1. Fariborz Navidi-Kasmai, P.E.
8316 Bear Creek Drive
Dundalk, MD 21222
Tel: 703-675-1024
navidi@curveconstructionllc.com
Typical Projects
Bridge Superstructure & Substructure Repairs, Latex and
Silica Fume Overlays, Deck Replacements, Steel Repairs
varying in range up to $12 million. Clients: Virginia Dept. of
Transportation, Maryland Department of Transportation, DC
Department of Public Works.
Connecticut Avenue over Klingle Valley Deck Replacement &
Steel Repairs - $12 million (DDOT).
D&E Streets over I-395 Deck Replacement - $8 million (FHWA).
Memorial Drive Bridge over Boundary Channel Histroric Bridge
Rehabilitation - $2 million (FHWA).
Clara Barton Parkway Cantilever Structure - $2.3 million
(FHWA).
Benedict Bridge over Patuxent River Hydrodemilition & Latex
Overlay - $3 million (MSHA).
I-64 over Rivanna River Rapidset Latex Overlay - $1 million
(VDOT).
Rte 460 over New River Latex Overlay - $1 million (VDOT)
Structural Concrete varying in range up to $5 million.
Dale City WWTP (12,000 CY of Structural Concrete, Mat
Foundations (2,000 CY pours), 30’ Tall Gang Formed Walls with
Manto Forms, Miscellaneous Structures.
German Ambassador’s Residence, Washington, DC.
Hillwood Museum Addition, Washington, DC.
Employment History
2011- 2014 Blastech Enterprises, Inc Baltimore, MD
Senior Project Manager
Cleaning & Painting Bridges, and steel repairs
$10-$20 million per year
2011 – 2014 Franco’s Liberty Bridge Baltimore, MD
Project Manager/Estimator
Bridge Repairs, Overlays, & Structural Concrete
$1-$2 million per year
1999 – 2011 Tessa Structures, LLC Upper Marlboro, MD
President, Professional Engineer
General Contracting and Bridge Construction/Repair/Replacement
2. Concrete Work: $5 - $10 million per year
1995 - 1998 Tessa-Martins, LLC Springfield, VA
Partner, Vice President
General Contracting and Bridge Construction/Repair/Replacement
Concrete Work: $8 million per year
Responsible for all construction and financial operations
1993 - 1999 Tessa Construction Co. Springfield, VA
President, Professional Engineer
General Contracting and Bridge Construction/Repair/Replacement
Concrete Work: $3 million per year
1989 – 1993 Fort Myer Construction Co. Washington, DC
Project Engineer, Quality Control Engineer, Project Manager
Concrete and Road Building
Volume: $60-$80 million per year
Responsible for project scheduling (CPM); material submittals,
acquisition and scheduling deliveries; subcontractor’s determination;
processing and control; change order generation and tracking, value
engineering, project safety.
1989 – 1989 Loierderman Associates, Inc. Chantilly, VA
Senior Project Design Engineer – Land Development
1986 - 1989 Progressive Engineering Consultants Chantilly, VA
Project Manger, Project Engineer – Highway Design
EDUCATION
1982 - 1986 Virginia Tech Blacksburg, VA
B.S. Civil Engineering
1981 - 1982 Lafayette College Easton, PA
Civil Engineering
Dean’s List
1978 - 1981 American School of Paris Paris, France
High School Diploma
REGISTRATIONS/AFFILIATIONS
Licensed Professional Engineer, State of Virginia
LANGUAGES
French, Persian