SlideShare a Scribd company logo
1 of 6
Mr. John Hilary Collins
84 Church Road,
Rivenhall,
Witham,
Essex.
CM83PH
Phone: Php. 00639193810089; UK. 0044 1376 51922:
Dear Sir,
Having spent more than 35 years of my professional career in the building services, engineering and
construction environment, I have attained a great deal of experience successfully engineering and
managing major construction projects.
My experience has also involved taking over existing projects of varying Complexity and resolving
outstanding problems to enable milestone and completion dates to be met.
Moreover my expertise extends to managing staff and labor of various dicipines and nationalities
and organizing the transitional period from construction through to operational handover including
the final testing and commissioning and subsequent operational elements of various buildings.
Please see my C.V. below for detailed information.
My last contract was in Riyadh KSA working on a 2.3 Billion euro project.
I am available for a new Contract immediately.
Yours sincerely,
JOHN HILARY COLLINS
CURRICULUM VITAE.
PERSONAL DATA:
Name: John Hilary Collins I. ENG. M.I.E.T.
Nationality: British.
CONTACT DETAILS:
Email: john_hilary_collins@yahoo.co.uk
Telephone: MB. +639193810089. (+8Hrs GMT).
EDUCATION:
1976-1978 North East London Polytechnic.
Qualification: City & Guilds 255 Full Technological Diploma in Mechanical engineering.
1972-1976 Barking College Of Engineering and IT. Technology.
Qualification: City and Guilds 255 Parts I and II. In mechanical & Technological Engineering
1972-1976 Engineering & Technological Apprenticeship to Ford Motor Company Ltd.
1967-1972 Romford Technical High School. GCE 8-O Levels Cambridge.
PROFESSIONAL:
Member of the Institute of Engineering & Technology, MIET.
Incorporated Engineer with the Council of Engineering Institutions, I.Eng.
EMPLOYMENT HISTORY:
2014 July – 2015 October: Hanmi International project managers for RIYADH INVESTMENT
COMPANY, (RIC KSA).
Position: Senior MEP Technical & commissioning Manager for an Information & Technology
Communications Center (ITCC).
• Responsible for the MEP project Management of 38 Buildings, Including a 5 star luxury 250
bedroom Hotel & conference center, 4 No. 20 story office towers, Sludge Treatment Plant, Data
Center, District Cooling Plant, Main substation, 5 sub stations and extensive retail infrastructure.
• Management and control of five consultants companies, and their main contractors and
various Sub contractors.
• Management of Testing & commissioning companies, chairing Meetings, and
implementation of Client directives leading to operational handover.
2012 - 2013 Sino Construction, Manila, Philippines.
Position: MEP project Manager to Casino, hotel and apartments.
• Responsible for managing all MEP works, including office and site based engineers, and
installation personnel, construction surveying team and sub-contractors
• Chairing meetings with MC Project Team, along with my own project team.
• Attending the engineers site office meetings and seminars and issuing progress reports and
recommendations to the Client and project team.
2010 - 2012 EL-SEIF ENGINEERING CONTRACTING CO LTD.DOHA, (QATAR).
Position: MEP Project Manager for Eight Airport Building Facilities to the new Doha
International Airport; Design & Build Project
• Responsible for managing the entire MEP works, including my team of office and site based
senior engineers, and installation personnel, and sub-contractor site teams, including the construction
surveying team. The mechanical sub-contractor was Drake and Scull international.
• Chairing the weekly meeting with Drake and Sculls Project Team, along with my own project
team.
• Attending the engineers (Bechtel international) site office meetings and seminars and issuing
progress reports and recommendations to Bechtel s project team.
2008-2010 LORNE STEWART PLC.LONDON, ENGLAND.
Position: MEP Project Manager to new Medical Centre.
• Responsible for all MEP works including placing of sub-contractor orders, reviewing and signing
off installation drawings, attending all client meetings and advising of planning dates with regard to
site progress and capabilities.
• Compliance with all local regulations. Site co-ordination of all Contractor activities including
Reviewing and authorizing payment applications
2005-2008 AMEC, LONDON, (ENGLAND).ST. PANCRAS RAILWAY STATION C.T.R.L.
Position MEP Project Manager for Eurostar Main railway Terminal.
• Responsible for and assisting the building services staff, site engineers & contractors including
the procurement, quality checking and site installation of MEP work, design issues, client meetings &
issuing sub-contractor site instruction.
• attending the engineers site office meetings and seminars and issuing progress reports and
recommendations to the project team.
New Hilton Hotel, Bishops Square tenant fit out Project (1 million sq. ft.). New Willis Building, City of
London (38 Story Shell & Core).
• Responsible for managing the entire MEP works, including my team of office and site based
engineers, foremen and installation personnel, and sub-contractor site teams, including the
construction surveying team.
• Chairing meetings with MC Project Team, along with my own project team.
2002-2005 MITIE ENGINEERING LTD.LONDON, (ENGLAND).
Position: MEP Project Manager to a College Refurbishment and New Build.
• Responsible for the entire MEP works from Procurement, through to commissioning, also
Involving consultant, architect and Client liaison.
• Contractor supervision, co-ordination and troubleshooting, advising on re-design and drawing
approval/Signing off, placing of contract orders, delivery scheduling, Cost evaluation, programming
and commissioning
• Involving reviewing and approving c.a.d. coordinated drawings in line with the latest
specifications and tender.
• Issuing tender enquiries and orders to electrical and mechanical sub-contractors, procurement
of all MEP ancillaries, and plant, attending weekly site meetings and the implementing of design and
VO costs. Issuing monthly applications, signing off/rejecting invoices, estimating variations and
Overseeing the testing and commissioning of all MEP works.
1999-2002 LORNE STEWART P.L.C. PARIS, (FRANCE).
Position: MEP Project Manager for USA Client. Refurbishment of eight-story pre-war
Factory, for a new I.T. Switching station.
• Responsible for a major strip out of redundant building services, alongside the new
installation.
• New concept of services riser Installations, involving pre-fabricated modules for cooling pumps
and riser pipe work, (700 mm dia.) transported from Holland Europe, and craned down redundant lift
shafts in sections and connected insitue. Project network computerized p
• Very large refurbishment of Sanderson paints ex. Head office, into high specification, five star
luxury hotel.
• Managing all sub-contractors and MEP operations, (hvac, pipework, plumbing, drainage MV &
LV systems).
. Bovis- LONDON. LUXUARY 5*Hotel.
1995 -1999 A.E.H. JOINT VENTURE, CHEK LAP KOK, (HONG KONG).
Position: MEP Project manager for the new Airport Passenger Terminal, service tunnels
and Aircraft Maintenance Facility Buildings. • Responsible for the entire mechanical contract
from Procurement, through to commissioning. Involving client, consultant, architect and Client liaison.
• Contractor supervision, co-ordination and troubleshooting, advising on re-design and drawing
approval/Signing off, placing of contract orders, delivery scheduling, Cost evaluation, programming
and commissioning
• Involving reviewing and signing off coordinated drawings in line with the latest specifications.
• Issuing tender enquiries and orders to electrical and mechanical sub-contractors. Procurement
of all MEP works, ancillaries, and plant. Attending weekly site meetings. Implementing design
change/costs. Issuing monthly applications, signing off/rejecting invoices. Estimating variations
Overseeing testing and commissioning of all M. & E works.
1991 -1995 KENTZ INTERNATIONAL, BARCELONA, (SPAIN).
Position: HVAC Manager, M. & P. Services. 44 Story luxury 5 Star Hotel, Apartments &
infrastructure. Senior MEP Manager for all H.V.A.C. Pipework, Ductwork, plumbing & Drainage, to the
Hotel Villa Olympica, office block and Retail areas.
1988 -1991 CROWN HOUSE / NIAGRA, MECHANICAL SERVICES, J.V.CANARY WHARF, LONDON, UK.
Position: MEP HVAC Engineer to 50 story office tower, (tallest in Europe at the time) and
Extensive retail infrastructure.
• Responsible for the detailing and coordination, of Mechanical services & tenant fit out,
including Retail areas, Restaurants, Shops and Bars.
1987 – 1988 MATHEW HALL P.L.C. LONDON, (ENGLAND).
Position: MEP Design Coordinator HVAC Engineer for Sprinkler Protection .
To Fire Officers Committee & National Fire Protection Association.
. Responsible for the detailing and coordination, of sprinkler systems, manufacture and
installation of such.
1976 – 1987 FORD MOTOR CO. LTD. (ENGLAND).
Position:
. Design Engineer for new plant building services.
1972 - 1976. TECHNICAL APPRENTICESHIP FORD MOTOR CO.LTD.
ADDITIONAL INFORMATION:
Driving licenses for UK, Qatar, Philippine, Saudi and International.
PC literate (Word, Excel, BIW Project Network)
Holder of C.S.C.S Project Manager Construction Card UK.
Position: HVAC Manager, M. & P. Services. 44 Story luxury 5 Star Hotel, Apartments &
infrastructure. Senior MEP Manager for all H.V.A.C. Pipework, Ductwork, plumbing & Drainage, to the
Hotel Villa Olympica, office block and Retail areas.
1988 -1991 CROWN HOUSE / NIAGRA, MECHANICAL SERVICES, J.V.CANARY WHARF, LONDON, UK.
Position: MEP HVAC Engineer to 50 story office tower, (tallest in Europe at the time) and
Extensive retail infrastructure.
• Responsible for the detailing and coordination, of Mechanical services & tenant fit out,
including Retail areas, Restaurants, Shops and Bars.
1987 – 1988 MATHEW HALL P.L.C. LONDON, (ENGLAND).
Position: MEP Design Coordinator HVAC Engineer for Sprinkler Protection .
To Fire Officers Committee & National Fire Protection Association.
. Responsible for the detailing and coordination, of sprinkler systems, manufacture and
installation of such.
1976 – 1987 FORD MOTOR CO. LTD. (ENGLAND).
Position:
. Design Engineer for new plant building services.
1972 - 1976. TECHNICAL APPRENTICESHIP FORD MOTOR CO.LTD.
ADDITIONAL INFORMATION:
Driving licenses for UK, Qatar, Philippine, Saudi and International.
PC literate (Word, Excel, BIW Project Network)
Holder of C.S.C.S Project Manager Construction Card UK.

More Related Content

What's hot

Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileHassan Al-Yami
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentHussain Sajid
 
CV-Osama Amin ..........
CV-Osama Amin  ..........CV-Osama Amin  ..........
CV-Osama Amin ..........Osama AL-Shaer
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-Adel Alqontar
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1Tushar Patil
 
HTP contraction overview.2019
HTP contraction overview.2019HTP contraction overview.2019
HTP contraction overview.2019liemnp
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHani Herzallah
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyorfady qezman
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolioKhaled Essam
 

What's hot (20)

R PROFILE 0216
R PROFILE 0216R PROFILE 0216
R PROFILE 0216
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
willem cv
willem cvwillem cv
willem cv
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
 
eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)eng.msotafa cv[Conflict] (1)
eng.msotafa cv[Conflict] (1)
 
CV-Osama Amin ..........
CV-Osama Amin  ..........CV-Osama Amin  ..........
CV-Osama Amin ..........
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
designage - Profile-1
designage - Profile-1designage - Profile-1
designage - Profile-1
 
HTP contraction overview.2019
HTP contraction overview.2019HTP contraction overview.2019
HTP contraction overview.2019
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - Latest
 
march 16
march 16march 16
march 16
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyor
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolio
 
cv bernard baruch.wps
cv bernard baruch.wpscv bernard baruch.wps
cv bernard baruch.wps
 
RCV JUN16
RCV JUN16RCV JUN16
RCV JUN16
 

Viewers also liked (13)

Module1 Part 2: Company
Module1 Part 2: CompanyModule1 Part 2: Company
Module1 Part 2: Company
 
MAURAD-CV
MAURAD-CVMAURAD-CV
MAURAD-CV
 
EDULIAN, SUZETTE MERIDEEH - CV
EDULIAN, SUZETTE MERIDEEH - CVEDULIAN, SUZETTE MERIDEEH - CV
EDULIAN, SUZETTE MERIDEEH - CV
 
Richard Heggen - 1 Page CV
Richard Heggen - 1 Page CVRichard Heggen - 1 Page CV
Richard Heggen - 1 Page CV
 
Asim ismail cv
Asim ismail cvAsim ismail cv
Asim ismail cv
 
Ahmad_CV
Ahmad_CVAhmad_CV
Ahmad_CV
 
NANA CV EDEBO
NANA CV EDEBONANA CV EDEBO
NANA CV EDEBO
 
short cv Jan 96 onward
short cv Jan 96 onwardshort cv Jan 96 onward
short cv Jan 96 onward
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Shani_Professional Resume
Shani_Professional ResumeShani_Professional Resume
Shani_Professional Resume
 
George Bostock CV 09-05-2015
George Bostock CV  09-05-2015George Bostock CV  09-05-2015
George Bostock CV 09-05-2015
 
Archt joseph cv architect2016
Archt joseph cv architect2016Archt joseph cv architect2016
Archt joseph cv architect2016
 
Updated cv, uk
Updated cv, ukUpdated cv, uk
Updated cv, uk
 

Similar to John H Collins CV March 2016 Word Doc

Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311weydon23
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Linkroy mann
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos BalanaoFroilan Balanao
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms
 
Mark's CURRICULUM VITAE (5)
Mark's CURRICULUM VITAE (5)Mark's CURRICULUM VITAE (5)
Mark's CURRICULUM VITAE (5)Mark O'Neill
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWstuart johnson
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)Simon Barkley
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1ASHRAF NAZME
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2Rolando Alvarez
 

Similar to John H Collins CV March 2016 Word Doc (20)

Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
CV OG Jan 2016
CV OG Jan 2016CV OG Jan 2016
CV OG Jan 2016
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to OilJames Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
James Nolan experience in Energy, renewables, Waste to Energy and Waste to Oil
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16
 
Mark's CURRICULUM VITAE (5)
Mark's CURRICULUM VITAE (5)Mark's CURRICULUM VITAE (5)
Mark's CURRICULUM VITAE (5)
 
Stuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEWStuart Johnson CV Updated 02-01-15 NEW
Stuart Johnson CV Updated 02-01-15 NEW
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2
 

John H Collins CV March 2016 Word Doc

  • 1. Mr. John Hilary Collins 84 Church Road, Rivenhall, Witham, Essex. CM83PH Phone: Php. 00639193810089; UK. 0044 1376 51922: Dear Sir, Having spent more than 35 years of my professional career in the building services, engineering and construction environment, I have attained a great deal of experience successfully engineering and managing major construction projects. My experience has also involved taking over existing projects of varying Complexity and resolving outstanding problems to enable milestone and completion dates to be met. Moreover my expertise extends to managing staff and labor of various dicipines and nationalities and organizing the transitional period from construction through to operational handover including the final testing and commissioning and subsequent operational elements of various buildings. Please see my C.V. below for detailed information. My last contract was in Riyadh KSA working on a 2.3 Billion euro project. I am available for a new Contract immediately. Yours sincerely, JOHN HILARY COLLINS CURRICULUM VITAE.
  • 2. PERSONAL DATA: Name: John Hilary Collins I. ENG. M.I.E.T. Nationality: British. CONTACT DETAILS: Email: john_hilary_collins@yahoo.co.uk Telephone: MB. +639193810089. (+8Hrs GMT). EDUCATION: 1976-1978 North East London Polytechnic. Qualification: City & Guilds 255 Full Technological Diploma in Mechanical engineering. 1972-1976 Barking College Of Engineering and IT. Technology. Qualification: City and Guilds 255 Parts I and II. In mechanical & Technological Engineering 1972-1976 Engineering & Technological Apprenticeship to Ford Motor Company Ltd. 1967-1972 Romford Technical High School. GCE 8-O Levels Cambridge. PROFESSIONAL: Member of the Institute of Engineering & Technology, MIET. Incorporated Engineer with the Council of Engineering Institutions, I.Eng. EMPLOYMENT HISTORY: 2014 July – 2015 October: Hanmi International project managers for RIYADH INVESTMENT COMPANY, (RIC KSA). Position: Senior MEP Technical & commissioning Manager for an Information & Technology Communications Center (ITCC). • Responsible for the MEP project Management of 38 Buildings, Including a 5 star luxury 250 bedroom Hotel & conference center, 4 No. 20 story office towers, Sludge Treatment Plant, Data Center, District Cooling Plant, Main substation, 5 sub stations and extensive retail infrastructure. • Management and control of five consultants companies, and their main contractors and various Sub contractors. • Management of Testing & commissioning companies, chairing Meetings, and implementation of Client directives leading to operational handover. 2012 - 2013 Sino Construction, Manila, Philippines. Position: MEP project Manager to Casino, hotel and apartments.
  • 3. • Responsible for managing all MEP works, including office and site based engineers, and installation personnel, construction surveying team and sub-contractors • Chairing meetings with MC Project Team, along with my own project team. • Attending the engineers site office meetings and seminars and issuing progress reports and recommendations to the Client and project team. 2010 - 2012 EL-SEIF ENGINEERING CONTRACTING CO LTD.DOHA, (QATAR). Position: MEP Project Manager for Eight Airport Building Facilities to the new Doha International Airport; Design & Build Project • Responsible for managing the entire MEP works, including my team of office and site based senior engineers, and installation personnel, and sub-contractor site teams, including the construction surveying team. The mechanical sub-contractor was Drake and Scull international. • Chairing the weekly meeting with Drake and Sculls Project Team, along with my own project team. • Attending the engineers (Bechtel international) site office meetings and seminars and issuing progress reports and recommendations to Bechtel s project team. 2008-2010 LORNE STEWART PLC.LONDON, ENGLAND. Position: MEP Project Manager to new Medical Centre. • Responsible for all MEP works including placing of sub-contractor orders, reviewing and signing off installation drawings, attending all client meetings and advising of planning dates with regard to site progress and capabilities. • Compliance with all local regulations. Site co-ordination of all Contractor activities including Reviewing and authorizing payment applications 2005-2008 AMEC, LONDON, (ENGLAND).ST. PANCRAS RAILWAY STATION C.T.R.L. Position MEP Project Manager for Eurostar Main railway Terminal. • Responsible for and assisting the building services staff, site engineers & contractors including the procurement, quality checking and site installation of MEP work, design issues, client meetings & issuing sub-contractor site instruction. • attending the engineers site office meetings and seminars and issuing progress reports and recommendations to the project team. New Hilton Hotel, Bishops Square tenant fit out Project (1 million sq. ft.). New Willis Building, City of London (38 Story Shell & Core). • Responsible for managing the entire MEP works, including my team of office and site based engineers, foremen and installation personnel, and sub-contractor site teams, including the construction surveying team. • Chairing meetings with MC Project Team, along with my own project team. 2002-2005 MITIE ENGINEERING LTD.LONDON, (ENGLAND). Position: MEP Project Manager to a College Refurbishment and New Build. • Responsible for the entire MEP works from Procurement, through to commissioning, also
  • 4. Involving consultant, architect and Client liaison. • Contractor supervision, co-ordination and troubleshooting, advising on re-design and drawing approval/Signing off, placing of contract orders, delivery scheduling, Cost evaluation, programming and commissioning • Involving reviewing and approving c.a.d. coordinated drawings in line with the latest specifications and tender. • Issuing tender enquiries and orders to electrical and mechanical sub-contractors, procurement of all MEP ancillaries, and plant, attending weekly site meetings and the implementing of design and VO costs. Issuing monthly applications, signing off/rejecting invoices, estimating variations and Overseeing the testing and commissioning of all MEP works. 1999-2002 LORNE STEWART P.L.C. PARIS, (FRANCE). Position: MEP Project Manager for USA Client. Refurbishment of eight-story pre-war Factory, for a new I.T. Switching station. • Responsible for a major strip out of redundant building services, alongside the new installation. • New concept of services riser Installations, involving pre-fabricated modules for cooling pumps and riser pipe work, (700 mm dia.) transported from Holland Europe, and craned down redundant lift shafts in sections and connected insitue. Project network computerized p • Very large refurbishment of Sanderson paints ex. Head office, into high specification, five star luxury hotel. • Managing all sub-contractors and MEP operations, (hvac, pipework, plumbing, drainage MV & LV systems). . Bovis- LONDON. LUXUARY 5*Hotel. 1995 -1999 A.E.H. JOINT VENTURE, CHEK LAP KOK, (HONG KONG). Position: MEP Project manager for the new Airport Passenger Terminal, service tunnels and Aircraft Maintenance Facility Buildings. • Responsible for the entire mechanical contract from Procurement, through to commissioning. Involving client, consultant, architect and Client liaison. • Contractor supervision, co-ordination and troubleshooting, advising on re-design and drawing approval/Signing off, placing of contract orders, delivery scheduling, Cost evaluation, programming and commissioning • Involving reviewing and signing off coordinated drawings in line with the latest specifications. • Issuing tender enquiries and orders to electrical and mechanical sub-contractors. Procurement of all MEP works, ancillaries, and plant. Attending weekly site meetings. Implementing design change/costs. Issuing monthly applications, signing off/rejecting invoices. Estimating variations Overseeing testing and commissioning of all M. & E works. 1991 -1995 KENTZ INTERNATIONAL, BARCELONA, (SPAIN).
  • 5. Position: HVAC Manager, M. & P. Services. 44 Story luxury 5 Star Hotel, Apartments & infrastructure. Senior MEP Manager for all H.V.A.C. Pipework, Ductwork, plumbing & Drainage, to the Hotel Villa Olympica, office block and Retail areas. 1988 -1991 CROWN HOUSE / NIAGRA, MECHANICAL SERVICES, J.V.CANARY WHARF, LONDON, UK. Position: MEP HVAC Engineer to 50 story office tower, (tallest in Europe at the time) and Extensive retail infrastructure. • Responsible for the detailing and coordination, of Mechanical services & tenant fit out, including Retail areas, Restaurants, Shops and Bars. 1987 – 1988 MATHEW HALL P.L.C. LONDON, (ENGLAND). Position: MEP Design Coordinator HVAC Engineer for Sprinkler Protection . To Fire Officers Committee & National Fire Protection Association. . Responsible for the detailing and coordination, of sprinkler systems, manufacture and installation of such. 1976 – 1987 FORD MOTOR CO. LTD. (ENGLAND). Position: . Design Engineer for new plant building services. 1972 - 1976. TECHNICAL APPRENTICESHIP FORD MOTOR CO.LTD. ADDITIONAL INFORMATION: Driving licenses for UK, Qatar, Philippine, Saudi and International. PC literate (Word, Excel, BIW Project Network) Holder of C.S.C.S Project Manager Construction Card UK.
  • 6. Position: HVAC Manager, M. & P. Services. 44 Story luxury 5 Star Hotel, Apartments & infrastructure. Senior MEP Manager for all H.V.A.C. Pipework, Ductwork, plumbing & Drainage, to the Hotel Villa Olympica, office block and Retail areas. 1988 -1991 CROWN HOUSE / NIAGRA, MECHANICAL SERVICES, J.V.CANARY WHARF, LONDON, UK. Position: MEP HVAC Engineer to 50 story office tower, (tallest in Europe at the time) and Extensive retail infrastructure. • Responsible for the detailing and coordination, of Mechanical services & tenant fit out, including Retail areas, Restaurants, Shops and Bars. 1987 – 1988 MATHEW HALL P.L.C. LONDON, (ENGLAND). Position: MEP Design Coordinator HVAC Engineer for Sprinkler Protection . To Fire Officers Committee & National Fire Protection Association. . Responsible for the detailing and coordination, of sprinkler systems, manufacture and installation of such. 1976 – 1987 FORD MOTOR CO. LTD. (ENGLAND). Position: . Design Engineer for new plant building services. 1972 - 1976. TECHNICAL APPRENTICESHIP FORD MOTOR CO.LTD. ADDITIONAL INFORMATION: Driving licenses for UK, Qatar, Philippine, Saudi and International. PC literate (Word, Excel, BIW Project Network) Holder of C.S.C.S Project Manager Construction Card UK.