Stores and Operating Budget.
Manage all transmission and distribution inspections and deficiencies repairs.
Incident Commander for Hurricane Sandy which NYSEG lost 90% of the
Brewster Region customers being restored safe and timely within ten days.
My responsibility was to safely guide crews during the restore efforts of
transmission, distribution, and substations to the Region timely. Communicate
with the State, County and Local political representatives on the progress of the
restoration efforts. I also worked closely with the MTA Management staff
during power restoration of their substations forrestoration and movement of
the transit system.
U.S.Utility Contractor Co. Inc.
February 7, 2008 to May, 25, 2011
Cleveland District Manager of Operations:
Oversee the daily operations of all current working projects,Job Bidding,
Inventory, Maintenance,Purchasing and Scheduling.
O.D.O.T. Project 060372 The Electrical Portion and Traffic Signal and Street
Lighting installation of the Fulton Road Bridge Project, Major renovation of
The Greater Cleveland Regional Transit Authority Rail Central Headquarters
Rail Yard of overhead power feeders and overhead Catenary System.
Managed all material inventory and purchase orders for all projects to maintain
and secure material for construction projects.
Managed all labor work forces, to complete daily crew assignments to maintain
prevailing wage packages,and labor unions jurisdiction for a skilled and
qualified work force. Attended job briefing meetings and handled project close
out and As-Built drawings.
Responded and dispatched the necessary crews for emergency outages for
overhead and underground electrical, fiber optic and signal repairs.
Scheduled and coordinated the work force, material, construction equipment
To keep projects on a timely work schedule to the owners satisfaction
City Of Cleveland
Cleveland Public Power
Superintendent ofOperations:
Retired December, 2006
Superintendent of Operations/Program Manager & Manager of Facilities
Oversee daily operations of the construction,trouble and field inspectors
departments.
Manager of the budget for the facilities and maintenance of all buildings,
storerooms and substations forrepairs, upkeep and daily operations.
Manager of construction for the $200 million Euclid Corridor Transportation
Project of the Cleveland Public Power’s underground power system.
Manager of construction of the new $6 million Ridge Road 40 MVA
substation and Transmission Line for the 138 kv inter-connection.
Manager of Repairs and operation of all of Cleveland Public Power’s
substations and facilities to coordinate and schedule of all building
maintenance.
2000 to 2005 Cleveland Public Power Meter Bureau
Superintendent
Manager of daily operations for service installations for commercial and
residential services, blocking and unblocking of meters, tamper department
and the acquisition of all meter reads.
Responsible for the start up and design of the 20,000 meter pilot program for
the (AMR) Automated Meter Reading systemto solid-state meters for C&I
and Residential metering.
Implemented training course for new equipment and metering.
1998 to 2000 Cleveland Public Power Trouble Operations
Assistant Superintendent
Supervised all Trouble Crews and all Crews working after normal working
hours
Monitor all of Cleveland Public Power’s equipment and substations.(Make
periodical checks of load and feeder conditions)
Handle all related customer service complaints to resolve all issues after
normal working hours.
To ensure that all of CPP’s equipment is in a safe condition 24/7 of
operations.
1995 to 1998 Cleveland Public Power Operations
Line Switchman
Work underindirect supervision, planned, direct, and supervise the de-
energizing of feeders, station transformers and all energized equipment for
necessary repairs and the re-energizing of the same equipment.
Direct emergency and routine repairs to power carrying equipment, transfer
electric load to various lines, and make periodical inspections ofenergized
equipment.
Diagnose and solve any problems related to energize electrical equipment.
Knowledge of all Cleveland Public Powers substations locations,customers
equipment and be familiar with customer’s voltage and distribution range
1988 to 1995 Cleveland Public Power Trouble Operations
Trouble Lineman
Performed required duties in connection with the location and isolation of
faults and restoration of service on distribution up to 15,000 volts as well as
making emergency repairs to restore electrical service.
1986 to 1988 Cleveland Public Power Operations
Lineman
Worked on the construction ofmeter and line equipment installation.
Interests Electrical, Computers, Sports and Exercise
Education 1982 to 1986 Cuyahoga Community College Cleveland, Ohio
Electrical Lineman (Journeyman)

More Related Content

What's hot

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Resume (Vineet Kumar)
Resume (Vineet Kumar)Resume (Vineet Kumar)
Resume (Vineet Kumar)Vineet kumar
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project ManagerMalcolm McEachern
 
Mike Mustered QCI Cert. Pkg. 11.23.11
Mike Mustered QCI Cert. Pkg. 11.23.11Mike Mustered QCI Cert. Pkg. 11.23.11
Mike Mustered QCI Cert. Pkg. 11.23.11Michael Mustered
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning managerMartin Bennie
 
Hayes, Ryan 9.17.14 Resume
Hayes, Ryan 9.17.14 ResumeHayes, Ryan 9.17.14 Resume
Hayes, Ryan 9.17.14 ResumeRyan Hayes
 
Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)James Macauley
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 

What's hot (20)

Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
James Hoove1 (1)
James Hoove1 (1)James Hoove1 (1)
James Hoove1 (1)
 
DEE
DEEDEE
DEE
 
Newest
NewestNewest
Newest
 
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
Resume (Vineet Kumar)
Resume (Vineet Kumar)Resume (Vineet Kumar)
Resume (Vineet Kumar)
 
Rusty McEacern Project Manager
Rusty McEacern Project ManagerRusty McEacern Project Manager
Rusty McEacern Project Manager
 
Mike Mustered QCI Cert. Pkg. 11.23.11
Mike Mustered QCI Cert. Pkg. 11.23.11Mike Mustered QCI Cert. Pkg. 11.23.11
Mike Mustered QCI Cert. Pkg. 11.23.11
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
CV - Martin Bennie- commissioning manager
CV - Martin Bennie-  commissioning managerCV - Martin Bennie-  commissioning manager
CV - Martin Bennie- commissioning manager
 
Resume' 2015
Resume' 2015Resume' 2015
Resume' 2015
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
 
Hayes, Ryan 9.17.14 Resume
Hayes, Ryan 9.17.14 ResumeHayes, Ryan 9.17.14 Resume
Hayes, Ryan 9.17.14 Resume
 
Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)Rev02 Resume of James Macauley Nov'16 (3)
Rev02 Resume of James Macauley Nov'16 (3)
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 

Viewers also liked

Viewers also liked (15)

Resume 2016
Resume 2016Resume 2016
Resume 2016
 
ANDREW J DANAN Resume Final2016
ANDREW J DANAN Resume Final2016ANDREW J DANAN Resume Final2016
ANDREW J DANAN Resume Final2016
 
Tony Sallmann Resume
Tony Sallmann ResumeTony Sallmann Resume
Tony Sallmann Resume
 
resume (4)
resume (4)resume (4)
resume (4)
 
LT-Resume
LT-ResumeLT-Resume
LT-Resume
 
RESUME
RESUMERESUME
RESUME
 
M BATES RESUME - UPLOAD - 042916
M BATES RESUME - UPLOAD - 042916M BATES RESUME - UPLOAD - 042916
M BATES RESUME - UPLOAD - 042916
 
James brendan mccarley professional resume#1
James brendan mccarley professional resume#1James brendan mccarley professional resume#1
James brendan mccarley professional resume#1
 
Andrew Wyatt Resume Updated 2016
Andrew Wyatt Resume Updated 2016Andrew Wyatt Resume Updated 2016
Andrew Wyatt Resume Updated 2016
 
McCurleyKassandra2016.Resume.v.5
McCurleyKassandra2016.Resume.v.5McCurleyKassandra2016.Resume.v.5
McCurleyKassandra2016.Resume.v.5
 
Anakin Resume
Anakin ResumeAnakin Resume
Anakin Resume
 
ALICIAN HOUSE RESUME (11)
ALICIAN HOUSE RESUME (11)ALICIAN HOUSE RESUME (11)
ALICIAN HOUSE RESUME (11)
 
2016 RESUME
2016 RESUME2016 RESUME
2016 RESUME
 
A Rios Resume
A Rios ResumeA Rios Resume
A Rios Resume
 
Jamal Scantlebury Resume
Jamal Scantlebury ResumeJamal Scantlebury Resume
Jamal Scantlebury Resume
 

Similar to Anthony Zangare Resume 2

Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedinEdward Maszczak
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
Lucas_David_2016_resume - Copy
Lucas_David_2016_resume - CopyLucas_David_2016_resume - Copy
Lucas_David_2016_resume - Copydavid lucas
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyMichael Roesch
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan ResumeLoga nathan
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
juan lara resume1
juan lara resume1juan lara resume1
juan lara resume1juan lara
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016Terry Evans
 

Similar to Anthony Zangare Resume 2 (20)

Resume Edward Maszczak linkedin
Resume  Edward Maszczak linkedinResume  Edward Maszczak linkedin
Resume Edward Maszczak linkedin
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Lucas_David_2016_resume - Copy
Lucas_David_2016_resume - CopyLucas_David_2016_resume - Copy
Lucas_David_2016_resume - Copy
 
RSRynkiewicz2015r
RSRynkiewicz2015rRSRynkiewicz2015r
RSRynkiewicz2015r
 
Cameron dipple resume
Cameron dipple resumeCameron dipple resume
Cameron dipple resume
 
Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
Electrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - CopyElectrical Resume Michael L Roesch 4Jan16 - Copy
Electrical Resume Michael L Roesch 4Jan16 - Copy
 
Loganathan Resume
Loganathan ResumeLoganathan Resume
Loganathan Resume
 
Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)Darrell Reid resume, Long (1)
Darrell Reid resume, Long (1)
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
juan lara resume1
juan lara resume1juan lara resume1
juan lara resume1
 
Resume
ResumeResume
Resume
 
ResumePSCatubig
ResumePSCatubigResumePSCatubig
ResumePSCatubig
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
FPL RESUME1115
FPL RESUME1115FPL RESUME1115
FPL RESUME1115
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 

Anthony Zangare Resume 2

  • 1. Anthony Zangare 3711 37th / Way West Palm BeachFlorida 33407 440-478-0376 Anthonyzangare12@gmail.com Objective Experience To fill a position of Supervisor/Superintendent/Project Manager/ Operation Manager Exelon Corp: Comed Illinois One Lincoln Centre Oak Brook Terrace IL 60181 January 21, 2016 to Current Construction Manager: Manage the construction oftwo new feeders from substation TSS80 to customer Enbridge. The installation and tie into the new 60 MVA station transformer and buss work at station to the new underground of 27 new manholes to the existing manholes to sections of new overhead 34kv construction overto the existing to the customer. This is a $55 project slated to energize section one feeder by June 1 and the second by November 31. BHI Energy February 9, 2015 to January 21, 2016 Distribution Engineer Working with Florida Power and Light on the Storm Harding Project for substation and distribution equipment and lines to sustain Hurricane wind forces of up to 145 mph. Working with design engineers on the restructure of wood poles to concrete poles described in the Storm Hardening package. Randstad Engineering Group February 20, 2014 to February 9, 2015 Superintendent Field Operations/Construction Manager
  • 2. I held the position of Superintendent of Field Operations Substations/Construction Manager for Randstad Engineering Group. I worked on projects directly for Burns and McDonnell Engineering Firm on substation projects in New Jersey for PSE&G, Ohio and Pennsylvania with Ohio Edison and First Energy on transformer, switch gear changes,relay changes and all related control house work. These project involves the installations of station transformers, circuit breaker from 69kv to 500kv and new SEL relaying and switch gear. I managed the construction ofall equipment in the substation switchyard and control house area and the Testing and Commissioning for the installation of the SEL relays at various substations. Ibadrola USA New York State Electric & Gas January 16, 2012 to January 2014 Manager of Regional Operations Manage daily operations for the Brewster Region of NYSEG area. Oversee major transmission and distribution projects. Transmission voltages of 115kv,69kv and 46 kv Distribution of 13.2 kv and 4800 kv. SAP certified and OSHA certified. I managed four supervisors oftransmission and distribution working under my direct supervision along with the supervisorof engineering. Responsible for all County interactions and meetings, training scheduling, and field planning. I was Incident Commander for the Brewster Region Storm Restoration Team. Manage the Brewster Fleet, Stores and Operating Budget. Manage all transmission and distribution inspections and deficiencies repairs. Incident Commander for Hurricane Sandy which NYSEG lost 90% of the Brewster Region customers being restored safe and timely within ten days. My responsibility was to safely guide crews during the restore efforts of transmission, distribution, and substations to the Region timely. Communicate with the State, County and Local political representatives on the progress of the restoration efforts. I also worked closely with the MTA Management staff during power restoration of their substations forrestoration and movement of the transit system. U.S.Utility Contractor Co. Inc. February 7, 2008 to May, 25, 2011 Cleveland District Manager of Operations: Oversee the daily operations of all current working projects,Job Bidding, Inventory, Maintenance,Purchasing and Scheduling. O.D.O.T. Project 060372 The Electrical Portion and Traffic Signal and Street Lighting installation of the Fulton Road Bridge Project, Major renovation of The Greater Cleveland Regional Transit Authority Rail Central Headquarters Rail Yard of overhead power feeders and overhead Catenary System. Managed all material inventory and purchase orders for all projects to maintain and secure material for construction projects.
  • 3. Managed all labor work forces, to complete daily crew assignments to maintain prevailing wage packages,and labor unions jurisdiction for a skilled and qualified work force. Attended job briefing meetings and handled project close out and As-Built drawings. Responded and dispatched the necessary crews for emergency outages for overhead and underground electrical, fiber optic and signal repairs. Scheduled and coordinated the work force, material, construction equipment To keep projects on a timely work schedule to the owners satisfaction City Of Cleveland Cleveland Public Power Superintendent ofOperations: Retired December, 2006 Superintendent of Operations/Program Manager & Manager of Facilities Oversee daily operations of the construction,trouble and field inspectors departments. Manager of the budget for the facilities and maintenance of all buildings, storerooms and substations forrepairs, upkeep and daily operations. Manager of construction for the $200 million Euclid Corridor Transportation Project of the Cleveland Public Power’s underground power system. Manager of construction of the new $6 million Ridge Road 40 MVA substation and Transmission Line for the 138 kv inter-connection. Manager of Repairs and operation of all of Cleveland Public Power’s substations and facilities to coordinate and schedule of all building maintenance. 2000 to 2005 Cleveland Public Power Meter Bureau Superintendent Manager of daily operations for service installations for commercial and residential services, blocking and unblocking of meters, tamper department and the acquisition of all meter reads. Responsible for the start up and design of the 20,000 meter pilot program for the (AMR) Automated Meter Reading systemto solid-state meters for C&I and Residential metering. Implemented training course for new equipment and metering. 1998 to 2000 Cleveland Public Power Trouble Operations Assistant Superintendent Supervised all Trouble Crews and all Crews working after normal working hours Monitor all of Cleveland Public Power’s equipment and substations.(Make periodical checks of load and feeder conditions) Handle all related customer service complaints to resolve all issues after normal working hours.
  • 4. To ensure that all of CPP’s equipment is in a safe condition 24/7 of operations. 1995 to 1998 Cleveland Public Power Operations Line Switchman Work underindirect supervision, planned, direct, and supervise the de- energizing of feeders, station transformers and all energized equipment for necessary repairs and the re-energizing of the same equipment. Direct emergency and routine repairs to power carrying equipment, transfer electric load to various lines, and make periodical inspections ofenergized equipment. Diagnose and solve any problems related to energize electrical equipment. Knowledge of all Cleveland Public Powers substations locations,customers equipment and be familiar with customer’s voltage and distribution range 1988 to 1995 Cleveland Public Power Trouble Operations Trouble Lineman Performed required duties in connection with the location and isolation of faults and restoration of service on distribution up to 15,000 volts as well as making emergency repairs to restore electrical service. 1986 to 1988 Cleveland Public Power Operations Lineman Worked on the construction ofmeter and line equipment installation. Interests Electrical, Computers, Sports and Exercise Education 1982 to 1986 Cuyahoga Community College Cleveland, Ohio Electrical Lineman (Journeyman)