SlideShare a Scribd company logo
1 of 3
JAMES B. HERMANN
1470 SouthRidge Trail jb.hermann@yahoo.com
Algonquin, IL 60102 (847) 309-8452
Quality Engineering Professional
Effective and innovative self-starter driven to deliver the highest-quality product through the most cost-effective solution.
Unique blend of Project Management and Quality Engineering skill sets to tackle complex technical problems , with soft
skills used to develop rapport, trust, and strong relationships both internally and externally. A dynamic personality with
the ability to build strong interpersonal relationships with both Internal and External customers. Intuitively able to identify
problems, define alternatives, build consensus and implement solutions. Excellent at maintaining big picture perspective
while managing details and handling numerous projects while maximizing goals.
I have an insatiable thirst for knowledge. I will use this knowledge to help your team deliver World Class Products linked
to World Class Quality, on Time, and under Budget, to your customers.
STRENGTHS INCLUDE:
Project Planning / Management Supplier Evaluation / Management ISO9001 Point Person / AS9100
Risk Mitigation NPI / APQP Design for Assembly / Design for Mfg.
Root Cause / Corrective Action Six Sigma Green Belt DMAIC
8D’s, 5W’s, Fish Bone, Pareto Collaboration / Team Building
_________________________________________________________________________________________
EXPERIENCE
General Electric Aviation – Air Management Systems Loves Park, IL 4/2015-10/2015
An aircraft Powered by GE technology takes off somewhere in the world every two seconds. Since they developed
America’s first jet engine in 1942; GE has continued to drive innovation across commercial, military, business & general
aviation. As a world-leading manufacturer and service provider for jet engines, GE Aviation works closely with our
suppliers to deliver on commitments to customers.
The Loves Park operation is responsible for De-icing Valves, Controllers, Actuators, Motors, Fans, and Blowers to
support the Air Management System portfolio.
Contract - Supplier Quality Engineer –
 Help support the Quality group in preparation for a new release of Oracle by reviewing 1700 part numbers to
determine their serial number format, before importing into Oracle.
 Compare and close Receiving Inspection records that were not closed because of software system limitations.
This included 450 part numbers.
 Organize and label Non-Conformance material to prepare for a customer audit.
 Attend DSQR training and complete certification for this standard.
 Send, Receive, and update Supplier surveys for several issues: GIDEP (Government Industry Data Exchange
Program), DSQR (Designated Supplier Quality Representative), and Supplier Self Survey (Quality Assessment)
 Conduct First Article Inspection reports
UTC – Aerospace Systems Rockford, IL 6/2012– 4/2014
One of world’s largest suppliers of technologically advanced aerospace and defense products; design, manufacture and
service systems and components and provide integrated solutions for commercial, regional, business and military aircraft,
helicopters and other platforms and major supplier to international space programs.
Senior Quality Engineer – Aftermarket, Distribution Center
 Provide the focal point for high visibility customer; the US Federal Government, for quality Non-Conformances.
o Drive quick and timely solutions to Root Cause and Corrective Action (RCCA) plans; A reduction from 42
to 8, in a 4 month time span; leading to Sales of $238,000
 Collaborate with Cross Functional team: Supplier Quality, Technical Inspections, Buyers, Planners, and
Distribution Center management to satisfactorily complete and close the CARS (Corrective Action Request) in a
timely manner
 Learn and apply Procurement systems knowledge to identify components and blue print requirements; track
component movement history to aid in completing Quality Notices and 8D’s (RCCA) to suppliers
 Obtain ,ACE (Achieving Completive Excellence) Level of Practitioner and use Lean tools to reduce NCM (Non-
Conforming Material) to less than 24hr. turn time, thus reducing inventory to $440,000
Zebra Technologies Corporation Vernon Hills, IL 9/2011 – 4/2012
Designer and manufacturer of printing devices that print variable information on demand at point of issuance; used
worldwide by manufacturers, service organizations and governments for automatic identification, data collection and
personal identification.
Contract - Environmental Compliance Component Engineer - (9/2011- 4/2012)
 Created and collaborated on 118 page document to define internal processes to create, validate, and approve
material declarations to comply with the RoHS Directive
 Using Agile (Oracle) system to solicit, validate, and store product compliance and governance for printers
produced by Zebra Technologies
 Create and support “Ad Hoc” queries to the Part Lifecycle Management Agile Database to support the Director
of Compliance on as needed basis
 Backfill compliance data for components / assemblies that were released without fully documented compliance
data from manufacturers, ~5,000
Esterline BVR Rockford, IL 6/2011- 8/2011
Specialized manufacturing company serving principally aerospace and defense markets by providing avionics and
controls, sensors and systems, and advanced materials.
Contract - Operations Quality Engineer
Complete PCPX – Process Control Planning and Execution (~APQP) for medical product process stabilization and
standardization. Structured approach allowed tracking of project progress and highlight all risks to management, along
with action plans to mitigate those risks
 Create detailed PFMEA – Process Failure Mode Effect Analysis for ZOLL product line, leading to improved
manufacturing processes and FTY
 Create and implement LEAN practices into manufacturing environment. 8D’s, root cause / corrective actions, 5
Why’s, process maps, value steam maps, tatk times, etc. were all used in our project
MOTOROLAINC Schaumburg, IL
Worldwide electronics company providing communications products and services to enterprises and governments,
including two-way and private radio systems, wireless network infrastructures, bar code scanning and private safety
broadband products.
Project Leader – New Products Introduction
Managed successful launch of new radio products with full responsibility for all supply chain issues ensuring supply chain
(both hardware and/or software) were ready for new product launch; included testing, manufacturing, and shipping by set
dates
 Met or exceeded all product and operations quality goals stated in contract book; created to provide manufacturing
goal metrics and necessitating approval by all team stakeholders
 Created plans to update and/or modify NPI ISO documents to prepare for an external audit; passed with no
infractions
Astro 6.8 2-way radio system
 Led cross functional team to address and redesign melting component in reflow oven; new product shipped on
time, within budget, having met quality metrics
Astro 7.7 2-way radio system
 As Supply Chain Project Leader, helped Motorola realize net revenue of $20M by the introduction of an Astro
radio system from US Navy and NJ State Police
PREVIOUS EXPERIENCE
Motorola INC. Senior Staff Engineer / SQE
Passive Commodity Specialist – SQE
Semiconductor Commodity Specialist – SQE
New Products Engineer, Lead – Quality
Manufacturing Process Engineer – Quality
Bar Code Specialist – Division
Electro- Static Discharge (ESD) Specialist – Division
Test Engineer - Automated PCBA
EDUCATION
B.S., Electrical Engineering, U of IL - Chicago, Chicago, Illinois
A.A. Business Admin, Elgin Community College, Elgin, Illinois
PROFESSIONAL DEVELOPMENT
 DMAIC TRAINING
 DFSS TRAINIG
 CERTIFIED MOTOROLA GREEN BELT
 VALUE STREAM MAPPING
 KAIZEN EVENT MEMBER
 MEMBER ASQ
 PROJECT MANAGEMENT – MASTERS CERTIFIED (GEORGE WASHINGTON UNIVERSITY)
 NEGOTATION TRAINING
 AS9100 TRAINING
 DSQR Certified – Designated Supplier Quality Representative
COMPUTER SKILLS
Microsoft Office Suite (Extensive use); Excel Pivot Tables, VISO, Motorola Web based tools: ICCS / PDM1(Component
Database), Minitab Statistical Tool, Oracle, EMARS (Environmental Database), and Compass (EMS Web Interface),
Agile (Oracle DB.), JD Edwards (MRP dB), iClass (Export/Import dB). VIA (Blueprint dB
ASSOCIATIONS
Member of ASQ (American Society of Quality)

More Related Content

Recently uploaded

Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
MohammadAliNayeem
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Recently uploaded (20)

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of Arduino
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
E-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentE-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are present
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfBURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdf
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 

Featured (20)

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 

James b. hermann rev. x

  • 1. JAMES B. HERMANN 1470 SouthRidge Trail jb.hermann@yahoo.com Algonquin, IL 60102 (847) 309-8452 Quality Engineering Professional Effective and innovative self-starter driven to deliver the highest-quality product through the most cost-effective solution. Unique blend of Project Management and Quality Engineering skill sets to tackle complex technical problems , with soft skills used to develop rapport, trust, and strong relationships both internally and externally. A dynamic personality with the ability to build strong interpersonal relationships with both Internal and External customers. Intuitively able to identify problems, define alternatives, build consensus and implement solutions. Excellent at maintaining big picture perspective while managing details and handling numerous projects while maximizing goals. I have an insatiable thirst for knowledge. I will use this knowledge to help your team deliver World Class Products linked to World Class Quality, on Time, and under Budget, to your customers. STRENGTHS INCLUDE: Project Planning / Management Supplier Evaluation / Management ISO9001 Point Person / AS9100 Risk Mitigation NPI / APQP Design for Assembly / Design for Mfg. Root Cause / Corrective Action Six Sigma Green Belt DMAIC 8D’s, 5W’s, Fish Bone, Pareto Collaboration / Team Building _________________________________________________________________________________________ EXPERIENCE General Electric Aviation – Air Management Systems Loves Park, IL 4/2015-10/2015 An aircraft Powered by GE technology takes off somewhere in the world every two seconds. Since they developed America’s first jet engine in 1942; GE has continued to drive innovation across commercial, military, business & general aviation. As a world-leading manufacturer and service provider for jet engines, GE Aviation works closely with our suppliers to deliver on commitments to customers. The Loves Park operation is responsible for De-icing Valves, Controllers, Actuators, Motors, Fans, and Blowers to support the Air Management System portfolio. Contract - Supplier Quality Engineer –  Help support the Quality group in preparation for a new release of Oracle by reviewing 1700 part numbers to determine their serial number format, before importing into Oracle.  Compare and close Receiving Inspection records that were not closed because of software system limitations. This included 450 part numbers.  Organize and label Non-Conformance material to prepare for a customer audit.  Attend DSQR training and complete certification for this standard.  Send, Receive, and update Supplier surveys for several issues: GIDEP (Government Industry Data Exchange Program), DSQR (Designated Supplier Quality Representative), and Supplier Self Survey (Quality Assessment)  Conduct First Article Inspection reports UTC – Aerospace Systems Rockford, IL 6/2012– 4/2014 One of world’s largest suppliers of technologically advanced aerospace and defense products; design, manufacture and service systems and components and provide integrated solutions for commercial, regional, business and military aircraft, helicopters and other platforms and major supplier to international space programs. Senior Quality Engineer – Aftermarket, Distribution Center  Provide the focal point for high visibility customer; the US Federal Government, for quality Non-Conformances. o Drive quick and timely solutions to Root Cause and Corrective Action (RCCA) plans; A reduction from 42 to 8, in a 4 month time span; leading to Sales of $238,000  Collaborate with Cross Functional team: Supplier Quality, Technical Inspections, Buyers, Planners, and Distribution Center management to satisfactorily complete and close the CARS (Corrective Action Request) in a timely manner  Learn and apply Procurement systems knowledge to identify components and blue print requirements; track component movement history to aid in completing Quality Notices and 8D’s (RCCA) to suppliers  Obtain ,ACE (Achieving Completive Excellence) Level of Practitioner and use Lean tools to reduce NCM (Non- Conforming Material) to less than 24hr. turn time, thus reducing inventory to $440,000
  • 2. Zebra Technologies Corporation Vernon Hills, IL 9/2011 – 4/2012 Designer and manufacturer of printing devices that print variable information on demand at point of issuance; used worldwide by manufacturers, service organizations and governments for automatic identification, data collection and personal identification. Contract - Environmental Compliance Component Engineer - (9/2011- 4/2012)  Created and collaborated on 118 page document to define internal processes to create, validate, and approve material declarations to comply with the RoHS Directive  Using Agile (Oracle) system to solicit, validate, and store product compliance and governance for printers produced by Zebra Technologies  Create and support “Ad Hoc” queries to the Part Lifecycle Management Agile Database to support the Director of Compliance on as needed basis  Backfill compliance data for components / assemblies that were released without fully documented compliance data from manufacturers, ~5,000 Esterline BVR Rockford, IL 6/2011- 8/2011 Specialized manufacturing company serving principally aerospace and defense markets by providing avionics and controls, sensors and systems, and advanced materials. Contract - Operations Quality Engineer Complete PCPX – Process Control Planning and Execution (~APQP) for medical product process stabilization and standardization. Structured approach allowed tracking of project progress and highlight all risks to management, along with action plans to mitigate those risks  Create detailed PFMEA – Process Failure Mode Effect Analysis for ZOLL product line, leading to improved manufacturing processes and FTY  Create and implement LEAN practices into manufacturing environment. 8D’s, root cause / corrective actions, 5 Why’s, process maps, value steam maps, tatk times, etc. were all used in our project MOTOROLAINC Schaumburg, IL Worldwide electronics company providing communications products and services to enterprises and governments, including two-way and private radio systems, wireless network infrastructures, bar code scanning and private safety broadband products. Project Leader – New Products Introduction Managed successful launch of new radio products with full responsibility for all supply chain issues ensuring supply chain (both hardware and/or software) were ready for new product launch; included testing, manufacturing, and shipping by set dates  Met or exceeded all product and operations quality goals stated in contract book; created to provide manufacturing goal metrics and necessitating approval by all team stakeholders  Created plans to update and/or modify NPI ISO documents to prepare for an external audit; passed with no infractions Astro 6.8 2-way radio system  Led cross functional team to address and redesign melting component in reflow oven; new product shipped on time, within budget, having met quality metrics Astro 7.7 2-way radio system  As Supply Chain Project Leader, helped Motorola realize net revenue of $20M by the introduction of an Astro radio system from US Navy and NJ State Police
  • 3. PREVIOUS EXPERIENCE Motorola INC. Senior Staff Engineer / SQE Passive Commodity Specialist – SQE Semiconductor Commodity Specialist – SQE New Products Engineer, Lead – Quality Manufacturing Process Engineer – Quality Bar Code Specialist – Division Electro- Static Discharge (ESD) Specialist – Division Test Engineer - Automated PCBA EDUCATION B.S., Electrical Engineering, U of IL - Chicago, Chicago, Illinois A.A. Business Admin, Elgin Community College, Elgin, Illinois PROFESSIONAL DEVELOPMENT  DMAIC TRAINING  DFSS TRAINIG  CERTIFIED MOTOROLA GREEN BELT  VALUE STREAM MAPPING  KAIZEN EVENT MEMBER  MEMBER ASQ  PROJECT MANAGEMENT – MASTERS CERTIFIED (GEORGE WASHINGTON UNIVERSITY)  NEGOTATION TRAINING  AS9100 TRAINING  DSQR Certified – Designated Supplier Quality Representative COMPUTER SKILLS Microsoft Office Suite (Extensive use); Excel Pivot Tables, VISO, Motorola Web based tools: ICCS / PDM1(Component Database), Minitab Statistical Tool, Oracle, EMARS (Environmental Database), and Compass (EMS Web Interface), Agile (Oracle DB.), JD Edwards (MRP dB), iClass (Export/Import dB). VIA (Blueprint dB ASSOCIATIONS Member of ASQ (American Society of Quality)