Resume
1. Wade Cormier
2032 23rd
Street
Lake Charles, LA 70601
(337) 474-1899
cormier_wade@yahoo.com PROFESSIONAL SUMMARY
SUMMARY OF EXPERIENCE:
Wade has over 19 years of experience in maintenance, construction, and industrial plant knowledge. In his
current role, Wade has consistently delivered favorable results as a Maintenance Supervisor/Field Planner at
the Alcoa Lake Charles Carbon Plant. He has demonstrated safety, quality, and leadership skills while
supervising the maintenance crew on the day and evening shifts. As a Maintenance Field Planner, he has
shown strong technical skills while performing job planning, kitting, and implementing and maintaining best
practices. Wade has also worked with procurement and accounts payable in the successful completion of
several capital and expense projects while working at Alcoa.
Wade is TWIC and OSHA 30 certified and has many capabilities and skills that include, but not limited to, the
following: Forklift Operations (6 – 20 Ton), Rigging, Crane Operations (5 Ton), Equipment Operating (Backhoe,
Bobcat, and Man Lifts up to 150ft), Project Management (Small and Medium Capital and Expense), Four Levels
of Electrical Training (Residential, industry electrical, wiring switches and controls), and Welding (6 Positions to
include first position pipe).
FIELDS OF EXPERTISE & EXPERIENCE:
Alcoa Primary Metals (Alcoa Lake Charles Carbon Plant)
Maintenance Supervisor/Field Planner, June 20, 2012 - Present
• Manage safety and productivity of maintenance employees
• Make key decisions in keeping the plant running and restoring production flow of the entire plant when
needed
• Manage employees on different shifts while working between emergency and planned jobs
• Assist crews with drawings, equipment data, purchase parts, as well as ship and receive damaged
parts to and from suppliers
• Manage third party contractor’s crews working on process equipment and mobile equipment
• Help restructure the planning and kitting process to align with best practices
• Work in Oracle procurement tool
Fluor Corporation
Superintendent Operations & Maintenance, July 07, 2011 – June 19, 2012
• Worked at the Alcoa Lake Charles Carbon Plant managing small to medium Capital and Expense
projects including the Kiln Stack Replacement, Transfer Tower Painting and Abatement, Coke Pre-
Heater Replacement and many others
• Created plans and procedures necessary to provide support in client operations
• Managed the following safety document as required per job: Contract Daily Report, Safety Task
Analysis, and Job Safety Analysis
• Coordinated and supported work activities for Project Management
• Coordinated with client Safety professionals to ensure that all requirements were met or exceeded
• Managed contractors on site to ensure client Safety, Quality, and Production needs were met or
exceeded
• Troubleshoot problem areas, provided recommendations to management, and coordinated solutions
• Planned work with the site to ensure desired objectives, priorities and schedules were met and
communicated to management
2. Wade Cormier
Page 2
• Supervised construction personnel on small to medium capital and expense projects
• Coordinated with customers to ensure desired objectives, priorities and schedules were met and
communicated
Ron Williams Construction
Working Foreman, 2011
• Supervised personnel and small to medium capital and expense projects at the L.A Pigment, Conoco
Tank Farm, Alcoa Facility
• Coordinated with company and client Safety professionals to ensure that all requirements were met or
exceeded
• Coordinated with customers to ensure desired objectives, priorities and schedules were met and
communicated
Fluor Corporation
Superintendent Operations & Maintenance, July 07, 2008 – June 19, 2011
• Worked at the Alcoa Lake Charles Carbon Plant managing small to medium Capital and Expense
projects including the Kiln Stack Demo, Transfer Tower Structural refurbish, Cone Crusher
Replacement and many others
• Created plans and procedures necessary to provide support in client operations
• Managed the following safety document as required per job: Contract Daily Report, Safety Task
Analysis, and Job Safety Analysis
• Coordinated and supported work activities for Project Management
• client Safety professionals to ensure that all requirements were met or exceeded
• Managed contractors on site to ensure client Safety, Quality, and Production needs were met or
exceeded
• Troubleshoot problem areas, provided recommendations to management, and coordinated solutions
• Planned work with the site to ensure desired objectives, priorities and schedules were met and
communicated to management
• Supervised construction personnel on small to medium capital and expense projects
• Coordinated with customers to ensure desired objectives, priorities and schedules were met and
communicated
MMR Construction
Supervisor, 2008
• Supervised personnel and small to medium capital and expense projects at the Alcoa Lake Charles
Facility
• Coordinated with company and client Safety professionals to ensure that all requirements were met or
exceeded
3. Wade Cormier
Page 3
• Coordinated with customers to ensure desired objectives, priorities and schedules were met and
communicated
Ron Williams Construction
Superintendent, 2006 – 2008
• Worked at the Alcoa Lake Charles Carbon Plant managing small to medium Capital and Expense
projects including Coke Pre- heater, Classifier, and other various projects
• Directed support to Fluor upper level management on several capital and expense projects in various
locations
• Created plans and procedures necessary to provide support in client operations
• Managed the following safety document as required per job: Contract Daily Report, Safety Task
Analysis, and Job Safety Analysis
• Coordinated and supported work activities for Project Management
• Coordinated with client Safety professionals to ensure that all requirements were met or exceeded
Managed contractors on site to ensure client Safety, Quality, and Production needs were met or
exceeded
• Troubleshoot problem areas, provided recommendations to management, and coordinated solutions
• Coordinated with customers to ensure desired objectives, priorities and schedules were met and
communicated
Ron Williams Construction
Supervisor, Working Foreman, and Structural welder 1994 - 2006
I have supervised personnel on and worked with on small to medium capital and expense projects at the L.A
Pigment, Conoco Tank Farm, Conoco, CITGO, and other facilities.
Coordinated with company and client Safety professionals to ensure that all requirements were met or
exceeded
Coordinated with customers to ensure desired objectives, priorities and schedules were met and communicated
Working Foreman - Welder -Fitter -Fabricator –General construction - Roof Repairs -Wall Repairs -Structural
Repairs -Road Repairs - Conveyor Repairs
Civil - Mechanical - Structural - Maintenance - Backhoe - Forklift - Bobcat –
Carpenter - Build Scaffolds - Concrete - Finisher
Port of Lake Charles, 1992-2006
Operator - Local 2047 Union / Local 3485 Union
4. Wade Cormier
Page 4
• Worked as an operator and laborer at the Port of Lake Charles
• Primary ship’s conveyor belt system operator and Ship 15 ton crane operator, which was used to move
loads from dock to ship
• Unloaded ships, railcars, trucks and others types of freight haulers with several pieces of equipment
during daily operations
EDUCATION:
A.M. Barbe High School, High School Diploma
ABC Training Center, emphasis in the following:
• Four Levels of Electrical Training, residential, industry electrical, wiring switches and controls
• Six position of welding including first position pipe
• Core Curriculum skills learning for construction
PROFESSIONAL LICENSES/CERTIFICATIONS:
Southwest Louisiana Safety Council
OSHA 30
TWIC
Alcoa/Fluor Alliance Key Supervisor Training (Plant Specific)
Alcoa Lock/Tag/Verify, Confined Space, and Hot Work Permit (Plant Specific)