SlideShare a Scribd company logo
1 of 4
Joni Clark_____________________________________________
6225 Morton Road * Katy, Texas 77493 * 832-486-2188 (w) * 281-875-5278 (c)
Professional Development:
Civil Engineering Technology – New Mexico State University
Associate Business Degree – New Mexico State University
Certification in 2D Autocad – Cad Institute in Phoenix
IRWA - Certification in Negotiations/Acquisitions
IRWA - SR/WA Certification 2013
Toastmasters
Professional Experience:
ConocoPhillips Company - 832-486-2188
Houston, TX PTRRC Eagle Ford Supervisor - 6/2012– Present
This job reports directly to the PTRRC Director, J. D. Adkins.
Job duties include:
 Supervises the well staking and pipeline right of way of 4 direct and 14 contractor
right of way agents
 Aligns goals with other Eagle Ford teams and collaborates in meeting these goals
with other Asset Teams.
 Approves title, survey plats, right of way agreements, drafts, time sheets, expense
reports, invoices, etc. Stays compliant with legal and corporate insurance approving
all right of way documents and property purchases.
ConocoPhillips Company - 832-486-2188
Houston, TX PTRRC Pipeline Project Lead - 5/2011 – 6/2012
This job reports directly to the PTRRC Director, J. D. Adkins.
Job duties include:
 Project coordinator over six pipeline right of way contractors in the Eagle Ford area
o Assign & track projects; update engineering and management on all requests
o Train contractors on COP right of way processes and procedures
o Assist with legal negotiations from internal and external counsel
o Assist with irate landowners and attorneys
o Ensure all projects files are closed in a timely manner
 Assist in routing and staking of flowlines, laterals, and trunklines
 Acquire and lease real estate for facility and office locations
ConocoPhillips Company - 832-486-2188
Houston, TX PTRRC Well Staking Project Lead - 2/2011 – 5/2011
This job reports directly to the PTRRC Supervisor, J. D. Adkins.
Job duties include:
 Coordinated well stakings and issued surface damages to landowner, per oil and gas
lease
 Resolved landowner and attorney issues and disputes
 Obtained Surface and Sub-Surface Agreements and negotiating consideration fee
ConocoPhillips Company (Burlington acquisition)– 505-320-3602
Farmington, NM PTRRC Agent - 2006 – 2011
This job reports directly to the PTRRC Supervisor, Mike Mankin
Job duties include:
 Negotiated right of way easements, well pads and temporary use agreements
 Resolved landowner issues and disputes
 Staked new well locations, access roads and pipelines
 Obtained permits from regulatory agencies for highway crossings, turnouts, etc
 Obtained permits and ROW from five different Native American Tribes
 Acquired title and leased real estate, office space, residential and warehouse space
 Resolved claim issues related to property damages
Burlington Resources Oil & Gas Company – 505-326-9701
Farmington, NM Regulatory Analyst - 1998 - 2006
This job reports directly to the Project Development Manager, Sharon Zubrod.
Job duties include:
 Prepared and filed necessary regulatory paperwork for new drills & remedials
 Assisted Landmen with right of way applications, title searches and check requests
 Conducted public relations with all Regulatory Agencies and Tribal Counsels
 Coordinated all Regulatory Industry Networking Group Meetings
 Conducted presentations on special projects with agencies & BR Mgmt.
Trigon-Sheehan Engineering & Constructors, LLC – 505-325-1266
Farmington, NM Office Manager/ROW Agent - 1996 - 1998
This job reported directly to the San Juan Regional Manager
Job duties included:
 Acquired title and right of way for third party pipeline right of ways
 Filed regulatory sundries to BLM or NMOCD for clients
 Supervised office administrative personnel
Trigon-Sheehan Engineering & Constructors, LLC – 505-325-1266
Farmington, NM Mechanical Designer 1995 – 1996
This job reported directly to the Design Team Lead.
Job duties included:
 Autocad piping drawings, P&ID’s, alignment sheets, right-of-way and survey plats,
baselinemaps, and “as-built” drawings, mainly for Burlington Resources clientele.
 Material take-offs for compressor stations, well head locations, looping, laterals and
mainline projects.
 Conducted random ultrasonic wall thickness measurements on pipelines for corrosion
control.
 Conducted field measurements for “as-built” drawings.
International Minerals and Chemical Corporation – 505-887-2871
Carlsbad, NM Mechanical Designer 1992 – 1995
This job reported directly to the Engineering Manager
Job duties included:
 Autocad piping, structural, general arrangement drawings for various piping and
structural project within the plant facility.
 Material takeoffs, construction estimating, concrete design, issuing requests for
quotes and material requisitions.
 Scheduled deliveries for equipment and steel, and inspected piping and fittings upon
arrival at plant.
 Maintained cost tracking on all engineering projects, along with construction
inspection and surveying on projects throughout completion.
 Conducted monthly ultrasonic testing on all dryers and tanks for corrosion control
purposes.
City of Carlsbad, New Mexico – 505-887-1191
Carlsbad, NM Engineering Technician 1987 - 1992
This job reported directly to the Public Works Director.
Job duties included:
 Construction surveying and sprinkler design for new parks and cemeteries.
 Cost estimations for various public works projects.
 Updated and maintained city maps.
 Conducted waterline locates for State Highway Department, County Road
Department, Carlsbad Irrigation District and other pipeline companies.
 Assisted with various waterline installations, notified customers of turnoffs, resolved
customer issues and prepared “as-built” drawings upon completion.
Eddy County Clerk’s Office
Carlsbad, NM Deputy Clerk 1986-1987
This job reported directly to the County Clerk.
Job duties included:
 Assisted Landman in title searches and filed documents.
Molzen-Corbin & Associates, Consulting Civil Engineers
Carlsbad, NM Engineering Technician 1983 – 1986
This job reported directly to the Carlsbad Regional Engineer.
Job duties included:
 Prepared highway, water, sewer, subdivision and various other engineering drawings.
 Prepared cost estimates and quantity takeoffs for all of above.
 Pulled title for correct land ownership.
 Performed soil and concrete materials testing.
Southern Union Gas Company
Carlsbad, NM Right-of-Way Agent 1980 – 1983
This job reported directly to the Vice President, Transmission
Job duties included:
 Coordinated surveys for new well pads, pipeline connects and access roads.
 Conducted regulatory agencies and landowner staking and onsites.
 Updated new well location maps and valve books.
 Extensive title searches for right-of-way easements.
 Negotiated right-of-way compensation with fee landowners and regulatory agencies.
 Tracked lease expirations and renewals.
 Served as 1981 International Right-of-Way Association Southern NM Pipeline
Chairman.
Computer Knowledge:
Windows Excel, Outlook, Word, Powerpoint
DSM
Microsoft Project
SAP
Professional Organizations:
Past President Toastmasters
Current Notary Public for the State of Texas
International Right of Way Association - SR/WA
Professional References:
Mike Mankin JD Akins
Former PTRRC Supervisor PTRRC Director
ConocoPhillips Eagle Ford Shale
Farmington, New Mexico ConocoPhillips
505-634-6393 Houston, Texas
832-486-2019

More Related Content

What's hot

Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
jzarb_resume[1]
jzarb_resume[1]jzarb_resume[1]
jzarb_resume[1]jeff zarb
 
Cindy Carey Resume[1]
Cindy Carey Resume[1]Cindy Carey Resume[1]
Cindy Carey Resume[1]Cindy Carey
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, RobsonRobson Lima
 
DILEEP C M_ Resume
DILEEP C M_ ResumeDILEEP C M_ Resume
DILEEP C M_ ResumeDILEEP C M
 
Edward Galasso_09
Edward Galasso_09Edward Galasso_09
Edward Galasso_09Ed Galasso
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)Danny Kilpatrick
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian Loftus
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Ken Bossung
 

What's hot (20)

JWSresume
JWSresumeJWSresume
JWSresume
 
Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Resume
ResumeResume
Resume
 
2016 Resume Alfredo Rauseo
2016 Resume Alfredo Rauseo2016 Resume Alfredo Rauseo
2016 Resume Alfredo Rauseo
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
jzarb_resume[1]
jzarb_resume[1]jzarb_resume[1]
jzarb_resume[1]
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
WALTER STEPHEN WALTER
WALTER STEPHEN WALTERWALTER STEPHEN WALTER
WALTER STEPHEN WALTER
 
Cindy Carey Resume[1]
Cindy Carey Resume[1]Cindy Carey Resume[1]
Cindy Carey Resume[1]
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
 
DILEEP C M_ Resume
DILEEP C M_ ResumeDILEEP C M_ Resume
DILEEP C M_ Resume
 
Edward Galasso_09
Edward Galasso_09Edward Galasso_09
Edward Galasso_09
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Jabez Corp Flyer
Jabez Corp FlyerJabez Corp Flyer
Jabez Corp Flyer
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)Brian P Loftus Resume(24AUG2015)
Brian P Loftus Resume(24AUG2015)
 
Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18Bossung, Kenneth W-NYC-18
Bossung, Kenneth W-NYC-18
 
randy
randyrandy
randy
 

Viewers also liked

ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System Ankit Sharma
 
VOZAK, Hugo Bitcoin Thesis
VOZAK, Hugo Bitcoin ThesisVOZAK, Hugo Bitcoin Thesis
VOZAK, Hugo Bitcoin ThesisHugo Vozak
 
FONTAINEBLEAU
FONTAINEBLEAUFONTAINEBLEAU
FONTAINEBLEAUxiel8
 
SAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantSAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantAnkit Sharma
 
SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide Ankit Sharma
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture Ankit Sharma
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 

Viewers also liked (11)

ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System
 
Jaya Shankar-9
Jaya Shankar-9Jaya Shankar-9
Jaya Shankar-9
 
VOZAK, Hugo Bitcoin Thesis
VOZAK, Hugo Bitcoin ThesisVOZAK, Hugo Bitcoin Thesis
VOZAK, Hugo Bitcoin Thesis
 
Lets begin
Lets beginLets begin
Lets begin
 
FONTAINEBLEAU
FONTAINEBLEAUFONTAINEBLEAU
FONTAINEBLEAU
 
PhotoFault
PhotoFaultPhotoFault
PhotoFault
 
SAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantSAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional Consultant
 
Roy hubbard
Roy hubbardRoy hubbard
Roy hubbard
 
SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 

Similar to resume

Similar to resume (20)

Resume / Project List
Resume / Project ListResume / Project List
Resume / Project List
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 PortfolioSCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
 
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 PortfolioSCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
SCOTT SCHROEDER RESUME AND SCHROEDER LAND COMPANY 2015 Portfolio
 
Resume_Lois-12-2015
Resume_Lois-12-2015Resume_Lois-12-2015
Resume_Lois-12-2015
 
Resume lois 12-2015
Resume lois 12-2015Resume lois 12-2015
Resume lois 12-2015
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
2016-0429 John Szadzinski
2016-0429 John Szadzinski2016-0429 John Szadzinski
2016-0429 John Szadzinski
 
Mark Ritayik Resume.wps
Mark Ritayik Resume.wpsMark Ritayik Resume.wps
Mark Ritayik Resume.wps
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
gfrsm2015
gfrsm2015gfrsm2015
gfrsm2015
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
 
Neil Curra Resume.
Neil Curra Resume.Neil Curra Resume.
Neil Curra Resume.
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
FNK rev 06.08.15
FNK rev 06.08.15FNK rev 06.08.15
FNK rev 06.08.15
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 

resume

  • 1. Joni Clark_____________________________________________ 6225 Morton Road * Katy, Texas 77493 * 832-486-2188 (w) * 281-875-5278 (c) Professional Development: Civil Engineering Technology – New Mexico State University Associate Business Degree – New Mexico State University Certification in 2D Autocad – Cad Institute in Phoenix IRWA - Certification in Negotiations/Acquisitions IRWA - SR/WA Certification 2013 Toastmasters Professional Experience: ConocoPhillips Company - 832-486-2188 Houston, TX PTRRC Eagle Ford Supervisor - 6/2012– Present This job reports directly to the PTRRC Director, J. D. Adkins. Job duties include:  Supervises the well staking and pipeline right of way of 4 direct and 14 contractor right of way agents  Aligns goals with other Eagle Ford teams and collaborates in meeting these goals with other Asset Teams.  Approves title, survey plats, right of way agreements, drafts, time sheets, expense reports, invoices, etc. Stays compliant with legal and corporate insurance approving all right of way documents and property purchases. ConocoPhillips Company - 832-486-2188 Houston, TX PTRRC Pipeline Project Lead - 5/2011 – 6/2012 This job reports directly to the PTRRC Director, J. D. Adkins. Job duties include:  Project coordinator over six pipeline right of way contractors in the Eagle Ford area o Assign & track projects; update engineering and management on all requests o Train contractors on COP right of way processes and procedures o Assist with legal negotiations from internal and external counsel o Assist with irate landowners and attorneys o Ensure all projects files are closed in a timely manner  Assist in routing and staking of flowlines, laterals, and trunklines  Acquire and lease real estate for facility and office locations ConocoPhillips Company - 832-486-2188 Houston, TX PTRRC Well Staking Project Lead - 2/2011 – 5/2011 This job reports directly to the PTRRC Supervisor, J. D. Adkins. Job duties include:
  • 2.  Coordinated well stakings and issued surface damages to landowner, per oil and gas lease  Resolved landowner and attorney issues and disputes  Obtained Surface and Sub-Surface Agreements and negotiating consideration fee ConocoPhillips Company (Burlington acquisition)– 505-320-3602 Farmington, NM PTRRC Agent - 2006 – 2011 This job reports directly to the PTRRC Supervisor, Mike Mankin Job duties include:  Negotiated right of way easements, well pads and temporary use agreements  Resolved landowner issues and disputes  Staked new well locations, access roads and pipelines  Obtained permits from regulatory agencies for highway crossings, turnouts, etc  Obtained permits and ROW from five different Native American Tribes  Acquired title and leased real estate, office space, residential and warehouse space  Resolved claim issues related to property damages Burlington Resources Oil & Gas Company – 505-326-9701 Farmington, NM Regulatory Analyst - 1998 - 2006 This job reports directly to the Project Development Manager, Sharon Zubrod. Job duties include:  Prepared and filed necessary regulatory paperwork for new drills & remedials  Assisted Landmen with right of way applications, title searches and check requests  Conducted public relations with all Regulatory Agencies and Tribal Counsels  Coordinated all Regulatory Industry Networking Group Meetings  Conducted presentations on special projects with agencies & BR Mgmt. Trigon-Sheehan Engineering & Constructors, LLC – 505-325-1266 Farmington, NM Office Manager/ROW Agent - 1996 - 1998 This job reported directly to the San Juan Regional Manager Job duties included:  Acquired title and right of way for third party pipeline right of ways  Filed regulatory sundries to BLM or NMOCD for clients  Supervised office administrative personnel Trigon-Sheehan Engineering & Constructors, LLC – 505-325-1266 Farmington, NM Mechanical Designer 1995 – 1996 This job reported directly to the Design Team Lead. Job duties included:  Autocad piping drawings, P&ID’s, alignment sheets, right-of-way and survey plats, baselinemaps, and “as-built” drawings, mainly for Burlington Resources clientele.  Material take-offs for compressor stations, well head locations, looping, laterals and mainline projects.  Conducted random ultrasonic wall thickness measurements on pipelines for corrosion control.  Conducted field measurements for “as-built” drawings.
  • 3. International Minerals and Chemical Corporation – 505-887-2871 Carlsbad, NM Mechanical Designer 1992 – 1995 This job reported directly to the Engineering Manager Job duties included:  Autocad piping, structural, general arrangement drawings for various piping and structural project within the plant facility.  Material takeoffs, construction estimating, concrete design, issuing requests for quotes and material requisitions.  Scheduled deliveries for equipment and steel, and inspected piping and fittings upon arrival at plant.  Maintained cost tracking on all engineering projects, along with construction inspection and surveying on projects throughout completion.  Conducted monthly ultrasonic testing on all dryers and tanks for corrosion control purposes. City of Carlsbad, New Mexico – 505-887-1191 Carlsbad, NM Engineering Technician 1987 - 1992 This job reported directly to the Public Works Director. Job duties included:  Construction surveying and sprinkler design for new parks and cemeteries.  Cost estimations for various public works projects.  Updated and maintained city maps.  Conducted waterline locates for State Highway Department, County Road Department, Carlsbad Irrigation District and other pipeline companies.  Assisted with various waterline installations, notified customers of turnoffs, resolved customer issues and prepared “as-built” drawings upon completion. Eddy County Clerk’s Office Carlsbad, NM Deputy Clerk 1986-1987 This job reported directly to the County Clerk. Job duties included:  Assisted Landman in title searches and filed documents. Molzen-Corbin & Associates, Consulting Civil Engineers Carlsbad, NM Engineering Technician 1983 – 1986 This job reported directly to the Carlsbad Regional Engineer. Job duties included:  Prepared highway, water, sewer, subdivision and various other engineering drawings.  Prepared cost estimates and quantity takeoffs for all of above.  Pulled title for correct land ownership.  Performed soil and concrete materials testing. Southern Union Gas Company Carlsbad, NM Right-of-Way Agent 1980 – 1983
  • 4. This job reported directly to the Vice President, Transmission Job duties included:  Coordinated surveys for new well pads, pipeline connects and access roads.  Conducted regulatory agencies and landowner staking and onsites.  Updated new well location maps and valve books.  Extensive title searches for right-of-way easements.  Negotiated right-of-way compensation with fee landowners and regulatory agencies.  Tracked lease expirations and renewals.  Served as 1981 International Right-of-Way Association Southern NM Pipeline Chairman. Computer Knowledge: Windows Excel, Outlook, Word, Powerpoint DSM Microsoft Project SAP Professional Organizations: Past President Toastmasters Current Notary Public for the State of Texas International Right of Way Association - SR/WA Professional References: Mike Mankin JD Akins Former PTRRC Supervisor PTRRC Director ConocoPhillips Eagle Ford Shale Farmington, New Mexico ConocoPhillips 505-634-6393 Houston, Texas 832-486-2019