SlideShare a Scribd company logo
1 of 3
Karma Lama
3332, 69 Street,
Woodside,NewYork11377, UnitedStates∙
Phone : + (1) 3472066577, Email : lama.karma@icloud.com
PROFESSIONALSUMMARY
Civil Engineer (roads and highway construction and management),
Professional with 10 years of experience in successful completion of various roads construction projects, 3 years of
experience in concrete bridge construction project, 2 years of experience in irrigation concrete, stone masonry and
earthwork canals and aqueduct construction project and 2 years of experience in hydropower construction project.
Contract management, procurement of goods, delegated authorization as a contract manager, supervision of civil
construction works in roads, bridge and irrigation projects. Supervised, Monitored Quality Controlling Mechanisms.
KeySkills
 US equivalentBachelorof Science degreein civil engineering
 Successfullymanagedvarious Roadsand highways,bridges,hydropower,irrigation andprivate residential
constructionprojects,backinNepal.
 QualityControl of worksandselectionof construction materials
 Analysisof unitcost and estimation of works
 SoftWell Roads(designsoftware) andLandDevelopment,MicrosoftOffice (Word,Excel, PowerPoint)
 FluentinEnglish,Nepali,Sherpa,Hindi and Russian
 ValidDrivingLicense :NYC, USA
PROFESSIONALEXPERIENCE
Contract Manager/ Project Cooridnator
Lama ConstructionCompanyPvt.Ltd. 12/12/2013 - 10/05/2014
 Contract management of 35.8 miles of roads construction project in the Himalayan region of eastern part of Nepal
with double surface dressing bituminous road construction project including subgrade, subbase, base, gabion,
cement mortared stone masonry retaining and breast walls, causeway, road side drainage systems and hillside
drainage chute system, pipe culverts and roadside bio-engineering works Financed jointlyby Asian Development
Bank (ADB) and government of Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166642013809386
11/03/2012 - 12/10/2013
 Successfully managed15km.of asphaltconcreteroad construction includingsewerconstructionworkswith NP3100-
1800 mm dia. concrete Hume drainagepipes, river training and construction of inlets and outlets chambers, gabion
and cement mortared stone masonry river bank protection works, outlets and overflow outlets along the Bagmati
River with the Kathmandu, Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166645223809065
03/13/2011 - 09/23/2012
 Successfullymanagedandsupervised surveying,planning, excavationof earthworks backcuttingandgrade cutting,
formationof embankment, subgrade preparationandcompaction works ,roadside drainconstruction and gabions
and cement mortared stone masonry structures for retaing and breast walls works of Km. 57.6 roads to be
constructed. Mobilized fully and efficiently a 7 members team of engineers, 14 sub-engineers, 34 supervisors, 15
members of sub contractors with more than 550 labors forces along with 25 numbers of heavy duty tippers and
trucks,4 watertankers,4numbersof VibratingRollers,15numbersof heavyexcavators,3numbersof motorgraders,
4 numbers of JCB backhoe loaders, 3 numbers of Kawasaki K65 loaders and 8 service vehicles. 12 motorcycles :
10/24/2010 - 07/23/2011
 Successfully managed 24 km. of double surface bituminous road construction project including subgrade, subbase,
base, gabion, cement mortared stone masonry retaining and breast walls, causeway, drainage system and hillside
drainage chute system, pipe culverts and roadside bio-engineering works in a remote Himalayan region of eastern
Nepal. Financed jointly by Asian Development Bank (ADB) and government of Nepal.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166638947143026
ADDITIONALWORKEXPERIENCE
Period:11/12/1997 - 10/12/2010
Managing Director/Contractor Representative/Project Coordinator
GoldenGoodSherpaConstruction Pvt.Ltd.,Kathmandu,Nepal
A RegisteredA ClassCivilContractorof Nepal
August 2008- October 2010
 CompletionConstructionof Powerhouse of 4.5 MW hydropowerproject,masonrysaddle,anchorblocks,river
trainingwork,aqueductandsupervision, monitoring,qualitycontrollingandprocurementof constructionmaterials
and goods.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166685940471660
May 2006- June 2008
 Completionof Constructionworkscomparisingof 3.9 kmof roads includingsubgrade,subbase,base withdouble
surface bituminoussurface dressingworks,retainingandbreastwallswithgabionsandstone masonrywalls.
Subsoil drainage andpipe culvertsandcausewaysconstructionworks.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166681500472104
September 2004- Feb 2006
 Supervision,andconstructionCompletionof 62.66 meterand 63.66 meterreinforcedconcrete bridges,
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=170446443428943
Oct 2002- June 2004
 Completionof constructionof 35 km of irrigationsecondarychannels,1.5km of acquduct,RCC concrete hume pipe
crossings, inlets, outlets,cattle crossing bridge and 1 km earthern main canal construction works, 8192.61 cubic
meterof stone bouldergabion works,19935.04 cubmicmeterof earthworkexcavationworks,18699.04 cubicmeter
of earthworkembankmentworks,12.26tonnesof steelreinforcementworks, 22925.91 square metersof formworks,
63581.43 square meters of gabion crates, 6000 cubic meters of concrete works.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167310690409185
Feb 2000- October 2002
 ConstructionManagerfor Supervisionandcompletionof 28 and42 meterspanof RCC bridges at Timbu,Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167304777076443
Nov 1997- Dec 1999
 Completionof 12km road includingsubgrade,subbase,base,penmacanddouble surface bituminoussurface
dressingworks&Completionof 15 kmrehabilitationof stormdamage rectificationworks,
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167309240409330
EDUCATION
Master of Science (Tech),Roads and Aerodrome Engineering(Ivanovo,Russia),1997
U.S. Equivalent:Bachelorof Science Degree inCivilEngineering,Globe Language Service ,Inc.New York,USA.
The CooperUnionAlbert NerkenSchool of Engineering
RetrainingProgram for Immingrant Engineerscompletedon:
 Structural Steeel andConcrete Designusingthe AmericanAISCandACIcodes, 2016|New York
 BuildingCostEstimatingandBridge,Highway,RailroadEngineering, 2016|New York
 Fundamentalsof AutoCADandRevit 2016|New York
PROFESSIONALDEVELOPMENT
 Workshopon Design&Build (EPC-EngineerProcure Construct) andotherContracts,
JICA-PPMO(Public-Private ManagementOffice),Kathmandu,Nepal, 12/18-19/2013
 Kulekhani-HetaudaTunnelingworks/PPP-(PublicPrivate Partnership) /CAR(ContractorAll Risk) Policyof
Insurance andDisasterManagementStrategyinConstructionIndustryinNepal, Kathmandu,Nepal,12/19/2013
 Sustainable ConstructionPractices:Two daysStakeholdersInteractionsConference, Kathmandu,Nepal,
10/26/2013
 Urban Planning:Formulationof LowCarbonEconomicDevelopmentStrategyforNepal, Kathmandu,Nepal,
10/07/2013
 Effective BuildingCode forBetterLiving, Kathmandu,Nepal, 09/14/2013
 Once monthCourse of Land DevelopmentCourse, Kathmandu,Nepal,09/07/2012
 SoftWell Road2010 and SoftWell DTM_2006(Digital TerrainModeling),Kathmandu,Nepal,07/29/2013
 One-day ColloquiumandTrainingon The FIDICMDB and Dispute ResolutionBoardsandtheirSuccessful Use in
International ConstructionContracts,Use of Dispute BoardsonConstructionProjects,Advantagesof Dispute
Avoidance andResolution,conductedby: The Dispute ResolutionBoardFoundation,Seattle,Washington,
USA. 11/05/2011.
 4 Hours UsersSupportedScaffoldingCourse,TSCTrainingAcademy,LongIslandCity,New York,03/26/2016
 10 Hours Occupational SafetyandHealthTrainingCourse, New York,04/07/2016
AFFILIATION
 Life Member : Nepal EngineeringAssociation
 Life Member : Nepal RedCrossSociety
 Associate Member : Federationof ContractorsAssociationof Nepal
 Member : Federationforthe Preservationof HimalayanBuddhistTradition.
 President : Nepal SherpaAssociation,KathmanduDistrictCommittee.
 V.President : Nepal SherpaContractorsAssociation

More Related Content

What's hot

Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementNIWASHISH VISWAS
 
Pavement Maintenance Practices in
Pavement Maintenance Practices inPavement Maintenance Practices in
Pavement Maintenance Practices inMohhammad Sujon
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road ConstructionVijaypal Bagariya
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC roadvikash mishra
 
Summer traning report
Summer traning reportSummer traning report
Summer traning reportAmit Raj
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
Cebu-Cordova Link Expressway (CCLEX) Project Brief
Cebu-Cordova Link Expressway (CCLEX) Project BriefCebu-Cordova Link Expressway (CCLEX) Project Brief
Cebu-Cordova Link Expressway (CCLEX) Project Briefprworksph
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...Pradeep Yadav
 
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUISubhendu Samui
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of RoadsSanjeev B
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemeakram akhtar
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 

What's hot (20)

PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Flexible pavement
Flexible pavement  Flexible pavement
Flexible pavement
 
Pavement Maintenance Practices in
Pavement Maintenance Practices inPavement Maintenance Practices in
Pavement Maintenance Practices in
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Summer training report on cement Road Construction
 Summer training report on cement Road Construction Summer training report on cement Road Construction
Summer training report on cement Road Construction
 
Project report on CC road
Project report on CC roadProject report on CC road
Project report on CC road
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
Summer traning report
Summer traning reportSummer traning report
Summer traning report
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Cebu-Cordova Link Expressway (CCLEX) Project Brief
Cebu-Cordova Link Expressway (CCLEX) Project BriefCebu-Cordova Link Expressway (CCLEX) Project Brief
Cebu-Cordova Link Expressway (CCLEX) Project Brief
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI[PDF]PROJECT ON HIGHWAY BY SUBHENDU  SAMUI
[PDF]PROJECT ON HIGHWAY BY SUBHENDU SAMUI
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of Roads
 
FINAL REPORT
FINAL REPORTFINAL REPORT
FINAL REPORT
 
railway
railwayrailway
railway
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 

Viewers also liked

CV_Plamen Georgiev_Eng short 2017
CV_Plamen Georgiev_Eng short 2017CV_Plamen Georgiev_Eng short 2017
CV_Plamen Georgiev_Eng short 2017Plamen Georgiev
 
CV Wageh Khedr - pdf.
CV  Wageh Khedr - pdf.CV  Wageh Khedr - pdf.
CV Wageh Khedr - pdf.wagieh kheder
 
Cover letter, CV and recom. letter
Cover letter, CV and recom. letterCover letter, CV and recom. letter
Cover letter, CV and recom. letterTigran Kroyan
 
Punkari mikko cv - ferc - eu-wb mar-2017
Punkari mikko   cv - ferc - eu-wb mar-2017Punkari mikko   cv - ferc - eu-wb mar-2017
Punkari mikko cv - ferc - eu-wb mar-2017Punkari Mikko
 

Viewers also liked (6)

sonam resume
sonam resumesonam resume
sonam resume
 
CV_Patrick_Sips
CV_Patrick_SipsCV_Patrick_Sips
CV_Patrick_Sips
 
CV_Plamen Georgiev_Eng short 2017
CV_Plamen Georgiev_Eng short 2017CV_Plamen Georgiev_Eng short 2017
CV_Plamen Georgiev_Eng short 2017
 
CV Wageh Khedr - pdf.
CV  Wageh Khedr - pdf.CV  Wageh Khedr - pdf.
CV Wageh Khedr - pdf.
 
Cover letter, CV and recom. letter
Cover letter, CV and recom. letterCover letter, CV and recom. letter
Cover letter, CV and recom. letter
 
Punkari mikko cv - ferc - eu-wb mar-2017
Punkari mikko   cv - ferc - eu-wb mar-2017Punkari mikko   cv - ferc - eu-wb mar-2017
Punkari mikko cv - ferc - eu-wb mar-2017
 

Similar to Karma Lama-resume

Similar to Karma Lama-resume (20)

CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Mohammad S. Alshakhatreh - Geotechnical / Grouting
Mohammad S. Alshakhatreh - Geotechnical / Grouting Mohammad S. Alshakhatreh - Geotechnical / Grouting
Mohammad S. Alshakhatreh - Geotechnical / Grouting
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
cv asif shah
cv asif shahcv asif shah
cv asif shah
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
Paper
PaperPaper
Paper
 
Khizer CV 2016
Khizer CV 2016Khizer CV 2016
Khizer CV 2016
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
CV ASIF MAHMOOD
CV ASIF MAHMOODCV ASIF MAHMOOD
CV ASIF MAHMOOD
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 

Karma Lama-resume

  • 1. Karma Lama 3332, 69 Street, Woodside,NewYork11377, UnitedStates∙ Phone : + (1) 3472066577, Email : lama.karma@icloud.com PROFESSIONALSUMMARY Civil Engineer (roads and highway construction and management), Professional with 10 years of experience in successful completion of various roads construction projects, 3 years of experience in concrete bridge construction project, 2 years of experience in irrigation concrete, stone masonry and earthwork canals and aqueduct construction project and 2 years of experience in hydropower construction project. Contract management, procurement of goods, delegated authorization as a contract manager, supervision of civil construction works in roads, bridge and irrigation projects. Supervised, Monitored Quality Controlling Mechanisms. KeySkills  US equivalentBachelorof Science degreein civil engineering  Successfullymanagedvarious Roadsand highways,bridges,hydropower,irrigation andprivate residential constructionprojects,backinNepal.  QualityControl of worksandselectionof construction materials  Analysisof unitcost and estimation of works  SoftWell Roads(designsoftware) andLandDevelopment,MicrosoftOffice (Word,Excel, PowerPoint)  FluentinEnglish,Nepali,Sherpa,Hindi and Russian  ValidDrivingLicense :NYC, USA PROFESSIONALEXPERIENCE Contract Manager/ Project Cooridnator Lama ConstructionCompanyPvt.Ltd. 12/12/2013 - 10/05/2014  Contract management of 35.8 miles of roads construction project in the Himalayan region of eastern part of Nepal with double surface dressing bituminous road construction project including subgrade, subbase, base, gabion, cement mortared stone masonry retaining and breast walls, causeway, road side drainage systems and hillside drainage chute system, pipe culverts and roadside bio-engineering works Financed jointlyby Asian Development Bank (ADB) and government of Nepal https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166642013809386 11/03/2012 - 12/10/2013  Successfully managed15km.of asphaltconcreteroad construction includingsewerconstructionworkswith NP3100- 1800 mm dia. concrete Hume drainagepipes, river training and construction of inlets and outlets chambers, gabion and cement mortared stone masonry river bank protection works, outlets and overflow outlets along the Bagmati River with the Kathmandu, Nepal https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166645223809065 03/13/2011 - 09/23/2012  Successfullymanagedandsupervised surveying,planning, excavationof earthworks backcuttingandgrade cutting, formationof embankment, subgrade preparationandcompaction works ,roadside drainconstruction and gabions and cement mortared stone masonry structures for retaing and breast walls works of Km. 57.6 roads to be constructed. Mobilized fully and efficiently a 7 members team of engineers, 14 sub-engineers, 34 supervisors, 15 members of sub contractors with more than 550 labors forces along with 25 numbers of heavy duty tippers and trucks,4 watertankers,4numbersof VibratingRollers,15numbersof heavyexcavators,3numbersof motorgraders, 4 numbers of JCB backhoe loaders, 3 numbers of Kawasaki K65 loaders and 8 service vehicles. 12 motorcycles : 10/24/2010 - 07/23/2011  Successfully managed 24 km. of double surface bituminous road construction project including subgrade, subbase, base, gabion, cement mortared stone masonry retaining and breast walls, causeway, drainage system and hillside drainage chute system, pipe culverts and roadside bio-engineering works in a remote Himalayan region of eastern Nepal. Financed jointly by Asian Development Bank (ADB) and government of Nepal. https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166638947143026
  • 2. ADDITIONALWORKEXPERIENCE Period:11/12/1997 - 10/12/2010 Managing Director/Contractor Representative/Project Coordinator GoldenGoodSherpaConstruction Pvt.Ltd.,Kathmandu,Nepal A RegisteredA ClassCivilContractorof Nepal August 2008- October 2010  CompletionConstructionof Powerhouse of 4.5 MW hydropowerproject,masonrysaddle,anchorblocks,river trainingwork,aqueductandsupervision, monitoring,qualitycontrollingandprocurementof constructionmaterials and goods. https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166685940471660 May 2006- June 2008  Completionof Constructionworkscomparisingof 3.9 kmof roads includingsubgrade,subbase,base withdouble surface bituminoussurface dressingworks,retainingandbreastwallswithgabionsandstone masonrywalls. Subsoil drainage andpipe culvertsandcausewaysconstructionworks. https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166681500472104 September 2004- Feb 2006  Supervision,andconstructionCompletionof 62.66 meterand 63.66 meterreinforcedconcrete bridges, https://www.facebook.com/166633863810201/photos/?tab=album&album_id=170446443428943 Oct 2002- June 2004  Completionof constructionof 35 km of irrigationsecondarychannels,1.5km of acquduct,RCC concrete hume pipe crossings, inlets, outlets,cattle crossing bridge and 1 km earthern main canal construction works, 8192.61 cubic meterof stone bouldergabion works,19935.04 cubmicmeterof earthworkexcavationworks,18699.04 cubicmeter of earthworkembankmentworks,12.26tonnesof steelreinforcementworks, 22925.91 square metersof formworks, 63581.43 square meters of gabion crates, 6000 cubic meters of concrete works. https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167310690409185 Feb 2000- October 2002  ConstructionManagerfor Supervisionandcompletionof 28 and42 meterspanof RCC bridges at Timbu,Nepal https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167304777076443 Nov 1997- Dec 1999  Completionof 12km road includingsubgrade,subbase,base,penmacanddouble surface bituminoussurface dressingworks&Completionof 15 kmrehabilitationof stormdamage rectificationworks, https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167309240409330 EDUCATION Master of Science (Tech),Roads and Aerodrome Engineering(Ivanovo,Russia),1997 U.S. Equivalent:Bachelorof Science Degree inCivilEngineering,Globe Language Service ,Inc.New York,USA. The CooperUnionAlbert NerkenSchool of Engineering RetrainingProgram for Immingrant Engineerscompletedon:  Structural Steeel andConcrete Designusingthe AmericanAISCandACIcodes, 2016|New York  BuildingCostEstimatingandBridge,Highway,RailroadEngineering, 2016|New York  Fundamentalsof AutoCADandRevit 2016|New York
  • 3. PROFESSIONALDEVELOPMENT  Workshopon Design&Build (EPC-EngineerProcure Construct) andotherContracts, JICA-PPMO(Public-Private ManagementOffice),Kathmandu,Nepal, 12/18-19/2013  Kulekhani-HetaudaTunnelingworks/PPP-(PublicPrivate Partnership) /CAR(ContractorAll Risk) Policyof Insurance andDisasterManagementStrategyinConstructionIndustryinNepal, Kathmandu,Nepal,12/19/2013  Sustainable ConstructionPractices:Two daysStakeholdersInteractionsConference, Kathmandu,Nepal, 10/26/2013  Urban Planning:Formulationof LowCarbonEconomicDevelopmentStrategyforNepal, Kathmandu,Nepal, 10/07/2013  Effective BuildingCode forBetterLiving, Kathmandu,Nepal, 09/14/2013  Once monthCourse of Land DevelopmentCourse, Kathmandu,Nepal,09/07/2012  SoftWell Road2010 and SoftWell DTM_2006(Digital TerrainModeling),Kathmandu,Nepal,07/29/2013  One-day ColloquiumandTrainingon The FIDICMDB and Dispute ResolutionBoardsandtheirSuccessful Use in International ConstructionContracts,Use of Dispute BoardsonConstructionProjects,Advantagesof Dispute Avoidance andResolution,conductedby: The Dispute ResolutionBoardFoundation,Seattle,Washington, USA. 11/05/2011.  4 Hours UsersSupportedScaffoldingCourse,TSCTrainingAcademy,LongIslandCity,New York,03/26/2016  10 Hours Occupational SafetyandHealthTrainingCourse, New York,04/07/2016 AFFILIATION  Life Member : Nepal EngineeringAssociation  Life Member : Nepal RedCrossSociety  Associate Member : Federationof ContractorsAssociationof Nepal  Member : Federationforthe Preservationof HimalayanBuddhistTradition.  President : Nepal SherpaAssociation,KathmanduDistrictCommittee.  V.President : Nepal SherpaContractorsAssociation