QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 1 of 8
1. PURPOSE:
To establish the system for the maintenance of electrical equipments and to ensure
that the equipments are available continuously for preventive maintenance.
2. SCOPE:
This is applicable to the preventive & breakdown Maintenance of electrical
equipment of Foil.
3. DEFINITIONS:
Dy.General Manager - Deputy General Manager
Asst.Manager - Assistant Manager
PMI - Preventive Maintenance Incharge
I.D. No. - Identification Number
P.M - Preventive Maintenance
4. RESPONSIBILITY:
4.1 Head of department is over all responsible for implementing this procedure.
4.2 Personal performing breakdown maintenance shall not carry out preventive
maintenance.
4.3 Individual responsibilities of specific activities are described here after.
5. PROCESS INPUT:
5.1 Work instruction for carrying out maintenance activities.
5.2 Intimation of breakdown by work order
5.3 P.M.Slippage Record
5.4 P.M.Schedule
5.5 PM Checklist
5.6 P.M.Schedule cum check sheet
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 2 of 8
6. PROCESS DESCRIPTION & INTERFACES:
A. Preventive maintenance: -
Sr.
No.
Activity Responsibility Ref. Doc.
1
All the equipments requiring periodic
maintenance will be identified and a list will
be prepared.
Asst.Manager FQMNT02F01
2 A unique I.D.No. Will be given to them. Asst.Manager FQMNT02F01
3
The frequency of maintenance will be
decided on the basis of
• Manufacture recommendation
Decided by maintenance Department
Asst.Manager
Operation &
Maintenance
Manual
FQMNT02F06
4
The P.M. schedule/P.M.Schedule cum
check sheet will be made as per the
identified frequency above.
Asst.Manager FQMNT02F06
FQMNT02F18
5
The equipment will be spared and the
preventive maintenance will be carried out
as per P.M check list/ P.M.Schedule cum
check sheet & relevant work instruction.
Asst.Manager/PMI/
Sr.Formen/
Foreman
FQMNT02F07,
FQMNT02W03,
FQMNT02W10,
FQMNT02W12
FQMNT02F18,
FQMNT02W05
6
The P.M. checklist / P.M.Schedule cum
check sheet will be filled up after
completing maintenance.
PMI
FQMNT02F07,
FQMNT02F18
7
In case of any schedule getting delayed due
to any reasons or preventive action if not
carried out, should be recorded in the P.M
slippage record.
PMI FQMNT02F08
8
Review the P.M. schedule at least Six
monthly for types of checks & frequency on
the basis of its effectiveness.
Asst.Manager/PMI
FQMNT02F03,
FQMNT02F04
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 3 of 8
9
Review the P.M.slippage record monthly &
to avoid the frequency of slippage.
Asst.Manager/
PMI
FQMNT02F08
10
In a case of overhauling required, for the
equipment, follow the respective work
instruction/Vendor instruction manual and
filled the over hauling check list.
Sr. Foreman/
Foreman
Operating and
maintenance
manual,
FQMNT02W09,
FQMNT02W07
FQMNT02F19
11
Operation of DG SET, Circuit breaker,
66KVSwithyard,HT Capacitor bank and
power changeover done as per work
instruction.
Shift foreman
FQMNT02W01
FQMNT02W02
FQMNT02W04
FQMNT02W08
FQMNT02W11
B. BREAKDOWN: -
Sr.
No.
Activity Responsibility Ref. Doc.
1
Receiving work order from user department
regarding breakdown of any equipment.
Shift Incharge
2
Review the problem and allocate the job to
concern person.
Asst.Manager/
Shift Incharge
3
Carry out the breakdown maintenance. As
per work instruction.
Sr.Forman/ Shift
Incharge/Foreman
FQMNT02W06
4
Prepare daily breakdown report and sent
copy to Dy.GM (Mech) & GM (F&A).
Sr.Forman
/Foreman
FQMNT02F03
5
Prepare monthly breakdown report and sent
copy to V.P. (foils), all Deptt. Heads, MIS
& PPC.
Sr.Forman
/Foreman
FQMNT02F04
7. PROCESS OUT PUTS:
7.1. Continue availability of machine.
7.2. Relevant reports & records of equipments.
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 4 of 8
7.3 P.M.Slippage Record.
8. PROCESS MONITORING:
Sr.
No.
Description Frequency Responsibility
1 Review of P.M. schedule. Six monthly Asst.Manager
2 Review P.M.slippage record. Monthly Asst.Manager
9. RECORDS:
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 5 of 8
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
Sr.No. Record No. Record Title
Retention
period
Location
Disposal
authority
1 FQMNT02F01
COMPREHENSIV
E EQUIPMENT
LIST
Till the
equipment
Last
ELECTRICAL
SHOP FLOOR
Dy.
General
Manager
2 FQMNT02F02
EQUIPMENT
HISTORY
RECORD
Till the
equipme
nt Last
ELECTRICAL
SHOP FLOOR,
MSDS&ERS
Dy.
General
Manager
3 FQMNT02F03
DAILY
BREAKDOWN
REPORT
Six
Months
ELECTRICAL
SHOP FLOOR
Dy.
General
Manager
4 FQMNT02F04
MONTHLY
BREAKDOWN
REPORT
1Year
ELECTRICAL
SHOP FLOOR
Dy.
General
Manager
5 FQMNT02F05
MAJOR
BREAKDOWN
ANALYSIS
REPORT
1Year
ELECTRICAL
SHOP FLOOR
Dy.
General
Manager
6 FQMNT02F06 PM SCHEDULE 1Year
ELECTRICAL
SHOP
FLOOR/MSDS
Dy.
General
Manager
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 6 of 8
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
7 FQMNT02F07
FQMNT02F07/ 01
FQMNT02F07/ 02
FQMNT02F07/ 03
FQMNT02F07/ 04
FQMNT02F07/ 05
FQMNT02F07/ 06
FQMNT02F07/ 07
FQMNT02F07/ 08
FQMNT02F07/ 09
FQMNT02F07/ 10
FQMNT02F07/ 11
FQMNT02F07/ 12
FQMNT02F07/ 13
FQMNT02F07/ 14
FQMNT02F07/ 15
FQMNT02F07/ 16
FQMNT02F07/ 17
FQMNT02F07/ 18
FQMNT02F07/ 19
FQMNT02F07/ 20
FQMNT02F07/ 21
FQMNT02F07/ 22
FQMNT02F07/ 23
FQMNT02F07/ 24
FQMNT02F07/ 25
FQMNT02F07/ 26
FQMNT02F07/ 27
FQMNT02F07/ 28
FQMNT02F07/ 29
FQMNT02F07/ 30
FQMNT02F07/ 31
P.M.CHECK LIST:-
MILL M50
MILL M51
MILL M52
MILL Q4
MILL Q5
CRANE # 1
CRANE # 2
CRANE # 3
CRANE # 4
CRANE # 5
CRANE # 6
CRANE # 7
CRANE # 8
CRANE # 4A
REWIND LINE # 1
REWIND LINE # 2
REWIND LINE # 3
BAILING PRESS
ROLL GRINDER
ANN. FURNACE # 1
ANN. FURNACE # 2
ANN. FURNACE # 3
ANN. FURNACE # 4
OVEN # 1
OVEN # 2
OVEN # 3
SEPARATOR # 25
SEPARATOR # 26
DOWN ENDER
FUME EXH. SYSTEM
H G SLITTER
1Year ELECTRICAL
SHOP
FLOOR/MSDS
Dy.
General
Manager
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 7 of 8
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
FQMNT02F07/ 32
FQMNT02F07/ 33
FQMNT02F07/ 34
FQMNT02F07/ 35
FQMNT02F07/ 36
FQMNT02F07/ 37
FQMNT02F07/ 38
FQMNT02F07/ 39
FQMNT02F07/ 40
FQMNT02F07/ 41
FQMNT02F07/ 42
FQMNT02F07/ 43
FQMNT02F07/ 44
M G SLITTER
L G SLITTER
DOCTOR REWINDER
DRY BOND LAM.
PRINTING MACHINE
EXTRUDER COATER
MAIN PUMP HOUSE
COOLING TOWER
NITROGEN GEN.
FIRE HYDRANT
W.T.P.
VENT. SYSTEM
COMP. HOUSE
1 Year ELECTRICAL
SHOP
FLOOR/MSDS
Dy.
General
Manager
8 FQMNT02F08
P.M.SLIPPAGE
RECORD
1Year
ELECTRICAL
SHOPFLOOR/
MSDS
Dy.
General
Manager
9 FQMNT02F09 WORK ORDER 3 Month
ECR Q4/Q5,
ERS& MSDS
Dy.
General
Manager
10 FQMNT02F10 WORK PERMIT 3Month
ECR Q4/Q5,
ERS& MSDS
Dy.
General
Manager
11 FQMNT02F11
OVERHAULING
SCHEDULE
1 Year MSDS / ERS
Dy.
General
Manager
12 FQMNT02F12 SHIFT LOG BOOK 1YEAR
Q4/Q5
CONTROL
ROOM
Dy.
General
Manager
13 FQMNT02F13
DAILY ENERGY
GENERATION
/CONSUMPTION
REPORT
Six
Months
MSDS
Dy.
General
Manager
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 8 of 8
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
14 FQMNT02F14
STATEMENT
SHOWING ENERGY
GENERATED &
CONSUMED
INCLUDING
CONSUMPTION OF
DIESEL
1Year MSDS
Dy. General
Manager
15 FQMNT02F15 DG LOG BOOK 1Year MSDS
Dy. General
Manager
16 FQMNT02F16
ANALYSIS OF
MOTOR FAILURE 1Year ERS
Dy. General
Manager
17 FQMNT02F17
ELECTRICAL
POWER
CONSUMPTION
REPORT
1Year
ELECTRICAL
SHOP FLOOR
Dy. General
Manager
18 FQMNT02F18
FQMNT02F18/
01
FQMNT02F18/
02
FQMNT02F18/
03
FQMNT02F18/
04
FQMNT02F18/
05
FQMNT02F18/
06
FQMNT02F18/
07
FQMNT02F18/
08
FQMNT02F18/
09
FQMNT02F18/
10
FQMNT02F18/
11
PM SCHEDULE CUM
CHECK SHEET: -
LT air circuit breaker
66 kv CT, PT, CVT & LA
LT APFC panel, HT
capacitor bank & reactor
Battery bank & battery
charger
11 kv & 132 kv MOCB
11 kv T.M.G. ACB
11 kv ABB (indoor &
outdoor) & Siemens VCB
66 kv Sf6 circuit breaker
22 kv Sf6 circuit breaker
11 kv, 22 kv & 66 kv
isolators
11 kv, 1500 kva DG set
1Year MSDS
Dy. General
Manager
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 9 of 8
10. REFERENCE :
Sr.No. Document no. Work instruction
1 FQMNT 02W01 OPERATION OF D.G.SET
2 FQMNT 02W02 OPERATION OF 66KV SWITCH YARD
3 FQMNT 02W03 OPERATION AND MAINTENANCE OF BATTERY BANK
4 FQMNT 02W04 OPERATION OF H.T CAPACITOR BANK
5 FQMNT 02W05 OPERATION AND MAINTENANCE OF TRANSFORMER
6 FQMNT 02W06 BREAKDOWN MAINTENANCE
7 FQMNT 02W07 OVER HAULING OF D.C. MOTOR
8 FQMNT 02W08 POWER CHANGE OVER
9 FQMNT 02W09 OVER HAULING OF A.C. SLIPRING MOTOR
10 FQMNT 02W10 MAINTENANCE OF DIESEL GENERATOR
11 FQMNT 02W11 OPERATION OF CIRCUIT BREAKER
12 FQMNT 02W12 PREVENTIVE MAINTENANCE
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
FQMNT02F18/
12
FQMNT02F18/
13
FQMNT02F18/
14
FQMNT02F18/
15
Power & distribution
transformer
415 v, 125 kva DG set
Sub- station (monthly)
Sub- station (fortnight) 1Year MSDS
Dy. General
Manager
19 FQMNT02F19 OVER HAULING
CHECK LIST
3 Years ERS
Dy. General
Manager
QUALITY MANAGEMENT
PROCEDURE Doc. No. : F Q MNT 02 P
ELECTRICAL MAINTENANCE Page No. : 10 of 8
Approved By:
Issued By: Edition No. 01
Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02

More Related Content

What's hot

Basics in Maintenance
Basics in MaintenanceBasics in Maintenance
Basics in Maintenance
raghuttam
 
Commissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.pptCommissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.ppt
AlemayehuAsmare
 
MTBF / MTTR - Energized Work TekTalk, Mar 2012
MTBF / MTTR - Energized Work TekTalk, Mar 2012MTBF / MTTR - Energized Work TekTalk, Mar 2012
MTBF / MTTR - Energized Work TekTalk, Mar 2012
Energized Work
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
ajayknows
 

What's hot (20)

Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Basics in Maintenance
Basics in MaintenanceBasics in Maintenance
Basics in Maintenance
 
Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
Practical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
Commissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.pptCommissioning of Electrical Equipment or systems.ppt
Commissioning of Electrical Equipment or systems.ppt
 
Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes) Industrial Maintenance (Full Notes)
Industrial Maintenance (Full Notes)
 
MTBF / MTTR - Energized Work TekTalk, Mar 2012
MTBF / MTTR - Energized Work TekTalk, Mar 2012MTBF / MTTR - Energized Work TekTalk, Mar 2012
MTBF / MTTR - Energized Work TekTalk, Mar 2012
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
 
Inspection of Electrical Installations in Homes
Inspection of Electrical Installations in HomesInspection of Electrical Installations in Homes
Inspection of Electrical Installations in Homes
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Power System Protection course - Part I
Power System Protection course - Part IPower System Protection course - Part I
Power System Protection course - Part I
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and DrivesTroubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
 

Viewers also liked

Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchens
Osama Bekhit
 
Extruder machine (hengli) revision 2 07-02-12
Extruder machine (hengli) revision 2 07-02-12Extruder machine (hengli) revision 2 07-02-12
Extruder machine (hengli) revision 2 07-02-12
unsaman1973
 
validated CS of fabricator and welder
validated CS of fabricator and weldervalidated CS of fabricator and welder
validated CS of fabricator and welder
atiqa_shahbaz
 
JMR Company Profile (pdf copy)
JMR Company Profile (pdf copy)JMR Company Profile (pdf copy)
JMR Company Profile (pdf copy)
Robert Mathesan
 
FINAL REPORT MAIN BODY
FINAL REPORT MAIN BODYFINAL REPORT MAIN BODY
FINAL REPORT MAIN BODY
Palash Awasthi
 

Viewers also liked (20)

Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenance
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
Turbine and Generator Repair Services
Turbine and Generator Repair ServicesTurbine and Generator Repair Services
Turbine and Generator Repair Services
 
Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchens
 
Extruder Manual Less System Essentials
Extruder Manual Less System EssentialsExtruder Manual Less System Essentials
Extruder Manual Less System Essentials
 
EOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspectionEOT Crane Inspection Check list, helpful for safety officers during inspection
EOT Crane Inspection Check list, helpful for safety officers during inspection
 
3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)
 
Training Adobe
Training AdobeTraining Adobe
Training Adobe
 
duct Cleaning company in Birmingham, Kitchen Cleaning Birmingham, commercial...
duct Cleaning company in Birmingham, Kitchen Cleaning  Birmingham, commercial...duct Cleaning company in Birmingham, Kitchen Cleaning  Birmingham, commercial...
duct Cleaning company in Birmingham, Kitchen Cleaning Birmingham, commercial...
 
Understanding the welding process and troubleshooting.
Understanding the welding process and troubleshooting.Understanding the welding process and troubleshooting.
Understanding the welding process and troubleshooting.
 
THE APPRENTICESHIP LEVY: A Guide for Employers & SME's
THE APPRENTICESHIP LEVY: A Guide for Employers & SME'sTHE APPRENTICESHIP LEVY: A Guide for Employers & SME's
THE APPRENTICESHIP LEVY: A Guide for Employers & SME's
 
bala.1
bala.1bala.1
bala.1
 
4. annexures
4. annexures4. annexures
4. annexures
 
Check list for crane inspection, B C Das
Check list for crane inspection, B C DasCheck list for crane inspection, B C Das
Check list for crane inspection, B C Das
 
Extruder machine (hengli) revision 2 07-02-12
Extruder machine (hengli) revision 2 07-02-12Extruder machine (hengli) revision 2 07-02-12
Extruder machine (hengli) revision 2 07-02-12
 
validated CS of fabricator and welder
validated CS of fabricator and weldervalidated CS of fabricator and welder
validated CS of fabricator and welder
 
Apqp-en
Apqp-enApqp-en
Apqp-en
 
JMR Company Profile (pdf copy)
JMR Company Profile (pdf copy)JMR Company Profile (pdf copy)
JMR Company Profile (pdf copy)
 
Commercial Kitchen Equipment
Commercial Kitchen EquipmentCommercial Kitchen Equipment
Commercial Kitchen Equipment
 
FINAL REPORT MAIN BODY
FINAL REPORT MAIN BODYFINAL REPORT MAIN BODY
FINAL REPORT MAIN BODY
 

Similar to Electrical maintenance

2001 Nissan Pathfinder Service Repair Manual
2001 Nissan Pathfinder Service Repair Manual2001 Nissan Pathfinder Service Repair Manual
2001 Nissan Pathfinder Service Repair Manual
fujjfjksekmdm
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A
Stephen Stuart
 
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdftoaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
JayshreeDutta4
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
Emeka Ngwobia
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
chintanraval24
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
Jim White
 

Similar to Electrical maintenance (16)

2001 Nissan Pathfinder Service Repair Manual
2001 Nissan Pathfinder Service Repair Manual2001 Nissan Pathfinder Service Repair Manual
2001 Nissan Pathfinder Service Repair Manual
 
IRJET- Monitoring of Distribution Transformer and its Theft Protection by usi...
IRJET- Monitoring of Distribution Transformer and its Theft Protection by usi...IRJET- Monitoring of Distribution Transformer and its Theft Protection by usi...
IRJET- Monitoring of Distribution Transformer and its Theft Protection by usi...
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A
 
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...
IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...IRJET-  	  Monitoring of Distribution Transformer and its Theft Protection by...
IRJET- Monitoring of Distribution Transformer and its Theft Protection by...
 
Inspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdfInspection and Test Plan_D.pdf
Inspection and Test Plan_D.pdf
 
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdftoaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
toaz.info-pwd-electrical-csr18-19pdf-pr_0b568bd5a34db1e29ae436dce34430a6.pdf
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
project ppt
project pptproject ppt
project ppt
 
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
HNT4018MT2R2 (1120-S0000126-01Z)訊舟承認書
 
HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002HNT5040MT4R7 訊舟 20121002
HNT5040MT4R7 訊舟 20121002
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Magnetic Cable CE-EMC Test Report - Shenzhen YouCable Technology Co., Ltd
Magnetic Cable CE-EMC Test Report - Shenzhen YouCable Technology Co., LtdMagnetic Cable CE-EMC Test Report - Shenzhen YouCable Technology Co., Ltd
Magnetic Cable CE-EMC Test Report - Shenzhen YouCable Technology Co., Ltd
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
2000 nissan maxima service repair manual
2000 nissan maxima service repair manual2000 nissan maxima service repair manual
2000 nissan maxima service repair manual
 
Technical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptxTechnical Presentation_20-08-2022.pptx
Technical Presentation_20-08-2022.pptx
 
Factors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE TransactionsFactors to Consider When Perfroming Maint - IEEE Transactions
Factors to Consider When Perfroming Maint - IEEE Transactions
 

Recently uploaded

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

Electrical maintenance

  • 1. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 1 of 8 1. PURPOSE: To establish the system for the maintenance of electrical equipments and to ensure that the equipments are available continuously for preventive maintenance. 2. SCOPE: This is applicable to the preventive & breakdown Maintenance of electrical equipment of Foil. 3. DEFINITIONS: Dy.General Manager - Deputy General Manager Asst.Manager - Assistant Manager PMI - Preventive Maintenance Incharge I.D. No. - Identification Number P.M - Preventive Maintenance 4. RESPONSIBILITY: 4.1 Head of department is over all responsible for implementing this procedure. 4.2 Personal performing breakdown maintenance shall not carry out preventive maintenance. 4.3 Individual responsibilities of specific activities are described here after. 5. PROCESS INPUT: 5.1 Work instruction for carrying out maintenance activities. 5.2 Intimation of breakdown by work order 5.3 P.M.Slippage Record 5.4 P.M.Schedule 5.5 PM Checklist 5.6 P.M.Schedule cum check sheet Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
  • 2. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 2 of 8 6. PROCESS DESCRIPTION & INTERFACES: A. Preventive maintenance: - Sr. No. Activity Responsibility Ref. Doc. 1 All the equipments requiring periodic maintenance will be identified and a list will be prepared. Asst.Manager FQMNT02F01 2 A unique I.D.No. Will be given to them. Asst.Manager FQMNT02F01 3 The frequency of maintenance will be decided on the basis of • Manufacture recommendation Decided by maintenance Department Asst.Manager Operation & Maintenance Manual FQMNT02F06 4 The P.M. schedule/P.M.Schedule cum check sheet will be made as per the identified frequency above. Asst.Manager FQMNT02F06 FQMNT02F18 5 The equipment will be spared and the preventive maintenance will be carried out as per P.M check list/ P.M.Schedule cum check sheet & relevant work instruction. Asst.Manager/PMI/ Sr.Formen/ Foreman FQMNT02F07, FQMNT02W03, FQMNT02W10, FQMNT02W12 FQMNT02F18, FQMNT02W05 6 The P.M. checklist / P.M.Schedule cum check sheet will be filled up after completing maintenance. PMI FQMNT02F07, FQMNT02F18 7 In case of any schedule getting delayed due to any reasons or preventive action if not carried out, should be recorded in the P.M slippage record. PMI FQMNT02F08 8 Review the P.M. schedule at least Six monthly for types of checks & frequency on the basis of its effectiveness. Asst.Manager/PMI FQMNT02F03, FQMNT02F04 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
  • 3. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 3 of 8 9 Review the P.M.slippage record monthly & to avoid the frequency of slippage. Asst.Manager/ PMI FQMNT02F08 10 In a case of overhauling required, for the equipment, follow the respective work instruction/Vendor instruction manual and filled the over hauling check list. Sr. Foreman/ Foreman Operating and maintenance manual, FQMNT02W09, FQMNT02W07 FQMNT02F19 11 Operation of DG SET, Circuit breaker, 66KVSwithyard,HT Capacitor bank and power changeover done as per work instruction. Shift foreman FQMNT02W01 FQMNT02W02 FQMNT02W04 FQMNT02W08 FQMNT02W11 B. BREAKDOWN: - Sr. No. Activity Responsibility Ref. Doc. 1 Receiving work order from user department regarding breakdown of any equipment. Shift Incharge 2 Review the problem and allocate the job to concern person. Asst.Manager/ Shift Incharge 3 Carry out the breakdown maintenance. As per work instruction. Sr.Forman/ Shift Incharge/Foreman FQMNT02W06 4 Prepare daily breakdown report and sent copy to Dy.GM (Mech) & GM (F&A). Sr.Forman /Foreman FQMNT02F03 5 Prepare monthly breakdown report and sent copy to V.P. (foils), all Deptt. Heads, MIS & PPC. Sr.Forman /Foreman FQMNT02F04 7. PROCESS OUT PUTS: 7.1. Continue availability of machine. 7.2. Relevant reports & records of equipments. Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
  • 4. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 4 of 8 7.3 P.M.Slippage Record. 8. PROCESS MONITORING: Sr. No. Description Frequency Responsibility 1 Review of P.M. schedule. Six monthly Asst.Manager 2 Review P.M.slippage record. Monthly Asst.Manager 9. RECORDS: Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02
  • 5. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 5 of 8 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02 Sr.No. Record No. Record Title Retention period Location Disposal authority 1 FQMNT02F01 COMPREHENSIV E EQUIPMENT LIST Till the equipment Last ELECTRICAL SHOP FLOOR Dy. General Manager 2 FQMNT02F02 EQUIPMENT HISTORY RECORD Till the equipme nt Last ELECTRICAL SHOP FLOOR, MSDS&ERS Dy. General Manager 3 FQMNT02F03 DAILY BREAKDOWN REPORT Six Months ELECTRICAL SHOP FLOOR Dy. General Manager 4 FQMNT02F04 MONTHLY BREAKDOWN REPORT 1Year ELECTRICAL SHOP FLOOR Dy. General Manager 5 FQMNT02F05 MAJOR BREAKDOWN ANALYSIS REPORT 1Year ELECTRICAL SHOP FLOOR Dy. General Manager 6 FQMNT02F06 PM SCHEDULE 1Year ELECTRICAL SHOP FLOOR/MSDS Dy. General Manager
  • 6. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 6 of 8 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02 7 FQMNT02F07 FQMNT02F07/ 01 FQMNT02F07/ 02 FQMNT02F07/ 03 FQMNT02F07/ 04 FQMNT02F07/ 05 FQMNT02F07/ 06 FQMNT02F07/ 07 FQMNT02F07/ 08 FQMNT02F07/ 09 FQMNT02F07/ 10 FQMNT02F07/ 11 FQMNT02F07/ 12 FQMNT02F07/ 13 FQMNT02F07/ 14 FQMNT02F07/ 15 FQMNT02F07/ 16 FQMNT02F07/ 17 FQMNT02F07/ 18 FQMNT02F07/ 19 FQMNT02F07/ 20 FQMNT02F07/ 21 FQMNT02F07/ 22 FQMNT02F07/ 23 FQMNT02F07/ 24 FQMNT02F07/ 25 FQMNT02F07/ 26 FQMNT02F07/ 27 FQMNT02F07/ 28 FQMNT02F07/ 29 FQMNT02F07/ 30 FQMNT02F07/ 31 P.M.CHECK LIST:- MILL M50 MILL M51 MILL M52 MILL Q4 MILL Q5 CRANE # 1 CRANE # 2 CRANE # 3 CRANE # 4 CRANE # 5 CRANE # 6 CRANE # 7 CRANE # 8 CRANE # 4A REWIND LINE # 1 REWIND LINE # 2 REWIND LINE # 3 BAILING PRESS ROLL GRINDER ANN. FURNACE # 1 ANN. FURNACE # 2 ANN. FURNACE # 3 ANN. FURNACE # 4 OVEN # 1 OVEN # 2 OVEN # 3 SEPARATOR # 25 SEPARATOR # 26 DOWN ENDER FUME EXH. SYSTEM H G SLITTER 1Year ELECTRICAL SHOP FLOOR/MSDS Dy. General Manager
  • 7. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 7 of 8 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02 FQMNT02F07/ 32 FQMNT02F07/ 33 FQMNT02F07/ 34 FQMNT02F07/ 35 FQMNT02F07/ 36 FQMNT02F07/ 37 FQMNT02F07/ 38 FQMNT02F07/ 39 FQMNT02F07/ 40 FQMNT02F07/ 41 FQMNT02F07/ 42 FQMNT02F07/ 43 FQMNT02F07/ 44 M G SLITTER L G SLITTER DOCTOR REWINDER DRY BOND LAM. PRINTING MACHINE EXTRUDER COATER MAIN PUMP HOUSE COOLING TOWER NITROGEN GEN. FIRE HYDRANT W.T.P. VENT. SYSTEM COMP. HOUSE 1 Year ELECTRICAL SHOP FLOOR/MSDS Dy. General Manager 8 FQMNT02F08 P.M.SLIPPAGE RECORD 1Year ELECTRICAL SHOPFLOOR/ MSDS Dy. General Manager 9 FQMNT02F09 WORK ORDER 3 Month ECR Q4/Q5, ERS& MSDS Dy. General Manager 10 FQMNT02F10 WORK PERMIT 3Month ECR Q4/Q5, ERS& MSDS Dy. General Manager 11 FQMNT02F11 OVERHAULING SCHEDULE 1 Year MSDS / ERS Dy. General Manager 12 FQMNT02F12 SHIFT LOG BOOK 1YEAR Q4/Q5 CONTROL ROOM Dy. General Manager 13 FQMNT02F13 DAILY ENERGY GENERATION /CONSUMPTION REPORT Six Months MSDS Dy. General Manager
  • 8. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 8 of 8 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02 14 FQMNT02F14 STATEMENT SHOWING ENERGY GENERATED & CONSUMED INCLUDING CONSUMPTION OF DIESEL 1Year MSDS Dy. General Manager 15 FQMNT02F15 DG LOG BOOK 1Year MSDS Dy. General Manager 16 FQMNT02F16 ANALYSIS OF MOTOR FAILURE 1Year ERS Dy. General Manager 17 FQMNT02F17 ELECTRICAL POWER CONSUMPTION REPORT 1Year ELECTRICAL SHOP FLOOR Dy. General Manager 18 FQMNT02F18 FQMNT02F18/ 01 FQMNT02F18/ 02 FQMNT02F18/ 03 FQMNT02F18/ 04 FQMNT02F18/ 05 FQMNT02F18/ 06 FQMNT02F18/ 07 FQMNT02F18/ 08 FQMNT02F18/ 09 FQMNT02F18/ 10 FQMNT02F18/ 11 PM SCHEDULE CUM CHECK SHEET: - LT air circuit breaker 66 kv CT, PT, CVT & LA LT APFC panel, HT capacitor bank & reactor Battery bank & battery charger 11 kv & 132 kv MOCB 11 kv T.M.G. ACB 11 kv ABB (indoor & outdoor) & Siemens VCB 66 kv Sf6 circuit breaker 22 kv Sf6 circuit breaker 11 kv, 22 kv & 66 kv isolators 11 kv, 1500 kva DG set 1Year MSDS Dy. General Manager
  • 9. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 9 of 8 10. REFERENCE : Sr.No. Document no. Work instruction 1 FQMNT 02W01 OPERATION OF D.G.SET 2 FQMNT 02W02 OPERATION OF 66KV SWITCH YARD 3 FQMNT 02W03 OPERATION AND MAINTENANCE OF BATTERY BANK 4 FQMNT 02W04 OPERATION OF H.T CAPACITOR BANK 5 FQMNT 02W05 OPERATION AND MAINTENANCE OF TRANSFORMER 6 FQMNT 02W06 BREAKDOWN MAINTENANCE 7 FQMNT 02W07 OVER HAULING OF D.C. MOTOR 8 FQMNT 02W08 POWER CHANGE OVER 9 FQMNT 02W09 OVER HAULING OF A.C. SLIPRING MOTOR 10 FQMNT 02W10 MAINTENANCE OF DIESEL GENERATOR 11 FQMNT 02W11 OPERATION OF CIRCUIT BREAKER 12 FQMNT 02W12 PREVENTIVE MAINTENANCE Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02 FQMNT02F18/ 12 FQMNT02F18/ 13 FQMNT02F18/ 14 FQMNT02F18/ 15 Power & distribution transformer 415 v, 125 kva DG set Sub- station (monthly) Sub- station (fortnight) 1Year MSDS Dy. General Manager 19 FQMNT02F19 OVER HAULING CHECK LIST 3 Years ERS Dy. General Manager
  • 10. QUALITY MANAGEMENT PROCEDURE Doc. No. : F Q MNT 02 P ELECTRICAL MAINTENANCE Page No. : 10 of 8 Approved By: Issued By: Edition No. 01 Date: 01. 12. 2001 Date: 01.12. 2001 Revision No. 02