SlideShare a Scribd company logo
1 of 4
CURRICULAM VITAE
LAKSHMAN VATADA
Email Id:lakshman.nutekindia@gmail.com
Mobile no : +91-8977879745/7353770226.
Carrier Objective :
Seeking a better position and to utilize my skills and abilities to render my services to the organization in a most
effective mode, innovative and flexible.
Executive Synopsis:
 Having an Experience of 3 Years in Telecom Industry.
 Maintaining KPI and Analysis it on regular basis.
 Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment
Success Rate, their reasons and take necessary action.
 Analysis of Zero CallVolume ,Unhealthy TRX & GPRS Working or not on daily basis
 Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool.
 Analysis of cells having high HO failure,high TCHdrop rate.
 Frequency Planning, Neighbor Planning,Optimization of the Network.
 Making CRF and prepare Script of RF Parameter like FR-HR Parameter Re-tune,Frequency Re-tune ,Radio link
Time Out parameter re-tune,Neighbor re-tune .
 Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning
 Proficient in Post Processing Software like TEMS, NEMO,XCAL,CNA,CNT,TEMS Discovery and GPS tool like Map
InfoProfessional.
 Proficient in Wireless Network Planning and simulation software like Discovery.
 Proficient in Drive Test Software like TEMS, XCAL,CNT.
 Network Optimization of 3G/ 2Gtechnology by analysing KPI’s,Drive Test & physical optimization like antenna
tilt, antenna azimuth changes & checking and changing the Cell RF Parameters.
 Pre & post analyzing of the Drive test log files for Coverage and Quality patch.
 Meeting with Area Managers to discuss improvement plan for network.
 Preparing the monthly action plan for network improvement.
 RNC Parameter Audit, Cell Parameter Audit, Database and Neighbor planning for the network, testing new
features for latest RAN versions.
 Analyse Drive Test log for signal strength, pilot pollution, interference,coverage lacking, handover,neighbor cell
relation, cell selection/reselection.
 Neighbor planning (Neighbor addition & deletion) & Neighbor tuning to overcome overshooting problems in the
network.
 Analysing the worst performing cells based on PDP context activation time (i.e. ping test), call drop rate, Poor CS
& PS Handover success rate, and High Access failure rate, Low call set up success rate, Poor uplink and
downlinks Quality in Network/RNC to improve the overall KPIs.
 Based upon the analysis suggest the various changes that are need to be the reason for KPI degradation.
 Pre and Post Drive test for the Clusters.
 Familiar with the launch strategy of 2nd and 3rd carriers for WCDMA. Also worked on UMTS at 900 Mhzband.
Trafficbalancing with hybrid technologies and different carriers.
 Prepare presentations for client regarding site with the help of post processing tools.
 WCDMA fundamentals,Spreading codes (Channelization & Scrambling),Power control, Admission Control, Load
control, Soft/Softer handover,Capacity limitation, Cellbreathing.
 Drive test data post-processing, map plots and report generation, frequency planning and interference analysis,
and site database maintenance.
 Perform design criteria, system dimensioning and traffic analysis (growth and trending).
 Making radionetwork parameters retuning in order to improve major KPI performance (Basic parameters,
handover parameters,idle mode parameters and radio channelmanagement).
 Wireless Network Planning,Optimization and Troubleshooting for technologies includingGSM,CDMA.
 Radio Network Performance management of GSM network.
 Post Processing of Drive Test log files to extract the network related information to assist in troubleshooting and
Optimization.
 Performance management for the wireless network with aid of the Daily Performance Reports.
 Handling technical aspect of project from design stage through implementation.
 Network dimensioning, Network parameter and KPI optimization.
 omparative Drive test, Neighbor list & Physical optimization recommendation.
Professional Experience.1:
 ZTE Telecom India Pvt.Ltd(NU TEK).[Sep 2016 to Till now]
 RNO
 ZTE-Idea Elite Project KTK,Bangalore.
Responsibility:
 Maintaining KPI and Analysis it on regular basis.
 Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment
Success Rate, their reasons and take necessary action.
 BSC Wise AFP Planning ,Analysis of Zero Call Volume ,Unhealthy TRX & GPRS Working or not on daily basis
 Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool
 Analysis of cells having high HO failure,high TCHdrop rate.
 Frequency Planning,Neighbor Planning,Optimization of the Network.
 Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning
 Neighbor Addition and Deletion in MIPT and Update Frequency Tuning like BCCH and TCH frequency
 2G (GSM) Drive-Test for data-collection and post-processing for Network Optimization.
 Using tools MapInfo, Google earth ,Tems & Net numen for Neighbor Re-tune , FR-HR parameter Re-tune , RLT
Parameter Re-tune & Frequency Re-tune
Professional Experience.2:
 ZTE Telecom India Pvt.Ltd(NU TEK).[March 216 to Aug 2016 ]
 Sr.RNO
 ZTE-BSNL-SLA Base Project, Karnataka.
Responsibility:
 I was worked in BSNL Projects Sr.RNO in ZTE Telecom India Pvt. Ltd at Bangalore for ZTE-BSNL 2G & 3G project.
• Project Planning, Review of Daily Progress of sites and meetings with customers and Clients.
• Team Management and Interaction with Clients, Supply and Contract Management of the Sites Issues so as to
achieve Site Progress as per projected Plans.
• Monitoring the daily KPI report of the network, analyzing the same and plan for the activities if required.
• Responsible for implementing and integration of the network and meeting the SLA of escalated technical issues.
• Planning of Acceptance Testing of Sites Equipment’s and Liaoning with Nutek for Acceptance Testing of
Equipment’s for completion of AT as per target plan
• Collection of Provisional Acceptance Certificate/Work Completion certificate based on the agreed
contract with customer and handing over it to finance team for Invoicing.
Professional Experience.3:
 ZTE Telecom India Pvt.Ltd(NU TEK).[Aug 2015 toMarch 216]
 RNO
 ZTE-Idea Global Project KTK,Bangalore.
Responsibility:
 I was worked in Idea Global Project as a RNO at ZTE Telecom India Pvt. Ltd in Bangalore for ZTE-Idea 2G project.
 Able to generate & prepare the reports on daily & weekly basis by using TEMS,NEMO, DISCOVERY software.
 Idea KPI reports followed Throughput, DRC.
 Drive test Data Analyzing of call drops, call failures, handoff failures, Poor coverage holes of Qul, C/I& FER.
 Verifying and optimize the high utilization sites and trying to share load by other nearby sites by optimization or
height increase, If not suggesting capacity site near to poor coverage holes.
 If needed Giving Proposal for new site or Adding additional sector in existing site.
 Handling the customer complaints and analyzing the worst performing sectors, giving proper trouble shooting
process to meet the bench marks in MS KPI.
 Completed comparison drive test for GSM, Tata CDMA & MTS with TEMS and XCAL tool at Bangalore.
 Comparing radio utilization of site, if any poor utilization sites or Cells observed then changing the optimization
according to Clutter to increase the even utilization.
 Providing LAC, CI & PN planning for new sites & additional sector in existing site to BSC Team.
 Suggestions giving for any field work issues.
 Verifying of missing Neighbors & configuring Neighbors in BSE As per FER plot in drive test data &customer
complaints.
 Configuring neighbors as Inter BSC & Intra BSC handoff for new sites & additional sectors in BSC.
 Maintaining RF Quarterly Drive test New sites, additional sectors & coverage improvement reports.
 Keeping healthy relationship with the Customer.
Professional Experience.4:
ZTE Telecom India Pvt.Ltd(NU TEK).[Dec 2015 TO July 2105 ]
RF Engineer
MTS-ZTE Project KTK, Bangalore.
Responsibility:
 Attending and solving Customer Complaints by proper solution for EVDO and 1x .Suggesting the possible solutions.
If needed giving proposal for new cell site.
 Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls, Missing
Neighbours, Coverage Holes.
 Recommendations making as Defining missing RF parameters, proposing antenna azimuth, tilt.
 Site Audit for new site has been done such as Photos of Clutter surrounded by new sites, Azimuth, Building
Height, Tower height ,Antenna Height, Antenna Type, Model, Tilt(Mechanical)& Feeder cable length.
 Conduct Drive Test after the site Integration, optimize if any issues like relevant wrong MSC parameters definition,
Border sector Handovers, Neighbors relation and others.
 To find the coverage of the network (1X) & to verify different Parameters e.g. Rx level, TX level, FER, EC/Io, TXAd&
Cell Id.
 EVDO Drive test observing parameters of C/I, DRC, SINR, FWD PPP, FWD FTP and REV PPP, REV FTP.
 Making PPT, PRE & POST Reports for new cell sites For 1X & EVDO.
 Drive Test Data processing and Analysis and providing suggestion regarding optimization.
 Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls &
Missing neighbours.
 Make the analysis report & Comparison report (Pre & Post Comparison of Drive Plot showing the improvement in
the network) from the drive data.
 Finding the reasons for any poor RX LEVEL, CALL DROPS & Suggesting the possible solutions.
 Verifying the KPI(IP RFS report) before Attending customer complaint.
ZTE Telecom India Pvt.Ltd (Telesia)[Sep 2013 toNov 2014]
Hyderabad,Andhra Pradesh,RF Engineer
TATA-ZTE Project.
Responsibility:
 I worked as RF drive test Engineer for ZTE Telecomm India Pvt. Ltd in Andhra Pradesh circle for Tata (CDMA)
project.
 Site Audit with verification of tilts, azimuths, height of CDMAantennas.
 Performing Drive Test using ZTE CNT and drive test report are analyzed using ZTE CNA software.
 To find the coverage of the network & to verify different Parameters e.g. Rx level, Tx level, FER, EC/Io,Cell ID as
per defined by the operator.
 Checking assigned Handoffs and suggesting addition or removal of neighbors.
 Finding the reasons for any poor Rx level, Call drops & suggesting the possible solutions.
 I Have Completed SCFT, pre&post drives & Changing the Rx, Tx Cables inside the BTS if any cable swap will
occurred.
Tools used :
 Drive Test Tools : TEMS,Discovery,XCAL,CNT 5.94, CNT V5.96(HASP Tool,CDT),
 Processing Tool : CNA7.0,CNA V11.3,XCAP.
 MapInfoProfessional : MapInfo8.5/7.5.
 ZTE ZXPOS CNO2 software, Crop FTP lite tool for QOS testing.
Academic Profile :
 B. E. in Electronic and Communication engineering with 66% in JNTU University.
 Intermediate in Gov. Junior College with 83% in Hiramandalam, AP.
 SSC in Z.P. high School with 80% in AP SSC Board.
Strengths :
 Feel Simple & Spirit of innovation.
 Punctual& Patience.
Personal Details:
Father’s Name : V.Mukunda Rao
Date of Birth : 23th-July -1992
Nationality : Indian
Marital Status : Unmarried
Languages Know : English, Telugu & Hindi.
Declaration:
I hereby declare that all the above details furnished by me are true to the best of my Knowledge.
Place:
Date: (V.LAKSHMAN RAO)

More Related Content

What's hot (20)

AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Bhawesh Resume(1)
Bhawesh Resume(1)Bhawesh Resume(1)
Bhawesh Resume(1)
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume
 
Akash Tandon - Resume
Akash Tandon - ResumeAkash Tandon - Resume
Akash Tandon - Resume
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
zia_mehdi_cv
zia_mehdi_cvzia_mehdi_cv
zia_mehdi_cv
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Debdip_Resume_2016
Debdip_Resume_2016Debdip_Resume_2016
Debdip_Resume_2016
 
karunakar.u
karunakar.ukarunakar.u
karunakar.u
 
Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
RF Engineer
RF EngineerRF Engineer
RF Engineer
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 

Viewers also liked

Viewers also liked (15)

Responsibilities
ResponsibilitiesResponsibilities
Responsibilities
 
ABHISHEKK_CHANDU
ABHISHEKK_CHANDUABHISHEKK_CHANDU
ABHISHEKK_CHANDU
 
SENTHIL RAMADOSS CV
SENTHIL RAMADOSS CVSENTHIL RAMADOSS CV
SENTHIL RAMADOSS CV
 
CV Attachment
CV AttachmentCV Attachment
CV Attachment
 
anbu_resume
anbu_resumeanbu_resume
anbu_resume
 
AaryaBI
AaryaBIAaryaBI
AaryaBI
 
Resume
ResumeResume
Resume
 
madhuri_r
madhuri_rmadhuri_r
madhuri_r
 
ALKA YADAV new resume
ALKA YADAV new resumeALKA YADAV new resume
ALKA YADAV new resume
 
SAP BI Course Structure
SAP BI Course StructureSAP BI Course Structure
SAP BI Course Structure
 
Resume (8)
Resume (8)Resume (8)
Resume (8)
 
sap basis 2.5 yr exp. resume
sap basis 2.5 yr exp. resumesap basis 2.5 yr exp. resume
sap basis 2.5 yr exp. resume
 
Santhosh Resume
Santhosh ResumeSanthosh Resume
Santhosh Resume
 
hemanth resume latest
hemanth resume latesthemanth resume latest
hemanth resume latest
 
Raya-SAP SD Resume
Raya-SAP SD ResumeRaya-SAP SD Resume
Raya-SAP SD Resume
 

Similar to Lakshman Resume 3 years experience

SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)Sanjeev Gupta
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resumesunil Saini
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)Rajneesh Mohan
 
AJITKUMARSHARMACV
AJITKUMARSHARMACVAJITKUMARSHARMACV
AJITKUMARSHARMACVajit sharma
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016Tushar Srivastava
 

Similar to Lakshman Resume 3 years experience (14)

CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)SANJEEV RF _CV (ECE) (1)
SANJEEV RF _CV (ECE) (1)
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
Musahid Resume
Musahid ResumeMusahid Resume
Musahid Resume
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Arslan Akbar
Arslan AkbarArslan Akbar
Arslan Akbar
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
AJITKUMARSHARMACV
AJITKUMARSHARMACVAJITKUMARSHARMACV
AJITKUMARSHARMACV
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 

Lakshman Resume 3 years experience

  • 1. CURRICULAM VITAE LAKSHMAN VATADA Email Id:lakshman.nutekindia@gmail.com Mobile no : +91-8977879745/7353770226. Carrier Objective : Seeking a better position and to utilize my skills and abilities to render my services to the organization in a most effective mode, innovative and flexible. Executive Synopsis:  Having an Experience of 3 Years in Telecom Industry.  Maintaining KPI and Analysis it on regular basis.  Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment Success Rate, their reasons and take necessary action.  Analysis of Zero CallVolume ,Unhealthy TRX & GPRS Working or not on daily basis  Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool.  Analysis of cells having high HO failure,high TCHdrop rate.  Frequency Planning, Neighbor Planning,Optimization of the Network.  Making CRF and prepare Script of RF Parameter like FR-HR Parameter Re-tune,Frequency Re-tune ,Radio link Time Out parameter re-tune,Neighbor re-tune .  Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning  Proficient in Post Processing Software like TEMS, NEMO,XCAL,CNA,CNT,TEMS Discovery and GPS tool like Map InfoProfessional.  Proficient in Wireless Network Planning and simulation software like Discovery.  Proficient in Drive Test Software like TEMS, XCAL,CNT.  Network Optimization of 3G/ 2Gtechnology by analysing KPI’s,Drive Test & physical optimization like antenna tilt, antenna azimuth changes & checking and changing the Cell RF Parameters.  Pre & post analyzing of the Drive test log files for Coverage and Quality patch.  Meeting with Area Managers to discuss improvement plan for network.  Preparing the monthly action plan for network improvement.  RNC Parameter Audit, Cell Parameter Audit, Database and Neighbor planning for the network, testing new features for latest RAN versions.  Analyse Drive Test log for signal strength, pilot pollution, interference,coverage lacking, handover,neighbor cell relation, cell selection/reselection.  Neighbor planning (Neighbor addition & deletion) & Neighbor tuning to overcome overshooting problems in the network.  Analysing the worst performing cells based on PDP context activation time (i.e. ping test), call drop rate, Poor CS & PS Handover success rate, and High Access failure rate, Low call set up success rate, Poor uplink and downlinks Quality in Network/RNC to improve the overall KPIs.  Based upon the analysis suggest the various changes that are need to be the reason for KPI degradation.  Pre and Post Drive test for the Clusters.  Familiar with the launch strategy of 2nd and 3rd carriers for WCDMA. Also worked on UMTS at 900 Mhzband. Trafficbalancing with hybrid technologies and different carriers.  Prepare presentations for client regarding site with the help of post processing tools.  WCDMA fundamentals,Spreading codes (Channelization & Scrambling),Power control, Admission Control, Load control, Soft/Softer handover,Capacity limitation, Cellbreathing.  Drive test data post-processing, map plots and report generation, frequency planning and interference analysis, and site database maintenance.  Perform design criteria, system dimensioning and traffic analysis (growth and trending).  Making radionetwork parameters retuning in order to improve major KPI performance (Basic parameters, handover parameters,idle mode parameters and radio channelmanagement).  Wireless Network Planning,Optimization and Troubleshooting for technologies includingGSM,CDMA.
  • 2.  Radio Network Performance management of GSM network.  Post Processing of Drive Test log files to extract the network related information to assist in troubleshooting and Optimization.  Performance management for the wireless network with aid of the Daily Performance Reports.  Handling technical aspect of project from design stage through implementation.  Network dimensioning, Network parameter and KPI optimization.  omparative Drive test, Neighbor list & Physical optimization recommendation. Professional Experience.1:  ZTE Telecom India Pvt.Ltd(NU TEK).[Sep 2016 to Till now]  RNO  ZTE-Idea Elite Project KTK,Bangalore. Responsibility:  Maintaining KPI and Analysis it on regular basis.  Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment Success Rate, their reasons and take necessary action.  BSC Wise AFP Planning ,Analysis of Zero Call Volume ,Unhealthy TRX & GPRS Working or not on daily basis  Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool  Analysis of cells having high HO failure,high TCHdrop rate.  Frequency Planning,Neighbor Planning,Optimization of the Network.  Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning  Neighbor Addition and Deletion in MIPT and Update Frequency Tuning like BCCH and TCH frequency  2G (GSM) Drive-Test for data-collection and post-processing for Network Optimization.  Using tools MapInfo, Google earth ,Tems & Net numen for Neighbor Re-tune , FR-HR parameter Re-tune , RLT Parameter Re-tune & Frequency Re-tune Professional Experience.2:  ZTE Telecom India Pvt.Ltd(NU TEK).[March 216 to Aug 2016 ]  Sr.RNO  ZTE-BSNL-SLA Base Project, Karnataka. Responsibility:  I was worked in BSNL Projects Sr.RNO in ZTE Telecom India Pvt. Ltd at Bangalore for ZTE-BSNL 2G & 3G project. • Project Planning, Review of Daily Progress of sites and meetings with customers and Clients. • Team Management and Interaction with Clients, Supply and Contract Management of the Sites Issues so as to achieve Site Progress as per projected Plans. • Monitoring the daily KPI report of the network, analyzing the same and plan for the activities if required. • Responsible for implementing and integration of the network and meeting the SLA of escalated technical issues. • Planning of Acceptance Testing of Sites Equipment’s and Liaoning with Nutek for Acceptance Testing of Equipment’s for completion of AT as per target plan • Collection of Provisional Acceptance Certificate/Work Completion certificate based on the agreed contract with customer and handing over it to finance team for Invoicing. Professional Experience.3:  ZTE Telecom India Pvt.Ltd(NU TEK).[Aug 2015 toMarch 216]  RNO  ZTE-Idea Global Project KTK,Bangalore. Responsibility:  I was worked in Idea Global Project as a RNO at ZTE Telecom India Pvt. Ltd in Bangalore for ZTE-Idea 2G project.
  • 3.  Able to generate & prepare the reports on daily & weekly basis by using TEMS,NEMO, DISCOVERY software.  Idea KPI reports followed Throughput, DRC.  Drive test Data Analyzing of call drops, call failures, handoff failures, Poor coverage holes of Qul, C/I& FER.  Verifying and optimize the high utilization sites and trying to share load by other nearby sites by optimization or height increase, If not suggesting capacity site near to poor coverage holes.  If needed Giving Proposal for new site or Adding additional sector in existing site.  Handling the customer complaints and analyzing the worst performing sectors, giving proper trouble shooting process to meet the bench marks in MS KPI.  Completed comparison drive test for GSM, Tata CDMA & MTS with TEMS and XCAL tool at Bangalore.  Comparing radio utilization of site, if any poor utilization sites or Cells observed then changing the optimization according to Clutter to increase the even utilization.  Providing LAC, CI & PN planning for new sites & additional sector in existing site to BSC Team.  Suggestions giving for any field work issues.  Verifying of missing Neighbors & configuring Neighbors in BSE As per FER plot in drive test data &customer complaints.  Configuring neighbors as Inter BSC & Intra BSC handoff for new sites & additional sectors in BSC.  Maintaining RF Quarterly Drive test New sites, additional sectors & coverage improvement reports.  Keeping healthy relationship with the Customer. Professional Experience.4: ZTE Telecom India Pvt.Ltd(NU TEK).[Dec 2015 TO July 2105 ] RF Engineer MTS-ZTE Project KTK, Bangalore. Responsibility:  Attending and solving Customer Complaints by proper solution for EVDO and 1x .Suggesting the possible solutions. If needed giving proposal for new cell site.  Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls, Missing Neighbours, Coverage Holes.  Recommendations making as Defining missing RF parameters, proposing antenna azimuth, tilt.  Site Audit for new site has been done such as Photos of Clutter surrounded by new sites, Azimuth, Building Height, Tower height ,Antenna Height, Antenna Type, Model, Tilt(Mechanical)& Feeder cable length.  Conduct Drive Test after the site Integration, optimize if any issues like relevant wrong MSC parameters definition, Border sector Handovers, Neighbors relation and others.  To find the coverage of the network (1X) & to verify different Parameters e.g. Rx level, TX level, FER, EC/Io, TXAd& Cell Id.  EVDO Drive test observing parameters of C/I, DRC, SINR, FWD PPP, FWD FTP and REV PPP, REV FTP.  Making PPT, PRE & POST Reports for new cell sites For 1X & EVDO.  Drive Test Data processing and Analysis and providing suggestion regarding optimization.  Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls & Missing neighbours.  Make the analysis report & Comparison report (Pre & Post Comparison of Drive Plot showing the improvement in the network) from the drive data.  Finding the reasons for any poor RX LEVEL, CALL DROPS & Suggesting the possible solutions.  Verifying the KPI(IP RFS report) before Attending customer complaint. ZTE Telecom India Pvt.Ltd (Telesia)[Sep 2013 toNov 2014] Hyderabad,Andhra Pradesh,RF Engineer TATA-ZTE Project. Responsibility:  I worked as RF drive test Engineer for ZTE Telecomm India Pvt. Ltd in Andhra Pradesh circle for Tata (CDMA) project.  Site Audit with verification of tilts, azimuths, height of CDMAantennas.  Performing Drive Test using ZTE CNT and drive test report are analyzed using ZTE CNA software.  To find the coverage of the network & to verify different Parameters e.g. Rx level, Tx level, FER, EC/Io,Cell ID as per defined by the operator.
  • 4.  Checking assigned Handoffs and suggesting addition or removal of neighbors.  Finding the reasons for any poor Rx level, Call drops & suggesting the possible solutions.  I Have Completed SCFT, pre&post drives & Changing the Rx, Tx Cables inside the BTS if any cable swap will occurred. Tools used :  Drive Test Tools : TEMS,Discovery,XCAL,CNT 5.94, CNT V5.96(HASP Tool,CDT),  Processing Tool : CNA7.0,CNA V11.3,XCAP.  MapInfoProfessional : MapInfo8.5/7.5.  ZTE ZXPOS CNO2 software, Crop FTP lite tool for QOS testing. Academic Profile :  B. E. in Electronic and Communication engineering with 66% in JNTU University.  Intermediate in Gov. Junior College with 83% in Hiramandalam, AP.  SSC in Z.P. high School with 80% in AP SSC Board. Strengths :  Feel Simple & Spirit of innovation.  Punctual& Patience. Personal Details: Father’s Name : V.Mukunda Rao Date of Birth : 23th-July -1992 Nationality : Indian Marital Status : Unmarried Languages Know : English, Telugu & Hindi. Declaration: I hereby declare that all the above details furnished by me are true to the best of my Knowledge. Place: Date: (V.LAKSHMAN RAO)