SlideShare a Scribd company logo
1 of 4
HARSHIT BHAWSARHARSHIT BHAWSAR
E-Mail: harshitbhawsar@yahoo.co.in;
Contact: +91-8017990796, 9406918505
Seeking middle level assignments in RF Planning & Optimization Engineering / Telecom Network Operations
with a growth oriented organization
PROFESSIONAL SYNOPSIS
 A dynamic professional with over 6.11 years of rich exposure in handling RF optimization & planning activities in
WCDMA technology.
 Currently working in Ericsson India Global Services Pvt. Ltd Kolkata from Oct'11 to till now on 3G Vodafone
Netherland Project.
 Domain expertise in improving and optimizing the mobile WCDMA networks using the exited and available
components only; efficient in analyzing the customer’s business requirements, needs and objectives and map them to
the GIS processes, solutions and products that are being implemented.
 Generated the KPI Reports & optimization.
 Adept in adhering to call success rate, handover failure, RF optimization service for network operators to increase
revenues & reduced costs, efficient in controlling the design & development operations using various designing tools.
 An effective communicator with distinguished abilities in maintaining deliverables as per the SLA & KRA.
Current Project Synopsis
Ericsson Netherland (Vodafone)
Role : Senior Engineer
Customer : Vodafone, Netherlands
Project Duration : October -2011 to continue.
Key Deliverables
 Daily Analysis 3G Network performance statistics (KPI) - Accessibility, Retain ability and Mobility.
 KSR and Trend Breach comments given to customer every week.
 Trouble Tickets handling and troubleshooting.
 Handling customer complaints and No IP cases.
 Carrier expansion, E1 expansion, HWAC, RAX and TX expansion.
 HS Sleeping cells, HS/EUL Throughput.
 Prepare Pre and Post Drive Test reports, for problem cause and recommendation.
 Report fetch & analysis from business objects.
 WMRR & WNCS for worst performing cell and Definition of missing neighbor.
 Releasing change requests due to Missing neighbor, add/delete neighbor.
 New Site Verification set HS/EUL Parameters check alarm, RET & ASC.
 Handling Event Site & tune change Tilt, Cpich, Pwradm, Codeadm and SF Parameter.
 Change in antenna orientation, change mechanical / electrical tilting to project team in case of Customer complaint.
 Checked the cell with blocking due to admission control and congestion control.
 RBS and RNC Parameter Tuning which are allowed in OSS (Amos) for minimizing the affect and maintaining the KPI.
 Optimizing Neighbor for intra frequency, inter frequency and IRAT handover.
PRIVOUS ORGANIZATIONAL EXPERIENCE
Bharti 3G Project Ericsson under Linkquest Telecom Ltd., Jammu & Kashmir Jan’11 to Oct’11
3G Optimization
Role : RF Optimization Engineer (3G).
Duration : Since Mar’11 to Oct’11.
Deliverables :
 Planning and designing 3G RF for Bharti 3G sites in J&K.
 Verifying External GSM relation along with BCCH, BSIC, CI and LAC analysis of WNCS and WMRR for worst performing
cell and Definition of missing neighbor from WNCS. 2) Parameter 3G Parameter Discrepancy from Kget.
 Verifying the definition External GSM cell along with necessary parameter changes required in corresponding 2G BSC.
 Performing technical site survey for Ericsson’s existing site and new site for implementation as 3G sites creating
coverage predictions for 3G sites already on air using TCPU.
 Generating the coverage prediction plots and statistics (based on Polygons & Maps).
 Releasing change requests due to Missing neighbor, add/delete neighbor, hardware problem to Ericsson’s OSS team.
 Change in antenna orientation; change mechanical / electrical tilting to project team.
 Recommending parameters for achieving proper traffic distribution between UMTS Layer and GSM network.
 Soft handoff analysis with various SHO trigger events and threshold fine tuning for optimum Soft/Hard HO
performance.
 RF Coverage using antenna tilt & azimuth fine tuning for optimal coverage, overlap & reduction of pilot pollution by
Ec/No & RSCP improvements.
Highlights
 Accomplished successful launch of 3G network in Jammu & Srinagar.
 Successfully executed:
- 500 SCFT for Bharti Airtel 3G respectively.
- Cluster optimization of each cluster in J&K.
- Maintained the KPI Reports.
-
Tool Used for Optimization
 Gladiator (4.3, 5.0.60) For Post Processing.
 Tems Cell planner 9.1.0 (WCDMA) For Prediction Plot.
 MapInfo Professional 8.5.
 Mcom for Sites Planning.
 Google Earth.
Projects Undertaken
Airtel 3G J&K
Role : RF Optimization Engineer (3G).
Duration : Since Jan’11 to Mar’11.
Deliverables :
 Prepared onsite as well as the add cell and onsite CCR scripts.
 Created neighbor for U2U, U2G and G2U.
 Successfully executed 300 SCFT for Aircel 3G respectively post processing of SCFT and Cluster Drive Logs.
 Undertook parametric tuning for HSPA and IRAT.
 Performed KPI analysis for CS-Speech, CS-64, PS-128, PS-384 & HSDPA for accessibility, retainabiltiy and mobility.
 Actively involved in IRAT handover and reselection.
 Spectrum cleanliness of the UMTS-900 band provided by costumer through Agilent Frequency Scanner.
 Neighbor optimization for Intra Frequency, Inter frequency and IRAT handover. Soft Handoff Analysis with various
SHO trigger events and threshold fine tuning for optimum Soft/Hard HO Performance.
 Performed FTP test for both HSDPA and R99 (UMTS) as well as verified the download speed on both the technologies.
 Suggested the various changes required for KPI degradation as well as neighbor tuning for 2G and 3G Neighbor List.
 Scrutinized pilot pollution with the scanner and verified areas with more than three active sets in the reporting
ranges.
Bharti Airtel 3G Project Ericsson under Decon Construction Pvt. Ltd., Kolkata. Apr’10 to Jan’11
BSNL 3G Kolkata Ericsson
Role : RF Planning & Optimization Engineer.
Duration : Apr’10 to Jan’11.
Deliverables :
 Planned and optimized 3G network in BSNL (CALTEL) Ericsson Kolkata circle.
 Optimized and conducted SCFT Test for 3G network in Kolkata and West Bengal.
 Worked as RF Planning & Optimization Engineer for BSNL Kolkata circle.
 Involved in RF planning of new as well as redeployment of sites.
 Optimized parameters & physical aspects of 3G GSM network.
 Managed a team of 10 DT Engineers for SCFT and Cluster Drive.
 Analyzed the drive test logs for maintaining various KPI like CSS.
 Dropped call both in dual mode and UMTS, Soft Handover Success Rate, Soft Handover Overhead, Hard Handover
Success Rate, 3G to 2G and 2G to cell Reselection, PDP context Activation Time (I.e. Ping test), CS and PS handover
Success Rate(3G to 2G and 2G to 3G).
 Verified RSCP Ec/Io and SC.
BSNL Kolkata Ericsson 2G
Role : RF Optimization Engineer (2G).
Duration : Oct’09 to Mar’10.
Deliverables :
 Worked with Mobile Comm. Technology Pvt. Ltd. as RF Planning & Optimization Engineer with vendor ERICSSON for
BSNL 3G Kolkata, West Bengal.
 Working on Nortel 2G BTS,Ericsson BTS,
 Optimization of the Nortel & Ericsson BTS in BSNL Project.
 Maintained the KPI of 2G sites for HOSR, SD Drop, SD Blocking, TCH Drop and Assignment.
 Site parameters from BSC Dump.
 Alarms from ZEHO and Shifting of BCCH from degraded TRX.
 Various coding schemes used in GPRS CS-1 to CS-4 and for EDGE from MCS-1 to MCS-9 and switched between the
various schemes based upon the radio scenario.
 Prepared the CRF for various changes like BCCH Change, SD Shift, DRU Addition, etc.
 Monitored neighbor tuning and verifying from Report.
 Optimized data by checking the number of slots allocated for GPRS (Edge).
PREVIOUS WORK EXPERIENCE
Ericsson under Mobile Communication Technology Pvt. Ltd., Bhopal (M.P.) Mar’09 - Oct’09
Coordinator DT Engineer
Projects Undertaken
 ETSLAT project covering the regions under M.P. (Mar’09 - Oct’09).
Huwai under ADACellwork Wireless Pvt. Ltd., Karnataka / Maharashtra/Andhra Pradesh Aug’08 - Mar’09
DT Engineer
Projects Undertaken
 Aircel Project covering the regions under Maharashtra (Dec’08 - Mar’09).
 Aircel Project covering the regions under Andhra Pradesh (Oct’08 – Dec’09).
 Aircel Project covering the regions under Karnataka (Aug’08 – Oct’09).
Nokia - Siemens under ADACellwork Wireless Pvt. Ltd., Pune Jun’08 - Aug’08
DT Engineer
Project Undertaken
 Airtel Project covering the regions under Maharashtra.
KNOWLEDGE PURVIEW
Tools Known
 Ericsson OSS-AMOS(Parameter tuning)
 Business Object 12.1.0.882
 Atoll
 Gladiator (4.3, 5.0.60).
 Tems Cell planner 9.1.0 (WCDMA).
 MapInfo Professional 8.5.
 Mcom for Sites Planning.
 Google Earth.
Tools Known in Drive Test
 Tems Investigation 8.0.3, 9.0.3, 10.0.5, 12.0.1.
 R&S Drive Test and Scanning Tool.
 PCTel Scanner.
ACADEMICS
 MBA – Telecom Management from Annamalai University with 60% in 2012.
 B.E. - Computer Science & Engineering from Malwa Institute of Technology, Indore, RGPV University, Bhopal with
65%, 2008.
PERSONAL DETAILS
 Date of Birth : November 22, 1986.
 Marital Status : Married
 Permanent Address : Vikash Nagar, Kalapatha Road, In Front of Hanuman Temple, Betul (M.P.).
 Languages : Hindi, English and Marathi.

More Related Content

What's hot (19)

CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Resume
ResumeResume
Resume
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
 
Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
CV_Sanjay Kanzariya
CV_Sanjay KanzariyaCV_Sanjay Kanzariya
CV_Sanjay Kanzariya
 
Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016
 
Akhilesh cv for noc
Akhilesh cv for nocAkhilesh cv for noc
Akhilesh cv for noc
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
 
CV
CVCV
CV
 
CV-Harith Zaidan
CV-Harith ZaidanCV-Harith Zaidan
CV-Harith Zaidan
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
JOHN HENRY CASTILLO_CV
JOHN HENRY CASTILLO_CVJOHN HENRY CASTILLO_CV
JOHN HENRY CASTILLO_CV
 
ROHIT SINGH RESUME DT
ROHIT SINGH RESUME DTROHIT SINGH RESUME DT
ROHIT SINGH RESUME DT
 

Viewers also liked

Tarea 3 funda
Tarea 3 fundaTarea 3 funda
Tarea 3 fundafatimarav
 
Escolta ganadora 22 de enero 2015
Escolta ganadora 22 de enero 2015Escolta ganadora 22 de enero 2015
Escolta ganadora 22 de enero 2015emmstone
 
Tarea 3 funda
Tarea 3 fundaTarea 3 funda
Tarea 3 fundafatimarav
 
Sample_Project Template - 6 0 - Infrastructure Effort
Sample_Project Template - 6 0 - Infrastructure EffortSample_Project Template - 6 0 - Infrastructure Effort
Sample_Project Template - 6 0 - Infrastructure EffortKevin C. McCormack, PMP
 
Est30 primera reunion con pf
Est30   primera reunion con pfEst30   primera reunion con pf
Est30 primera reunion con pfemmstone
 
Est30 evidencias primer cte
Est30   evidencias primer cteEst30   evidencias primer cte
Est30 evidencias primer cteemmstone
 
Est29 abril
Est29   abrilEst29   abril
Est29 abrilemmstone
 
Est29 evidencias agosto
Est29   evidencias agostoEst29   evidencias agosto
Est29 evidencias agostoemmstone
 
Est02 ciclo escolar 15-16
Est02   ciclo escolar 15-16Est02   ciclo escolar 15-16
Est02 ciclo escolar 15-16emmstone
 
Est29 junio
Est29   junioEst29   junio
Est29 junioemmstone
 
Desfile 20 de nov
Desfile 20 de novDesfile 20 de nov
Desfile 20 de novemmstone
 
Cooperativa est34
Cooperativa est34Cooperativa est34
Cooperativa est34emmstone
 

Viewers also liked (13)

Kasvi tosu 2015
Kasvi tosu 2015Kasvi tosu 2015
Kasvi tosu 2015
 
Tarea 3 funda
Tarea 3 fundaTarea 3 funda
Tarea 3 funda
 
Escolta ganadora 22 de enero 2015
Escolta ganadora 22 de enero 2015Escolta ganadora 22 de enero 2015
Escolta ganadora 22 de enero 2015
 
Tarea 3 funda
Tarea 3 fundaTarea 3 funda
Tarea 3 funda
 
Sample_Project Template - 6 0 - Infrastructure Effort
Sample_Project Template - 6 0 - Infrastructure EffortSample_Project Template - 6 0 - Infrastructure Effort
Sample_Project Template - 6 0 - Infrastructure Effort
 
Est30 primera reunion con pf
Est30   primera reunion con pfEst30   primera reunion con pf
Est30 primera reunion con pf
 
Est30 evidencias primer cte
Est30   evidencias primer cteEst30   evidencias primer cte
Est30 evidencias primer cte
 
Est29 abril
Est29   abrilEst29   abril
Est29 abril
 
Est29 evidencias agosto
Est29   evidencias agostoEst29   evidencias agosto
Est29 evidencias agosto
 
Est02 ciclo escolar 15-16
Est02   ciclo escolar 15-16Est02   ciclo escolar 15-16
Est02 ciclo escolar 15-16
 
Est29 junio
Est29   junioEst29   junio
Est29 junio
 
Desfile 20 de nov
Desfile 20 de novDesfile 20 de nov
Desfile 20 de nov
 
Cooperativa est34
Cooperativa est34Cooperativa est34
Cooperativa est34
 

Similar to Harshit Bhawsar Resume

Similar to Harshit Bhawsar Resume (20)

Sumeet (Resume)
Sumeet (Resume)Sumeet (Resume)
Sumeet (Resume)
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
DIPU CV
DIPU CVDIPU CV
DIPU CV
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
Sandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_ExpSandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_Exp
 
Ashraf Ali
Ashraf AliAshraf Ali
Ashraf Ali
 
Akash Tandon - Resume
Akash Tandon - ResumeAkash Tandon - Resume
Akash Tandon - Resume
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsCV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE Optimization
 
Resume
ResumeResume
Resume
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
CV_PANKAJ KR JHA
CV_PANKAJ KR JHACV_PANKAJ KR JHA
CV_PANKAJ KR JHA
 

Harshit Bhawsar Resume

  • 1. HARSHIT BHAWSARHARSHIT BHAWSAR E-Mail: harshitbhawsar@yahoo.co.in; Contact: +91-8017990796, 9406918505 Seeking middle level assignments in RF Planning & Optimization Engineering / Telecom Network Operations with a growth oriented organization PROFESSIONAL SYNOPSIS  A dynamic professional with over 6.11 years of rich exposure in handling RF optimization & planning activities in WCDMA technology.  Currently working in Ericsson India Global Services Pvt. Ltd Kolkata from Oct'11 to till now on 3G Vodafone Netherland Project.  Domain expertise in improving and optimizing the mobile WCDMA networks using the exited and available components only; efficient in analyzing the customer’s business requirements, needs and objectives and map them to the GIS processes, solutions and products that are being implemented.  Generated the KPI Reports & optimization.  Adept in adhering to call success rate, handover failure, RF optimization service for network operators to increase revenues & reduced costs, efficient in controlling the design & development operations using various designing tools.  An effective communicator with distinguished abilities in maintaining deliverables as per the SLA & KRA. Current Project Synopsis Ericsson Netherland (Vodafone) Role : Senior Engineer Customer : Vodafone, Netherlands Project Duration : October -2011 to continue. Key Deliverables  Daily Analysis 3G Network performance statistics (KPI) - Accessibility, Retain ability and Mobility.  KSR and Trend Breach comments given to customer every week.  Trouble Tickets handling and troubleshooting.  Handling customer complaints and No IP cases.  Carrier expansion, E1 expansion, HWAC, RAX and TX expansion.  HS Sleeping cells, HS/EUL Throughput.  Prepare Pre and Post Drive Test reports, for problem cause and recommendation.  Report fetch & analysis from business objects.  WMRR & WNCS for worst performing cell and Definition of missing neighbor.  Releasing change requests due to Missing neighbor, add/delete neighbor.  New Site Verification set HS/EUL Parameters check alarm, RET & ASC.  Handling Event Site & tune change Tilt, Cpich, Pwradm, Codeadm and SF Parameter.  Change in antenna orientation, change mechanical / electrical tilting to project team in case of Customer complaint.  Checked the cell with blocking due to admission control and congestion control.  RBS and RNC Parameter Tuning which are allowed in OSS (Amos) for minimizing the affect and maintaining the KPI.  Optimizing Neighbor for intra frequency, inter frequency and IRAT handover.
  • 2. PRIVOUS ORGANIZATIONAL EXPERIENCE Bharti 3G Project Ericsson under Linkquest Telecom Ltd., Jammu & Kashmir Jan’11 to Oct’11 3G Optimization Role : RF Optimization Engineer (3G). Duration : Since Mar’11 to Oct’11. Deliverables :  Planning and designing 3G RF for Bharti 3G sites in J&K.  Verifying External GSM relation along with BCCH, BSIC, CI and LAC analysis of WNCS and WMRR for worst performing cell and Definition of missing neighbor from WNCS. 2) Parameter 3G Parameter Discrepancy from Kget.  Verifying the definition External GSM cell along with necessary parameter changes required in corresponding 2G BSC.  Performing technical site survey for Ericsson’s existing site and new site for implementation as 3G sites creating coverage predictions for 3G sites already on air using TCPU.  Generating the coverage prediction plots and statistics (based on Polygons & Maps).  Releasing change requests due to Missing neighbor, add/delete neighbor, hardware problem to Ericsson’s OSS team.  Change in antenna orientation; change mechanical / electrical tilting to project team.  Recommending parameters for achieving proper traffic distribution between UMTS Layer and GSM network.  Soft handoff analysis with various SHO trigger events and threshold fine tuning for optimum Soft/Hard HO performance.  RF Coverage using antenna tilt & azimuth fine tuning for optimal coverage, overlap & reduction of pilot pollution by Ec/No & RSCP improvements. Highlights  Accomplished successful launch of 3G network in Jammu & Srinagar.  Successfully executed: - 500 SCFT for Bharti Airtel 3G respectively. - Cluster optimization of each cluster in J&K. - Maintained the KPI Reports. - Tool Used for Optimization  Gladiator (4.3, 5.0.60) For Post Processing.  Tems Cell planner 9.1.0 (WCDMA) For Prediction Plot.  MapInfo Professional 8.5.  Mcom for Sites Planning.  Google Earth. Projects Undertaken Airtel 3G J&K Role : RF Optimization Engineer (3G). Duration : Since Jan’11 to Mar’11. Deliverables :  Prepared onsite as well as the add cell and onsite CCR scripts.  Created neighbor for U2U, U2G and G2U.  Successfully executed 300 SCFT for Aircel 3G respectively post processing of SCFT and Cluster Drive Logs.  Undertook parametric tuning for HSPA and IRAT.  Performed KPI analysis for CS-Speech, CS-64, PS-128, PS-384 & HSDPA for accessibility, retainabiltiy and mobility.  Actively involved in IRAT handover and reselection.  Spectrum cleanliness of the UMTS-900 band provided by costumer through Agilent Frequency Scanner.  Neighbor optimization for Intra Frequency, Inter frequency and IRAT handover. Soft Handoff Analysis with various SHO trigger events and threshold fine tuning for optimum Soft/Hard HO Performance.  Performed FTP test for both HSDPA and R99 (UMTS) as well as verified the download speed on both the technologies.
  • 3.  Suggested the various changes required for KPI degradation as well as neighbor tuning for 2G and 3G Neighbor List.  Scrutinized pilot pollution with the scanner and verified areas with more than three active sets in the reporting ranges. Bharti Airtel 3G Project Ericsson under Decon Construction Pvt. Ltd., Kolkata. Apr’10 to Jan’11 BSNL 3G Kolkata Ericsson Role : RF Planning & Optimization Engineer. Duration : Apr’10 to Jan’11. Deliverables :  Planned and optimized 3G network in BSNL (CALTEL) Ericsson Kolkata circle.  Optimized and conducted SCFT Test for 3G network in Kolkata and West Bengal.  Worked as RF Planning & Optimization Engineer for BSNL Kolkata circle.  Involved in RF planning of new as well as redeployment of sites.  Optimized parameters & physical aspects of 3G GSM network.  Managed a team of 10 DT Engineers for SCFT and Cluster Drive.  Analyzed the drive test logs for maintaining various KPI like CSS.  Dropped call both in dual mode and UMTS, Soft Handover Success Rate, Soft Handover Overhead, Hard Handover Success Rate, 3G to 2G and 2G to cell Reselection, PDP context Activation Time (I.e. Ping test), CS and PS handover Success Rate(3G to 2G and 2G to 3G).  Verified RSCP Ec/Io and SC. BSNL Kolkata Ericsson 2G Role : RF Optimization Engineer (2G). Duration : Oct’09 to Mar’10. Deliverables :  Worked with Mobile Comm. Technology Pvt. Ltd. as RF Planning & Optimization Engineer with vendor ERICSSON for BSNL 3G Kolkata, West Bengal.  Working on Nortel 2G BTS,Ericsson BTS,  Optimization of the Nortel & Ericsson BTS in BSNL Project.  Maintained the KPI of 2G sites for HOSR, SD Drop, SD Blocking, TCH Drop and Assignment.  Site parameters from BSC Dump.  Alarms from ZEHO and Shifting of BCCH from degraded TRX.  Various coding schemes used in GPRS CS-1 to CS-4 and for EDGE from MCS-1 to MCS-9 and switched between the various schemes based upon the radio scenario.  Prepared the CRF for various changes like BCCH Change, SD Shift, DRU Addition, etc.  Monitored neighbor tuning and verifying from Report.  Optimized data by checking the number of slots allocated for GPRS (Edge). PREVIOUS WORK EXPERIENCE Ericsson under Mobile Communication Technology Pvt. Ltd., Bhopal (M.P.) Mar’09 - Oct’09 Coordinator DT Engineer Projects Undertaken  ETSLAT project covering the regions under M.P. (Mar’09 - Oct’09). Huwai under ADACellwork Wireless Pvt. Ltd., Karnataka / Maharashtra/Andhra Pradesh Aug’08 - Mar’09 DT Engineer Projects Undertaken  Aircel Project covering the regions under Maharashtra (Dec’08 - Mar’09).  Aircel Project covering the regions under Andhra Pradesh (Oct’08 – Dec’09).  Aircel Project covering the regions under Karnataka (Aug’08 – Oct’09). Nokia - Siemens under ADACellwork Wireless Pvt. Ltd., Pune Jun’08 - Aug’08 DT Engineer
  • 4. Project Undertaken  Airtel Project covering the regions under Maharashtra. KNOWLEDGE PURVIEW Tools Known  Ericsson OSS-AMOS(Parameter tuning)  Business Object 12.1.0.882  Atoll  Gladiator (4.3, 5.0.60).  Tems Cell planner 9.1.0 (WCDMA).  MapInfo Professional 8.5.  Mcom for Sites Planning.  Google Earth. Tools Known in Drive Test  Tems Investigation 8.0.3, 9.0.3, 10.0.5, 12.0.1.  R&S Drive Test and Scanning Tool.  PCTel Scanner. ACADEMICS  MBA – Telecom Management from Annamalai University with 60% in 2012.  B.E. - Computer Science & Engineering from Malwa Institute of Technology, Indore, RGPV University, Bhopal with 65%, 2008. PERSONAL DETAILS  Date of Birth : November 22, 1986.  Marital Status : Married  Permanent Address : Vikash Nagar, Kalapatha Road, In Front of Hanuman Temple, Betul (M.P.).  Languages : Hindi, English and Marathi.