Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room visits annually. The hospital required a comprehensive lighting system upgrade to replace their outdated system, improve occupant comfort, and increase overall operational efficiency.
Working under crunching time constraints, IoEnergy demonstrated its technical acumen by designing an upgrade for the entire hospital that was installed in just three weeks. The project, which included 3,800 fixtures was completed during the Covid-19 outbreak, with zero interruptions to hospital operations or impact on patient care.
Similar to Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations
Similar to Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to Hospital Operations (20)
2. INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE
3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to
Hospital Operations
BUSINESS TYPE:
HOSPITAL
LOCATION:
BROOKLYN, NY
PROJECT SUMMARY:
Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that
services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room
visits annually. The hospital required a comprehensive lighting upgrade to replace their
outdated system, improve occupant comfort, and increase overall operational efficiency.
Working under crunching time constraints, IoEnergy demonstrated its technical acumen by
designing an upgrade for the entire hospital that was installed in just three weeks. The project,
which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero
interruptions to hospital operations or impact on patient care.
www.ioenergyinc.com | 03
3. PROJECT SCOPE:
• LED Lighting Upgrade
RESULTS:
• $214,015 Annual Energy
Savings
• $62,606 Annual Maintenance
Savings
• $34,051 HVAC Savings
• 2.85-Year ROI Payback
• 1,258,912 kWh Saved Annually
• 226 kW Demand Savings
INTERFAITH MEDICAL CENTER LED LIGHTING UPGRADE
3,800 Fixture Upgrade Completed During Covid-19 Pandemic with Zero Disruption to
Hospital Operations
BUSINESS TYPE:
HOSPITAL
LOCATION:
BROOKLYN, NY
PROJECT SUMMARY:
Interfaith Medical Center is a 287-bed teaching hospital located in Brooklyn, New York that
services approximately 11,000 inpatients, 200,000 outpatients, and 50,000 emergency room
visits annually. The hospital required a comprehensive lighting upgrade to replace their
outdated system, improve occupant comfort, and increase overall operational efficiency.
Working under crunching time constraints, IoEnergy demonstrated its technical acumen by
designing an upgrade for the entire hospital that was installed in just three weeks. The project,
which included 3,800 fixtures, completed during the Covid-19 outbreak, with zero
interruptions to hospital operations or impact on patient care.
www.ioenergyinc.com | 03
4. This was a deadline-driven project that
required a high level of execution and close
attention to detail. We had to overcome the
hurdles of a three-week installation window, a
global pandemic, and the need to get the job
done without any disruption to hospital
operations. Our crews really stepped up and
did an amazing job.”
-Len Pisano,
IoEnergy Director of Strategic Accounts
www.ioenergyinc.com | 04
“