SlideShare a Scribd company logo
1 of 10
Curriculum
Vitae
Of
Keith Conelius
Personal aspirations
I am passionate about Health and Safety, education and training in the industry and
have a need to pass on my knowledge and develop best practice models. I am calm
under pressure with a ‘can do’ attitude. I like to build strong relationships with the
stakeholders and local communities.
I like to challenge myself in a position that will allow me the scope to apply a broad
range of knowledge and experiences gained throughout my career, and pass on this
experience to my employer and other industry colleagues.
Personal Particulars
NAME Keith Conelius
ADDRESS 18 Karwin st Bay View Hts 4868
Cairns QLD
MOBILE 0498 288 965
0497 388 387
E-MAIL keith.conelius@hotmail.com
LICENSE Current QLD Open (Aust)
Current PNG Open Class 4
HR – Heavy Rigid (Unrestricted)
R – Motorcycle
Current Australian passport
QLD Construction Induction card
HRW lic. Forklift licence
Demonstrated Abilities
• Conduct and document prestart meetings
• Conduct and train workers on the importance of JHA’s and reporting
• Daily workplace inspections
• Develop safety reports and conduct incident investigations
• Implementation of company Health and Safety management system
• Well-developed computer skills using Microsoft Word, Microsoft Excel,
Microsoft PowerPoint, Microsoft Project, Outlook, Internet,
• Excellent organisational skills aided by effective time management practices
• Highly developed interpersonal, verbal, written and listening skills
• Flexible and adaptable to changing work environments
• Keen and enthusiastic to broaden and expand on current knowledge
• Ability to work autonomously and / or as part of a team
• Extremely motivated with a professional and proactive approach to job/role
responsibilities
Courses / Qualifications
• Generic Induction to Coal Mining (Surface)
• Training provider SGS Aust. Reg No.2646
• BMA SOP Site Surface Induction
• Training provider SGS Aust Reg No. 2646
• Certificate IV in Carpentry and Joinery (Trade Qualification)
• Training provider-T.A.F.E Collage
• Working at heights training
• Training provider Training Prof. Reg No.31955
• Certificate IV in Building
• Training provider-T.A.F.E Collage
• Certificate IV work health and safety
• Training provider Total management and training
• Certificate IV Trainer & Assessor
• Training provider Total Management & Training
• Enrolled Diploma Work Health and Safety
• Training provider Total Management & Training
• 7th
Oct 2016
Employment History
April 2016 - August 2016
Site Manager
Pacific building solutions
Laucala Island Fiji
Role/Responsibility
• Ensure all work is performed in accordance with Health and Safety
and Environmental legislation, maintain documentation to
benchmark standards
• Conduct safety pre-start meetings, risk assessment and training,
site inspections, and reporting.
• Management of repairs and new construction of world class resort
on Laucala Island Fiji (Owner Red Bull)
• Completed on time within an extremely tight time frame to the
managements great satisfaction
• Procurement of materials well in advance due to the logistical
difficulties of an isolated work environment
• Manage 100+local tradespersons over 20 separate areas
• Communicate with local tradesmen on daily work expectations
• Daily meetings with project manager and client to discuss workload
and timeframes
October 2012 – April 2016
Construction supervisor
PNG Forrest Products
Port Moresby PNG
Role / responsibility
• Facilitate and manage training and assessment of new staff and
apprentices with JHA’s and Health and Safety Management System
• Manage all aspects of Health and Safety on site, including site
inspections, auditing, accident and incident investigations
• Management of multiple projects and employee’s (80+) including
• New industrial kitchen facility in Moro (Oil search Ltd)
• Construction of largest nightclub in Papua New Guinea
• New timber framed 14 unit development Port Moresby
• Multiple school projects for AusAid in Port moresby
• Multiple unit and housing developments in Port Moresby
• Daily meetings with project manager and engineers
• Liaise with clients to ensure quality of service
• Daily site inspections to ensure financial and operational efficiency
of worksite
• Manage all aspects of the business strategic planning for
budgets/targets allocated to designated projects
• Communicate with local government authorities on completion and
certificates of occupancy.
• Ensure all work is performed in accordance with workplace health,
safety and environmental requirements, maintain documentation to
benchmark standards
28th
June 2011 – 9th
August 2012
Construction Supervisor
Curtain Bros PNG
Motukea Island
Role / Responsibility
• Manage all aspects of Health and Safety on site including risk
assessment training, pre-start meetings, site inspections and
incident reporting
• Facilitate and manage training and assessment of new staff and
apprentices with JHA’s and Health and Safety Plan
• Workplace auditing and monitoring, site investigations, and accident
and incident investigations
• Management of multiple projects and employee’s (110+) including
• Suspended concrete slabs and concrete tilt panels for 2 story unit
development,
• Block work and suspended concrete to multi story offices,
• Civil works, steel erection to large warehouse and storage facility,
• Site management of a multi story office development in southern
highlands (Mendi)
• Maintenance to offices, buildings and accommodation facilities,
• Estimations, quotations, project development, procurement of
materials, planning. Liaise with suppliers to ensure quality products
• Work alongside piling and ship birthing operations
• Daily meetings with project manager and engineers
• Liaise with clients to ensure quality of service
• Daily site inspections to ensure financial and operational efficiency
of worksite
• Manage all aspects of the business strategic planning for
budgets/targets allocated to designated projects
• Communicate with local tradesmen on daily work expectations
• Ensure all work is performed in accordance with workplace health,
safety and environmental requirements maintain documentation to
benchmark standards
15th
Oct 2007 – 3RD
June 2011
Business Owner
Eucalyptus Developments
Licensed Builder
Estimated total cost $2m
Role / Responsibility
• Building all aspects of residential homes from design and council
approval through to building, completion and handover to clients in
the Mackay and Moranbah areas
• Inspect and approve sub-contractor progress claims
• Management of multiple projects including estimations, quotations,
Project development, procurement of materials, planning and
council inspections
• Designing and drafting of renovations to residential and commercial
developments.
• Liaise with suppliers to ensure quality products
• Liaise with clients to ensure quality of service
• Facilitate and manage training and assessment of new staff and
apprentices
• Daily site inspections to ensure financial and operational efficiency
of worksite
• Manage all aspects of the business strategic planning for
budgets/targets allocated to designated projects
• Ensure all work is performed in accordance with workplace health,
safety and environmental requirements maintain documentation to
benchmark standards
20TH
Feb 2007 – 1st
Oct 2007
Pacific Building Solutions
Laucala Island Fiji
Site manager
Construction of Laucala Island Resort
Estimated total cost $40m
Role / Responsibility
• Assist in project management of construction of world class resort
including
• A large slab on ground and block work kitchen and bakery facility,
• Block work offices and administration facilities with adjoining
walkways,
• New 5 star restaurant and bar facility,
• Beach villa, bar facilities, pavilions,
• Estimations, quotations, Project development, procurement of
materials, planning and inspections
• Liaise with suppliers to ensure quality products
• Facilitate and manage training and assessment of new staff and
trades persons (80+)
• Daily site inspections to ensure financial and operational efficiency
of worksite
• Manage all aspects of the business strategic planning for
budgets/targets allocated to designated projects
• Ensure all work is performed in accordance with workplace health,
safety and environmental requirements
• Maintain documentation to benchmark standards
• Communicate with the local community and abide by the local laws
and regulations
• Ensure the health and safety of the local community and its people
by liaising closely with the elders of the Island
• Extensive experience in sub-contract management and quality
procedures as well as leadership of project personnel.
• A high commitment to WHS
• Experienced in tender processes.
•
• Ability to work in the field and manage multiple projects and
activities simultaneously.
7TH
Aug 2000 – 2ND
Feb 2007
WH Frier Building Contractors
Mackay
Project Manager
Estimated cost $15m
Role / Responsibility
• Management of multiple projects including
• Slab on ground block work 24 unit and 5 executive house
development,
• Large concrete tilt panel and suspended slab workshops with 50
tonne overhead crane,
• 10 Multi-story unit developments (Whitsundays)
• Numerous mine site developments including, civil works, concrete
works, steel erection, roofing and cladding, fit outs and
refurbishments,
• Estimations, quotations, Project development, procurement of
materials, planning and inspections
• Prepare, plan and implement projects. Source and purchase
materials and equipment.
• Liaise with suppliers to ensure quality products
• Liaise with clients to ensure quality of service
• Three Subsidiary companies –conduct monthly meetings with
training in application of JSA’s and risk assessment procedures
• Ensure all work is performed in accordance with workplace health
safety and environmental requirements
• Facilitate and manage training and assessment of new and existing
staff
• Daily site inspections to ensure financial and operational efficiency
of worksite
• Manage all aspects of the business strategic planning for
budgets/targets allocated to designated projects
• Ensure all work is performed in accordance with workplace health,
safety and environmental requirements
• Maintain documentation to benchmark standards
• Progress the implementation and application of workplace health
safety and environmental practices in pursuit of assuring continuous
improvement
References
References will be supplied upon request

More Related Content

What's hot

Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne
 
C Kelly Cv 25.01.11
C Kelly Cv 25.01.11C Kelly Cv 25.01.11
C Kelly Cv 25.01.11Cheryl Kelly
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015Rodrigo Rodriguez
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell currentAndrew Mitchell
 
RESUME- STUART JOHNSTONE 2015-4
RESUME- STUART JOHNSTONE 2015-4RESUME- STUART JOHNSTONE 2015-4
RESUME- STUART JOHNSTONE 2015-4Stuart Johnstone
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael BowerMichael Bower
 
Ed Rapp New Resume Revised July 2016
Ed Rapp New Resume Revised July 2016Ed Rapp New Resume Revised July 2016
Ed Rapp New Resume Revised July 2016Ed Rapp
 
New Resume - General
New Resume - GeneralNew Resume - General
New Resume - GeneralWayne Brennan
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years ExperiencePrince David K
 
SCOTT, Peter Resume
SCOTT, Peter ResumeSCOTT, Peter Resume
SCOTT, Peter ResumePeter Scott
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's ResumeMehdi Kessouar
 

What's hot (19)

Dwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No IDDwayne Payne Resume Feb 2016 No ID
Dwayne Payne Resume Feb 2016 No ID
 
Resume Mark Shuttleworth
Resume Mark ShuttleworthResume Mark Shuttleworth
Resume Mark Shuttleworth
 
C Kelly Cv 25.01.11
C Kelly Cv 25.01.11C Kelly Cv 25.01.11
C Kelly Cv 25.01.11
 
ali al omari CV
ali al omari CVali al omari CV
ali al omari CV
 
RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015RODRIGO+RODRIGUEZ copy 12-18-2015
RODRIGO+RODRIGUEZ copy 12-18-2015
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
Shane Covington - CV
 Shane Covington - CV Shane Covington - CV
Shane Covington - CV
 
RESUME- STUART JOHNSTONE 2015-4
RESUME- STUART JOHNSTONE 2015-4RESUME- STUART JOHNSTONE 2015-4
RESUME- STUART JOHNSTONE 2015-4
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 
Ed Rapp New Resume Revised July 2016
Ed Rapp New Resume Revised July 2016Ed Rapp New Resume Revised July 2016
Ed Rapp New Resume Revised July 2016
 
New Resume - General
New Resume - GeneralNew Resume - General
New Resume - General
 
RESUME EN (SB)
RESUME EN (SB)RESUME EN (SB)
RESUME EN (SB)
 
Resume
ResumeResume
Resume
 
keithCV2016 new
keithCV2016 newkeithCV2016 new
keithCV2016 new
 
CV - Drilling Logistics Coordinator with 8 years Experience
CV - Drilling  Logistics Coordinator with 8 years ExperienceCV - Drilling  Logistics Coordinator with 8 years Experience
CV - Drilling Logistics Coordinator with 8 years Experience
 
CV_Julianne Samuelson
CV_Julianne SamuelsonCV_Julianne Samuelson
CV_Julianne Samuelson
 
SCOTT, Peter Resume
SCOTT, Peter ResumeSCOTT, Peter Resume
SCOTT, Peter Resume
 
Andrew Graham C.V
Andrew Graham C.VAndrew Graham C.V
Andrew Graham C.V
 
updated Kessouar's Resume
updated Kessouar's Resumeupdated Kessouar's Resume
updated Kessouar's Resume
 

Viewers also liked

La energía renovable
La energía renovableLa energía renovable
La energía renovableConMuchoFlow
 
,5кл прокоф*єв попелюшка
,5кл прокоф*єв попелюшка,5кл прокоф*єв попелюшка
,5кл прокоф*єв попелюшкаnataliyu roschina
 
Boletin semana 49 Libros y Cómics
Boletin semana 49 Libros y CómicsBoletin semana 49 Libros y Cómics
Boletin semana 49 Libros y Cómicsgalaxy0
 
Case studies 3[400]
Case studies 3[400]Case studies 3[400]
Case studies 3[400]milly311
 
Presentacio en pawer poin maira
Presentacio en pawer poin mairaPresentacio en pawer poin maira
Presentacio en pawer poin maira16-10256
 
01. sistemas de control grado 10
01. sistemas de control grado 1001. sistemas de control grado 10
01. sistemas de control grado 10luale1824
 
Apresentacao Hinode (1)
Apresentacao Hinode (1)Apresentacao Hinode (1)
Apresentacao Hinode (1)Eliseu Vieira
 
Ensayo sobre aprendizaje vivencial y la metodología tradicional
Ensayo sobre aprendizaje vivencial y la metodología tradicionalEnsayo sobre aprendizaje vivencial y la metodología tradicional
Ensayo sobre aprendizaje vivencial y la metodología tradicionalEgduar Ariel Cardenas Portilla
 

Viewers also liked (11)

La energía renovable
La energía renovableLa energía renovable
La energía renovable
 
,5кл прокоф*єв попелюшка
,5кл прокоф*єв попелюшка,5кл прокоф*єв попелюшка
,5кл прокоф*єв попелюшка
 
Boletin semana 49 Libros y Cómics
Boletin semana 49 Libros y CómicsBoletin semana 49 Libros y Cómics
Boletin semana 49 Libros y Cómics
 
Case studies 3[400]
Case studies 3[400]Case studies 3[400]
Case studies 3[400]
 
Presentacio en pawer poin maira
Presentacio en pawer poin mairaPresentacio en pawer poin maira
Presentacio en pawer poin maira
 
01. sistemas de control grado 10
01. sistemas de control grado 1001. sistemas de control grado 10
01. sistemas de control grado 10
 
Apresentacao Hinode (1)
Apresentacao Hinode (1)Apresentacao Hinode (1)
Apresentacao Hinode (1)
 
Ensayo sobre aprendizaje vivencial y la metodología tradicional
Ensayo sobre aprendizaje vivencial y la metodología tradicionalEnsayo sobre aprendizaje vivencial y la metodología tradicional
Ensayo sobre aprendizaje vivencial y la metodología tradicional
 
Aprendizaje ubicuo
Aprendizaje ubicuoAprendizaje ubicuo
Aprendizaje ubicuo
 
09.19 논제
09.19 논제09.19 논제
09.19 논제
 
Resume (bharath)
Resume (bharath)Resume (bharath)
Resume (bharath)
 

Similar to C V Keith Conelius 5

Similar to C V Keith Conelius 5 (20)

cv17 uk
cv17 ukcv17 uk
cv17 uk
 
Resume Craig Edwards 042016
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016
 
KevinHaddow-CV
KevinHaddow-CVKevinHaddow-CV
KevinHaddow-CV
 
Mark's Resume
Mark's ResumeMark's Resume
Mark's Resume
 
Walid Kerbaje CV
Walid Kerbaje CVWalid Kerbaje CV
Walid Kerbaje CV
 
Terry Bradbury CV
Terry Bradbury CVTerry Bradbury CV
Terry Bradbury CV
 
ANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANANANBU DURAI VEERANARAYANAN
ANBU DURAI VEERANARAYANAN
 
Mishaal resume copy
Mishaal resume copyMishaal resume copy
Mishaal resume copy
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Mark Unwin CV Oct 16
Mark Unwin CV Oct 16Mark Unwin CV Oct 16
Mark Unwin CV Oct 16
 
Dave's resume
Dave's resumeDave's resume
Dave's resume
 
Darren Walsh medical device
Darren Walsh medical deviceDarren Walsh medical device
Darren Walsh medical device
 
Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
P. HAYES, Qualifications
P. HAYES, QualificationsP. HAYES, Qualifications
P. HAYES, Qualifications
 
Shafik Janhangeer - Resume -HSE Practitioner
Shafik Janhangeer - Resume -HSE PractitionerShafik Janhangeer - Resume -HSE Practitioner
Shafik Janhangeer - Resume -HSE Practitioner
 
NOEL DAVID CV NEW
NOEL DAVID CV NEWNOEL DAVID CV NEW
NOEL DAVID CV NEW
 
ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1ENGINEERING PROJECTS 1
ENGINEERING PROJECTS 1
 
David Higgins C.V 2016
David Higgins C.V 2016David Higgins C.V 2016
David Higgins C.V 2016
 

C V Keith Conelius 5

  • 1. Curriculum Vitae Of Keith Conelius Personal aspirations I am passionate about Health and Safety, education and training in the industry and have a need to pass on my knowledge and develop best practice models. I am calm under pressure with a ‘can do’ attitude. I like to build strong relationships with the stakeholders and local communities. I like to challenge myself in a position that will allow me the scope to apply a broad range of knowledge and experiences gained throughout my career, and pass on this experience to my employer and other industry colleagues.
  • 2. Personal Particulars NAME Keith Conelius ADDRESS 18 Karwin st Bay View Hts 4868 Cairns QLD MOBILE 0498 288 965 0497 388 387 E-MAIL keith.conelius@hotmail.com LICENSE Current QLD Open (Aust) Current PNG Open Class 4 HR – Heavy Rigid (Unrestricted) R – Motorcycle Current Australian passport QLD Construction Induction card HRW lic. Forklift licence Demonstrated Abilities • Conduct and document prestart meetings • Conduct and train workers on the importance of JHA’s and reporting • Daily workplace inspections • Develop safety reports and conduct incident investigations • Implementation of company Health and Safety management system • Well-developed computer skills using Microsoft Word, Microsoft Excel, Microsoft PowerPoint, Microsoft Project, Outlook, Internet, • Excellent organisational skills aided by effective time management practices
  • 3. • Highly developed interpersonal, verbal, written and listening skills • Flexible and adaptable to changing work environments • Keen and enthusiastic to broaden and expand on current knowledge • Ability to work autonomously and / or as part of a team • Extremely motivated with a professional and proactive approach to job/role responsibilities Courses / Qualifications • Generic Induction to Coal Mining (Surface) • Training provider SGS Aust. Reg No.2646 • BMA SOP Site Surface Induction • Training provider SGS Aust Reg No. 2646 • Certificate IV in Carpentry and Joinery (Trade Qualification) • Training provider-T.A.F.E Collage • Working at heights training • Training provider Training Prof. Reg No.31955 • Certificate IV in Building • Training provider-T.A.F.E Collage
  • 4. • Certificate IV work health and safety • Training provider Total management and training • Certificate IV Trainer & Assessor • Training provider Total Management & Training • Enrolled Diploma Work Health and Safety • Training provider Total Management & Training • 7th Oct 2016 Employment History April 2016 - August 2016 Site Manager Pacific building solutions Laucala Island Fiji Role/Responsibility
  • 5. • Ensure all work is performed in accordance with Health and Safety and Environmental legislation, maintain documentation to benchmark standards • Conduct safety pre-start meetings, risk assessment and training, site inspections, and reporting. • Management of repairs and new construction of world class resort on Laucala Island Fiji (Owner Red Bull) • Completed on time within an extremely tight time frame to the managements great satisfaction • Procurement of materials well in advance due to the logistical difficulties of an isolated work environment • Manage 100+local tradespersons over 20 separate areas • Communicate with local tradesmen on daily work expectations • Daily meetings with project manager and client to discuss workload and timeframes October 2012 – April 2016 Construction supervisor PNG Forrest Products Port Moresby PNG Role / responsibility • Facilitate and manage training and assessment of new staff and apprentices with JHA’s and Health and Safety Management System • Manage all aspects of Health and Safety on site, including site inspections, auditing, accident and incident investigations • Management of multiple projects and employee’s (80+) including • New industrial kitchen facility in Moro (Oil search Ltd) • Construction of largest nightclub in Papua New Guinea • New timber framed 14 unit development Port Moresby • Multiple school projects for AusAid in Port moresby
  • 6. • Multiple unit and housing developments in Port Moresby • Daily meetings with project manager and engineers • Liaise with clients to ensure quality of service • Daily site inspections to ensure financial and operational efficiency of worksite • Manage all aspects of the business strategic planning for budgets/targets allocated to designated projects • Communicate with local government authorities on completion and certificates of occupancy. • Ensure all work is performed in accordance with workplace health, safety and environmental requirements, maintain documentation to benchmark standards 28th June 2011 – 9th August 2012 Construction Supervisor Curtain Bros PNG Motukea Island Role / Responsibility • Manage all aspects of Health and Safety on site including risk assessment training, pre-start meetings, site inspections and incident reporting • Facilitate and manage training and assessment of new staff and apprentices with JHA’s and Health and Safety Plan • Workplace auditing and monitoring, site investigations, and accident and incident investigations • Management of multiple projects and employee’s (110+) including • Suspended concrete slabs and concrete tilt panels for 2 story unit development, • Block work and suspended concrete to multi story offices, • Civil works, steel erection to large warehouse and storage facility, • Site management of a multi story office development in southern highlands (Mendi)
  • 7. • Maintenance to offices, buildings and accommodation facilities, • Estimations, quotations, project development, procurement of materials, planning. Liaise with suppliers to ensure quality products • Work alongside piling and ship birthing operations • Daily meetings with project manager and engineers • Liaise with clients to ensure quality of service • Daily site inspections to ensure financial and operational efficiency of worksite • Manage all aspects of the business strategic planning for budgets/targets allocated to designated projects • Communicate with local tradesmen on daily work expectations • Ensure all work is performed in accordance with workplace health, safety and environmental requirements maintain documentation to benchmark standards 15th Oct 2007 – 3RD June 2011 Business Owner Eucalyptus Developments Licensed Builder Estimated total cost $2m Role / Responsibility • Building all aspects of residential homes from design and council approval through to building, completion and handover to clients in the Mackay and Moranbah areas • Inspect and approve sub-contractor progress claims • Management of multiple projects including estimations, quotations, Project development, procurement of materials, planning and council inspections • Designing and drafting of renovations to residential and commercial developments. • Liaise with suppliers to ensure quality products • Liaise with clients to ensure quality of service
  • 8. • Facilitate and manage training and assessment of new staff and apprentices • Daily site inspections to ensure financial and operational efficiency of worksite • Manage all aspects of the business strategic planning for budgets/targets allocated to designated projects • Ensure all work is performed in accordance with workplace health, safety and environmental requirements maintain documentation to benchmark standards 20TH Feb 2007 – 1st Oct 2007 Pacific Building Solutions Laucala Island Fiji Site manager Construction of Laucala Island Resort Estimated total cost $40m Role / Responsibility • Assist in project management of construction of world class resort including • A large slab on ground and block work kitchen and bakery facility, • Block work offices and administration facilities with adjoining walkways, • New 5 star restaurant and bar facility, • Beach villa, bar facilities, pavilions, • Estimations, quotations, Project development, procurement of materials, planning and inspections • Liaise with suppliers to ensure quality products • Facilitate and manage training and assessment of new staff and trades persons (80+) • Daily site inspections to ensure financial and operational efficiency of worksite • Manage all aspects of the business strategic planning for budgets/targets allocated to designated projects
  • 9. • Ensure all work is performed in accordance with workplace health, safety and environmental requirements • Maintain documentation to benchmark standards • Communicate with the local community and abide by the local laws and regulations • Ensure the health and safety of the local community and its people by liaising closely with the elders of the Island • Extensive experience in sub-contract management and quality procedures as well as leadership of project personnel. • A high commitment to WHS • Experienced in tender processes. • • Ability to work in the field and manage multiple projects and activities simultaneously. 7TH Aug 2000 – 2ND Feb 2007 WH Frier Building Contractors Mackay Project Manager Estimated cost $15m Role / Responsibility • Management of multiple projects including • Slab on ground block work 24 unit and 5 executive house development, • Large concrete tilt panel and suspended slab workshops with 50 tonne overhead crane, • 10 Multi-story unit developments (Whitsundays) • Numerous mine site developments including, civil works, concrete works, steel erection, roofing and cladding, fit outs and refurbishments, • Estimations, quotations, Project development, procurement of materials, planning and inspections
  • 10. • Prepare, plan and implement projects. Source and purchase materials and equipment. • Liaise with suppliers to ensure quality products • Liaise with clients to ensure quality of service • Three Subsidiary companies –conduct monthly meetings with training in application of JSA’s and risk assessment procedures • Ensure all work is performed in accordance with workplace health safety and environmental requirements • Facilitate and manage training and assessment of new and existing staff • Daily site inspections to ensure financial and operational efficiency of worksite • Manage all aspects of the business strategic planning for budgets/targets allocated to designated projects • Ensure all work is performed in accordance with workplace health, safety and environmental requirements • Maintain documentation to benchmark standards • Progress the implementation and application of workplace health safety and environmental practices in pursuit of assuring continuous improvement References References will be supplied upon request