1. Karma Lama
3332, 69 Street,
Woodside,NewYork11377, UnitedStates∙
Phone : + (1) 3472066577, Email : lama.karma@icloud.com
PROFESSIONALSUMMARY
Civil Engineer (roads and highway construction and management),
Professional with 10 years of experience in successful completion of various roads construction projects, 3 years of
experience in concrete bridge construction project, 2 years of experience in irrigation concrete, stone masonry and
earthwork canals and aqueduct construction project and 2 years of experience in hydropower construction project.
Contract management, procurement of goods, delegated authorization as a contract manager, supervision of civil
construction works in roads, bridge and irrigation projects. Supervised, Monitored Quality Controlling Mechanisms.
KeySkills
US equivalentBachelorof Science degreein civil engineering
Successfullymanagedvarious Roadsand highways,bridges,hydropower,irrigation andprivate residential
constructionprojects,backinNepal.
QualityControl of worksandselectionof construction materials
Analysisof unitcost and estimation of works
SoftWell Roads(designsoftware) andLandDevelopment,MicrosoftOffice (Word,Excel, PowerPoint)
FluentinEnglish,Nepali,Sherpa,Hindi and Russian
ValidDrivingLicense :NYC, USA
PROFESSIONALEXPERIENCE
Contract Manager/ Project Cooridnator
Lama ConstructionCompanyPvt.Ltd. 12/12/2013 - 10/05/2014
Contract management of 35.8 miles of roads construction project in the Himalayan region of eastern part of Nepal
with double surface dressing bituminous road construction project including subgrade, subbase, base, gabion,
cement mortared stone masonry retaining and breast walls, causeway, road side drainage systems and hillside
drainage chute system, pipe culverts and roadside bio-engineering works Financed jointlyby Asian Development
Bank (ADB) and government of Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166642013809386
11/03/2012 - 12/10/2013
Successfully managed15km.of asphaltconcreteroad construction includingsewerconstructionworkswith NP3100-
1800 mm dia. concrete Hume drainagepipes, river training and construction of inlets and outlets chambers, gabion
and cement mortared stone masonry river bank protection works, outlets and overflow outlets along the Bagmati
River with the Kathmandu, Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166645223809065
03/13/2011 - 09/23/2012
Successfullymanagedandsupervised surveying,planning, excavationof earthworks backcuttingandgrade cutting,
formationof embankment, subgrade preparationandcompaction works ,roadside drainconstruction and gabions
and cement mortared stone masonry structures for retaing and breast walls works of Km. 57.6 roads to be
constructed. Mobilized fully and efficiently a 7 members team of engineers, 14 sub-engineers, 34 supervisors, 15
members of sub contractors with more than 550 labors forces along with 25 numbers of heavy duty tippers and
trucks,4 watertankers,4numbersof VibratingRollers,15numbersof heavyexcavators,3numbersof motorgraders,
4 numbers of JCB backhoe loaders, 3 numbers of Kawasaki K65 loaders and 8 service vehicles. 12 motorcycles :
10/24/2010 - 07/23/2011
Successfully managed 24 km. of double surface bituminous road construction project including subgrade, subbase,
base, gabion, cement mortared stone masonry retaining and breast walls, causeway, drainage system and hillside
drainage chute system, pipe culverts and roadside bio-engineering works in a remote Himalayan region of eastern
Nepal. Financed jointly by Asian Development Bank (ADB) and government of Nepal.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166638947143026
2. ADDITIONALWORKEXPERIENCE
Period:11/12/1997 - 10/12/2010
Managing Director/Contractor Representative/Project Coordinator
GoldenGoodSherpaConstruction Pvt.Ltd.,Kathmandu,Nepal
A RegisteredA ClassCivilContractorof Nepal
August 2008- October 2010
CompletionConstructionof Powerhouse of 4.5 MW hydropowerproject,masonrysaddle,anchorblocks,river
trainingwork,aqueductandsupervision, monitoring,qualitycontrollingandprocurementof constructionmaterials
and goods.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166685940471660
May 2006- June 2008
Completionof Constructionworkscomparisingof 3.9 kmof roads includingsubgrade,subbase,base withdouble
surface bituminoussurface dressingworks,retainingandbreastwallswithgabionsandstone masonrywalls.
Subsoil drainage andpipe culvertsandcausewaysconstructionworks.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=166681500472104
September 2004- Feb 2006
Supervision,andconstructionCompletionof 62.66 meterand 63.66 meterreinforcedconcrete bridges,
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=170446443428943
Oct 2002- June 2004
Completionof constructionof 35 km of irrigationsecondarychannels,1.5km of acquduct,RCC concrete hume pipe
crossings, inlets, outlets,cattle crossing bridge and 1 km earthern main canal construction works, 8192.61 cubic
meterof stone bouldergabion works,19935.04 cubmicmeterof earthworkexcavationworks,18699.04 cubicmeter
of earthworkembankmentworks,12.26tonnesof steelreinforcementworks, 22925.91 square metersof formworks,
63581.43 square meters of gabion crates, 6000 cubic meters of concrete works.
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167310690409185
Feb 2000- October 2002
ConstructionManagerfor Supervisionandcompletionof 28 and42 meterspanof RCC bridges at Timbu,Nepal
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167304777076443
Nov 1997- Dec 1999
Completionof 12km road includingsubgrade,subbase,base,penmacanddouble surface bituminoussurface
dressingworks&Completionof 15 kmrehabilitationof stormdamage rectificationworks,
https://www.facebook.com/166633863810201/photos/?tab=album&album_id=167309240409330
EDUCATION
Master of Science (Tech),Roads and Aerodrome Engineering(Ivanovo,Russia),1997
U.S. Equivalent:Bachelorof Science Degree inCivilEngineering,Globe Language Service ,Inc.New York,USA.
The CooperUnionAlbert NerkenSchool of Engineering
RetrainingProgram for Immingrant Engineerscompletedon:
Structural Steeel andConcrete Designusingthe AmericanAISCandACIcodes, 2016|New York
BuildingCostEstimatingandBridge,Highway,RailroadEngineering, 2016|New York
Fundamentalsof AutoCADandRevit 2016|New York
3. PROFESSIONALDEVELOPMENT
Workshopon Design&Build (EPC-EngineerProcure Construct) andotherContracts,
JICA-PPMO(Public-Private ManagementOffice),Kathmandu,Nepal, 12/18-19/2013
Kulekhani-HetaudaTunnelingworks/PPP-(PublicPrivate Partnership) /CAR(ContractorAll Risk) Policyof
Insurance andDisasterManagementStrategyinConstructionIndustryinNepal, Kathmandu,Nepal,12/19/2013
Sustainable ConstructionPractices:Two daysStakeholdersInteractionsConference, Kathmandu,Nepal,
10/26/2013
Urban Planning:Formulationof LowCarbonEconomicDevelopmentStrategyforNepal, Kathmandu,Nepal,
10/07/2013
Effective BuildingCode forBetterLiving, Kathmandu,Nepal, 09/14/2013
Once monthCourse of Land DevelopmentCourse, Kathmandu,Nepal,09/07/2012
SoftWell Road2010 and SoftWell DTM_2006(Digital TerrainModeling),Kathmandu,Nepal,07/29/2013
One-day ColloquiumandTrainingon The FIDICMDB and Dispute ResolutionBoardsandtheirSuccessful Use in
International ConstructionContracts,Use of Dispute BoardsonConstructionProjects,Advantagesof Dispute
Avoidance andResolution,conductedby: The Dispute ResolutionBoardFoundation,Seattle,Washington,
USA. 11/05/2011.
4 Hours UsersSupportedScaffoldingCourse,TSCTrainingAcademy,LongIslandCity,New York,03/26/2016
10 Hours Occupational SafetyandHealthTrainingCourse, New York,04/07/2016
AFFILIATION
Life Member : Nepal EngineeringAssociation
Life Member : Nepal RedCrossSociety
Associate Member : Federationof ContractorsAssociationof Nepal
Member : Federationforthe Preservationof HimalayanBuddhistTradition.
President : Nepal SherpaAssociation,KathmanduDistrictCommittee.
V.President : Nepal SherpaContractorsAssociation