SlideShare a Scribd company logo
1 of 31
Download to read offline
1
Is there a need for strategic
planning in PM?
PM was (is) used
but
not recognized as core -
competency. Why?
2
• viewed as simply a scheduling tool for workers
• Executives failed to recognize true benefits
• Executives were fearful about need to decentralize
authority (diminish their power & authority)
Which company exhibited
better project management?
3
Target
Stock Price
Actual
Stock Price
Target
Stock Price
Actual
Stock Price
Behavior in different time
Factor Growth / Favorable Time Recession Time
Strategic Focus
Organizational Focus
Management Focus
Sponsorship
Training Emphasis
Risk Analysis
Team Building
Changes in mgmt. style
Changes in culture
4
Behavior in different time
Factor Growth / Favorable Time Recession Time
Strategic Focus Short term Long term
Organizational Focus Internal, secure power,
control, authority
External – Get closer to
customer
Management Focus Manage people, profit Manage work, deliverable,
customer service
Sponsorship Not so active Active
Training Emphasis Quantitative Behavior, Qualitative
Risk Analysis Minimal efforts Maximum focus
Team Building Functional Teams Cross functional teams
Changes in mgmt. style Slow speed Fast speed
Changes in culture Slow speed Fast speed
5
Group Exercise
• COEP is evaluating to launch e-Mtech (1 year )
in Project Management to offer
students/working professionals across the
globe. 1st of it’s kind program to be launched
by Jun-2020. Do project planning in small
teams and suggest what should be done to
roll it out as per desired schedule? (Major
activities & estimated time)
6
Questions
• Will this project be successful?
• Will it attract desired number of participants?
• Will it break-even?
7
If your answer is
• Yes – relax, have a cup of tea and enjoy rest of
evening the way you like it
• No – be attentive, engage and take active part
in remaining discussions.
• Why Yes? Why No?
8
Strategic Planning is
• the process of formulating & implementing
decisions about future direction
• Helps to adapt ever changing business
environment
• Applicable to all management levels and all
type/size of organizations
• Process : Collect Info  Evaluation 
Selection  Implementation  Review
9
Reasons to perform strategic
planning
Your
competitive
advantage
Competitor’s
competitive
advantage
Strengthen
Minimize
10
First step is always
• Perform
gap analysis
– Speed to market
– Cost competitiveness
– Quality competitiveness
11
Strategic
Planning
Project
Management
Competitive
Advantage
12
Simple PM methodology
Project
Defining
SOW
Specs
WBS
Timing
Spending
Curve
Resumes
Policies
Procedures
Proj. Org.
Responsibility
matrices
Base line
Matrices
13
Technical Functional Financial
Monitoring & Control
Project
Strategic Planning for PM
14
Project Definition
Environmental
Situation
Competitive
Situation
Resources &
Capabilities
Analysis of Past
Performance
Objectives
Opportunities &
Threats
Strengths &
Weakness
Specification of
present project
Impact
Analysis
Identify
Skills
needed
Develop
potential
benefits
Risks
Cost
Schedule
Technical
Bid
/
No
Bid
• Vision, mission, objectives
• Size of the market
• Risks
• Capital requirements
• Market position on price
• Expected competitive response
• Regulatory climate
• Degree of social acceptance
• Human factors
15
• Competitive advantage
• Technical superiority
• Business attractiveness
• Competitive positioning
• Opportunities for market positioning
• Supply Chain management
• Financial capabilities
• Operations management
• Customer relationship management
16
• Resources & capabilities
• Market opportunities & Threats
• Internal strengths & weaknesses (R & D,
Manufacturing, Financial, HR etc.)
17
PM Maturity Mode
18
Level – 1 – Recognize
importance (Initial)
• Use of project management only some time
• “Lip service” support to PM
• Small pockets of interest in PM
• No attempt to recognize benefits of PM
• Self interest before company’s interest
• No investment or support for PM training &
education
19
Action to achieve Level 1
• Training & education in PM
• Encourage training / hiring of certified
management professionals
• Begin communicating in common PM
language
• Recognize & start using tools
• Develop understanding of PMBOK and other
standards
20
Level – 2 Processes (Managed)
• Recognizes benefits of PM
• Organizational Support at all levels
• Recognizes need for cost control
• Recognizes need for Processes/Methods, but
resistance to new methods
• Believe what we already have works well
21
Actions to achieve Level-2
• Culture that supports behavioral and
quantitative side of PM
• Recognize PM’s benefits for long term also
• Develop process/methods to achieve
repetitive success
• Develop PM curriculum
22
Level – 3 – Singular method
(Defined)
• Committed to PM
• Integrated processes
• Cultural support to PM, co-operative
• Management support is visible
• But still - Don’t fix if it isn’t broken
• Resistance to integration
• Resistance to shared accountability
23
Actions to achieve Level-3
• Integrate all processes in to single method
with demonstrated success execution
• Develop support for shared accountability
• Encourage acceptance of culture that supports
multiple reporting
• Move from fragmented culture to single co-
operative culture
24
Level – 4 – Benchmarking
(Measured)
• Establish PMO or centre of excellence
• Interest in benchmarking
• Recognize its benefits
• Not invented here syndrome
• Doesn’t apply to us
• Wrong industry to benchmark
• Fearful of what result will be
25
Actions to achieve Level-4
• Dedication to benchmarking
• Decide what to benchmark and against whom
• Quantitative & qualitative benchmarking
26
Level – 5 – Improvements
(Optimized)
• Lessons learned
• Knowledge Transfer
• COE/PO mentorship
• Strategic planning for PM
27
Road Ahead - PM Maturity
Model
• A brief session on Maturity Model followed by
• Self assessment comprising 200+ questions to
find out current maturity level and gaps
• Suggest structured action plan to achieve
Level-5 in few months to few years time
28
Do you need to work on PM
Maturity Model?
• Scope creep in every project
• End date set before scope is agreed
• Detailed project plans are not available
• Emphasize on deadline more than milestones,
quality
• Date driven instead of requirement driven
• Pressure to cut estimates low to win contract
• Hidden agendas
• Budget & schedules are not co-ordinated
• Filter information from reports due to fear
29
30
Thank you, keep
communicating!
31

More Related Content

What's hot

Stragetic Sourcing Examples
Stragetic Sourcing ExamplesStragetic Sourcing Examples
Stragetic Sourcing Examplesgxg0703
 
Strategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development StrategyStrategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development Strategymashley
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcingNathan
 
July 2015 webinar d2 slides
July 2015 webinar d2 slidesJuly 2015 webinar d2 slides
July 2015 webinar d2 slidesBella Akora
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outlineTransnet Port Terminals
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcingpulkit0406
 
Operations strategy
Operations strategyOperations strategy
Operations strategyRajThakuri
 
Economies of Scale and Resource Mix
Economies of Scale and Resource MixEconomies of Scale and Resource Mix
Economies of Scale and Resource Mixtutor2u
 
Product Management Lifecycle
Product Management LifecycleProduct Management Lifecycle
Product Management LifecycleSameer Paradia
 
战略采购 Strategic Sourcing Process
战略采购 Strategic Sourcing Process战略采购 Strategic Sourcing Process
战略采购 Strategic Sourcing ProcessBill Kohnen
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzDerek Hendrikz
 
Cost, diff, responce
Cost, diff, responceCost, diff, responce
Cost, diff, responcekahogan62
 
03 operations strategy_Operations Management
03 operations strategy_Operations Management03 operations strategy_Operations Management
03 operations strategy_Operations ManagementBrent Weeks
 
Operation strategy and competitiveness
Operation strategy and competitiveness Operation strategy and competitiveness
Operation strategy and competitiveness Pritesh Kholkar
 
Ch01.Operation Strategy
Ch01.Operation StrategyCh01.Operation Strategy
Ch01.Operation StrategySaumyakanti
 

What's hot (20)

Stragetic Sourcing Examples
Stragetic Sourcing ExamplesStragetic Sourcing Examples
Stragetic Sourcing Examples
 
Strategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development StrategyStrategic Sourcing And Supplier Development Strategy
Strategic Sourcing And Supplier Development Strategy
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
 
July 2015 webinar d2 slides
July 2015 webinar d2 slidesJuly 2015 webinar d2 slides
July 2015 webinar d2 slides
 
Tpt's supplier development (sd) initiative outline
Tpt's supplier  development (sd) initiative outlineTpt's supplier  development (sd) initiative outline
Tpt's supplier development (sd) initiative outline
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
 
Economies of Scale and Resource Mix
Economies of Scale and Resource MixEconomies of Scale and Resource Mix
Economies of Scale and Resource Mix
 
Product Management Lifecycle
Product Management LifecycleProduct Management Lifecycle
Product Management Lifecycle
 
战略采购 Strategic Sourcing Process
战略采购 Strategic Sourcing Process战略采购 Strategic Sourcing Process
战略采购 Strategic Sourcing Process
 
IT Sourcing
IT SourcingIT Sourcing
IT Sourcing
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek Hendrikz
 
Cost, diff, responce
Cost, diff, responceCost, diff, responce
Cost, diff, responce
 
03 operations strategy_Operations Management
03 operations strategy_Operations Management03 operations strategy_Operations Management
03 operations strategy_Operations Management
 
Ch2 operations strategy
Ch2 operations strategyCh2 operations strategy
Ch2 operations strategy
 
Example CIPS online lecture
Example CIPS online lectureExample CIPS online lecture
Example CIPS online lecture
 
Operation strategy and competitiveness
Operation strategy and competitiveness Operation strategy and competitiveness
Operation strategy and competitiveness
 
Strategic sourcing
Strategic sourcingStrategic sourcing
Strategic sourcing
 
Ch01.Operation Strategy
Ch01.Operation StrategyCh01.Operation Strategy
Ch01.Operation Strategy
 

Similar to Strategic Planning in project Management using Maturity Model

Anthony grullon - strategic leadership and managing crises and change
Anthony grullon -  strategic leadership and managing crises and changeAnthony grullon -  strategic leadership and managing crises and change
Anthony grullon - strategic leadership and managing crises and changeAnthonyGrullon6
 
Chapter17 total quality control
Chapter17 total quality controlChapter17 total quality control
Chapter17 total quality controlmeomeomano
 
Management 5 - 7
Management 5 - 7Management 5 - 7
Management 5 - 7Tim Arroyo
 
Sales operations
Sales operationsSales operations
Sales operationsnirosuganya
 
Basic Management Principles.pdf
Basic Management Principles.pdfBasic Management Principles.pdf
Basic Management Principles.pdfCjWynn1
 
Extending business performance within the organisation - The role of Finance
Extending business performance within the organisation - The role of FinanceExtending business performance within the organisation - The role of Finance
Extending business performance within the organisation - The role of FinanceMehdi J. Alaoui
 
Run_shared_services_like_a_business_devikencki
Run_shared_services_like_a_business_devikenckiRun_shared_services_like_a_business_devikencki
Run_shared_services_like_a_business_devikenckidevikencki
 
International Target Operating Model Design
International Target Operating Model DesignInternational Target Operating Model Design
International Target Operating Model DesignChris Oddy
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizationsLizzette Danan
 
Growth stage general management success drivers dave litwiller - mar 29 2017
Growth stage general management success drivers   dave litwiller - mar 29 2017Growth stage general management success drivers   dave litwiller - mar 29 2017
Growth stage general management success drivers dave litwiller - mar 29 2017Dave Litwiller
 
Competency-based Management for HR Executive.ppt
Competency-based Management for HR Executive.pptCompetency-based Management for HR Executive.ppt
Competency-based Management for HR Executive.pptSaqib Mansoor Ahmed
 
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...Project Controls Expo
 
PM-Champion-PPT-11-10-2020.pdf
PM-Champion-PPT-11-10-2020.pdfPM-Champion-PPT-11-10-2020.pdf
PM-Champion-PPT-11-10-2020.pdfErmiyas Tariku
 
Effective portfolio management
Effective portfolio managementEffective portfolio management
Effective portfolio managementDave Angelow
 
Identifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to ChangeIdentifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to ChangeCaltech
 

Similar to Strategic Planning in project Management using Maturity Model (20)

Anthony grullon - strategic leadership and managing crises and change
Anthony grullon -  strategic leadership and managing crises and changeAnthony grullon -  strategic leadership and managing crises and change
Anthony grullon - strategic leadership and managing crises and change
 
Chapter17 total quality control
Chapter17 total quality controlChapter17 total quality control
Chapter17 total quality control
 
Management 5 - 7
Management 5 - 7Management 5 - 7
Management 5 - 7
 
Sales operations
Sales operationsSales operations
Sales operations
 
Basic management principles
Basic management principlesBasic management principles
Basic management principles
 
Basic management principles
Basic management principlesBasic management principles
Basic management principles
 
Basic Management Principles.pdf
Basic Management Principles.pdfBasic Management Principles.pdf
Basic Management Principles.pdf
 
Business Process Engineering
Business Process EngineeringBusiness Process Engineering
Business Process Engineering
 
An Introduction to Strategy
An Introduction to StrategyAn Introduction to Strategy
An Introduction to Strategy
 
A New Perspective on Operational Excellence
A New Perspective on Operational ExcellenceA New Perspective on Operational Excellence
A New Perspective on Operational Excellence
 
Extending business performance within the organisation - The role of Finance
Extending business performance within the organisation - The role of FinanceExtending business performance within the organisation - The role of Finance
Extending business performance within the organisation - The role of Finance
 
Run_shared_services_like_a_business_devikencki
Run_shared_services_like_a_business_devikenckiRun_shared_services_like_a_business_devikencki
Run_shared_services_like_a_business_devikencki
 
International Target Operating Model Design
International Target Operating Model DesignInternational Target Operating Model Design
International Target Operating Model Design
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizations
 
Growth stage general management success drivers dave litwiller - mar 29 2017
Growth stage general management success drivers   dave litwiller - mar 29 2017Growth stage general management success drivers   dave litwiller - mar 29 2017
Growth stage general management success drivers dave litwiller - mar 29 2017
 
Competency-based Management for HR Executive.ppt
Competency-based Management for HR Executive.pptCompetency-based Management for HR Executive.ppt
Competency-based Management for HR Executive.ppt
 
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...
Project Controls Expo, 13th Nov 2013 - "CREATING CONFIDENCE THROUGH PROJECT C...
 
PM-Champion-PPT-11-10-2020.pdf
PM-Champion-PPT-11-10-2020.pdfPM-Champion-PPT-11-10-2020.pdf
PM-Champion-PPT-11-10-2020.pdf
 
Effective portfolio management
Effective portfolio managementEffective portfolio management
Effective portfolio management
 
Identifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to ChangeIdentifying and Overcoming Roadblocks to Change
Identifying and Overcoming Roadblocks to Change
 

Recently uploaded

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxSamahhassan30
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 

Recently uploaded (17)

Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
crisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptxcrisiscommunication-presentation in crisis management.pptx
crisiscommunication-presentation in crisis management.pptx
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 

Strategic Planning in project Management using Maturity Model

  • 1. 1
  • 2. Is there a need for strategic planning in PM? PM was (is) used but not recognized as core - competency. Why? 2 • viewed as simply a scheduling tool for workers • Executives failed to recognize true benefits • Executives were fearful about need to decentralize authority (diminish their power & authority)
  • 3. Which company exhibited better project management? 3 Target Stock Price Actual Stock Price Target Stock Price Actual Stock Price
  • 4. Behavior in different time Factor Growth / Favorable Time Recession Time Strategic Focus Organizational Focus Management Focus Sponsorship Training Emphasis Risk Analysis Team Building Changes in mgmt. style Changes in culture 4
  • 5. Behavior in different time Factor Growth / Favorable Time Recession Time Strategic Focus Short term Long term Organizational Focus Internal, secure power, control, authority External – Get closer to customer Management Focus Manage people, profit Manage work, deliverable, customer service Sponsorship Not so active Active Training Emphasis Quantitative Behavior, Qualitative Risk Analysis Minimal efforts Maximum focus Team Building Functional Teams Cross functional teams Changes in mgmt. style Slow speed Fast speed Changes in culture Slow speed Fast speed 5
  • 6. Group Exercise • COEP is evaluating to launch e-Mtech (1 year ) in Project Management to offer students/working professionals across the globe. 1st of it’s kind program to be launched by Jun-2020. Do project planning in small teams and suggest what should be done to roll it out as per desired schedule? (Major activities & estimated time) 6
  • 7. Questions • Will this project be successful? • Will it attract desired number of participants? • Will it break-even? 7
  • 8. If your answer is • Yes – relax, have a cup of tea and enjoy rest of evening the way you like it • No – be attentive, engage and take active part in remaining discussions. • Why Yes? Why No? 8
  • 9. Strategic Planning is • the process of formulating & implementing decisions about future direction • Helps to adapt ever changing business environment • Applicable to all management levels and all type/size of organizations • Process : Collect Info  Evaluation  Selection  Implementation  Review 9
  • 10. Reasons to perform strategic planning Your competitive advantage Competitor’s competitive advantage Strengthen Minimize 10
  • 11. First step is always • Perform gap analysis – Speed to market – Cost competitiveness – Quality competitiveness 11
  • 13. Simple PM methodology Project Defining SOW Specs WBS Timing Spending Curve Resumes Policies Procedures Proj. Org. Responsibility matrices Base line Matrices 13 Technical Functional Financial Monitoring & Control Project
  • 14. Strategic Planning for PM 14 Project Definition Environmental Situation Competitive Situation Resources & Capabilities Analysis of Past Performance Objectives Opportunities & Threats Strengths & Weakness Specification of present project Impact Analysis Identify Skills needed Develop potential benefits Risks Cost Schedule Technical Bid / No Bid
  • 15. • Vision, mission, objectives • Size of the market • Risks • Capital requirements • Market position on price • Expected competitive response • Regulatory climate • Degree of social acceptance • Human factors 15
  • 16. • Competitive advantage • Technical superiority • Business attractiveness • Competitive positioning • Opportunities for market positioning • Supply Chain management • Financial capabilities • Operations management • Customer relationship management 16
  • 17. • Resources & capabilities • Market opportunities & Threats • Internal strengths & weaknesses (R & D, Manufacturing, Financial, HR etc.) 17
  • 19. Level – 1 – Recognize importance (Initial) • Use of project management only some time • “Lip service” support to PM • Small pockets of interest in PM • No attempt to recognize benefits of PM • Self interest before company’s interest • No investment or support for PM training & education 19
  • 20. Action to achieve Level 1 • Training & education in PM • Encourage training / hiring of certified management professionals • Begin communicating in common PM language • Recognize & start using tools • Develop understanding of PMBOK and other standards 20
  • 21. Level – 2 Processes (Managed) • Recognizes benefits of PM • Organizational Support at all levels • Recognizes need for cost control • Recognizes need for Processes/Methods, but resistance to new methods • Believe what we already have works well 21
  • 22. Actions to achieve Level-2 • Culture that supports behavioral and quantitative side of PM • Recognize PM’s benefits for long term also • Develop process/methods to achieve repetitive success • Develop PM curriculum 22
  • 23. Level – 3 – Singular method (Defined) • Committed to PM • Integrated processes • Cultural support to PM, co-operative • Management support is visible • But still - Don’t fix if it isn’t broken • Resistance to integration • Resistance to shared accountability 23
  • 24. Actions to achieve Level-3 • Integrate all processes in to single method with demonstrated success execution • Develop support for shared accountability • Encourage acceptance of culture that supports multiple reporting • Move from fragmented culture to single co- operative culture 24
  • 25. Level – 4 – Benchmarking (Measured) • Establish PMO or centre of excellence • Interest in benchmarking • Recognize its benefits • Not invented here syndrome • Doesn’t apply to us • Wrong industry to benchmark • Fearful of what result will be 25
  • 26. Actions to achieve Level-4 • Dedication to benchmarking • Decide what to benchmark and against whom • Quantitative & qualitative benchmarking 26
  • 27. Level – 5 – Improvements (Optimized) • Lessons learned • Knowledge Transfer • COE/PO mentorship • Strategic planning for PM 27
  • 28. Road Ahead - PM Maturity Model • A brief session on Maturity Model followed by • Self assessment comprising 200+ questions to find out current maturity level and gaps • Suggest structured action plan to achieve Level-5 in few months to few years time 28
  • 29. Do you need to work on PM Maturity Model? • Scope creep in every project • End date set before scope is agreed • Detailed project plans are not available • Emphasize on deadline more than milestones, quality • Date driven instead of requirement driven • Pressure to cut estimates low to win contract • Hidden agendas • Budget & schedules are not co-ordinated • Filter information from reports due to fear 29
  • 30. 30