SlideShare a Scribd company logo
1 of 12
Download to read offline
PF
PF PNF
PNF
ECAM PHILOSOPHY
A320 - Version 04b
SITUATION ASSESSMENT / DECISION
DETECTION
ECAM ACTIONS
ECAM PROCEDURE
SYSTEM DISPLAY ( if required )
STATUS
LDG DIST
LDG DIST
WEATHER
WEATHER
OPERATIONAL AND
COMMERCIAL
CONSIDERATIONS
OPERATIONAL AND
COMMERCIAL
CONSIDERATIONS
NOTIFY
NOTIFY
DECISION
DECISION
OPS …
OPS …
PURSER / PAX
PURSER / PAX
ATC
ATC
STATUS, or
SUMMARY
PF
PF PNF
PNF
First pilot who notices:
MASTER CAUTION/MASTER WARNING……….RESET
ANNOUNCE………………………...…..”TITLE OF FAILURE”
FLIES THE AIRCRAFT
NAVIGATES
1. DETECTION
If failure at takeoff:
400ft AGL
NO ACTION until , with safe flight path established.
CONSIDER AUTOMATION USE : A/THR, AP
PF
PF PNF
PNF
2. ECAM ACTIONS
ORDER…………….………………”ECAM ACTIONS”
ECAM ACTIONS COMPLETE……….CHECK
CONFIRM……….… CLEAR “name of SYS”?
ECAM ………………..………..CONFIRM (using SD
and overhead panel)
ECAM ACTIONS……………….PERFORM
REQUEST………CLEAR “name of SYS”?
ECAM………………………………..CLEAR
Both pilots should confirm
irreversible/guarded actions
This is to be repeated for each failure displayed on the
ECAM.
Example :
LAND ASAP
*Task sharing:
As soon as he announced “ECAM
ACTIONS”, the PF is in charge of
communications, until all the ECAM
actions have been completed.
PF
PF
PF PNF
PNF
3. SYSTEM DISPLAYS
CONFIRM………… CLEAR “name of SYS”?
SYSTEM PAGE DISPLAYED……….ANALYSE
REQUEST…………...CLEAR “name of SYS”?
SYSTEM DISPLAY…………………..CLEAR
This is to be repeated until all the displayed system pages
have been reviewed, and the STATUS page is displayed.
If a SYSTEM page is displayed on the lower ECAM screen:
PF
PF PNF
PNF
4. STATUS
CONFIRM………………..…………READ STATUS
CONFIRM……………………………CLEAR STATUS
REQUEST….………………………………..STATUS?
STATUS …………………………………...……..READ
LIMITATIONS……………………...….….CHECK
PROC………………...……………..…CONSIDER
LANDING DIST&SPEED INCREMENT..CHECK
INOP SYS……………………………...….CHECK
REQUEST…………………………CLEAR STATUS ?
STATUS…………………………………………CLEAR
ANNOUNCE………ECAM ACTIONS COMPLETED
Landing distance and approach speed
computation:
•For complex procedures (dual hydraulic
failure or electrical emergency
configuration): Use SUMMARY
•For other cases:
Review FCOM procedure:
3
Applying ECAM procedure ensures
flight safety.
However, referring to FCOM 3.02, if
time permits, may provide useful
additional information.
02
–
ABN-
EMER
RETURN TO NORMAL TASK SHARING
QRH
1.00
PF
PF PNF
PNF
5. SITUATION ASSESSMENT/DECISION
LDG DIST
LDG DIST
WEATHER
WEATHER
OPERATIONAL AND
COMMERCIAL
CONSIDERATIONS
OPERATIONAL AND
COMMERCIAL
CONSIDERATIONS
NOTIFY
NOTIFY
DECISION
DECISION
OPS …
OPS …
PURSER / PAX
PURSER / PAX
ATC
ATC
STATUS, or
SUMMARY
PF
PF PNF
PNF
6. SYNTHESIS
FLY / NAV
ECAM ACTIONS
(until STATUS page)
Consider:
Normal C/L
OEB
Computer resets
CONTINUE ECAM
(STATUS page)
APPROACH C/L
ECAM APPROACH
PROC (if any)
APPROACH
PREPARATION
Briefing
DECISION
COM
T
E
A
M
W
O
R
K
PF
PF PNF
PNF
IRREVERSIBLE / GUARDED ACTIONS
CONFIRMATION
Confirmation from both pilots is required, when the action concerns:
How to proceed for confirmation ?
PNF
PNF
Hand on related control:
REQUEST……………….………..CONFIRM ?
ACTION…………………………….PERFORM
PF
PF
ACTION…………………………..….CHECK
ANSWER………………..………..CONFIRM
Master switch or
ADIRS control
Any guarded switch Thrust lever is a PF action
given that it may influence flight path
!
How to proceed for confirmation ?
PNF
PNF
PF
PF
ACTION…………………………..….CHECK
ANSWER………………..………..CONFIRM
Hand on related control:
REQUEST……………….………..CONFIRM ?
ACTION…………………………….PERFORM
PF
PF PNF
PNF
2. ECAM ACTIONS
ORDER…………….………………”ECAM ACTIONS”
ECAM ACTIONS COMPLETE……….CHECK
CONFIRM……………………………….CLEAR
ECAM ………………..………..CONFIRM (using SD
and overhead panel)
ECAM ACTIONS……………….PERFORM
REQUEST………CLEAR “name of SYS”?
ECAM………………………………..CLEAR
Both pilots should confirm
irreversible/guarded actions
This is to be repeated for each failure displayed on the
ECAM.
Example :
LAND ASAP
*Task sharing:
As soon as he announced “ECAM
ACTIONS”, the PF is in charge of
communications, until all the ECAM
actions have been completed.
PF
Depending on the failure, , or , may be displayed, in
the right column of the ECAM procedure.
RED : Land at the next suitable airport.
AMBER : Assess the seriousness of the situation and consider the
selection of a suitable airport.
LAND ASAP LAND ASAP
LAND ASAP
LAND ASAP
PF
PF PNF
PNF
LANDING DISTANCE COMPUTATION
SYS
FAILURE A
FAILURE B 3
NORM (1)
1.2
1.1
10
_
(1) If NORM is indicated for landing configuration, and if CONF
3 is used, apply an additional 1.1 coefficient to the landing
distance.
Determine the landing
distance coefficient.
Determine the landing
distance in CONF FULL
CONF FULL
without failure
Apply the coefficient
determined above to this
distance.
APPR SPD-LDG DIST CORRECTIONS
FOR FAILURES
LANDING DISTANCE WITHOUT
AUTOBRAKE – CONF FULL
QRH
2.00
QRH
4.00
PF
PF PNF
PNF
APPROACH SPEED COMPUTATION
Select CONF FULL
Read VREF = VLS CONF FULL
Add 
VREF to VREF
Add wind correction, if applicable
Enter VAPP manually
If LDG in CONF 3 :
Select CONF 3
MCDU PERF APPR
page
LDG CONF
CONF 3
LDG CONF
FULL
VLS
VAPP
If the ECAM shows :
“APPR SPEED……….VREF+
VREF”:
VAPP = VREF + 
VREF + WIND CORRECTION (if applicable)
Note: This computation must be
done according to the appropriate
weight at destination, so, with
F-PLN properly updated.

VREF is given:
On the ECAM, and
On the QRH
Wind correction only
applies when 
VREF is
lower than 20 kts.
 

PF
PF PNF
PNF
4. STATUS
CONFIRM………………..…………READ STATUS
CONFIRM……………………………CLEAR STATUS
REQUEST….………………………………..STATUS?
STATUS …………………………………...……..READ
LIMITATIONS……………………...….….CHECK
PROC………………...……………..…CONSIDER
LANDING DIST&SPEED INCREMENT..CHECK
INOP SYS……………………………...….CHECK
REQUEST…………………………CLEAR STATUS ?
STATUS…………………………………………CLEAR
ANNOUNCE………ECAM ACTIONS COMPLETED
Landing distance and approach speed
computation:
•For complex procedures (dual hydraulic
failure or electrical emergency
configuration): Use SUMMARY
•For other cases:
Review FCOM procedure:
3
Applying ECAM procedure ensures
flight safety.
However, referring to FCOM 3.02, if
time permits, may provide useful
additional information.
02
–
ABN-
EMER
RETURN TO NORMAL TASK SHARING
QRH
1.00
The PNF should not start reading the STATUS before confirmation from the PF.
For any priority reason Status analysis can be postponed by PF
e.g. C/L, ATC communication…
In some cases, some other checks or actions may have to be performed, before reading the STATUS:
In case of failure at takeoff, the NORMAL TAKEOFF C/L
NORMAL TAKEOFF C/L has to be performed

OEB
OEB (if applicable) is to be applied at that time (Refer to QRH 6.00),
Computer resets
Computer resets may be considered (Refer to QRH 2.00)
QRH
2.00
QRH
6.00

More Related Content

Similar to 17383112-A320-ECAM-Philosophy.pdf

Similar to 17383112-A320-ECAM-Philosophy.pdf (11)

MERCEDES Actros & Atego Fault Codes DTC
MERCEDES Actros & Atego Fault Codes DTCMERCEDES Actros & Atego Fault Codes DTC
MERCEDES Actros & Atego Fault Codes DTC
 
Air Traffic Controllers Runway Condition Reporting
Air Traffic Controllers Runway Condition ReportingAir Traffic Controllers Runway Condition Reporting
Air Traffic Controllers Runway Condition Reporting
 
Runway Condition Reporting
Runway Condition ReportingRunway Condition Reporting
Runway Condition Reporting
 
Preparing CACP Interview
Preparing CACP InterviewPreparing CACP Interview
Preparing CACP Interview
 
Stage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departuresStage 2 ifh chapter 10 departures
Stage 2 ifh chapter 10 departures
 
Sample
SampleSample
Sample
 
Instrument route 1
Instrument route 1Instrument route 1
Instrument route 1
 
Crj200 fms
Crj200 fmsCrj200 fms
Crj200 fms
 
NorthernCross Demo 2009
NorthernCross Demo 2009NorthernCross Demo 2009
NorthernCross Demo 2009
 
2014 25-52 emergency
2014 25-52 emergency2014 25-52 emergency
2014 25-52 emergency
 
B 737NG Warning systems.
B 737NG Warning systems.B 737NG Warning systems.
B 737NG Warning systems.
 

Recently uploaded

Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxFIDO Alliance
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data SciencePaolo Missier
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctBrainSell Technologies
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfAnubhavMangla3
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Paige Cruz
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?Paolo Missier
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...marcuskenyatta275
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingScyllaDB
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxFIDO Alliance
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireExakis Nelite
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightSafe Software
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsLeah Henrickson
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuidePixlogix Infotech
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandIES VE
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...ScyllaDB
 

Recently uploaded (20)

Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data Science
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and Insight
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Using IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & IrelandUsing IESVE for Room Loads Analysis - UK & Ireland
Using IESVE for Room Loads Analysis - UK & Ireland
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 

17383112-A320-ECAM-Philosophy.pdf

  • 1. PF PF PNF PNF ECAM PHILOSOPHY A320 - Version 04b SITUATION ASSESSMENT / DECISION DETECTION ECAM ACTIONS ECAM PROCEDURE SYSTEM DISPLAY ( if required ) STATUS LDG DIST LDG DIST WEATHER WEATHER OPERATIONAL AND COMMERCIAL CONSIDERATIONS OPERATIONAL AND COMMERCIAL CONSIDERATIONS NOTIFY NOTIFY DECISION DECISION OPS … OPS … PURSER / PAX PURSER / PAX ATC ATC STATUS, or SUMMARY
  • 2. PF PF PNF PNF First pilot who notices: MASTER CAUTION/MASTER WARNING……….RESET ANNOUNCE………………………...…..”TITLE OF FAILURE” FLIES THE AIRCRAFT NAVIGATES 1. DETECTION If failure at takeoff: 400ft AGL NO ACTION until , with safe flight path established. CONSIDER AUTOMATION USE : A/THR, AP
  • 3. PF PF PNF PNF 2. ECAM ACTIONS ORDER…………….………………”ECAM ACTIONS” ECAM ACTIONS COMPLETE……….CHECK CONFIRM……….… CLEAR “name of SYS”? ECAM ………………..………..CONFIRM (using SD and overhead panel) ECAM ACTIONS……………….PERFORM REQUEST………CLEAR “name of SYS”? ECAM………………………………..CLEAR Both pilots should confirm irreversible/guarded actions This is to be repeated for each failure displayed on the ECAM. Example : LAND ASAP *Task sharing: As soon as he announced “ECAM ACTIONS”, the PF is in charge of communications, until all the ECAM actions have been completed. PF
  • 4. PF PF PNF PNF 3. SYSTEM DISPLAYS CONFIRM………… CLEAR “name of SYS”? SYSTEM PAGE DISPLAYED……….ANALYSE REQUEST…………...CLEAR “name of SYS”? SYSTEM DISPLAY…………………..CLEAR This is to be repeated until all the displayed system pages have been reviewed, and the STATUS page is displayed. If a SYSTEM page is displayed on the lower ECAM screen:
  • 5. PF PF PNF PNF 4. STATUS CONFIRM………………..…………READ STATUS CONFIRM……………………………CLEAR STATUS REQUEST….………………………………..STATUS? STATUS …………………………………...……..READ LIMITATIONS……………………...….….CHECK PROC………………...……………..…CONSIDER LANDING DIST&SPEED INCREMENT..CHECK INOP SYS……………………………...….CHECK REQUEST…………………………CLEAR STATUS ? STATUS…………………………………………CLEAR ANNOUNCE………ECAM ACTIONS COMPLETED Landing distance and approach speed computation: •For complex procedures (dual hydraulic failure or electrical emergency configuration): Use SUMMARY •For other cases: Review FCOM procedure: 3 Applying ECAM procedure ensures flight safety. However, referring to FCOM 3.02, if time permits, may provide useful additional information. 02 – ABN- EMER RETURN TO NORMAL TASK SHARING QRH 1.00
  • 6. PF PF PNF PNF 5. SITUATION ASSESSMENT/DECISION LDG DIST LDG DIST WEATHER WEATHER OPERATIONAL AND COMMERCIAL CONSIDERATIONS OPERATIONAL AND COMMERCIAL CONSIDERATIONS NOTIFY NOTIFY DECISION DECISION OPS … OPS … PURSER / PAX PURSER / PAX ATC ATC STATUS, or SUMMARY
  • 7. PF PF PNF PNF 6. SYNTHESIS FLY / NAV ECAM ACTIONS (until STATUS page) Consider: Normal C/L OEB Computer resets CONTINUE ECAM (STATUS page) APPROACH C/L ECAM APPROACH PROC (if any) APPROACH PREPARATION Briefing DECISION COM T E A M W O R K
  • 8. PF PF PNF PNF IRREVERSIBLE / GUARDED ACTIONS CONFIRMATION Confirmation from both pilots is required, when the action concerns: How to proceed for confirmation ? PNF PNF Hand on related control: REQUEST……………….………..CONFIRM ? ACTION…………………………….PERFORM PF PF ACTION…………………………..….CHECK ANSWER………………..………..CONFIRM Master switch or ADIRS control Any guarded switch Thrust lever is a PF action given that it may influence flight path ! How to proceed for confirmation ? PNF PNF PF PF ACTION…………………………..….CHECK ANSWER………………..………..CONFIRM Hand on related control: REQUEST……………….………..CONFIRM ? ACTION…………………………….PERFORM
  • 9. PF PF PNF PNF 2. ECAM ACTIONS ORDER…………….………………”ECAM ACTIONS” ECAM ACTIONS COMPLETE……….CHECK CONFIRM……………………………….CLEAR ECAM ………………..………..CONFIRM (using SD and overhead panel) ECAM ACTIONS……………….PERFORM REQUEST………CLEAR “name of SYS”? ECAM………………………………..CLEAR Both pilots should confirm irreversible/guarded actions This is to be repeated for each failure displayed on the ECAM. Example : LAND ASAP *Task sharing: As soon as he announced “ECAM ACTIONS”, the PF is in charge of communications, until all the ECAM actions have been completed. PF Depending on the failure, , or , may be displayed, in the right column of the ECAM procedure. RED : Land at the next suitable airport. AMBER : Assess the seriousness of the situation and consider the selection of a suitable airport. LAND ASAP LAND ASAP LAND ASAP LAND ASAP
  • 10. PF PF PNF PNF LANDING DISTANCE COMPUTATION SYS FAILURE A FAILURE B 3 NORM (1) 1.2 1.1 10 _ (1) If NORM is indicated for landing configuration, and if CONF 3 is used, apply an additional 1.1 coefficient to the landing distance. Determine the landing distance coefficient. Determine the landing distance in CONF FULL CONF FULL without failure Apply the coefficient determined above to this distance. APPR SPD-LDG DIST CORRECTIONS FOR FAILURES LANDING DISTANCE WITHOUT AUTOBRAKE – CONF FULL QRH 2.00 QRH 4.00
  • 11. PF PF PNF PNF APPROACH SPEED COMPUTATION Select CONF FULL Read VREF = VLS CONF FULL Add  VREF to VREF Add wind correction, if applicable Enter VAPP manually If LDG in CONF 3 : Select CONF 3 MCDU PERF APPR page LDG CONF CONF 3 LDG CONF FULL VLS VAPP If the ECAM shows : “APPR SPEED……….VREF+ VREF”: VAPP = VREF +  VREF + WIND CORRECTION (if applicable) Note: This computation must be done according to the appropriate weight at destination, so, with F-PLN properly updated.  VREF is given: On the ECAM, and On the QRH Wind correction only applies when  VREF is lower than 20 kts.   
  • 12. PF PF PNF PNF 4. STATUS CONFIRM………………..…………READ STATUS CONFIRM……………………………CLEAR STATUS REQUEST….………………………………..STATUS? STATUS …………………………………...……..READ LIMITATIONS……………………...….….CHECK PROC………………...……………..…CONSIDER LANDING DIST&SPEED INCREMENT..CHECK INOP SYS……………………………...….CHECK REQUEST…………………………CLEAR STATUS ? STATUS…………………………………………CLEAR ANNOUNCE………ECAM ACTIONS COMPLETED Landing distance and approach speed computation: •For complex procedures (dual hydraulic failure or electrical emergency configuration): Use SUMMARY •For other cases: Review FCOM procedure: 3 Applying ECAM procedure ensures flight safety. However, referring to FCOM 3.02, if time permits, may provide useful additional information. 02 – ABN- EMER RETURN TO NORMAL TASK SHARING QRH 1.00 The PNF should not start reading the STATUS before confirmation from the PF. For any priority reason Status analysis can be postponed by PF e.g. C/L, ATC communication… In some cases, some other checks or actions may have to be performed, before reading the STATUS: In case of failure at takeoff, the NORMAL TAKEOFF C/L NORMAL TAKEOFF C/L has to be performed  OEB OEB (if applicable) is to be applied at that time (Refer to QRH 6.00), Computer resets Computer resets may be considered (Refer to QRH 2.00) QRH 2.00 QRH 6.00