1. CV Mr. P Haribabu
Page 1 of 7
1. Name : Peddinti Haribabu
2. Date of Birth : 12.01.1982
3. Nationality : Indian
4. Personal Address : Locharala (Vill) & (Post),Teralam (MD)
Vizianagaram (Dist.).Andhra Pradesh state- 535126
Telephone No. : +91 9405609397
Mobile No. : +91 8806661466
E-mail Address : haripeddinti@gmail.com
5. Education : Degree of Bachelor of Engineering in Civil From Andhra University-2005,
(Visakhapatnam.-Regular Evening college)
Diploma in Civil Engineering From Govt. Polytechnic College, Srikakulam.-
2002
6. Other training : AutoCAD
7. Language& Degree
of Proficiency
: Language Speak Read Write
English Good Good Good
Telugu Good Good Good
Hindi Good Good Good
8. Membership in
professional
societies
: Nil
9. Countries of Work
Experience
: India
10
.
Employment Record : 12 years and 3 months
Name of Assignment:
Project: 01
Independent Engineer Services for Six-Laning of Solapur-
Maharashtra/Karnataka Border Section of NH 09 from Km 249.000 to Km
348.800 under NHDP phase-lll in the State of Maharashtra on BOT(Toll) basis
Year: OCT -2014 to Till Date
Employer Artefact Project Ltd
Position Held: Asst. Bridge Engineer
Location: Solapur – Maharashtra/Karnataka (Maharashtra) NH - 09
Client: National Highway Authority of India
Main Project Features: Total Length: 100.6kms.; Project Cost: INR 923.04 Crs; Funded: BOT
The number of Structures are:
Major Bridge 03No’s PSC- Girder
Minor Bridge 28 No’s
VUP & PUP 08 No’s
Box Culvert 38 No’s
2. CV Mr. P Haribabu
Page 2 of 7
HPC 107 No’s
Activities Performed: As Asst Bridge Engineer the major duties includes
Checking of safety arrangements for workers, machinery at every activity before
proceeding work and recording of safety tool box talk minutes at every day
morning at site.
Participating in work shop and discussed thoroughly with the Contractor about
each activity of structure prior to proceeding work at site.
Reviewing of contract drawings, shop drawings, materials approval records,
Inspection of Test Plan and method statements for each part of structure prior to
inspection at site.
Joint inspection of existing ground to know the location of local utility services, if
any the same will be incorporated in shop drawing therefore can be protected
from damage or relocate the utilities or taken care at the time of excavation.
Inspection of Steel reinforcement to make sure of Dia, Shape, Placing, Spacing,
Quantity, Over Lapping, Tying and its State (i.e. Rust/dust free, Oil free, etc.) as
per approved drawings and specifications.
Inspection of Formwork to make sure of Shape, Cleaning, Supporting,
Verticality, Batter, Water tight seal, Concrete Cover as per approved drawings
and specifications.
Supervising of Concrete pouring to make sure of Temperature, Slump, Placing,
Vibration, Levelling, Shear keys as per approved drawings and specifications
Maintaining of DPR (Daily Progress Report), Status Charts of Project day to day
basis and the same will be submitted to superiors
Closing of Request for Inspection/Test every following day after completion of
works.
Name of Assignment:
Project: 02
Six-lane of DHANKUNI–KHARAGPUR Section NH – O6, From Km 17.600 to
Km 129.00 in the state of West Bengal. to be executed as BOT(Toll) project
on DBFO Pattern under NHDP Phase V
Year: JAN - 2014 to OCT - 2014
Employer HALCROW Consulting India Put Ltd
Position Held: Asst. Bridge Engineer
Location: DHANKUNI–KHARAGPUR (West Bengal) NH-06
Concessnoire Ashoka Buildcon Limited
Client: National Highway Authority of India
Main Project Features: Total Length: 73kms.; Project Cost: INR 2000 Crs; Funded: BOT
The number of Structures are:
ROB 01 No Steel girder (18 No’s X 22.000 m +2 No’s X 26.000 m
Major Bridge 03No’s PSC- Girder
Minor Bridge 8 No’s
VUP & PUP 08 No’s
3. CV Mr. P Haribabu
Page 3 of 7
Box Culvert & HPC 93 No’s
Activities Performed: As Asst Bridge Engineer the major duties includes
ROB Steel girder Launching.
PSC –Girder Stressing, Grouting & Launching .
Checking of safety arrangements for workers, machinery at every activity before
proceeding work and recording of safety tool box talk minutes at every day
morning at site.
Participating in work shop and discussed thoroughly with the Contractor about
each activity of structure prior to proceeding work at site.
Reviewing of contract drawings, shop drawings, materials approval records,
Inspection of Test Plan and method statements for each part of structure prior to
inspection at site.
Joint inspection of existing ground to know the location of local utility services, if
any the same will be incorporated in shop drawing therefore can be protected
from damage or relocate the utilities or taken care at the time of excavation.
Inspection of Steel reinforcement to make sure of Dia, Shape, Placing, Spacing,
Quantity, Over Lapping, Tying and its State (i.e. Rust/dust free, Oil free, etc.) as
per approved drawings and specifications.
Inspection of Formwork to make sure of Shape, Cleaning, Supporting,
Verticality, Batter, Water tight seal, Concrete Cover as per approved drawings
and specifications.
Supervising of Concrete pouring to make sure of Temperature, Slump, Placing,
Vibration, Levelling, Shear keys as per approved drawings and specifications
Maintaining of DPR (Daily Progress Report), Status Charts of Project day to day
basis and the same will be submitted to superiors
Closing of Request for Inspection/Test every following day after completion of
works.
Name of Assignment:
Project: 03
Four-Laning of Jalgaon-Gujarat/Maharashtra Border Section of NH6 in the
State of Maharashtra under NHDP Phase IV on DBFOT Basis (KM 441.950 to
KM 650.794),
Year: May - 2013 to Dec - 2013
Employer HALCROW Consulting India Put Ltd
Position Held: Asst. Bridge Engineer
Location: Jalgaon-Gujarat/Maharashtra (Maharashtra) NH - 06
Concessnoire L&T IDPL Ltd
Client: National Highway Authority of India
Main Project Features: Total Length: 73kms.; Project Cost: INR 3900 Crs; Funded: BOT
The number of Structures are: Package-02
ROB 01 No
Major Bridge 05No’s
Minor Bridge 16 No’s
VUP & PUP 09 No’s
Box Culvert & HPC 124 No’s
4. CV Mr. P Haribabu
Page 4 of 7
Activities Performed: As Asst Bridge Engineer the major duties includes
Existing Major & Minor Bridges Rehabilitation (NDT Testing , Rebound
Hammer testing , Half cell , Cover meter testing
Total Structure Quantity Prepared.
Checking of safety arrangements for workers, machinery at every activity before
proceeding work and recording of safety tool box talk minutes at every day
morning at site.
Closing of Request for Inspection/Test every following day after completion of
works.
Name of Assignment:
Project: 04
Four-Laning of Pune – Solapur Section 0f NH – O9, in the State of
Maharashtra under NHDP Phase III on DBFOT Basis (40+000 to 140+700 km)
Year: Dec - 2009 to May - 2013
Employer EGIS - INDIA Consulting Engineer Pvt Ltd
Position Held: Field Engineer (Bridges)
Location: Pune – Solapur (Maharashtra) NH - 09
Concessnoire Pune Solapur Expressway Pvt Ltd. ( Tata Reality Infra Ltd)
Client: National Highway Authority of India
Main Project Features: Total Length: 52kms.; Project Cost: INR 1180 Crs; Funded: BOT
The number of Structures are: Package-01
ROB 01 No PSC- 30No’s Girder
Major Bridge 01No’s PSC- 10 No’s Girder
Minor Bridge 20 No’s RCC & Soiled Slab
VUP & PUP 09 No’s Voided Slab & Soiled Slab
Box Culvert & HPC 145 No’s
Activities Performed: As Asst Bridge Engineer the major duties includes
ROB Steel girder Launching .B/side 30No’s girder Stressing, Grouting
Launching.
Existing Major & Minor Bridges Rehabilitation.
Bridge Load Testing.
Checking of safety arrangements for workers, machinery at every activity before
proceeding work and recording of safety tool box talk minutes at every day
morning at site.
Participating in work shop and discussed thoroughly with the Contractor about
each activity of structure prior to proceeding work at site.
Reviewing of contract drawings, shop drawings, materials approval records,
Inspection of Test Plan and method statements for each part of structure prior to
inspection at site.
Joint inspection of existing ground to know the location of local utility services, if
any the same will be incorporated in shop drawing therefore can be protected
from damage or relocate the utilities or taken care at the time of excavation.
Inspection of Steel reinforcement to make sure of Dia, Shape, Placing, Spacing,
Quantity, Over Lapping, Tying and its State (i.e. Rust/dust free, Oil free, etc.) as
5. CV Mr. P Haribabu
Page 5 of 7
per approved drawings and specifications.
Inspection of Formwork to make sure of Shape, Cleaning, Supporting,
Verticality, Batter, Water tight seal, Concrete Cover as per approved drawings
and specifications.
Supervising of Concrete pouring to make sure of Temperature, Slump, Placing,
Vibration, Levelling, Shear keys as per approved drawings and specifications
Maintaining of DPR (Daily Progress Report), Status Charts of Project day to day
basis and the same will be submitted to superiors.
Closing of Request for Inspection/Test every following day after completion
of works.
Name of Assignment:
Project: 05
Four-Lane Dindigal- Samyanallur in NH-7 Tamilnadu State from km 373.725
to 426.600.
Year: Oct - 2006 to Nov- 2009
Employer Prasad &Company (P.W) Ltd
Position Held: Senior Engineer (Structures)
Location: Dindigal- Samyanallur (Tamilnadu) NH - 07
Concessnoire DS TOLL Road Ltd (Reliance Infra Ltd).
Client: National Highway Authority of India
Main Project Features: Total Length: 52kms.; Project Cost: INR 427 Crs; Funded: BOT
The number of Structures are: Package-01
ROB 02 No 71°Skew Soiled Slab, 32° Skew Box girder Slab.
Flyover 04No’s Box girder Slab
Minor Bridge 06 No’s RCC & Soiled Slab
VUP & PUP 05 No’s Voided Slab & Soiled Slab
Box Culvert & HPC 54 No’s
Activities Performed: As Senior Engineer the major duties includes
Inspecting of prompt safety arrangements prior to proceeding any activity
at site. Execution of structural & road works as per planned schedules
given by superiors.
Execution of structural & road works as per planned schedules given by
superiors.
Deciding priorities deployment of suitable equipment and man power
depending upon the requirement at site
Liaising with client / consultant engineers to get the approval of completed works
at site.
Preparation of design calculation reports based on field data by using relevant
software and shop drawings for structures and cross section drawings for roads
to get them approval from client / consultant engineers.
Preparation of bar bending schedules and getting them approval from consul tant
engineers.
Forecasting of required construction materials, manpower and machinery for
smooth functioning of activities
Submitting of Daily Progress Reports and Following day program reports to
6. CV Mr. P Haribabu
Page 6 of 7
Superiors
Communicating with planning & quantity department to know the progress verses
program & revenue achieved at every month end.
ROB 3Span 71’ Degree skew Solid Slab, Constructing Railway Bridge at these
locations in coordination with the Railway was a major challenge.
ROB 32’Degree, Box Girder four line, 3 No’s Flyover Box Girder
34.000m.
Name of Assignment:
Project: 06
Two-Lane State Highway Upgrading of Roads from Arcot to Ulundurpettai,
Polur to Chengam, Vriddhachalam to Turvarur TNRSP-01 founded by World
Bank ..
Year: Mar - 2006 to Oct- 2006
Employer KMC Constructions Limited
Position Held: Senior Engineer (Structures)
Location: Polur to Chengam (Tamilnadu) State Highway
Concessnoire TNRSP-01 World Bank Funded..
Client: Govt. of Tamilnadu Highways and Rural Works Department .Tamil Nadu
Road Sector Project
Main Project Features: Total Length: 25kms.; Project Cost: INR 611 Crs; Funded: World bank Funded.
The number of Structures are: Package-04
Slab & Box Culvert & HPC 63No’s
Activities Performed: As Senior Engineer the major duties includes
Liaising with client / consultant engineers to get the approval of completed works
at site.
Preparation of bar bending schedules and getting them approval from consultant
engineers.
Submitting of Daily Progress Reports and Following day program reports to
Superiors
Preparation of bill and Quantities.
Maintenance of Labour Reports.
Name of Assignment:
Project: 07
Four-Lane State Highway Upgrading of Roads SH-17 56+587 Ramanagar –
90+432 (Maddur) (Bangalore to Mysore) road in the Karnataka State for
(Karnataka Road Development Project)
Year: Dec - 2005 to Mar- 2006
Employer KMC Constructions Limited
Position Held: Senior Engineer (Structures)
Location: Ramanagar –Maddur (Bangalore to Mysore) road in the Karnataka State
State Highway
Concessnoire KRDCL
7. CV Mr. P Haribabu
Page 7 of 7
Client: Karnataka State State Highway
Main Project Features: Total Length: 10kms.; Project Cost: INR 429 Crs; Funded: World bank Funded.
The number of Structures are: Package-01
ROB – 1 No PSC -10 girders LHS Cast in Situ
Slab & Box Culvert & HPC 20No’s
Activities Performed: As Senior Engineer the major duties includes
Liaising with client / consultant engineers to get the approval of completed works
at site..
Preparation of bar bending schedules and getting them approval from consultant
engineers.
Submitting of Daily Progress Reports and Following day program reports to
Superiors.
Preparation of bill and Quantities.
Maintenance of Labour Reports.
Name of Assignment:
Project: 07
Year: July - 2002 to Octr- 2005
Employer Reddy Construction
Position Held: Junior Engineer
Location: Vishakhapatnam
Main Project Features: Greater Visakhapatnam Municipal Corporation,
G+4th floor Apartment
Slab Culverts, Box & Pipe Culverts, (30 km RCC Drain).
DECLARTION:
I am sure that given an opportunity, I can prove my ability to the entire satisfaction of my
superiors and turnout to be an asset to the organization.
I, the Undersigned, certify that to the best of my knowledge and belief, this curriculum
vitae correctly describes my qualification, experience and myself.
Place :
Date : (PEDDINTI. HARI BABU)