SlideShare a Scribd company logo
1 of 3
Download to read offline
Fariborz Navidi-Kasmai, P.E.
8316 Bear Creek Drive
Dundalk, MD 21222
Tel: 703-675-1024
navidi@curveconstructionllc.com
Typical Projects
 Bridge Superstructure & Substructure Repairs, Latex and
Silica Fume Overlays, Deck Replacements, Steel Repairs
varying in range up to $12 million. Clients: Virginia Dept. of
Transportation, Maryland Department of Transportation, DC
Department of Public Works.
 Connecticut Avenue over Klingle Valley Deck Replacement &
Steel Repairs - $12 million (DDOT).
 D&E Streets over I-395 Deck Replacement - $8 million (FHWA).
 Memorial Drive Bridge over Boundary Channel Histroric Bridge
Rehabilitation - $2 million (FHWA).
 Clara Barton Parkway Cantilever Structure - $2.3 million
(FHWA).
 Benedict Bridge over Patuxent River Hydrodemilition & Latex
Overlay - $3 million (MSHA).
 I-64 over Rivanna River Rapidset Latex Overlay - $1 million
(VDOT).
 Rte 460 over New River Latex Overlay - $1 million (VDOT)
 Structural Concrete varying in range up to $5 million.
 Dale City WWTP (12,000 CY of Structural Concrete, Mat
Foundations (2,000 CY pours), 30’ Tall Gang Formed Walls with
Manto Forms, Miscellaneous Structures.
 German Ambassador’s Residence, Washington, DC.
 Hillwood Museum Addition, Washington, DC.
Employment History
 2011- 2014 Blastech Enterprises, Inc Baltimore, MD
 Senior Project Manager
 Cleaning & Painting Bridges, and steel repairs
 $10-$20 million per year
 2011 – 2014 Franco’s Liberty Bridge Baltimore, MD
 Project Manager/Estimator
 Bridge Repairs, Overlays, & Structural Concrete
 $1-$2 million per year
 1999 – 2011 Tessa Structures, LLC Upper Marlboro, MD
 President, Professional Engineer
 General Contracting and Bridge Construction/Repair/Replacement
 Concrete Work: $5 - $10 million per year
 1995 - 1998 Tessa-Martins, LLC Springfield, VA
 Partner, Vice President
 General Contracting and Bridge Construction/Repair/Replacement
 Concrete Work: $8 million per year
Responsible for all construction and financial operations
 1993 - 1999 Tessa Construction Co. Springfield, VA
 President, Professional Engineer
 General Contracting and Bridge Construction/Repair/Replacement
Concrete Work: $3 million per year
1989 – 1993 Fort Myer Construction Co. Washington, DC
Project Engineer, Quality Control Engineer, Project Manager
 Concrete and Road Building
 Volume: $60-$80 million per year
 Responsible for project scheduling (CPM); material submittals,
acquisition and scheduling deliveries; subcontractor’s determination;
processing and control; change order generation and tracking, value
engineering, project safety.
1989 – 1989 Loierderman Associates, Inc. Chantilly, VA
Senior Project Design Engineer – Land Development
1986 - 1989 Progressive Engineering Consultants Chantilly, VA
Project Manger, Project Engineer – Highway Design
EDUCATION
1982 - 1986 Virginia Tech Blacksburg, VA
 B.S. Civil Engineering
1981 - 1982 Lafayette College Easton, PA
 Civil Engineering
 Dean’s List
1978 - 1981 American School of Paris Paris, France
 High School Diploma
REGISTRATIONS/AFFILIATIONS
Licensed Professional Engineer, State of Virginia
LANGUAGES
French, Persian
FNK rev 06.08.15

More Related Content

What's hot

tlewisresumetopekarev (1)
tlewisresumetopekarev (1)tlewisresumetopekarev (1)
tlewisresumetopekarev (1)Thomas Lewis
 
Wade A Cantwell's Resume Rev B
Wade A  Cantwell's Resume Rev BWade A  Cantwell's Resume Rev B
Wade A Cantwell's Resume Rev BWade A. Cantwell
 
Route 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneRoute 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneFairfax County
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadFairfax County
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Fairfax County
 
Lynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC ProjectsLynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC ProjectsLynee Russell
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayRiverFirst Initiative
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Fairfax County
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadFairfax County
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project ResumeEric Girod
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampFairfax County
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16David Beverly
 
Route 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection ImprovementsRoute 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection ImprovementsFairfax County
 
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Fairfax County
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)novacsi
 

What's hot (20)

tlewisresumetopekarev (1)
tlewisresumetopekarev (1)tlewisresumetopekarev (1)
tlewisresumetopekarev (1)
 
Wade A Cantwell's Resume Rev B
Wade A  Cantwell's Resume Rev BWade A  Cantwell's Resume Rev B
Wade A Cantwell's Resume Rev B
 
Route 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneRoute 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden Lane
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
jake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDFjake bellamy Resume 1 (1).PDF
jake bellamy Resume 1 (1).PDF
 
Lynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC ProjectsLynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC Projects
 
91 Design Build Update
91 Design Build Update91 Design Build Update
91 Design Build Update
 
TLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 MayTLS/KVA RiverFIRST Project Criteria, 24-25 May
TLS/KVA RiverFIRST Project Criteria, 24-25 May
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
 
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview RoadIntersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
Intersection Sight Distance Improvement: Old Dominion Drive at Bellview Road
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
Resume
ResumeResume
Resume
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
 
Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16Resume Part A - Summary 7-19-16
Resume Part A - Summary 7-19-16
 
Route 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection ImprovementsRoute 50 at Woodlawn Ave Intersection Improvements
Route 50 at Woodlawn Ave Intersection Improvements
 
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)
 
Curtis' Resume
Curtis' ResumeCurtis' Resume
Curtis' Resume
 
ResumeExport
ResumeExportResumeExport
ResumeExport
 

Viewers also liked

134367 20160212 - lai acompanhamento+anexo - lombadas santander
134367   20160212 - lai acompanhamento+anexo - lombadas santander134367   20160212 - lai acompanhamento+anexo - lombadas santander
134367 20160212 - lai acompanhamento+anexo - lombadas santanderCampinas Que Queremos
 
культура западной европы в раннее средневековье
культура западной европы в раннее средневековьекультура западной европы в раннее средневековье
культура западной европы в раннее средневековьеvtvvoa
 
Gary Paul Smith - Living The User Experience
Gary Paul Smith - Living The User ExperienceGary Paul Smith - Living The User Experience
Gary Paul Smith - Living The User ExperienceGary Smith
 
Presentazione Fidia spa
Presentazione Fidia spaPresentazione Fidia spa
Presentazione Fidia spagiadagaron27
 
Advertising production for television- presentation
Advertising production for television- presentationAdvertising production for television- presentation
Advertising production for television- presentationkaleradurand
 
Aparato locomotor (1)
Aparato locomotor (1)Aparato locomotor (1)
Aparato locomotor (1)Judith Pujols
 
Pat Good Results Analysis
Pat Good Results AnalysisPat Good Results Analysis
Pat Good Results Analysismilkowski
 
Will Good Conclusion
Will Good ConclusionWill Good Conclusion
Will Good Conclusionmilkowski
 
Foot locker challenge
Foot locker challengeFoot locker challenge
Foot locker challengemackenzeydunn
 

Viewers also liked (20)

134367 20160212 - lai acompanhamento+anexo - lombadas santander
134367   20160212 - lai acompanhamento+anexo - lombadas santander134367   20160212 - lai acompanhamento+anexo - lombadas santander
134367 20160212 - lai acompanhamento+anexo - lombadas santander
 
культура западной европы в раннее средневековье
культура западной европы в раннее средневековьекультура западной европы в раннее средневековье
культура западной европы в раннее средневековье
 
Assigment 2
Assigment 2Assigment 2
Assigment 2
 
Procés tecnològic
Procés tecnològicProcés tecnològic
Procés tecnològic
 
My
MyMy
My
 
Fol
FolFol
Fol
 
Pmmu são paulo - bicicletas
Pmmu são paulo - bicicletasPmmu são paulo - bicicletas
Pmmu são paulo - bicicletas
 
Gary Paul Smith - Living The User Experience
Gary Paul Smith - Living The User ExperienceGary Paul Smith - Living The User Experience
Gary Paul Smith - Living The User Experience
 
Akashi Brochure - General
Akashi Brochure - GeneralAkashi Brochure - General
Akashi Brochure - General
 
Name
NameName
Name
 
Presentazione Fidia spa
Presentazione Fidia spaPresentazione Fidia spa
Presentazione Fidia spa
 
Advertising production for television- presentation
Advertising production for television- presentationAdvertising production for television- presentation
Advertising production for television- presentation
 
Aparato locomotor (1)
Aparato locomotor (1)Aparato locomotor (1)
Aparato locomotor (1)
 
SOCIAL MEDIA
SOCIAL MEDIASOCIAL MEDIA
SOCIAL MEDIA
 
Pat Good Results Analysis
Pat Good Results AnalysisPat Good Results Analysis
Pat Good Results Analysis
 
Shia and belief
Shia and beliefShia and belief
Shia and belief
 
Constructor Destructor
Constructor DestructorConstructor Destructor
Constructor Destructor
 
Will Good Conclusion
Will Good ConclusionWill Good Conclusion
Will Good Conclusion
 
Foot locker challenge
Foot locker challengeFoot locker challenge
Foot locker challenge
 
Lymphatic system
Lymphatic systemLymphatic system
Lymphatic system
 

Similar to FNK rev 06.08.15

Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copydon rawson
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire
 
Resume / Project List
Resume / Project ListResume / Project List
Resume / Project Listamerolla
 
Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew Ruth
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards ACECSDES
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)AGC of California
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1Ted Warren
 
Minnesota State Bridge Profile
Minnesota State Bridge ProfileMinnesota State Bridge Profile
Minnesota State Bridge Profileartba
 

Similar to FNK rev 06.08.15 (20)

Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Donald J resume Word 2 copy
Donald J resume Word 2 copyDonald J resume Word 2 copy
Donald J resume Word 2 copy
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
Epw Cv 2009
Epw Cv 2009Epw Cv 2009
Epw Cv 2009
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
Resume / Project List
Resume / Project ListResume / Project List
Resume / Project List
 
Project list
Project listProject list
Project list
 
resume_2015
resume_2015resume_2015
resume_2015
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016
 
resume
resumeresume
resume
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards
 
sh183_tracker
sh183_trackersh183_tracker
sh183_tracker
 
Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
 
resume
resumeresume
resume
 
Epw. Cv. Doc 2010 A1
Epw. Cv.  Doc  2010 A1Epw. Cv.  Doc  2010 A1
Epw. Cv. Doc 2010 A1
 
Resume
ResumeResume
Resume
 
Minnesota State Bridge Profile
Minnesota State Bridge ProfileMinnesota State Bridge Profile
Minnesota State Bridge Profile
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 

FNK rev 06.08.15

  • 1. Fariborz Navidi-Kasmai, P.E. 8316 Bear Creek Drive Dundalk, MD 21222 Tel: 703-675-1024 navidi@curveconstructionllc.com Typical Projects  Bridge Superstructure & Substructure Repairs, Latex and Silica Fume Overlays, Deck Replacements, Steel Repairs varying in range up to $12 million. Clients: Virginia Dept. of Transportation, Maryland Department of Transportation, DC Department of Public Works.  Connecticut Avenue over Klingle Valley Deck Replacement & Steel Repairs - $12 million (DDOT).  D&E Streets over I-395 Deck Replacement - $8 million (FHWA).  Memorial Drive Bridge over Boundary Channel Histroric Bridge Rehabilitation - $2 million (FHWA).  Clara Barton Parkway Cantilever Structure - $2.3 million (FHWA).  Benedict Bridge over Patuxent River Hydrodemilition & Latex Overlay - $3 million (MSHA).  I-64 over Rivanna River Rapidset Latex Overlay - $1 million (VDOT).  Rte 460 over New River Latex Overlay - $1 million (VDOT)  Structural Concrete varying in range up to $5 million.  Dale City WWTP (12,000 CY of Structural Concrete, Mat Foundations (2,000 CY pours), 30’ Tall Gang Formed Walls with Manto Forms, Miscellaneous Structures.  German Ambassador’s Residence, Washington, DC.  Hillwood Museum Addition, Washington, DC. Employment History  2011- 2014 Blastech Enterprises, Inc Baltimore, MD  Senior Project Manager  Cleaning & Painting Bridges, and steel repairs  $10-$20 million per year  2011 – 2014 Franco’s Liberty Bridge Baltimore, MD  Project Manager/Estimator  Bridge Repairs, Overlays, & Structural Concrete  $1-$2 million per year  1999 – 2011 Tessa Structures, LLC Upper Marlboro, MD  President, Professional Engineer  General Contracting and Bridge Construction/Repair/Replacement
  • 2.  Concrete Work: $5 - $10 million per year  1995 - 1998 Tessa-Martins, LLC Springfield, VA  Partner, Vice President  General Contracting and Bridge Construction/Repair/Replacement  Concrete Work: $8 million per year Responsible for all construction and financial operations  1993 - 1999 Tessa Construction Co. Springfield, VA  President, Professional Engineer  General Contracting and Bridge Construction/Repair/Replacement Concrete Work: $3 million per year 1989 – 1993 Fort Myer Construction Co. Washington, DC Project Engineer, Quality Control Engineer, Project Manager  Concrete and Road Building  Volume: $60-$80 million per year  Responsible for project scheduling (CPM); material submittals, acquisition and scheduling deliveries; subcontractor’s determination; processing and control; change order generation and tracking, value engineering, project safety. 1989 – 1989 Loierderman Associates, Inc. Chantilly, VA Senior Project Design Engineer – Land Development 1986 - 1989 Progressive Engineering Consultants Chantilly, VA Project Manger, Project Engineer – Highway Design EDUCATION 1982 - 1986 Virginia Tech Blacksburg, VA  B.S. Civil Engineering 1981 - 1982 Lafayette College Easton, PA  Civil Engineering  Dean’s List 1978 - 1981 American School of Paris Paris, France  High School Diploma REGISTRATIONS/AFFILIATIONS Licensed Professional Engineer, State of Virginia LANGUAGES French, Persian