Vertical High-street
Section 1: 100
Vertical High-street
Final Plans 1: 100
Small 1 Bedroom flat
Large 1 Bedroom flat
2 Bedroom flat 3 Bedroom flat
Vertical High-Street - Roof Top View
Axonometric
Roof Top
Garden Centre
Ground Floor
Reception
Community Shops/Spaces
Outodoor/Green space
Core/Elevators
Staircase/Fire Escape
- 8 Studio Aparments
- 8 1 Bedroom Aparments
- 6 Bedrooms Aparments
- 4 Bedrooms Aparments
Housing
Garden Centre: Views to to central London
Garden Centre
External staircase: A place for Interaction on their journeys to and out of the building
Coffee Shop: A space for interaction between residents and the outside community
2 Layers of Gypsum
- based board
Insulation
V.C.L
Cavity
Rigid Insulation
Timber Block
Pile Foundation
Vertical Timber battens
Timber Cladding
Timber Cladding
Floor Construction
Floor Construction
Steel Beam Connections
Connection to Foundation
Mineral wool packing
Gypsum board
Steel Beam
Steel Decking
Concrete over mesh
Timber Battens
Roof Detail Wall Detail Floor Detail
1:25 Section
Timber FlooringEpdm Rubber
Timber decking
Insulation
Vapour control layer
Timber decking
Concrete
Timber decking
Insulation
Steel Beam
Gypsum board
Double Skin service wall
Closest 24/7 medical centre
Users of River Soar
Encourage users to use the health
station by including
Bridge Inspiration
Improved pathways/ Public spaces
Public Spaces
Public Bike racks
Sheltered Public seating area
Central space sheltered by custodian accommodation.
24 hour Health station
Well lit public spaces at night
Lit up canal pathway for night time saftey
Light boxes that act as benches.
Minimial placement on site
Retains the beauty of the existing site
Cable stayed bridge mast implimented in
design for support
Public spaces and canal pathway illuminated to reassure saftey
Research from the BBC shows that people from the ages of
5 - 64 may not be getting enough regular health checks.
‘ Men in particular ‘
Popular site for bikers
Draws publics attention to the
health station
Exterior Views
Minimal placement
within site
Design addresses views
to Soar River
Community Space integrated within
the landscape of the design
Citizen Health check area interior space
Cantilevered design allows for
free walk ways beneath the
structure
Zinc cladding
Softwood board
Timber batten
Vapour barrier
OSB
Insulation
Gypsum board
Wall Section
Floor Section
Timber floorboards
PE sheeting
Insulation
3-ply core plywood, glazed finish
Zinc cladding
Insulated Beams
Columns are filled with mineral
wool in order to reduce cold
bridging.
Steel Structure
Strength
Demountable Structure
Recyclable Material
Durability
Mast
The mast which supports the design consists of two steel
panels with steel cinders in-between holding the two
panels together. The reason for this design is to reduce
the weight of having one large steel column and also a
mast that is more aesthetically than a large column.
Tie Bar System
To support the two building block the design would compromise of a tie bar system. The reason
for using this is purely for the simplicity of the system and how easy it is to attach and detach from
the building. The tie bar system will use steel cables as this is what is used in bridge technology
and heavy duty cables would be needed to stabilise the buildings.
Due to the nature of the design, the structure of the design had to be as
strong as possible in order to cope with the cantilever design. A timber
structure would not have been suitable for this design.
Steel being one of the most recyclable materials on earth means that the
structures can always be recycled or even made from recycled steel. This
enables a design that sustainable.
One of the main advantages of using a steel frame means that it can easily
be assembled and disassembled in order to be relocated.
Having a design that may need to be taken down and re assembled
means that steel would work well as it would last a long time without any
major problems that a timber structure would have.
I Beams
Using beams for aesthetics
Foundation
One way in which I wanted to use the structure
as an antithetical element was by having the
steel beams flush with the floor, Even though this
increases the chance of cold bridging I felt it was
import to do this as it flows with my design by
having all the steel elements in the heart of the
design like the mast.
The foundation of the mast uses a
concrete base which is bolted to the
mast itself.
I beams would be used for the main
frame and uses a simple bolt on struc-
ture which makes it easy to disassemble
and assemble to be relocated.
Roof
Zinc cladding
Insulation
Vapour control layer
Roof decking
Plasterboard ceiling
Heating: Ground source heat pump
Ventilation
Because of the size of the building I believed that windows would be suffi-
cient enough to ventilate the building and also cool the building down. To
improve ventilation through the building each individual room has its own
window.
The ground source heat pump is a good solution to heat the
building as a water pump can not be used as the building does not
have direct access to the river soar.
1: 50 First Floor plan
1: 50 Ground Floor plan
1 : 20 Section
1
2
3
Solution is heated by grounds
natural heat.
Heated solution pumped into a
heat exchanger.
Heat exchanger heats the hot water
in the tank and is passed through the
health station using radiators.
Cressingham Gardens
Landscape Pathways/ Shelters
Nursery Project - Site Model
Montessori - Nursery Project

More Related Content

What's hot

Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Mrinal -
 
GreenStudio - Chapter 4 1 4 Double Envelopes
GreenStudio - Chapter 4 1 4 Double EnvelopesGreenStudio - Chapter 4 1 4 Double Envelopes
GreenStudio - Chapter 4 1 4 Double EnvelopesGalala University
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade systemahmong4
 
STEEL DOORS AND WINDOW'S FITTINGS
STEEL DOORS AND WINDOW'S FITTINGSSTEEL DOORS AND WINDOW'S FITTINGS
STEEL DOORS AND WINDOW'S FITTINGSSiddiq Salim
 
Curtain wall introduction & requirements
Curtain wall introduction & requirementsCurtain wall introduction & requirements
Curtain wall introduction & requirementsArshad khan
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Constructionsnoshoesam
 
03 Curtain-wall Presentation
03 Curtain-wall Presentation03 Curtain-wall Presentation
03 Curtain-wall Presentation★ Aybige Tek
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of buildingabidha karthu
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsMihirPawar5
 
Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure infoMatis Velt
 
Ch 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and HazardsCh 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and Hazardssnoshoesam
 

What's hot (20)

Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
final dcc
final dccfinal dcc
final dcc
 
Double skin facade
Double skin facade Double skin facade
Double skin facade
 
Details
DetailsDetails
Details
 
Curtain wall
Curtain wallCurtain wall
Curtain wall
 
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...Research On Building Projects In Structural Glazing(Three Projects In The Fie...
Research On Building Projects In Structural Glazing(Three Projects In The Fie...
 
GreenStudio - Chapter 4 1 4 Double Envelopes
GreenStudio - Chapter 4 1 4 Double EnvelopesGreenStudio - Chapter 4 1 4 Double Envelopes
GreenStudio - Chapter 4 1 4 Double Envelopes
 
Curtain wall%2 f facade system
Curtain wall%2 f facade systemCurtain wall%2 f facade system
Curtain wall%2 f facade system
 
STEEL DOORS AND WINDOW'S FITTINGS
STEEL DOORS AND WINDOW'S FITTINGSSTEEL DOORS AND WINDOW'S FITTINGS
STEEL DOORS AND WINDOW'S FITTINGS
 
Ventilated Facade Systems
Ventilated Facade SystemsVentilated Facade Systems
Ventilated Facade Systems
 
Curtain wall introduction & requirements
Curtain wall introduction & requirementsCurtain wall introduction & requirements
Curtain wall introduction & requirements
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Construction
 
03 Curtain-wall Presentation
03 Curtain-wall Presentation03 Curtain-wall Presentation
03 Curtain-wall Presentation
 
CEILING
CEILINGCEILING
CEILING
 
Glass beams
Glass beamsGlass beams
Glass beams
 
Facade - presentation
Facade - presentationFacade - presentation
Facade - presentation
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
False Ceiling Information and Joinary Details
False Ceiling Information and Joinary DetailsFalse Ceiling Information and Joinary Details
False Ceiling Information and Joinary Details
 
Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure info
 
Ch 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and HazardsCh 12 Specific Occupancy Details and Hazards
Ch 12 Specific Occupancy Details and Hazards
 

Similar to A4 Portfolio Sample edited 2 .compressed

Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemIan Toisa
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionarymasonry
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum buildingMehari Melaku
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system reportshensin1015
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment shensin1015
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system reportw ss
 
Structural steel
Structural steelStructural steel
Structural steelvinod singh
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionarysp10pex
 
fdocuments.in_farnsworth-house-construction-details.pdf
fdocuments.in_farnsworth-house-construction-details.pdffdocuments.in_farnsworth-house-construction-details.pdf
fdocuments.in_farnsworth-house-construction-details.pdfAthraa7
 
Farnsworth house Construction Details
Farnsworth house Construction DetailsFarnsworth house Construction Details
Farnsworth house Construction DetailsAlHosn University
 

Similar to A4 Portfolio Sample edited 2 .compressed (20)

Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Roof
RoofRoof
Roof
 
Steel
Steel Steel
Steel
 
Btechfinal
BtechfinalBtechfinal
Btechfinal
 
University of exeter, forum building
University of exeter, forum  buildingUniversity of exeter, forum  building
University of exeter, forum building
 
steelfinal
steelfinalsteelfinal
steelfinal
 
Steel
SteelSteel
Steel
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
B con 2
B con 2B con 2
B con 2
 
Structural steel
Structural steelStructural steel
Structural steel
 
A3 report
A3 reportA3 report
A3 report
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 
fdocuments.in_farnsworth-house-construction-details.pdf
fdocuments.in_farnsworth-house-construction-details.pdffdocuments.in_farnsworth-house-construction-details.pdf
fdocuments.in_farnsworth-house-construction-details.pdf
 
Farnsworth house Construction Details
Farnsworth house Construction DetailsFarnsworth house Construction Details
Farnsworth house Construction Details
 
Kimbell report
Kimbell reportKimbell report
Kimbell report
 

A4 Portfolio Sample edited 2 .compressed

  • 3. Final Plans 1: 100 Small 1 Bedroom flat Large 1 Bedroom flat 2 Bedroom flat 3 Bedroom flat
  • 4. Vertical High-Street - Roof Top View
  • 5. Axonometric Roof Top Garden Centre Ground Floor Reception Community Shops/Spaces Outodoor/Green space Core/Elevators Staircase/Fire Escape - 8 Studio Aparments - 8 1 Bedroom Aparments - 6 Bedrooms Aparments - 4 Bedrooms Aparments Housing Garden Centre: Views to to central London Garden Centre External staircase: A place for Interaction on their journeys to and out of the building Coffee Shop: A space for interaction between residents and the outside community
  • 6. 2 Layers of Gypsum - based board Insulation V.C.L Cavity Rigid Insulation Timber Block Pile Foundation Vertical Timber battens Timber Cladding Timber Cladding Floor Construction Floor Construction Steel Beam Connections Connection to Foundation Mineral wool packing Gypsum board Steel Beam Steel Decking Concrete over mesh Timber Battens Roof Detail Wall Detail Floor Detail 1:25 Section Timber FlooringEpdm Rubber Timber decking Insulation Vapour control layer Timber decking Concrete Timber decking Insulation Steel Beam Gypsum board Double Skin service wall
  • 7. Closest 24/7 medical centre Users of River Soar Encourage users to use the health station by including Bridge Inspiration Improved pathways/ Public spaces Public Spaces Public Bike racks Sheltered Public seating area Central space sheltered by custodian accommodation. 24 hour Health station Well lit public spaces at night Lit up canal pathway for night time saftey Light boxes that act as benches. Minimial placement on site Retains the beauty of the existing site Cable stayed bridge mast implimented in design for support Public spaces and canal pathway illuminated to reassure saftey Research from the BBC shows that people from the ages of 5 - 64 may not be getting enough regular health checks. ‘ Men in particular ‘ Popular site for bikers Draws publics attention to the health station
  • 8. Exterior Views Minimal placement within site Design addresses views to Soar River Community Space integrated within the landscape of the design Citizen Health check area interior space Cantilevered design allows for free walk ways beneath the structure
  • 9. Zinc cladding Softwood board Timber batten Vapour barrier OSB Insulation Gypsum board Wall Section Floor Section Timber floorboards PE sheeting Insulation 3-ply core plywood, glazed finish Zinc cladding Insulated Beams Columns are filled with mineral wool in order to reduce cold bridging. Steel Structure Strength Demountable Structure Recyclable Material Durability Mast The mast which supports the design consists of two steel panels with steel cinders in-between holding the two panels together. The reason for this design is to reduce the weight of having one large steel column and also a mast that is more aesthetically than a large column. Tie Bar System To support the two building block the design would compromise of a tie bar system. The reason for using this is purely for the simplicity of the system and how easy it is to attach and detach from the building. The tie bar system will use steel cables as this is what is used in bridge technology and heavy duty cables would be needed to stabilise the buildings. Due to the nature of the design, the structure of the design had to be as strong as possible in order to cope with the cantilever design. A timber structure would not have been suitable for this design. Steel being one of the most recyclable materials on earth means that the structures can always be recycled or even made from recycled steel. This enables a design that sustainable. One of the main advantages of using a steel frame means that it can easily be assembled and disassembled in order to be relocated. Having a design that may need to be taken down and re assembled means that steel would work well as it would last a long time without any major problems that a timber structure would have. I Beams Using beams for aesthetics Foundation One way in which I wanted to use the structure as an antithetical element was by having the steel beams flush with the floor, Even though this increases the chance of cold bridging I felt it was import to do this as it flows with my design by having all the steel elements in the heart of the design like the mast. The foundation of the mast uses a concrete base which is bolted to the mast itself. I beams would be used for the main frame and uses a simple bolt on struc- ture which makes it easy to disassemble and assemble to be relocated. Roof Zinc cladding Insulation Vapour control layer Roof decking Plasterboard ceiling Heating: Ground source heat pump Ventilation Because of the size of the building I believed that windows would be suffi- cient enough to ventilate the building and also cool the building down. To improve ventilation through the building each individual room has its own window. The ground source heat pump is a good solution to heat the building as a water pump can not be used as the building does not have direct access to the river soar. 1: 50 First Floor plan 1: 50 Ground Floor plan 1 : 20 Section 1 2 3 Solution is heated by grounds natural heat. Heated solution pumped into a heat exchanger. Heat exchanger heats the hot water in the tank and is passed through the health station using radiators.
  • 11. Nursery Project - Site Model