SlideShare a Scribd company logo
1 of 2
Jehosh Jeyaseelan Samuel
(ISTQB Certified)
SUMMARY of the MAJOR projects / ASSIGNMENTS handled
1. Lyca Mobiles - RRBS - OSS Testing (Apr 2015- Mar 2016)
• Involved in testing the network features and the rating and billing system.
• Designed and developed test cases for the application
• Executed the test cases for the application testing using call simulators and SMS simulators
• Performed integration testing with the BSS teams.
2. Lyca Mobiles –My Accounts – BSS Testing (Dec 2014- Apr 2015)
• Involved in requirement analysis.
• Designed and developed test cases for the application from enduser perspective
• Executed functional and regression test cases for the application testing
• Performed integration testing with the interlinked applications
3. Lloyds Banking Group – PEGA - Workflow Testing (Jun 2014- Dec 2014)
• Involved in requirement analysis.
• Designed and developed test cases for the application
• Executed the test cases for the application testing various business workflows
• Preparation of Test plan and Test completion reports.
• Attending Defect calls and Clarification calls
• Sending DSR to all the project stake holders.
• Providing KT to the new joinees
4. Lloyds Banking Group - Welcome- System Integration Testing (Oct 2013- Jun 2014)
• Involved in all the phases of testing life cycle.
• Handling daily status reports, target trackers and handle challenging situations during any phase of
the project.
• Raised the maximum number of defects.
• Performed the role of Offshore SPOC.
• Handled a team of 15 members
• Tracking the defects till closure by attending defect calls
• Preparation of knowledge transfer document.
• Providing KT to the new joinees
• Preparation of End of the test reports.
5. Asgard Wealth Solutions- FOFA Platforms -System Acceptance Testing (Jan 2013- Sep 2013)
• Asgard project followed Distributed AGILE testing methodology.
• Involved in Story elaboration meeting with product owner and business analyst to understand the
customer’s requirement
• Participating in Effort estimation meeting and provided test estimation for test conditions, test cases
and test execution.
• Prepared testing artefacts Test Plan & Test Completion Report.
• Prepared Test Conditions and Test Cases based on Story document.
• Test Execution of Manual test scripts.
• Test monitoring of Sprints & Scrums.
• Identifying, reporting and analysing the defects, Tracking & Maintaining Defects in defect tracking
tool (Quality center) and testing the fixes.
• Training newcomers/freshers and make sure that they have sufficient knowledge in Asgard
application.
• Attending sprint demo and retrospection meeting with product owner, business analyst and
developers at the end of each sprint.
6. Lloyds Banking Group –Wealth SPoS- System Acceptance Testing (Sep 2011-Dec 2012)
• Involved in test condition and test script preparation for Smoke testing, System acceptance testing
and Regression testing.
• Involved in self and peer reviews of the Test Conditions and Test scripts.
• Preparation of knowledge transfer document.
• Understanding the Functional Specification and BRC.
• Execution of Smoke testing, System Acceptance and Regression test scripts.
• Managing VCs to the team members
• Providing KT to the new joinees.
• Tracking the defects till closure.
Non Technical Tasks handled
• Performed the role of Configuration Controller in all the projects.
• Managed the allocation of VCs and Seats for the entire team
• Member of organising committee for client visits
• Designed the draft version of SMR and Governance PPTs every month.
Extracurricular Activities
• Part of Program office – An initiative to help the new joinees and conduct team outings
• Elected as one of the Chargers – A team to coordinate employee engagement programmes
• Active Volunteer of HCLT foundation and participated in Charity runs and Beach cleaning drives.
Personal Information
Date of Birth : 01-04-1990
Nationality : Indian
Marital Status : Single
Contact Address : S3, Plot no 3, Vasantham Flats, Kannapan Street, Shanti nagar , Ramapuram
Chennai, India, Pin- 600089.
Languages Known: English & Tamil.
Mob : +91 9940998389, +91 7845562674
Email : jehoshgce@gmail.com

More Related Content

What's hot

Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesAndrew Whittaker
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedAndrew Whittaker
 
Item 1. Report of the work performed by GLOSOLAN since its establishment
Item 1. Report of the work performed by GLOSOLAN since its establishmentItem 1. Report of the work performed by GLOSOLAN since its establishment
Item 1. Report of the work performed by GLOSOLAN since its establishmentExternalEvents
 
R & R Accuracy - Location & Inventory Oct14 Kaizen 18
R & R Accuracy - Location & Inventory Oct14 Kaizen 18R & R Accuracy - Location & Inventory Oct14 Kaizen 18
R & R Accuracy - Location & Inventory Oct14 Kaizen 18Vasu devan.R
 
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!” Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!” Dakiry
 
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETIC
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETICOW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETIC
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETICOW2
 
Veera raghavan current cv 10 august 2016
Veera  raghavan current  cv 10 august 2016Veera  raghavan current  cv 10 august 2016
Veera raghavan current cv 10 august 2016Veeraraghavan raghavan
 

What's hot (20)

Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1Mithun Pavithran Mechanical QAQC Engineer 1
Mithun Pavithran Mechanical QAQC Engineer 1
 
Word resume
Word resumeWord resume
Word resume
 
Seismic Supervisor- Position available
Seismic Supervisor- Position availableSeismic Supervisor- Position available
Seismic Supervisor- Position available
 
Vinay CV
Vinay CVVinay CV
Vinay CV
 
Prdz_resume_march16
Prdz_resume_march16Prdz_resume_march16
Prdz_resume_march16
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier Responsibilities
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
 
Item 1. Report of the work performed by GLOSOLAN since its establishment
Item 1. Report of the work performed by GLOSOLAN since its establishmentItem 1. Report of the work performed by GLOSOLAN since its establishment
Item 1. Report of the work performed by GLOSOLAN since its establishment
 
Ekta Gupta - CV
Ekta Gupta - CVEkta Gupta - CV
Ekta Gupta - CV
 
Why Choose Flowmeter Remanufacturing?
Why Choose Flowmeter Remanufacturing?Why Choose Flowmeter Remanufacturing?
Why Choose Flowmeter Remanufacturing?
 
LaLonde_Resume_11-2016
LaLonde_Resume_11-2016LaLonde_Resume_11-2016
LaLonde_Resume_11-2016
 
Hareesh updated CV
Hareesh updated CVHareesh updated CV
Hareesh updated CV
 
R & R Accuracy - Location & Inventory Oct14 Kaizen 18
R & R Accuracy - Location & Inventory Oct14 Kaizen 18R & R Accuracy - Location & Inventory Oct14 Kaizen 18
R & R Accuracy - Location & Inventory Oct14 Kaizen 18
 
Starling2783
Starling2783Starling2783
Starling2783
 
ResumeofRobertBangerter
ResumeofRobertBangerterResumeofRobertBangerter
ResumeofRobertBangerter
 
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!” Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
Наталія Ведернікова “Хочете забезпечити якість? Не упустіть 5 моментів!”
 
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETIC
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETICOW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETIC
OW2con'14 - Open Source software quality and OW2 SQuAT initiative, CETIC
 
Veera raghavan current cv 10 august 2016
Veera  raghavan current  cv 10 august 2016Veera  raghavan current  cv 10 august 2016
Veera raghavan current cv 10 august 2016
 
krishnajith_original
krishnajith_originalkrishnajith_original
krishnajith_original
 
V-Test Model
V-Test ModelV-Test Model
V-Test Model
 

Similar to ISTQB Certified- Functional Tester - Jehosh

Similar to ISTQB Certified- Functional Tester - Jehosh (20)

Pallavi Chaturvedi cv
Pallavi Chaturvedi cvPallavi Chaturvedi cv
Pallavi Chaturvedi cv
 
Lenora alderman resume
Lenora alderman resumeLenora alderman resume
Lenora alderman resume
 
Lenora Alderman Resume
Lenora Alderman ResumeLenora Alderman Resume
Lenora Alderman Resume
 
Arnab_Resume
Arnab_ResumeArnab_Resume
Arnab_Resume
 
Sandeep Mishra_Resume
Sandeep Mishra_ResumeSandeep Mishra_Resume
Sandeep Mishra_Resume
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 
MydhiliVadlamaniCV
MydhiliVadlamaniCVMydhiliVadlamaniCV
MydhiliVadlamaniCV
 
Sunil Kumar Raju_Software Testing (1)
Sunil Kumar Raju_Software Testing (1)Sunil Kumar Raju_Software Testing (1)
Sunil Kumar Raju_Software Testing (1)
 
Quality_Assurance_Engineer_8yrs_Exp_ISTQB_Certified_MCA
Quality_Assurance_Engineer_8yrs_Exp_ISTQB_Certified_MCAQuality_Assurance_Engineer_8yrs_Exp_ISTQB_Certified_MCA
Quality_Assurance_Engineer_8yrs_Exp_ISTQB_Certified_MCA
 
CV_Vineet_Kumar
CV_Vineet_KumarCV_Vineet_Kumar
CV_Vineet_Kumar
 
Sudhakar Resume
Sudhakar ResumeSudhakar Resume
Sudhakar Resume
 
Robert Latest cv
Robert Latest cvRobert Latest cv
Robert Latest cv
 
Rachana Resume To be sent
Rachana Resume To be sentRachana Resume To be sent
Rachana Resume To be sent
 
Raghavendra Ganiger
Raghavendra GanigerRaghavendra Ganiger
Raghavendra Ganiger
 
Srinithya_Software Testing resume
Srinithya_Software Testing resumeSrinithya_Software Testing resume
Srinithya_Software Testing resume
 
Chandana Das Resume
Chandana Das ResumeChandana Das Resume
Chandana Das Resume
 
Chandana Das Resume updated
Chandana Das Resume updatedChandana Das Resume updated
Chandana Das Resume updated
 
Datta_Capital_Market_4+_Automation_Manual
Datta_Capital_Market_4+_Automation_ManualDatta_Capital_Market_4+_Automation_Manual
Datta_Capital_Market_4+_Automation_Manual
 
Gaurav Savla - Consultant
Gaurav Savla - ConsultantGaurav Savla - Consultant
Gaurav Savla - Consultant
 
Raj Kunwar Singh_PM_Testing
Raj Kunwar Singh_PM_TestingRaj Kunwar Singh_PM_Testing
Raj Kunwar Singh_PM_Testing
 

ISTQB Certified- Functional Tester - Jehosh

  • 1. Jehosh Jeyaseelan Samuel (ISTQB Certified) SUMMARY of the MAJOR projects / ASSIGNMENTS handled 1. Lyca Mobiles - RRBS - OSS Testing (Apr 2015- Mar 2016) • Involved in testing the network features and the rating and billing system. • Designed and developed test cases for the application • Executed the test cases for the application testing using call simulators and SMS simulators • Performed integration testing with the BSS teams. 2. Lyca Mobiles –My Accounts – BSS Testing (Dec 2014- Apr 2015) • Involved in requirement analysis. • Designed and developed test cases for the application from enduser perspective • Executed functional and regression test cases for the application testing • Performed integration testing with the interlinked applications 3. Lloyds Banking Group – PEGA - Workflow Testing (Jun 2014- Dec 2014) • Involved in requirement analysis. • Designed and developed test cases for the application • Executed the test cases for the application testing various business workflows • Preparation of Test plan and Test completion reports. • Attending Defect calls and Clarification calls • Sending DSR to all the project stake holders. • Providing KT to the new joinees 4. Lloyds Banking Group - Welcome- System Integration Testing (Oct 2013- Jun 2014) • Involved in all the phases of testing life cycle. • Handling daily status reports, target trackers and handle challenging situations during any phase of the project. • Raised the maximum number of defects. • Performed the role of Offshore SPOC. • Handled a team of 15 members • Tracking the defects till closure by attending defect calls • Preparation of knowledge transfer document. • Providing KT to the new joinees • Preparation of End of the test reports. 5. Asgard Wealth Solutions- FOFA Platforms -System Acceptance Testing (Jan 2013- Sep 2013) • Asgard project followed Distributed AGILE testing methodology. • Involved in Story elaboration meeting with product owner and business analyst to understand the customer’s requirement • Participating in Effort estimation meeting and provided test estimation for test conditions, test cases and test execution. • Prepared testing artefacts Test Plan & Test Completion Report. • Prepared Test Conditions and Test Cases based on Story document.
  • 2. • Test Execution of Manual test scripts. • Test monitoring of Sprints & Scrums. • Identifying, reporting and analysing the defects, Tracking & Maintaining Defects in defect tracking tool (Quality center) and testing the fixes. • Training newcomers/freshers and make sure that they have sufficient knowledge in Asgard application. • Attending sprint demo and retrospection meeting with product owner, business analyst and developers at the end of each sprint. 6. Lloyds Banking Group –Wealth SPoS- System Acceptance Testing (Sep 2011-Dec 2012) • Involved in test condition and test script preparation for Smoke testing, System acceptance testing and Regression testing. • Involved in self and peer reviews of the Test Conditions and Test scripts. • Preparation of knowledge transfer document. • Understanding the Functional Specification and BRC. • Execution of Smoke testing, System Acceptance and Regression test scripts. • Managing VCs to the team members • Providing KT to the new joinees. • Tracking the defects till closure. Non Technical Tasks handled • Performed the role of Configuration Controller in all the projects. • Managed the allocation of VCs and Seats for the entire team • Member of organising committee for client visits • Designed the draft version of SMR and Governance PPTs every month. Extracurricular Activities • Part of Program office – An initiative to help the new joinees and conduct team outings • Elected as one of the Chargers – A team to coordinate employee engagement programmes • Active Volunteer of HCLT foundation and participated in Charity runs and Beach cleaning drives. Personal Information Date of Birth : 01-04-1990 Nationality : Indian Marital Status : Single Contact Address : S3, Plot no 3, Vasantham Flats, Kannapan Street, Shanti nagar , Ramapuram Chennai, India, Pin- 600089. Languages Known: English & Tamil. Mob : +91 9940998389, +91 7845562674 Email : jehoshgce@gmail.com