1. ContingencyPlanning
ProjectTitle:review seriesof the Mandalorian season2
Pot. Problem Effecton Production Solution/Control PersonResponsible
technical
Computercrashes Thiscan slowdown
productiontoa halt
Use a secondary
computeror a tablet
to continue editing
work
Jamescooper-abel
Camera to record live
action footage get
damage and is
unusable
Thiscan slowdown
productionfora time
Use phone torecord
live actionfootage
Jamescooper-abel
Flash drive lost or
broken
Thiscan lead tothe
lossof existingwork
requiringthe project
to start again
Keepa spare flash
drive butalsosave file
to multiple locations
Jamescooper-abel
Adobe programs crash Thiscan slowdown
production
Use otherediting
software suchas open
shot
Jamescooper-abel
Capture card footage
become corrupted
Can slowdown
production
Use xbox builtin
recordingfeature for
footage
Jamescooper-abel
organisational
Production fallsbehind Will leadtothe project
not makingits
deadline forrelease
Catch up on late work
inspare time
Jamescooper-abel
Time managementis
not followed
Thiswill leadtosome
aspectof the project
beingmore detailed
withotherbeingless
detailed
Double checkto see if
time managementis
beingutilizedproperly
Jamescooper-abel
Schedulingismess up Thiswill leadtono one
knowingwhatneeds
doingto the point
where nothinggets
done
Double check
schedulingis100%
correct withno
mistakes
Jamescooper-abel
Schedule Islost Thiswill leadto
nothinggettingdone
resultinginthe project
not meetingitrelease
date
Have back up of
schedule onstandby
incase firstschedule is
lost
Jamescooper-abel
Planningisn’t fully
complete or correct or
missingdetails
Thiswill leadtono one
knowingwhatneeds
doingto the point
where nothinggets
done
Double checkplanning
to see if its100%
Jamescooper-abel
2. logistical
Living room beingtoo
loud to record in
Slowingdown
productionasaudio
will notbe available to
editandcomplete
project
Findarea that isquite
enoughtorecord in
such as bedroom
Jamescooper-abel
Unable to obtain a
room to record inat
college fordiolog
Slowingdown
productionasaudio
will notbe available to
editandcomplete
project
Use roomsat home as
recordingstudio
Jamescooper-abel
Bedroom is too loudto
record in
Slowingdown
productionasaudio
will notbe available to
editandcomplete
project
Findarea that isquite
enoughtorecord in
such as livingroom
Jamescooper-abel
Unable to get to
college to do project
due to pandemic
Thiswill resultinthe
projectnotgetting
done
Do workat home using
the resourcesyouare
given
Jamescooper-abel
personnel
Voice actor is unable
to record their lines
Thislead to project
slowingdownasaudio
isneededtobringthe
projecttogether
Focuson aspectof
projectthat can be
done and use free time
afterwardstocatch up
Jamescooper-abel
Editor Is sick and can’t
work
Work will come toa
halt
Focuson aspectof
projectthat can be
done and use free time
afterwardstocatch up
Jamescooper-abel
Camera person doesn’t
show up or unable to
Shootingcome toa
halt
Focuson aspectof
projectthat can be
done and use free time
afterwardstocatch up
Jamescooper-abel
Artist isn’t able finish
the designsneededfor
the shirt design
Thismeansthat the
merchwebsite gets
delayedasthere isno
designtoshow off
Have secondaryartist
on standby to pickup
flack
Jamescooper-abel