Project Fact Sheet
Project Name: Refurbishment of the X-Ray Room 3 & 4
Location: X-Ray Imaging Department
Stage: Delivered
Client representative: Keith Marfleet / Imaging Services Lead
Andrew Delaney / Deputy Imaging Service Lead
Senior Project Manager (Capital): Alessandro Annunziata
Head of Capital Projects: John Brierley
Director of Estates: Phil Eagles
Project Update:
• Project completed in June 2016
• In Defects until June 2017
Project Brief:
In 2015 Milton Keynes University Hospital NHS Foundation Trust stated that the existing Philips
X-Ray systems, installed in 1990, were obsolete and unreliable.
The current system has been upgraded to a full solution Konica Minolta Aero DR X70 Unit
ceiling mounted with X-ray table and tilting wall stand procured via NHS Supply Chain.
The installation of the new system required a complete refurbishment of the rooms including
compliance to electrical Installations in medical locations BS 7671.
Construction works to create adequate clinical areas for effective delivery of services include
as follows:
• Alteration of partition walls to
reconfigure the layout of the area
and creation of a new corridor.
• Mechanical ventilation with hygienic
air grilles
• Hot and cold water services for
clinical sink installed via IPS panel in
Solid Grade Laminated
• New fire smoke detectors
• New antiglare dimmable lights
panels in LED
• New heating and cooling at X-Ray
department with Daikin VRV IV Heat
Pump with Variable Refrigerant
Temperature (VRT)
• New Lead screens
• New MEIGaN panels
• New hygienic Glass Reinforced
Polyester (GRP) doors
Construction Project Team:
Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata
Main Contractor David Nott and sons ltd
Project Facts & Figures:
Budget: £580,000.00 including equipment Funding Source: Capital
Tendering: single stage with priced schedule of works
Contract: JCT Minor works

More Related Content

Similar to MKUH Project Fact Sheet X-Ray room 3 & 4

MKUH Cook Chill Project Fact Sheet 2015
MKUH Cook Chill Project Fact Sheet 2015MKUH Cook Chill Project Fact Sheet 2015
MKUH Cook Chill Project Fact Sheet 2015Alessandro Annunziata
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 
Carina & Gemini Case Study[1]
Carina & Gemini Case Study[1]Carina & Gemini Case Study[1]
Carina & Gemini Case Study[1]Nicky Moroncini
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from DribuildMichael McVey
 
BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building SuccessJason Holbrook, PMP
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011 charkins
 
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalwandysgal
 
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...IoEnergy, Inc.
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special ProjectsChalcroft Ltd
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDYPaul Harrison
 
BUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdfBUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdfaZrieyajizzz
 
Scientific Support Unit - Wakefield
Scientific Support Unit - WakefieldScientific Support Unit - Wakefield
Scientific Support Unit - WakefieldAlan Wood & Partners
 
Spider Cloud Wireless & Vodafone case studies
Spider Cloud Wireless & Vodafone case studiesSpider Cloud Wireless & Vodafone case studies
Spider Cloud Wireless & Vodafone case studiesSmall Cell Forum
 

Similar to MKUH Project Fact Sheet X-Ray room 3 & 4 (20)

TB Clinic Project Report
TB Clinic Project ReportTB Clinic Project Report
TB Clinic Project Report
 
MKUH Cook Chill Project Fact Sheet 2015
MKUH Cook Chill Project Fact Sheet 2015MKUH Cook Chill Project Fact Sheet 2015
MKUH Cook Chill Project Fact Sheet 2015
 
Murray Ward - PM report
Murray Ward - PM reportMurray Ward - PM report
Murray Ward - PM report
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
Guys Hospital[1]
Guys Hospital[1]Guys Hospital[1]
Guys Hospital[1]
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
FXB_Mission Critical
FXB_Mission CriticalFXB_Mission Critical
FXB_Mission Critical
 
!dRA Project List
!dRA Project List!dRA Project List
!dRA Project List
 
Carina & Gemini Case Study[1]
Carina & Gemini Case Study[1]Carina & Gemini Case Study[1]
Carina & Gemini Case Study[1]
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from Dribuild
 
BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building Success
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
 
Premier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-finalPremier modular case_studies_-_north_middlesex_hospital_-final
Premier modular case_studies_-_north_middlesex_hospital_-final
 
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...
Interfaith Medical Center LED Lighting Upgrade - 3,800 Fixture Upgrade Comple...
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special Projects
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
BUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdfBUILDING REFURBISHMENT for industry bb.pdf
BUILDING REFURBISHMENT for industry bb.pdf
 
Scientific Support Unit - Wakefield
Scientific Support Unit - WakefieldScientific Support Unit - Wakefield
Scientific Support Unit - Wakefield
 
Spider Cloud Wireless & Vodafone case studies
Spider Cloud Wireless & Vodafone case studiesSpider Cloud Wireless & Vodafone case studies
Spider Cloud Wireless & Vodafone case studies
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 

More from Alessandro Annunziata

More from Alessandro Annunziata (8)

MKUH X-Ray room 3 & 4 - After works
MKUH X-Ray room 3 & 4 - After worksMKUH X-Ray room 3 & 4 - After works
MKUH X-Ray room 3 & 4 - After works
 
MKUH Cook Chill project - Before & after works
MKUH Cook Chill project - Before & after worksMKUH Cook Chill project - Before & after works
MKUH Cook Chill project - Before & after works
 
MKUH Barium project -After works
MKUH Barium project -After worksMKUH Barium project -After works
MKUH Barium project -After works
 
Maternity Murray ward - After works
Maternity Murray ward - After worksMaternity Murray ward - After works
Maternity Murray ward - After works
 
Maternity Murray ward - Before refurbishment
Maternity Murray ward - Before refurbishmentMaternity Murray ward - Before refurbishment
Maternity Murray ward - Before refurbishment
 
TB Clinic After
TB Clinic AfterTB Clinic After
TB Clinic After
 
TB Clinic Before
TB Clinic BeforeTB Clinic Before
TB Clinic Before
 
TB Clinic Proposed Layout
TB Clinic Proposed LayoutTB Clinic Proposed Layout
TB Clinic Proposed Layout
 

MKUH Project Fact Sheet X-Ray room 3 & 4

  • 1. Project Fact Sheet Project Name: Refurbishment of the X-Ray Room 3 & 4 Location: X-Ray Imaging Department Stage: Delivered Client representative: Keith Marfleet / Imaging Services Lead Andrew Delaney / Deputy Imaging Service Lead Senior Project Manager (Capital): Alessandro Annunziata Head of Capital Projects: John Brierley Director of Estates: Phil Eagles Project Update: • Project completed in June 2016 • In Defects until June 2017 Project Brief: In 2015 Milton Keynes University Hospital NHS Foundation Trust stated that the existing Philips X-Ray systems, installed in 1990, were obsolete and unreliable. The current system has been upgraded to a full solution Konica Minolta Aero DR X70 Unit ceiling mounted with X-ray table and tilting wall stand procured via NHS Supply Chain. The installation of the new system required a complete refurbishment of the rooms including compliance to electrical Installations in medical locations BS 7671. Construction works to create adequate clinical areas for effective delivery of services include as follows: • Alteration of partition walls to reconfigure the layout of the area and creation of a new corridor. • Mechanical ventilation with hygienic air grilles • Hot and cold water services for clinical sink installed via IPS panel in Solid Grade Laminated • New fire smoke detectors • New antiglare dimmable lights panels in LED • New heating and cooling at X-Ray department with Daikin VRV IV Heat Pump with Variable Refrigerant Temperature (VRT) • New Lead screens • New MEIGaN panels • New hygienic Glass Reinforced Polyester (GRP) doors Construction Project Team: Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata Main Contractor David Nott and sons ltd Project Facts & Figures: Budget: £580,000.00 including equipment Funding Source: Capital Tendering: single stage with priced schedule of works Contract: JCT Minor works