Employer Project Brief
1
The Design, Construction and Completion of the
Proposed Buggy Bus Station at Taylor’s University
Lakeside Campus’s Zone H Parking Area.
PROJECT BRIEF
Employer Project Brief
2
As one of Malaysia's oldest, most successful and reputable private education institutions, Taylor's
University has achieved multiple awards, including ‘Most Popular Private College and/or University
in Malaysia’out of more than 100 other institutions.
PROJECT BACKGROUND
In keeping with our reputation, we decide to enhance our service to students and visitors by
providing one-of-its-kind transportation service: Free shutter service from the parking lots to the
main campus entrance.
A buggy stop complete with roof shelter for two no.10-person buggies is to be constructed. The
buggy stop is to have an attached waiting shelter of a size to accommodate 20 students/visitors at
anyone one time.
The condition of the existing site is shown in Appendix A herewith.
PROJECT REQUIREMENTS
The design of the buggy stop must compliment with the overall design of the campus.
The buggy stop structural frame, column and beam support may be designed with
reinforced concrete or structural steel option to suit the practicality of the site condition and
constraints.
The planning and design of the buggy stop is to adhere to requirements set by the relevant
by-laws and codes of practices, including the following, but not limited to:
I. Uniform Building By-laws;
II. Town & Country Planning Act;
III. JabatanBombadanPenyelamat Malaysia (JBPM)
IV. Department of Occupational Safety and Health (JKKP)
V. Department of Electricity Supply and Gas (JBEG);
VI. SuruhanjayaTenaga Malaysia (TNB);
VII. Syarikat Bekalan Air Selangor SdnBhd (SYABAS)
VIII. Department of Occupational Safety and Health Regulations;
IX. Relevant Malaysian Standards, British Building Standards and other
Standards approved by local authorities.
X. MajlisPerbandaraanSubang Jaya (MPSJ)
The buggy stop’s form, façade treatment and structural form shall be harmonious and
aesthetically pleasing with the surrounding and unique as a landmark.
All works carried out by the contractor shall be subject to quality assessment carried out by
representative from Construction Industry Development Board (CIDB)
Employer Project Brief
3
CONTRACT REQUIREMENTS
Form of contract to be PertubuhanArkitek Malaysia (PAM) form.
Insurance coverage for Third Party Liability to be minimum RM1, 000,000.
The Liquidated and Ascertain Damage (LAD) to be RM500 per day for delays caused by
contractor’s own fault.
The performance bond shall be 5% of the contract sum in a form of banker’s guarantee.
The Defects Liability Period is 12 months from Certificate of Practical Completion for Building
Works.
The period of honouring payment certificate shall be 30 days from the date of receipt of
Certificate by the Employer.
ARCHITECTURAL DESIGN REQUIREMENTS
The selection and proposal of the materials and finishes are to be:
I. Well designed
II. Of good quality and conforming to ISO and relevant building code standards.
III. Inexpensive for procurement, maintenance and replacement.
IV. Of good visual compatibility to the surrounding area.
V. Of low maintenance and/or high durability in daily wear and tear.
The planning and design of the buggy stop is to considered and incorporate the following
environmental factors;
I. Solar path, reflectivity and shading
II. Natural Ventilation
III. Solar/heat gain and loss
IV. Location of fan units
V. Natural wind patterns and wind loading
VI. External shading and rain cover
VII. Adequate landscaping
Selection of planting shall complement the surrounding landscape and comply with
authority guidelines.
ELECTRICAL REQUIREMENTS
 All fluorescent lamps shall be PLC square downlight c/w tempered glass diffuser
 All lighting circuits shall be provided with contactors, timers and by manual pass switches for
control.
 All wall and ceiling fans shall be KDK brand.
Employer Project Brief
4
CIVIL AND STRUCTURAL DESIGN REQUIREMENTS
The general requirements are as follows:
 The buggy stop shall be designed and constructed to ensure structural
integrity and serviceability and satisfy the requirements of aesthetics.
 Generally, all structural steel and reinforced concrete structures shall be
designed in accordance with BS 5950 and BS 8110 respectively.
The following code of practice and standards shall be complied with:
I. Uniform Building By-Laws(Malaysia) 1984
II. BS 6399-Part 1 : Code of Practice for Dead and Imposed Load
III. BS 6399-Part 2 : Wind Loads
IV. BS 6399-Part 3 : Code of Practice for Imposed Roof Loads
V. BS 8110 (1997) : Structural Use of Concrete
VI. BS 5950 (2000) : Structural Use of Steelwork in Building
VII. BS 8004 : Code of Practice for Foundations
The following loads and forces shall be considered in the structural design:
 Dead Load
 Imposed Load
 Wind Load
 Equipment Load such as ceiling fans and lightings.
All structural materials incorporated in the works shall comply with relevant Malaysian
Standards or British Standards. The following material grade shall be used:
I. Concrete for all reinforced concrete structures shall be Grade 25 or higher.
Grade 43A shall be adopted for structural steel.
II. Cement shall be Portland cement complying to BS 12:1978 or MS.522
III. The quality of structural steel shall be in accordance with B.S. 4360
IV. The welding of steel shall comply with B.S. 5135
V. Mild steel reinforcement shall comply to B.S. 4449
VI. High yield stress steel reinforcement shall comply to B.S. 4461
VII. Welded steel fabric shall comply to B.S. 4483
SITE LOCATION AND SIZE
Located near theentrance of Taylor’s University Lakeside Campus’s ZONE H Parking Area
shown at Appendix A.
Site area of 8mx20m, beside the existing car park.
The existing ground condition is generally concrete pavement with patches of bushes as
shown at Appendix A.
Employer Project Brief
5
BUDGET
The budget for the projectincluding construction cost, professional fees and authorities
charges is not exceedingRM100,000
The professional fees (including architectural, civil and structural, mechanical and electrical
and Quantity Surveying) shall be a total 15% of the contract sum.
TIMEFRAME
The timeframe from inception to completion of project is allowed at 6 months.
Expected completion: January 2014.
RESTRICTION
All workers are not allowed to use the campus’s facilities such as toilets and canteen.
Contractor to provide portable toilets on site.
All workers accommodation is not allowed on site.
No work is allowed to start on site before 8am and after 6pm, Monday to Sunday.
The contractor must register all his workers, sub-contractors, lorry drivers etc. with the
University to obtain security passes before starting work on site.
All workers are to present the security passes to the University security guards before
entering the campus.
Contractor should refrain from noisy machinery on site.
All machineryshould be equipped with sound insulators and smoke emission from machines
must be controlled.
The construction site must be fenced around.
UNIVERSITY CONTACT PERSON
Mr. A.B Chee
University property department
012-3456789
Employer Project Brief
6
APPENDIX A
LOCATION PLAN AND CONDITION
Employer Project Brief
7
APPENDIX A – Location plan and current site condition for the proposed buggy bus stop

More Related Content

What's hot

Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Sam
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Albitar
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalMuntazir Sheikh
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Muntazir Sheikh
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoFernando Villarojo
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander Pace
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil EngineerBinu Babu
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021Eduardo H. Pare
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018Eduardo H. Pare
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv Venkatesh -
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021Eduardo H. Pare
 

What's hot (20)

Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
Alexander_Pace_Resume2016
Alexander_Pace_Resume2016Alexander_Pace_Resume2016
Alexander_Pace_Resume2016
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
BAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CVBAHA AL DEN AL JOBOURI, MSc.CV
BAHA AL DEN AL JOBOURI, MSc.CV
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
CV Chenna
CV ChennaCV Chenna
CV Chenna
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer20161120 Binu CV - Sr. Civil Engineer
20161120 Binu CV - Sr. Civil Engineer
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
EDUARDO H. PARE CV -- circa 10.2018
EDUARDO H. PARE CV  --  circa 10.2018EDUARDO H. PARE CV  --  circa 10.2018
EDUARDO H. PARE CV -- circa 10.2018
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
Venkatesh planning cv
Venkatesh  planning cv Venkatesh  planning cv
Venkatesh planning cv
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 

Similar to Taylor's University Buggy Stop Project

Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabilMohamed Omer
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)TeohPeiNi
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInGabriel Koncal
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)YONG WEN TING
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -Earlvic Torcino
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineerHashim Vayalilakath
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015Peter Bricknell
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)Suresh Singh
 

Similar to Taylor's University Buggy Stop Project (20)

KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Khaled CV
Khaled CVKhaled CV
Khaled CV
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedIn
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Ibrahim C.V
Ibrahim C.VIbrahim C.V
Ibrahim C.V
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Resume
ResumeResume
Resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 

More from J-Sern Phua

B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2J-Sern Phua
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1J-Sern Phua
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1J-Sern Phua
 
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSIS
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSISTHEORIES OF ARCHITECTURE AND URBANISM SYNOPSIS
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSISJ-Sern Phua
 
THEORIES OF ARCHITECTURE AND URBANISM PART B
THEORIES OF ARCHITECTURE AND URBANISM PART BTHEORIES OF ARCHITECTURE AND URBANISM PART B
THEORIES OF ARCHITECTURE AND URBANISM PART BJ-Sern Phua
 
THEORIES OF ARCHITECTURE AND URBANISM PART A
THEORIES OF ARCHITECTURE AND URBANISM PART ATHEORIES OF ARCHITECTURE AND URBANISM PART A
THEORIES OF ARCHITECTURE AND URBANISM PART AJ-Sern Phua
 
Thinking Architecture - Personal Values Statement
Thinking Architecture - Personal Values StatementThinking Architecture - Personal Values Statement
Thinking Architecture - Personal Values StatementJ-Sern Phua
 
Thinking Architecture - Think Sheet Compiliation
Thinking Architecture - Think Sheet CompiliationThinking Architecture - Think Sheet Compiliation
Thinking Architecture - Think Sheet CompiliationJ-Sern Phua
 
Building Structure Project B Report
Building Structure Project B ReportBuilding Structure Project B Report
Building Structure Project B ReportJ-Sern Phua
 
Literature Review of Pulau Ketam
Literature Review of Pulau KetamLiterature Review of Pulau Ketam
Literature Review of Pulau KetamJ-Sern Phua
 
Research Report Presentation
Research Report PresentationResearch Report Presentation
Research Report PresentationJ-Sern Phua
 
Compare and Constrast Essay
Compare and Constrast EssayCompare and Constrast Essay
Compare and Constrast EssayJ-Sern Phua
 
Descriptive and Narrative Essay
Descriptive and Narrative EssayDescriptive and Narrative Essay
Descriptive and Narrative EssayJ-Sern Phua
 
IDJ 2 - Cans and Can'ts
IDJ 2 - Cans and Can'tsIDJ 2 - Cans and Can'ts
IDJ 2 - Cans and Can'tsJ-Sern Phua
 
ENBE PROJECT 2 REPORT
ENBE PROJECT 2 REPORTENBE PROJECT 2 REPORT
ENBE PROJECT 2 REPORTJ-Sern Phua
 

More from J-Sern Phua (20)

B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1
 
Acoustic Analysis Project 1
Acoustic Analysis Project 1Acoustic Analysis Project 1
Acoustic Analysis Project 1
 
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSIS
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSISTHEORIES OF ARCHITECTURE AND URBANISM SYNOPSIS
THEORIES OF ARCHITECTURE AND URBANISM SYNOPSIS
 
THEORIES OF ARCHITECTURE AND URBANISM PART B
THEORIES OF ARCHITECTURE AND URBANISM PART BTHEORIES OF ARCHITECTURE AND URBANISM PART B
THEORIES OF ARCHITECTURE AND URBANISM PART B
 
THEORIES OF ARCHITECTURE AND URBANISM PART A
THEORIES OF ARCHITECTURE AND URBANISM PART ATHEORIES OF ARCHITECTURE AND URBANISM PART A
THEORIES OF ARCHITECTURE AND URBANISM PART A
 
Thinking Architecture - Personal Values Statement
Thinking Architecture - Personal Values StatementThinking Architecture - Personal Values Statement
Thinking Architecture - Personal Values Statement
 
Thinking Architecture - Think Sheet Compiliation
Thinking Architecture - Think Sheet CompiliationThinking Architecture - Think Sheet Compiliation
Thinking Architecture - Think Sheet Compiliation
 
Building Structure Project B Report
Building Structure Project B ReportBuilding Structure Project B Report
Building Structure Project B Report
 
BUSINESS
BUSINESSBUSINESS
BUSINESS
 
Psy Report
Psy ReportPsy Report
Psy Report
 
PSY Proposal
PSY ProposalPSY Proposal
PSY Proposal
 
S.Psy journals
S.Psy journalsS.Psy journals
S.Psy journals
 
Literature Review of Pulau Ketam
Literature Review of Pulau KetamLiterature Review of Pulau Ketam
Literature Review of Pulau Ketam
 
Pulau Ketam
Pulau KetamPulau Ketam
Pulau Ketam
 
Research Report Presentation
Research Report PresentationResearch Report Presentation
Research Report Presentation
 
Compare and Constrast Essay
Compare and Constrast EssayCompare and Constrast Essay
Compare and Constrast Essay
 
Descriptive and Narrative Essay
Descriptive and Narrative EssayDescriptive and Narrative Essay
Descriptive and Narrative Essay
 
IDJ 2 - Cans and Can'ts
IDJ 2 - Cans and Can'tsIDJ 2 - Cans and Can'ts
IDJ 2 - Cans and Can'ts
 
ENBE PROJECT 2 REPORT
ENBE PROJECT 2 REPORTENBE PROJECT 2 REPORT
ENBE PROJECT 2 REPORT
 

Recently uploaded

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Recently uploaded (20)

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

Taylor's University Buggy Stop Project

  • 1. Employer Project Brief 1 The Design, Construction and Completion of the Proposed Buggy Bus Station at Taylor’s University Lakeside Campus’s Zone H Parking Area. PROJECT BRIEF
  • 2. Employer Project Brief 2 As one of Malaysia's oldest, most successful and reputable private education institutions, Taylor's University has achieved multiple awards, including ‘Most Popular Private College and/or University in Malaysia’out of more than 100 other institutions. PROJECT BACKGROUND In keeping with our reputation, we decide to enhance our service to students and visitors by providing one-of-its-kind transportation service: Free shutter service from the parking lots to the main campus entrance. A buggy stop complete with roof shelter for two no.10-person buggies is to be constructed. The buggy stop is to have an attached waiting shelter of a size to accommodate 20 students/visitors at anyone one time. The condition of the existing site is shown in Appendix A herewith. PROJECT REQUIREMENTS The design of the buggy stop must compliment with the overall design of the campus. The buggy stop structural frame, column and beam support may be designed with reinforced concrete or structural steel option to suit the practicality of the site condition and constraints. The planning and design of the buggy stop is to adhere to requirements set by the relevant by-laws and codes of practices, including the following, but not limited to: I. Uniform Building By-laws; II. Town & Country Planning Act; III. JabatanBombadanPenyelamat Malaysia (JBPM) IV. Department of Occupational Safety and Health (JKKP) V. Department of Electricity Supply and Gas (JBEG); VI. SuruhanjayaTenaga Malaysia (TNB); VII. Syarikat Bekalan Air Selangor SdnBhd (SYABAS) VIII. Department of Occupational Safety and Health Regulations; IX. Relevant Malaysian Standards, British Building Standards and other Standards approved by local authorities. X. MajlisPerbandaraanSubang Jaya (MPSJ) The buggy stop’s form, façade treatment and structural form shall be harmonious and aesthetically pleasing with the surrounding and unique as a landmark. All works carried out by the contractor shall be subject to quality assessment carried out by representative from Construction Industry Development Board (CIDB)
  • 3. Employer Project Brief 3 CONTRACT REQUIREMENTS Form of contract to be PertubuhanArkitek Malaysia (PAM) form. Insurance coverage for Third Party Liability to be minimum RM1, 000,000. The Liquidated and Ascertain Damage (LAD) to be RM500 per day for delays caused by contractor’s own fault. The performance bond shall be 5% of the contract sum in a form of banker’s guarantee. The Defects Liability Period is 12 months from Certificate of Practical Completion for Building Works. The period of honouring payment certificate shall be 30 days from the date of receipt of Certificate by the Employer. ARCHITECTURAL DESIGN REQUIREMENTS The selection and proposal of the materials and finishes are to be: I. Well designed II. Of good quality and conforming to ISO and relevant building code standards. III. Inexpensive for procurement, maintenance and replacement. IV. Of good visual compatibility to the surrounding area. V. Of low maintenance and/or high durability in daily wear and tear. The planning and design of the buggy stop is to considered and incorporate the following environmental factors; I. Solar path, reflectivity and shading II. Natural Ventilation III. Solar/heat gain and loss IV. Location of fan units V. Natural wind patterns and wind loading VI. External shading and rain cover VII. Adequate landscaping Selection of planting shall complement the surrounding landscape and comply with authority guidelines. ELECTRICAL REQUIREMENTS  All fluorescent lamps shall be PLC square downlight c/w tempered glass diffuser  All lighting circuits shall be provided with contactors, timers and by manual pass switches for control.  All wall and ceiling fans shall be KDK brand.
  • 4. Employer Project Brief 4 CIVIL AND STRUCTURAL DESIGN REQUIREMENTS The general requirements are as follows:  The buggy stop shall be designed and constructed to ensure structural integrity and serviceability and satisfy the requirements of aesthetics.  Generally, all structural steel and reinforced concrete structures shall be designed in accordance with BS 5950 and BS 8110 respectively. The following code of practice and standards shall be complied with: I. Uniform Building By-Laws(Malaysia) 1984 II. BS 6399-Part 1 : Code of Practice for Dead and Imposed Load III. BS 6399-Part 2 : Wind Loads IV. BS 6399-Part 3 : Code of Practice for Imposed Roof Loads V. BS 8110 (1997) : Structural Use of Concrete VI. BS 5950 (2000) : Structural Use of Steelwork in Building VII. BS 8004 : Code of Practice for Foundations The following loads and forces shall be considered in the structural design:  Dead Load  Imposed Load  Wind Load  Equipment Load such as ceiling fans and lightings. All structural materials incorporated in the works shall comply with relevant Malaysian Standards or British Standards. The following material grade shall be used: I. Concrete for all reinforced concrete structures shall be Grade 25 or higher. Grade 43A shall be adopted for structural steel. II. Cement shall be Portland cement complying to BS 12:1978 or MS.522 III. The quality of structural steel shall be in accordance with B.S. 4360 IV. The welding of steel shall comply with B.S. 5135 V. Mild steel reinforcement shall comply to B.S. 4449 VI. High yield stress steel reinforcement shall comply to B.S. 4461 VII. Welded steel fabric shall comply to B.S. 4483 SITE LOCATION AND SIZE Located near theentrance of Taylor’s University Lakeside Campus’s ZONE H Parking Area shown at Appendix A. Site area of 8mx20m, beside the existing car park. The existing ground condition is generally concrete pavement with patches of bushes as shown at Appendix A.
  • 5. Employer Project Brief 5 BUDGET The budget for the projectincluding construction cost, professional fees and authorities charges is not exceedingRM100,000 The professional fees (including architectural, civil and structural, mechanical and electrical and Quantity Surveying) shall be a total 15% of the contract sum. TIMEFRAME The timeframe from inception to completion of project is allowed at 6 months. Expected completion: January 2014. RESTRICTION All workers are not allowed to use the campus’s facilities such as toilets and canteen. Contractor to provide portable toilets on site. All workers accommodation is not allowed on site. No work is allowed to start on site before 8am and after 6pm, Monday to Sunday. The contractor must register all his workers, sub-contractors, lorry drivers etc. with the University to obtain security passes before starting work on site. All workers are to present the security passes to the University security guards before entering the campus. Contractor should refrain from noisy machinery on site. All machineryshould be equipped with sound insulators and smoke emission from machines must be controlled. The construction site must be fenced around. UNIVERSITY CONTACT PERSON Mr. A.B Chee University property department 012-3456789
  • 6. Employer Project Brief 6 APPENDIX A LOCATION PLAN AND CONDITION
  • 7. Employer Project Brief 7 APPENDIX A – Location plan and current site condition for the proposed buggy bus stop