PM Services

  1. 2. Construction Program Management   “ Program Management”   The management, on behalf of the Owner*, of a construction program(s), including the management of Pre-design Planning, Programming, Design Services Procurement, Design, Agency Approvals, Construction Procurements, Construction, Commissioning, Furnishing & Equipping, Move-in, Close-out and Coordination with the Funding. *Owner, User, and/or Funder
  2. 3. Brookwood’s Fundamental Approach Throughout: Advancing and Protecting the Interests of the Owner
  3. 5. <ul><li>Basic Required Capabilities of the Program Management Team </li></ul><ul><li>Extensive Experience in the Architectural and Engineering Design Process </li></ul><ul><li>Solid Experience in all types of Design Contracts and Construction Contracts </li></ul><ul><li>Extensive Experience in Construction Procurements </li></ul><ul><li>Good “muddy boots” Construction Field Experience </li></ul><ul><li>Extensive Experience in General Project Management </li></ul><ul><li>Extensive Knowledge of Cost Estimating Process </li></ul><ul><li>Extensive Knowledge of Scheduling Design and Construction </li></ul><ul><li>Good Skills in Computer Based Scheduling and Reporting </li></ul><ul><li>No Conflict of Interest with the Owner, User or Funder </li></ul>
  4. 6. 1 3 5 2 4 6 1. Predesign Planning and Programming <ul><li>Design Services Procurement </li></ul>3. Design Phases 4. Pricing and Award of Main Construction Contract(s) 5. Construction 6. Close-out Typical Major Phases of a Construction Program
  5. 7. 1 3 5 2 4 6 1. Pre-design Planning and Programming
  6. 8. The Project Budget Total can be smaller... not larger ... if a qualified Program Manager is employed and carries out full PM services.
  7. 9. 1 3 5 2 4 6 PMIS May be web-based Program Management Information System – Provides detailed tracking, analysis, reporting and recommendations throughout
  8. 10. Quick Update reports for Owner’s Senior Management Periodic dynamic database-generated reports on all aspects of the construction program PMIS
  9. 12. 1 3 5 2 4 6 PMP Program Management Plan The strategic plan for design and construction to meet the Owner’s goals, objectives & constraints
  10. 13. 1 3 5 2 4 6 2. Design Services Procurement A Frequently Overlooked and Very Valuable Management Tool
  11. 14. <ul><li>Send out RFQs or informal requests for expressions of interest in typical manner. </li></ul><ul><li>Prepare a detailed, project specific form of Agreement between Owner and Architect with more detail on deliverables and Architect’s responsibility for budget adherence. Architect to have own cost estimator with stipulated costing procedures and with appropriate attachments such as Program of Requirements, Property Survey and Geotechnical Report. </li></ul><ul><li>Before final interviews, set fee as flat dollar amount or fixed percentage to convert to flat dollar amount at approval of the Schematic Design. </li></ul><ul><li>Upon short listing of design firms, provide a copy of the Agreement to shortlisted firms and require written acceptance as a condition of interview. </li></ul>
  12. 15. 1 3 5 2 4 6 Design Phase services include, among many other management actions, careful tracking of the cost and close review of the work of the architect and engineers. System illustrated is for a large project. 3. Design Phases
  13. 20. 1 3 5 2 4 6 The Program Manager’s skills in buying construction, analyzing proposals and negotiating are often very much needed at this point in order to protect the interests of the Owner and Users. 4. Pricing & Award of main Construction Contract(s)
  14. 21. 1 3 5 2 4 6 In most cases the Program Manager would have one or more people full time on site and should be the leader of regular meetings of all the key players. In addition to the thorough administration of the construction contract(s), the Program Manager continues to coordinate the services of the Architect, Engineers, other consultants and manage and coordinate other contracts for such items as for furnishings and commissioning not included in the construction contract(s). All RFIs and their responses should pass through the Program Manager. 5. Construction
  15. 22. 1 3 5 2 4 6 Program Manager manages the close-out of all contracts on behalf of the Owner and/or Funder, and delivers all project files properly organized and labeled to the Owner. 6. Close Out
  16. 23. Additional Information in Publications Section of www.BrookwoodGroup.com 7 Project Delivery Methods PM Services for Design-Bid-Build Projects PM Services for Design-Build Projects PM Services for CM-at-Risk Projects PM Services for Bridging Projects PM Services for CM-at-Risk/Bridging Projects PM Services for CM Agency Projects

×