1. CURRICULAM VITAE
LAKSHMAN VATADA
Email Id:lakshman.nutekindia@gmail.com
Mobile no : +91-8977879745/7353770226.
Carrier Objective :
Seeking a better position and to utilize my skills and abilities to render my services to the organization in a most
effective mode, innovative and flexible.
Executive Synopsis:
Having an Experience of 3 Years in Telecom Industry.
Maintaining KPI and Analysis it on regular basis.
Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment
Success Rate, their reasons and take necessary action.
Analysis of Zero CallVolume ,Unhealthy TRX & GPRS Working or not on daily basis
Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool.
Analysis of cells having high HO failure,high TCHdrop rate.
Frequency Planning, Neighbor Planning,Optimization of the Network.
Making CRF and prepare Script of RF Parameter like FR-HR Parameter Re-tune,Frequency Re-tune ,Radio link
Time Out parameter re-tune,Neighbor re-tune .
Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning
Proficient in Post Processing Software like TEMS, NEMO,XCAL,CNA,CNT,TEMS Discovery and GPS tool like Map
InfoProfessional.
Proficient in Wireless Network Planning and simulation software like Discovery.
Proficient in Drive Test Software like TEMS, XCAL,CNT.
Network Optimization of 3G/ 2Gtechnology by analysing KPI’s,Drive Test & physical optimization like antenna
tilt, antenna azimuth changes & checking and changing the Cell RF Parameters.
Pre & post analyzing of the Drive test log files for Coverage and Quality patch.
Meeting with Area Managers to discuss improvement plan for network.
Preparing the monthly action plan for network improvement.
RNC Parameter Audit, Cell Parameter Audit, Database and Neighbor planning for the network, testing new
features for latest RAN versions.
Analyse Drive Test log for signal strength, pilot pollution, interference,coverage lacking, handover,neighbor cell
relation, cell selection/reselection.
Neighbor planning (Neighbor addition & deletion) & Neighbor tuning to overcome overshooting problems in the
network.
Analysing the worst performing cells based on PDP context activation time (i.e. ping test), call drop rate, Poor CS
& PS Handover success rate, and High Access failure rate, Low call set up success rate, Poor uplink and
downlinks Quality in Network/RNC to improve the overall KPIs.
Based upon the analysis suggest the various changes that are need to be the reason for KPI degradation.
Pre and Post Drive test for the Clusters.
Familiar with the launch strategy of 2nd and 3rd carriers for WCDMA. Also worked on UMTS at 900 Mhzband.
Trafficbalancing with hybrid technologies and different carriers.
Prepare presentations for client regarding site with the help of post processing tools.
WCDMA fundamentals,Spreading codes (Channelization & Scrambling),Power control, Admission Control, Load
control, Soft/Softer handover,Capacity limitation, Cellbreathing.
Drive test data post-processing, map plots and report generation, frequency planning and interference analysis,
and site database maintenance.
Perform design criteria, system dimensioning and traffic analysis (growth and trending).
Making radionetwork parameters retuning in order to improve major KPI performance (Basic parameters,
handover parameters,idle mode parameters and radio channelmanagement).
Wireless Network Planning,Optimization and Troubleshooting for technologies includingGSM,CDMA.
2. Radio Network Performance management of GSM network.
Post Processing of Drive Test log files to extract the network related information to assist in troubleshooting and
Optimization.
Performance management for the wireless network with aid of the Daily Performance Reports.
Handling technical aspect of project from design stage through implementation.
Network dimensioning, Network parameter and KPI optimization.
omparative Drive test, Neighbor list & Physical optimization recommendation.
Professional Experience.1:
ZTE Telecom India Pvt.Ltd(NU TEK).[Sep 2016 to Till now]
RNO
ZTE-Idea Elite Project KTK,Bangalore.
Responsibility:
Maintaining KPI and Analysis it on regular basis.
Analysis of Network performance statistics (KPI’s) e.g.TCH Drop, SDCCHDrop, HOSR, Blocking, TCHAssignment
Success Rate, their reasons and take necessary action.
BSC Wise AFP Planning ,Analysis of Zero Call Volume ,Unhealthy TRX & GPRS Working or not on daily basis
Report fetching like BBH , NBH, DBH, BBH24Hrs, HO 24hrs,TA Report via Net numen tool
Analysis of cells having high HO failure,high TCHdrop rate.
Frequency Planning,Neighbor Planning,Optimization of the Network.
Optimization of Co-Channel(C/I) and Adjacent-Channel(C/A) interference by BCCH,BSIC and TCH Planning
Neighbor Addition and Deletion in MIPT and Update Frequency Tuning like BCCH and TCH frequency
2G (GSM) Drive-Test for data-collection and post-processing for Network Optimization.
Using tools MapInfo, Google earth ,Tems & Net numen for Neighbor Re-tune , FR-HR parameter Re-tune , RLT
Parameter Re-tune & Frequency Re-tune
Professional Experience.2:
ZTE Telecom India Pvt.Ltd(NU TEK).[March 216 to Aug 2016 ]
Sr.RNO
ZTE-BSNL-SLA Base Project, Karnataka.
Responsibility:
I was worked in BSNL Projects Sr.RNO in ZTE Telecom India Pvt. Ltd at Bangalore for ZTE-BSNL 2G & 3G project.
• Project Planning, Review of Daily Progress of sites and meetings with customers and Clients.
• Team Management and Interaction with Clients, Supply and Contract Management of the Sites Issues so as to
achieve Site Progress as per projected Plans.
• Monitoring the daily KPI report of the network, analyzing the same and plan for the activities if required.
• Responsible for implementing and integration of the network and meeting the SLA of escalated technical issues.
• Planning of Acceptance Testing of Sites Equipment’s and Liaoning with Nutek for Acceptance Testing of
Equipment’s for completion of AT as per target plan
• Collection of Provisional Acceptance Certificate/Work Completion certificate based on the agreed
contract with customer and handing over it to finance team for Invoicing.
Professional Experience.3:
ZTE Telecom India Pvt.Ltd(NU TEK).[Aug 2015 toMarch 216]
RNO
ZTE-Idea Global Project KTK,Bangalore.
Responsibility:
I was worked in Idea Global Project as a RNO at ZTE Telecom India Pvt. Ltd in Bangalore for ZTE-Idea 2G project.
3. Able to generate & prepare the reports on daily & weekly basis by using TEMS,NEMO, DISCOVERY software.
Idea KPI reports followed Throughput, DRC.
Drive test Data Analyzing of call drops, call failures, handoff failures, Poor coverage holes of Qul, C/I& FER.
Verifying and optimize the high utilization sites and trying to share load by other nearby sites by optimization or
height increase, If not suggesting capacity site near to poor coverage holes.
If needed Giving Proposal for new site or Adding additional sector in existing site.
Handling the customer complaints and analyzing the worst performing sectors, giving proper trouble shooting
process to meet the bench marks in MS KPI.
Completed comparison drive test for GSM, Tata CDMA & MTS with TEMS and XCAL tool at Bangalore.
Comparing radio utilization of site, if any poor utilization sites or Cells observed then changing the optimization
according to Clutter to increase the even utilization.
Providing LAC, CI & PN planning for new sites & additional sector in existing site to BSC Team.
Suggestions giving for any field work issues.
Verifying of missing Neighbors & configuring Neighbors in BSE As per FER plot in drive test data &customer
complaints.
Configuring neighbors as Inter BSC & Intra BSC handoff for new sites & additional sectors in BSC.
Maintaining RF Quarterly Drive test New sites, additional sectors & coverage improvement reports.
Keeping healthy relationship with the Customer.
Professional Experience.4:
ZTE Telecom India Pvt.Ltd(NU TEK).[Dec 2015 TO July 2105 ]
RF Engineer
MTS-ZTE Project KTK, Bangalore.
Responsibility:
Attending and solving Customer Complaints by proper solution for EVDO and 1x .Suggesting the possible solutions.
If needed giving proposal for new cell site.
Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls, Missing
Neighbours, Coverage Holes.
Recommendations making as Defining missing RF parameters, proposing antenna azimuth, tilt.
Site Audit for new site has been done such as Photos of Clutter surrounded by new sites, Azimuth, Building
Height, Tower height ,Antenna Height, Antenna Type, Model, Tilt(Mechanical)& Feeder cable length.
Conduct Drive Test after the site Integration, optimize if any issues like relevant wrong MSC parameters definition,
Border sector Handovers, Neighbors relation and others.
To find the coverage of the network (1X) & to verify different Parameters e.g. Rx level, TX level, FER, EC/Io, TXAd&
Cell Id.
EVDO Drive test observing parameters of C/I, DRC, SINR, FWD PPP, FWD FTP and REV PPP, REV FTP.
Making PPT, PRE & POST Reports for new cell sites For 1X & EVDO.
Drive Test Data processing and Analysis and providing suggestion regarding optimization.
Optimizing cell sites by investigating capacity and coverage problem, Interference Analysis, Dropped calls &
Missing neighbours.
Make the analysis report & Comparison report (Pre & Post Comparison of Drive Plot showing the improvement in
the network) from the drive data.
Finding the reasons for any poor RX LEVEL, CALL DROPS & Suggesting the possible solutions.
Verifying the KPI(IP RFS report) before Attending customer complaint.
ZTE Telecom India Pvt.Ltd (Telesia)[Sep 2013 toNov 2014]
Hyderabad,Andhra Pradesh,RF Engineer
TATA-ZTE Project.
Responsibility:
I worked as RF drive test Engineer for ZTE Telecomm India Pvt. Ltd in Andhra Pradesh circle for Tata (CDMA)
project.
Site Audit with verification of tilts, azimuths, height of CDMAantennas.
Performing Drive Test using ZTE CNT and drive test report are analyzed using ZTE CNA software.
To find the coverage of the network & to verify different Parameters e.g. Rx level, Tx level, FER, EC/Io,Cell ID as
per defined by the operator.
4. Checking assigned Handoffs and suggesting addition or removal of neighbors.
Finding the reasons for any poor Rx level, Call drops & suggesting the possible solutions.
I Have Completed SCFT, pre&post drives & Changing the Rx, Tx Cables inside the BTS if any cable swap will
occurred.
Tools used :
Drive Test Tools : TEMS,Discovery,XCAL,CNT 5.94, CNT V5.96(HASP Tool,CDT),
Processing Tool : CNA7.0,CNA V11.3,XCAP.
MapInfoProfessional : MapInfo8.5/7.5.
ZTE ZXPOS CNO2 software, Crop FTP lite tool for QOS testing.
Academic Profile :
B. E. in Electronic and Communication engineering with 66% in JNTU University.
Intermediate in Gov. Junior College with 83% in Hiramandalam, AP.
SSC in Z.P. high School with 80% in AP SSC Board.
Strengths :
Feel Simple & Spirit of innovation.
Punctual& Patience.
Personal Details:
Father’s Name : V.Mukunda Rao
Date of Birth : 23th-July -1992
Nationality : Indian
Marital Status : Unmarried
Languages Know : English, Telugu & Hindi.
Declaration:
I hereby declare that all the above details furnished by me are true to the best of my Knowledge.
Place:
Date: (V.LAKSHMAN RAO)