Day 3 Final Revision
(Quality)
2
3Quality Management
Project Quality Management includes the processes and activities of the performing organization that
determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which
it was undertaken.
Key Concepts
 Quality Management Plan to
determine action plan for
quality
 Audit Checklist to ensure
deliverables met quality
requirements
 Quality Control
Measurements to monitor the
quality of Project works
4Quality Management
8.1 Plan Quality Management—The process of identifying
quality requirements and/or standards for the
project and its deliverables and documenting how the project will
demonstrate compliance with quality
requirements.
8.2 Perform Quality Assurance—The process of auditing the
quality requirements and the results from
quality control measurements to ensure that appropriate quality
standards and operational definitions
are used.
8.3 Control Quality—The process of monitoring and recording
results of executing the quality activities
to assess performance and recommend necessary changes.
These processes interact with each other and with processes in
other
58.1 Plan Quality Management
68.2 Perform Quality Assurance
78.3 Control Quality
8

More Related Content

What's hot

Day 3-6 - Final Revision (HR)
Day 3-6 - Final Revision (HR)Day 3-6 - Final Revision (HR)
Day 3-6 - Final Revision (HR)Jeffrey Cheah
 
Day 1 - 3PM Revision
Day 1 - 3PM RevisionDay 1 - 3PM Revision
Day 1 - 3PM RevisionJeffrey Cheah
 
Day 3 Final Revision
Day 3 Final RevisionDay 3 Final Revision
Day 3 Final RevisionJeffrey Cheah
 
Human Resource Masterclass
Human Resource MasterclassHuman Resource Masterclass
Human Resource MasterclassJeffrey Cheah
 
Day 3-8 - Final Revision (Risk)
Day 3-8 - Final Revision (Risk)Day 3-8 - Final Revision (Risk)
Day 3-8 - Final Revision (Risk)Jeffrey Cheah
 
Day 3-7 - Final Revision (Communications)
Day 3-7 - Final Revision (Communications)Day 3-7 - Final Revision (Communications)
Day 3-7 - Final Revision (Communications)Jeffrey Cheah
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge AreaJoshua Render
 
Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge AreaJoshua Render
 
Project scope Management - PMP/CAPM
Project scope Management - PMP/CAPMProject scope Management - PMP/CAPM
Project scope Management - PMP/CAPMMudassir Iqbal
 
GARYcve0116 - StrategicNova Funds Management
GARYcve0116 - StrategicNova Funds ManagementGARYcve0116 - StrategicNova Funds Management
GARYcve0116 - StrategicNova Funds ManagementGary Jones
 
Day 3-10 - Final Revision (Stakeholder)
Day 3-10 - Final Revision (Stakeholder)Day 3-10 - Final Revision (Stakeholder)
Day 3-10 - Final Revision (Stakeholder)Jeffrey Cheah
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaJoshua Render
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangementMaveric Systems
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaJoshua Render
 
Project Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaProject Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaJoshua Render
 

What's hot (20)

Day 3-6 - Final Revision (HR)
Day 3-6 - Final Revision (HR)Day 3-6 - Final Revision (HR)
Day 3-6 - Final Revision (HR)
 
Day 1 - 3PM Revision
Day 1 - 3PM RevisionDay 1 - 3PM Revision
Day 1 - 3PM Revision
 
Day 3 Final Revision
Day 3 Final RevisionDay 3 Final Revision
Day 3 Final Revision
 
Risk Masterclass
Risk MasterclassRisk Masterclass
Risk Masterclass
 
Human Resource Masterclass
Human Resource MasterclassHuman Resource Masterclass
Human Resource Masterclass
 
Day 3-8 - Final Revision (Risk)
Day 3-8 - Final Revision (Risk)Day 3-8 - Final Revision (Risk)
Day 3-8 - Final Revision (Risk)
 
Day 3-7 - Final Revision (Communications)
Day 3-7 - Final Revision (Communications)Day 3-7 - Final Revision (Communications)
Day 3-7 - Final Revision (Communications)
 
Introduction to PM
Introduction to PMIntroduction to PM
Introduction to PM
 
Quality Management Knowledge Area
Quality Management Knowledge AreaQuality Management Knowledge Area
Quality Management Knowledge Area
 
Project Scope Management Knowledge Area
Project Scope Management Knowledge AreaProject Scope Management Knowledge Area
Project Scope Management Knowledge Area
 
Project scope Management - PMP/CAPM
Project scope Management - PMP/CAPMProject scope Management - PMP/CAPM
Project scope Management - PMP/CAPM
 
Day 1 - Revision
Day 1 - RevisionDay 1 - Revision
Day 1 - Revision
 
GARYcve0116 - StrategicNova Funds Management
GARYcve0116 - StrategicNova Funds ManagementGARYcve0116 - StrategicNova Funds Management
GARYcve0116 - StrategicNova Funds Management
 
Day 3-10 - Final Revision (Stakeholder)
Day 3-10 - Final Revision (Stakeholder)Day 3-10 - Final Revision (Stakeholder)
Day 3-10 - Final Revision (Stakeholder)
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge Area
 
Project manegement
Project manegementProject manegement
Project manegement
 
CAPM week 1 chapter 3
CAPM week 1 chapter 3CAPM week 1 chapter 3
CAPM week 1 chapter 3
 
Critical success factors for successful requirements manangement
Critical success factors for successful requirements manangementCritical success factors for successful requirements manangement
Critical success factors for successful requirements manangement
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge Area
 
Project Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge AreaProject Management: Cost Management Knowledge Area
Project Management: Cost Management Knowledge Area
 

Viewers also liked

Day 6 - Post Attendance
Day 6 - Post AttendanceDay 6 - Post Attendance
Day 6 - Post AttendanceJeffrey Cheah
 
Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Jeffrey Cheah
 
Tuckman's group development (Adjourning)
Tuckman's group development (Adjourning)Tuckman's group development (Adjourning)
Tuckman's group development (Adjourning)Jeffrey Cheah
 
Procurement Masterclass
Procurement MasterclassProcurement Masterclass
Procurement MasterclassJeffrey Cheah
 
Stakeholder Masterclass
Stakeholder MasterclassStakeholder Masterclass
Stakeholder MasterclassJeffrey Cheah
 
Group and team dynamics
Group and team dynamicsGroup and team dynamics
Group and team dynamicsPooja Tayal
 
Blue ocean strategy, balanced scorecard strategy and team forming a shared p...
Blue ocean strategy, balanced scorecard strategy and team forming  a shared p...Blue ocean strategy, balanced scorecard strategy and team forming  a shared p...
Blue ocean strategy, balanced scorecard strategy and team forming a shared p...Ali Anani, PhD
 
Tuckman's group development (Storming)
Tuckman's group development (Storming)Tuckman's group development (Storming)
Tuckman's group development (Storming)Jeffrey Cheah
 
Tuckman's group development (Norming)
Tuckman's group development (Norming)Tuckman's group development (Norming)
Tuckman's group development (Norming)Jeffrey Cheah
 
Integration Masterclass
Integration MasterclassIntegration Masterclass
Integration MasterclassJeffrey Cheah
 
ISSUE & WIKI based Integration of Project Management
ISSUE & WIKI based Integration of Project ManagementISSUE & WIKI based Integration of Project Management
ISSUE & WIKI based Integration of Project ManagementPeter Kim
 
Day 4 - Group Effectiveness
Day 4 - Group EffectivenessDay 4 - Group Effectiveness
Day 4 - Group EffectivenessJeffrey Cheah
 

Viewers also liked (13)

Day 6 - Post Attendance
Day 6 - Post AttendanceDay 6 - Post Attendance
Day 6 - Post Attendance
 
Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)Day 3-9 - Final Revision (Procurement)
Day 3-9 - Final Revision (Procurement)
 
Tuckman's group development (Adjourning)
Tuckman's group development (Adjourning)Tuckman's group development (Adjourning)
Tuckman's group development (Adjourning)
 
Procurement Masterclass
Procurement MasterclassProcurement Masterclass
Procurement Masterclass
 
Stakeholder Masterclass
Stakeholder MasterclassStakeholder Masterclass
Stakeholder Masterclass
 
Group and team dynamics
Group and team dynamicsGroup and team dynamics
Group and team dynamics
 
Blue ocean strategy, balanced scorecard strategy and team forming a shared p...
Blue ocean strategy, balanced scorecard strategy and team forming  a shared p...Blue ocean strategy, balanced scorecard strategy and team forming  a shared p...
Blue ocean strategy, balanced scorecard strategy and team forming a shared p...
 
Day 2 - Revision
Day 2 - RevisionDay 2 - Revision
Day 2 - Revision
 
Tuckman's group development (Storming)
Tuckman's group development (Storming)Tuckman's group development (Storming)
Tuckman's group development (Storming)
 
Tuckman's group development (Norming)
Tuckman's group development (Norming)Tuckman's group development (Norming)
Tuckman's group development (Norming)
 
Integration Masterclass
Integration MasterclassIntegration Masterclass
Integration Masterclass
 
ISSUE & WIKI based Integration of Project Management
ISSUE & WIKI based Integration of Project ManagementISSUE & WIKI based Integration of Project Management
ISSUE & WIKI based Integration of Project Management
 
Day 4 - Group Effectiveness
Day 4 - Group EffectivenessDay 4 - Group Effectiveness
Day 4 - Group Effectiveness
 

Similar to Day 3-5 - Final Revision (Quality)

Quality management slides
Quality management slidesQuality management slides
Quality management slidesSaba Afaq
 
Quality Management Presentation
Quality Management PresentationQuality Management Presentation
Quality Management Presentationbrianbish10795
 
Project quality management
Project quality managementProject quality management
Project quality managementsyeda zoya mehdi
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
Product quality management
Product quality managementProduct quality management
Product quality managementSunil Meena
 
Quality assurance
Quality assuranceQuality assurance
Quality assuranceSahil Shah
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagementDhamo daran
 
quality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxquality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxHardikPatel611017
 
quality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxquality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxHardikPatel611017
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptTHULASIMANOHARAN2
 
Quality control the focus of quality control is on deliverables .pdf
    Quality control  the focus of quality control is on deliverables .pdf    Quality control  the focus of quality control is on deliverables .pdf
Quality control the focus of quality control is on deliverables .pdfajitdoll
 
ISO 9001:2008 Standards Requirements
ISO 9001:2008 Standards RequirementsISO 9001:2008 Standards Requirements
ISO 9001:2008 Standards RequirementsNajib Bahurdin
 

Similar to Day 3-5 - Final Revision (Quality) (20)

Quality management slides
Quality management slidesQuality management slides
Quality management slides
 
8.2 Manage Quality
8.2 Manage Quality8.2 Manage Quality
8.2 Manage Quality
 
Quality Management Presentation
Quality Management PresentationQuality Management Presentation
Quality Management Presentation
 
Project quality management
Project quality managementProject quality management
Project quality management
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Pmb
PmbPmb
Pmb
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
9001 2008 details
9001 2008 details9001 2008 details
9001 2008 details
 
quality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptxquality_management_plan_4108_ppt_final.pptx
quality_management_plan_4108_ppt_final.pptx
 
quality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptxquality_management_plan_4108 ppt final.pptx
quality_management_plan_4108 ppt final.pptx
 
SQMC briefing on ISO 9001 2015
SQMC briefing on ISO 9001 2015SQMC briefing on ISO 9001 2015
SQMC briefing on ISO 9001 2015
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
 
Quality control the focus of quality control is on deliverables .pdf
    Quality control  the focus of quality control is on deliverables .pdf    Quality control  the focus of quality control is on deliverables .pdf
Quality control the focus of quality control is on deliverables .pdf
 
ISO 9001:2008 Standards Requirements
ISO 9001:2008 Standards RequirementsISO 9001:2008 Standards Requirements
ISO 9001:2008 Standards Requirements
 
Juran’s Trilogy
Juran’s TrilogyJuran’s Trilogy
Juran’s Trilogy
 

Recently uploaded

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (13)

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

Day 3-5 - Final Revision (Quality)

  • 1. Day 3 Final Revision (Quality)
  • 2. 2
  • 3. 3Quality Management Project Quality Management includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken. Key Concepts  Quality Management Plan to determine action plan for quality  Audit Checklist to ensure deliverables met quality requirements  Quality Control Measurements to monitor the quality of Project works
  • 4. 4Quality Management 8.1 Plan Quality Management—The process of identifying quality requirements and/or standards for the project and its deliverables and documenting how the project will demonstrate compliance with quality requirements. 8.2 Perform Quality Assurance—The process of auditing the quality requirements and the results from quality control measurements to ensure that appropriate quality standards and operational definitions are used. 8.3 Control Quality—The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes. These processes interact with each other and with processes in other
  • 5. 58.1 Plan Quality Management
  • 8. 8