SlideShare a Scribd company logo
1 of 33
Download to read offline
SysEng (s) Pte. Ltd
Real Time Structural
Monitoring System
(Hong Kong North East Tower)
Construction
Phases of a 420 m
High Tower Block in
the Region
Configuration
Level 33
RS485
Network
Level 53
RS485
Network
Level 65
RS485
Network
2.4 GHz
Highway
Central
monitoring
Station
SMS Alert
System
Construction at
Stage 1 of the
420 m Tower
Block
Level 33
Strain Gages and Displacement Sensors
Strain gage installation
with redundancy
On site
measurement system
Displacement
sensor
Monitoring Station at Construction Site
SysEng (s) Pte. Ltd
Real Time Structural
Monitoring System
(Marina Bay Sand Hotel Tower)
Cast-in VW Strain Gage
•To measure the vertical force
•from the superstructure
Welded VW Strain Gage
•To measure the
tension/compression force on the
support beam between the vertical
and slope core
x
L
x = Lsinθ
Where L is floor height
D
Ln-2Ln-1Ln
L1L3L2
Tilt meter
Proposed method for tower tilt measurement
Proposed installation location
Proposed installation location to form
a sensor array to detect tower
movement profile at the vertical core
and slope core
Total Lateral Displacement at level n
Xi = D + ∑ Li sin θi
D
Individual floor level lateral
displacement can be determined by
using
•Displacement sensor as the referencing datum
•Accumulated lateral movement resolved from
tilting angle detected by tilt meter
X i
X i
X i
X i
X i
X i
D
How to determine the lateral displacement
T3 East (slope) displacement
GL64 (30 Nov 09)
0
10
20
30
40
50
60
-30 -20 -10 0 10 20 30 40 50
mm
Level
T3 GL64
Expected
T3 E GL64
The expected lateral movement vs. the actual measured movement
The comparison between the
expected lateral movement (modeling)
and the actual lateral movement from
sensor array
• the movement profile is similar
•The maximum difference between the
actual and expected is 10mm
mid span
Cast-In Strain Gage
Cross section view
side view
Proposed installation location for
Embedded VWSG in
PT Beam
SysEng (s) Pte. Ltd
Human Comfort Measurement
(ORD Building)
Tower 1 Level 9 Human Foot Fall
Human Comfort test
for multi floor level for ORQ
Structure Human Comfort standard (ISO 2631) Testing Service
Building vibration noise level test
For multi floor level
(Office and M&E)
SysEng (s) Pte. Ltd
Long Term
Structure Health Monitoring
(Republic Plaza)
(The Sail)
a) Long Term Building Monitoring at
280 m Republic Plaza since 1995
Remote Monitoring of the 280m High
Republic Plaza
 Measures the Wind Load and Seismic
conditions experienced by the Building
 NTU conducts the Full Scale Research while
SysEng (S) designs and install the
Instrumentation
 The system operates automatically since 1995
 The system can be controlled remotely and
measured data are via modems
Transducers at Republic Plaza
 (Top) Ultra sonic
Anemometer to
measure Wind
Direction & Speed
 (Top & Bottom)
Servo
Accelerometers to
measure vibrations
 GPS receivers to
measure
displacements
Central Monitoring System
 16 Channels,16 bits,
Sample & Hold
 Multi-tasking for data
logging and file transfer
 6 hours UPS
 Operates continuously 24
hours
 Lightning and Voltage
surge protection
SysEng (s) Pte. Ltd
SysEng Server System for
Real Time Monitoring Service
Our real time monitoring systems track record
SysEng (s) Pte. Ltd
Measurement proposal for
Mumbai International Airport
Structure information
Project Facts
Project Area: 4,843,759 ft
Building Height: 45 m
Number of support pillar: 28
Number of Stories: 4
Proposal for
mega structure deflection measurement
Consideration
• To provide a direct measurement method for deflection movement
due to unbalance of loading during construction period
• To provide dynamic deflection info of the mega structure
• to provide an overview on all the 28 mega structure deflection info
in a single screen
• To provide an alert/ warning feature on loading activities when the
deflection is breaching the design limit
• Easy installation, minimize effect on the construction schedule
• On site standalone system, easy to maintain and operate
displacement
sensor
Side View
movement
vertical movement due to
unbalance loading
Proposal for
mega structure deflection measurement
•During installation of steel structure will cause a vertical deflection
of the top portion of the mega structure
•The installed vertical displacement sensor (V) will able to detect
the dynamic movement of the top portion of the mega structure
•The datum of the vertical displacement sensor is refer to the floor
level which is no direct link to the mega structure
V
H
Proposal for
mega structure deflection measurement
displacement
sensor
Plan View
sensor
measurement
system
pillar lateral movement
due to unbalance loading
movement
movement
H
V
V
H
•During installation of steel structure may cause a bending moment
n the pillar portion of the mega structure
•This bending moment will translate into horizontal deflection
•The installed horizontal displacement sensor (H) will able to detect
the dynamic movement of the bending moment of the mega
structure
•The datum of the horizontal displacement sensor is refer to the
floor level which is no direct link to the mega structure
Proposal for
mega structure deflection measurement
Central
Monitoring System
On-site Measurement
Station
Mega Structure #1
Mega Structure #28
•The On-site Measurement Station (MS) will collect all the dynamic
info and send it back to the Central Monitoring System (CMS)
•When receiving info from MS, the CMS will do:
•Check and analysis the data
•Display the info on the CMS display
•Send alert/ warning when info is breaching design limit
•Achieve data to database
SysEng (s) Pte. Ltd
Thank You

More Related Content

What's hot

Vibration Measurements In Wind Power Turbines
Vibration Measurements In Wind Power TurbinesVibration Measurements In Wind Power Turbines
Vibration Measurements In Wind Power Turbinesalexzio
 
Online monitoring of wind induced vibration of transmission steel high tower
Online monitoring of wind induced vibration of transmission steel high towerOnline monitoring of wind induced vibration of transmission steel high tower
Online monitoring of wind induced vibration of transmission steel high towersudhakar5472
 
Uav flight control system with ins gps
Uav flight control system with ins gpsUav flight control system with ins gps
Uav flight control system with ins gpsamir amiry
 
Presentation on Prospect of Non Destructive Testing and Condition Monitoring...
Presentation on Prospect of Non Destructive Testing and  Condition Monitoring...Presentation on Prospect of Non Destructive Testing and  Condition Monitoring...
Presentation on Prospect of Non Destructive Testing and Condition Monitoring...Ferdous Kabir
 
Instrumentation Technologies Inc - Providing High Performance Electronics for...
Instrumentation Technologies Inc - Providing High Performance Electronics for...Instrumentation Technologies Inc - Providing High Performance Electronics for...
Instrumentation Technologies Inc - Providing High Performance Electronics for...Peter Baloh, PMP, PROSCI
 
Development of on line monitoring system of substation power equipment based ...
Development of on line monitoring system of substation power equipment based ...Development of on line monitoring system of substation power equipment based ...
Development of on line monitoring system of substation power equipment based ...sudhakar5472
 
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...AFAS - Automated Fault Analysis NetCeler
 
Wind turbine vibration analysis
Wind turbine vibration analysisWind turbine vibration analysis
Wind turbine vibration analysisMartin Gascon
 
BK Mikro Scanners - Techna Tool
BK Mikro Scanners - Techna ToolBK Mikro Scanners - Techna Tool
BK Mikro Scanners - Techna Tooltechnatool
 
Inline freeness transmitter
Inline freeness transmitterInline freeness transmitter
Inline freeness transmitterMiia Moffitt
 
_Meggitt_GasTurbine_trifold_2015-final
_Meggitt_GasTurbine_trifold_2015-final_Meggitt_GasTurbine_trifold_2015-final
_Meggitt_GasTurbine_trifold_2015-finalMelina Brunet
 
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4   session 3 - st dev con 2016 - pedestrian dead reckoningTrack 4   session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoningST_World
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptRohit Kaushik
 
Solution: Stainless Steel Weld Inspection
Solution: Stainless Steel Weld InspectionSolution: Stainless Steel Weld Inspection
Solution: Stainless Steel Weld InspectionZetec Inc.
 
Quadrocopter
QuadrocopterQuadrocopter
Quadrocopterbeak90
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powereSAT Journals
 

What's hot (20)

Vibration Measurements In Wind Power Turbines
Vibration Measurements In Wind Power TurbinesVibration Measurements In Wind Power Turbines
Vibration Measurements In Wind Power Turbines
 
Online monitoring of wind induced vibration of transmission steel high tower
Online monitoring of wind induced vibration of transmission steel high towerOnline monitoring of wind induced vibration of transmission steel high tower
Online monitoring of wind induced vibration of transmission steel high tower
 
Uav flight control system with ins gps
Uav flight control system with ins gpsUav flight control system with ins gps
Uav flight control system with ins gps
 
Presentation on Prospect of Non Destructive Testing and Condition Monitoring...
Presentation on Prospect of Non Destructive Testing and  Condition Monitoring...Presentation on Prospect of Non Destructive Testing and  Condition Monitoring...
Presentation on Prospect of Non Destructive Testing and Condition Monitoring...
 
Instrumentation Technologies Inc - Providing High Performance Electronics for...
Instrumentation Technologies Inc - Providing High Performance Electronics for...Instrumentation Technologies Inc - Providing High Performance Electronics for...
Instrumentation Technologies Inc - Providing High Performance Electronics for...
 
OPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIKOPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIK
 
Development of on line monitoring system of substation power equipment based ...
Development of on line monitoring system of substation power equipment based ...Development of on line monitoring system of substation power equipment based ...
Development of on line monitoring system of substation power equipment based ...
 
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
Automated Fault Analysis - IVPower for Transmission System Operators and Dist...
 
Spybot cum Surveillance Robo
Spybot cum Surveillance RoboSpybot cum Surveillance Robo
Spybot cum Surveillance Robo
 
Wind turbine vibration analysis
Wind turbine vibration analysisWind turbine vibration analysis
Wind turbine vibration analysis
 
BK Mikro Scanners - Techna Tool
BK Mikro Scanners - Techna ToolBK Mikro Scanners - Techna Tool
BK Mikro Scanners - Techna Tool
 
Inline freeness transmitter
Inline freeness transmitterInline freeness transmitter
Inline freeness transmitter
 
Group26_ledtech2016
Group26_ledtech2016Group26_ledtech2016
Group26_ledtech2016
 
_Meggitt_GasTurbine_trifold_2015-final
_Meggitt_GasTurbine_trifold_2015-final_Meggitt_GasTurbine_trifold_2015-final
_Meggitt_GasTurbine_trifold_2015-final
 
PRESETATIONS
PRESETATIONSPRESETATIONS
PRESETATIONS
 
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4   session 3 - st dev con 2016 - pedestrian dead reckoningTrack 4   session 3 - st dev con 2016 - pedestrian dead reckoning
Track 4 session 3 - st dev con 2016 - pedestrian dead reckoning
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
 
Solution: Stainless Steel Weld Inspection
Solution: Stainless Steel Weld InspectionSolution: Stainless Steel Weld Inspection
Solution: Stainless Steel Weld Inspection
 
Quadrocopter
QuadrocopterQuadrocopter
Quadrocopter
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar power
 

Viewers also liked

11 - Modern Water Monitoring overview_Sept 15
11 - Modern Water Monitoring overview_Sept 1511 - Modern Water Monitoring overview_Sept 15
11 - Modern Water Monitoring overview_Sept 15indiawrm
 
Real Time Network Monitoring System
Real  Time  Network  Monitoring  SystemReal  Time  Network  Monitoring  System
Real Time Network Monitoring SystemGirish Naik
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...RekaNext Capital
 
Assistive Intelligent Environments For Automatic Health Monitoring
Assistive Intelligent Environments For Automatic Health MonitoringAssistive Intelligent Environments For Automatic Health Monitoring
Assistive Intelligent Environments For Automatic Health Monitoringwacerone
 
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy   igc 2013 roorkeeAbhishek, tarachand and satyanarayana reddy   igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkeeTarachand Veeragattapu
 
Tracking Megatrends to build Sustainable Businesses (Singapore)
Tracking Megatrends to build Sustainable Businesses (Singapore)Tracking Megatrends to build Sustainable Businesses (Singapore)
Tracking Megatrends to build Sustainable Businesses (Singapore)RekaNext Capital
 
Samlight manual
Samlight manualSamlight manual
Samlight manualdiendomtpd
 
High System Reliability through Design Innovation
High System Reliability through Design InnovationHigh System Reliability through Design Innovation
High System Reliability through Design InnovationRekaNext Capital
 
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) TechnologyAutomatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) TechnologyRekaNext Capital
 
Tidal Gate Control System used during KPE C423 construction
Tidal Gate Control System used during KPE C423 constructionTidal Gate Control System used during KPE C423 construction
Tidal Gate Control System used during KPE C423 constructionRekaNext Capital
 
Fundamentos técnicos de internet
Fundamentos técnicos de internetFundamentos técnicos de internet
Fundamentos técnicos de internetJara Díaz Calvarro
 
AWS101: London May 2014
AWS101: London May 2014AWS101: London May 2014
AWS101: London May 2014Ian Massingham
 
Principles and Instrumentation of QC Equipments by Sourav Sharma
Principles and Instrumentation of QC Equipments by Sourav SharmaPrinciples and Instrumentation of QC Equipments by Sourav Sharma
Principles and Instrumentation of QC Equipments by Sourav SharmaSourav Sharma
 
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...IAEME Publication
 
Abhishek and tarachand stone columns an over view
Abhishek and tarachand stone columns an over viewAbhishek and tarachand stone columns an over view
Abhishek and tarachand stone columns an over viewTarachand Veeragattapu
 
Continuous Monitoring of Harmful Algal Blooms | YSI
Continuous Monitoring of Harmful Algal Blooms | YSIContinuous Monitoring of Harmful Algal Blooms | YSI
Continuous Monitoring of Harmful Algal Blooms | YSIXylem Inc.
 
Kanchan Ghangrekar_SrTestingAnalyst
Kanchan Ghangrekar_SrTestingAnalystKanchan Ghangrekar_SrTestingAnalyst
Kanchan Ghangrekar_SrTestingAnalystKanchan Ghangrekar
 

Viewers also liked (20)

11 - Modern Water Monitoring overview_Sept 15
11 - Modern Water Monitoring overview_Sept 1511 - Modern Water Monitoring overview_Sept 15
11 - Modern Water Monitoring overview_Sept 15
 
Real Time Network Monitoring System
Real  Time  Network  Monitoring  SystemReal  Time  Network  Monitoring  System
Real Time Network Monitoring System
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
 
Assistive Intelligent Environments For Automatic Health Monitoring
Assistive Intelligent Environments For Automatic Health MonitoringAssistive Intelligent Environments For Automatic Health Monitoring
Assistive Intelligent Environments For Automatic Health Monitoring
 
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy   igc 2013 roorkeeAbhishek, tarachand and satyanarayana reddy   igc 2013 roorkee
Abhishek, tarachand and satyanarayana reddy igc 2013 roorkee
 
Pinakin
PinakinPinakin
Pinakin
 
Tracking Megatrends to build Sustainable Businesses (Singapore)
Tracking Megatrends to build Sustainable Businesses (Singapore)Tracking Megatrends to build Sustainable Businesses (Singapore)
Tracking Megatrends to build Sustainable Businesses (Singapore)
 
Samlight manual
Samlight manualSamlight manual
Samlight manual
 
Factory Test Systems
Factory Test SystemsFactory Test Systems
Factory Test Systems
 
High System Reliability through Design Innovation
High System Reliability through Design InnovationHigh System Reliability through Design Innovation
High System Reliability through Design Innovation
 
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) TechnologyAutomatic Real Time Monitoring using Machine to Machine (M2M) Technology
Automatic Real Time Monitoring using Machine to Machine (M2M) Technology
 
Tidal Gate Control System used during KPE C423 construction
Tidal Gate Control System used during KPE C423 constructionTidal Gate Control System used during KPE C423 construction
Tidal Gate Control System used during KPE C423 construction
 
Fundamentos técnicos de internet
Fundamentos técnicos de internetFundamentos técnicos de internet
Fundamentos técnicos de internet
 
AWS101: London May 2014
AWS101: London May 2014AWS101: London May 2014
AWS101: London May 2014
 
Principles and Instrumentation of QC Equipments by Sourav Sharma
Principles and Instrumentation of QC Equipments by Sourav SharmaPrinciples and Instrumentation of QC Equipments by Sourav Sharma
Principles and Instrumentation of QC Equipments by Sourav Sharma
 
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
EFFECT OF L/B RATIO OF STONE COLUMN ON BEARING CAPACITY AND RELATIVE SETTLEME...
 
Abhishek and tarachand stone columns an over view
Abhishek and tarachand stone columns an over viewAbhishek and tarachand stone columns an over view
Abhishek and tarachand stone columns an over view
 
ICIECA 2014 Paper 03
ICIECA 2014 Paper 03ICIECA 2014 Paper 03
ICIECA 2014 Paper 03
 
Continuous Monitoring of Harmful Algal Blooms | YSI
Continuous Monitoring of Harmful Algal Blooms | YSIContinuous Monitoring of Harmful Algal Blooms | YSI
Continuous Monitoring of Harmful Algal Blooms | YSI
 
Kanchan Ghangrekar_SrTestingAnalyst
Kanchan Ghangrekar_SrTestingAnalystKanchan Ghangrekar_SrTestingAnalyst
Kanchan Ghangrekar_SrTestingAnalyst
 

Similar to Real Time Structural Monitoring for High Rise Buildings and Bridges

General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural MonitoringBoQan
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionKundan Sanap
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptxSaddoAjmal
 
Seismic response of rc frame structure with soft storey
Seismic response of rc frame structure with soft storeySeismic response of rc frame structure with soft storey
Seismic response of rc frame structure with soft storeyeSAT Publishing House
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemRajesh Prasad
 
Technologies that make a difference
Technologies that make a differenceTechnologies that make a difference
Technologies that make a differenceGreg Ellrodt
 
Rj101 tower crane safety monitor user manual(e)
Rj101 tower crane safety monitor user manual(e)Rj101 tower crane safety monitor user manual(e)
Rj101 tower crane safety monitor user manual(e)Bradley Zhao
 
Rion products solutions for_the_railway_industry_denkei
Rion products solutions for_the_railway_industry_denkeiRion products solutions for_the_railway_industry_denkei
Rion products solutions for_the_railway_industry_denkeiNIHON DENKEI SINGAPORE
 
Atw segments 1 & 2 final 6 6-09
Atw segments 1 & 2 final 6 6-09Atw segments 1 & 2 final 6 6-09
Atw segments 1 & 2 final 6 6-09Robert L. Ussery
 
MTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptxMTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptxgkchang
 
AMO Incremental Length Encoder
AMO Incremental Length EncoderAMO Incremental Length Encoder
AMO Incremental Length EncoderElectromate
 
surveying Work methodology
surveying Work methodologysurveying Work methodology
surveying Work methodologysimon mhando
 
dark_territory_switch_monitoring_ptc_system
dark_territory_switch_monitoring_ptc_systemdark_territory_switch_monitoring_ptc_system
dark_territory_switch_monitoring_ptc_systemDeepak Dangi
 
Lelantos-Structural-Health-Monitoring-Brochure
Lelantos-Structural-Health-Monitoring-BrochureLelantos-Structural-Health-Monitoring-Brochure
Lelantos-Structural-Health-Monitoring-BrochureRajiv Dinesh
 
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPDmichaeljmack
 

Similar to Real Time Structural Monitoring for High Rise Buildings and Bridges (20)

General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural Monitoring
 
Roles of gps in high rise buildings construction
Roles of gps in high rise buildings constructionRoles of gps in high rise buildings construction
Roles of gps in high rise buildings construction
 
In-Place 3D Inclinometer Settlement (IPIS) System.ppt
In-Place 3D Inclinometer Settlement (IPIS) System.pptIn-Place 3D Inclinometer Settlement (IPIS) System.ppt
In-Place 3D Inclinometer Settlement (IPIS) System.ppt
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Instrumentation & Structural Monitoring of Dams
Instrumentation & Structural Monitoring of DamsInstrumentation & Structural Monitoring of Dams
Instrumentation & Structural Monitoring of Dams
 
strata monitoring Instrumentation
strata monitoring Instrumentationstrata monitoring Instrumentation
strata monitoring Instrumentation
 
Seismic response of rc frame structure with soft storey
Seismic response of rc frame structure with soft storeySeismic response of rc frame structure with soft storey
Seismic response of rc frame structure with soft storey
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring system
 
Technologies that make a difference
Technologies that make a differenceTechnologies that make a difference
Technologies that make a difference
 
Q safe Pte PPT.pptx
Q safe Pte PPT.pptxQ safe Pte PPT.pptx
Q safe Pte PPT.pptx
 
Servo 2.0
Servo 2.0Servo 2.0
Servo 2.0
 
Rj101 tower crane safety monitor user manual(e)
Rj101 tower crane safety monitor user manual(e)Rj101 tower crane safety monitor user manual(e)
Rj101 tower crane safety monitor user manual(e)
 
Rion products solutions for_the_railway_industry_denkei
Rion products solutions for_the_railway_industry_denkeiRion products solutions for_the_railway_industry_denkei
Rion products solutions for_the_railway_industry_denkei
 
Atw segments 1 & 2 final 6 6-09
Atw segments 1 & 2 final 6 6-09Atw segments 1 & 2 final 6 6-09
Atw segments 1 & 2 final 6 6-09
 
MTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptxMTCE-ISIC-04-Milling Paving.pptx
MTCE-ISIC-04-Milling Paving.pptx
 
AMO Incremental Length Encoder
AMO Incremental Length EncoderAMO Incremental Length Encoder
AMO Incremental Length Encoder
 
surveying Work methodology
surveying Work methodologysurveying Work methodology
surveying Work methodology
 
dark_territory_switch_monitoring_ptc_system
dark_territory_switch_monitoring_ptc_systemdark_territory_switch_monitoring_ptc_system
dark_territory_switch_monitoring_ptc_system
 
Lelantos-Structural-Health-Monitoring-Brochure
Lelantos-Structural-Health-Monitoring-BrochureLelantos-Structural-Health-Monitoring-Brochure
Lelantos-Structural-Health-Monitoring-Brochure
 
Special Seismic Certification OSHPD
Special Seismic Certification OSHPDSpecial Seismic Certification OSHPD
Special Seismic Certification OSHPD
 

More from RekaNext Capital

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRekaNext Capital
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4RekaNext Capital
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3RekaNext Capital
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2RekaNext Capital
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdfRekaNext Capital
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...RekaNext Capital
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docRekaNext Capital
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab RekaNext Capital
 
IDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfIDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfRekaNext Capital
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfRekaNext Capital
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemRekaNext Capital
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FRRekaNext Capital
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6RekaNext Capital
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5RekaNext Capital
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010RekaNext Capital
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationRekaNext Capital
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental ProjectsRekaNext Capital
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison SystemsRekaNext Capital
 

More from RekaNext Capital (20)

Root cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to TransformerRoot cause of Magnetic Humming due to Transformer
Root cause of Magnetic Humming due to Transformer
 
Design for Product Assembly#4
Design for Product Assembly#4Design for Product Assembly#4
Design for Product Assembly#4
 
Design for Product Assembly#3
Design for Product Assembly#3Design for Product Assembly#3
Design for Product Assembly#3
 
Design for Product Assembly#2
Design for Product Assembly#2Design for Product Assembly#2
Design for Product Assembly#2
 
Henderson Bridge Report.pdf
Henderson Bridge Report.pdfHenderson Bridge Report.pdf
Henderson Bridge Report.pdf
 
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
Assessment of the dynamic characteristics of the Helix Bridge at Marina Bay, ...
 
MBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.docMBFC Test Report Dec2008.doc
MBFC Test Report Dec2008.doc
 
Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab Z Vibration Monitoring for pre-cast slab
Z Vibration Monitoring for pre-cast slab
 
Pre-load results.ppt
Pre-load results.pptPre-load results.ppt
Pre-load results.ppt
 
IDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdfIDA Mission Critical M2M of SysEng.pdf
IDA Mission Critical M2M of SysEng.pdf
 
Dr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdfDr Tan Guan Hong PhD Thesis 1980.pdf
Dr Tan Guan Hong PhD Thesis 1980.pdf
 
ZigBee Personnel Tracking System
ZigBee Personnel Tracking SystemZigBee Personnel Tracking System
ZigBee Personnel Tracking System
 
AV Latency Measurement
AV Latency MeasurementAV Latency Measurement
AV Latency Measurement
 
Computer Vision for Measurement & FR
Computer Vision for Measurement & FRComputer Vision for Measurement & FR
Computer Vision for Measurement & FR
 
Business Transformation V6
Business Transformation V6Business Transformation V6
Business Transformation V6
 
Business Transformation V5
Business Transformation V5Business Transformation V5
Business Transformation V5
 
Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010Building and Construction Authority GeoSS Seminar 2010
Building and Construction Authority GeoSS Seminar 2010
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
SysEng Environmental Projects
SysEng Environmental ProjectsSysEng Environmental Projects
SysEng Environmental Projects
 
SysEng Computer Vison Systems
SysEng Computer Vison SystemsSysEng Computer Vison Systems
SysEng Computer Vison Systems
 

Recently uploaded

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 

Recently uploaded (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

Real Time Structural Monitoring for High Rise Buildings and Bridges

  • 1. SysEng (s) Pte. Ltd Real Time Structural Monitoring System (Hong Kong North East Tower)
  • 2.
  • 3.
  • 4. Construction Phases of a 420 m High Tower Block in the Region
  • 5. Configuration Level 33 RS485 Network Level 53 RS485 Network Level 65 RS485 Network 2.4 GHz Highway Central monitoring Station SMS Alert System
  • 6. Construction at Stage 1 of the 420 m Tower Block Level 33
  • 7. Strain Gages and Displacement Sensors Strain gage installation with redundancy On site measurement system Displacement sensor
  • 8. Monitoring Station at Construction Site
  • 9. SysEng (s) Pte. Ltd Real Time Structural Monitoring System (Marina Bay Sand Hotel Tower)
  • 10. Cast-in VW Strain Gage •To measure the vertical force •from the superstructure Welded VW Strain Gage •To measure the tension/compression force on the support beam between the vertical and slope core
  • 11. x L x = Lsinθ Where L is floor height D Ln-2Ln-1Ln L1L3L2 Tilt meter Proposed method for tower tilt measurement
  • 12. Proposed installation location Proposed installation location to form a sensor array to detect tower movement profile at the vertical core and slope core
  • 13. Total Lateral Displacement at level n Xi = D + ∑ Li sin θi D Individual floor level lateral displacement can be determined by using •Displacement sensor as the referencing datum •Accumulated lateral movement resolved from tilting angle detected by tilt meter X i X i X i X i X i X i D How to determine the lateral displacement
  • 14. T3 East (slope) displacement GL64 (30 Nov 09) 0 10 20 30 40 50 60 -30 -20 -10 0 10 20 30 40 50 mm Level T3 GL64 Expected T3 E GL64 The expected lateral movement vs. the actual measured movement The comparison between the expected lateral movement (modeling) and the actual lateral movement from sensor array • the movement profile is similar •The maximum difference between the actual and expected is 10mm
  • 15. mid span Cast-In Strain Gage Cross section view side view Proposed installation location for Embedded VWSG in PT Beam
  • 16. SysEng (s) Pte. Ltd Human Comfort Measurement (ORD Building)
  • 17. Tower 1 Level 9 Human Foot Fall Human Comfort test for multi floor level for ORQ Structure Human Comfort standard (ISO 2631) Testing Service
  • 18. Building vibration noise level test For multi floor level (Office and M&E)
  • 19. SysEng (s) Pte. Ltd Long Term Structure Health Monitoring (Republic Plaza) (The Sail)
  • 20. a) Long Term Building Monitoring at 280 m Republic Plaza since 1995
  • 21. Remote Monitoring of the 280m High Republic Plaza  Measures the Wind Load and Seismic conditions experienced by the Building  NTU conducts the Full Scale Research while SysEng (S) designs and install the Instrumentation  The system operates automatically since 1995  The system can be controlled remotely and measured data are via modems
  • 22. Transducers at Republic Plaza  (Top) Ultra sonic Anemometer to measure Wind Direction & Speed  (Top & Bottom) Servo Accelerometers to measure vibrations  GPS receivers to measure displacements
  • 23. Central Monitoring System  16 Channels,16 bits, Sample & Hold  Multi-tasking for data logging and file transfer  6 hours UPS  Operates continuously 24 hours  Lightning and Voltage surge protection
  • 24. SysEng (s) Pte. Ltd SysEng Server System for Real Time Monitoring Service
  • 25.
  • 26. Our real time monitoring systems track record
  • 27. SysEng (s) Pte. Ltd Measurement proposal for Mumbai International Airport
  • 28. Structure information Project Facts Project Area: 4,843,759 ft Building Height: 45 m Number of support pillar: 28 Number of Stories: 4
  • 29. Proposal for mega structure deflection measurement Consideration • To provide a direct measurement method for deflection movement due to unbalance of loading during construction period • To provide dynamic deflection info of the mega structure • to provide an overview on all the 28 mega structure deflection info in a single screen • To provide an alert/ warning feature on loading activities when the deflection is breaching the design limit • Easy installation, minimize effect on the construction schedule • On site standalone system, easy to maintain and operate
  • 30. displacement sensor Side View movement vertical movement due to unbalance loading Proposal for mega structure deflection measurement •During installation of steel structure will cause a vertical deflection of the top portion of the mega structure •The installed vertical displacement sensor (V) will able to detect the dynamic movement of the top portion of the mega structure •The datum of the vertical displacement sensor is refer to the floor level which is no direct link to the mega structure V H
  • 31. Proposal for mega structure deflection measurement displacement sensor Plan View sensor measurement system pillar lateral movement due to unbalance loading movement movement H V V H •During installation of steel structure may cause a bending moment n the pillar portion of the mega structure •This bending moment will translate into horizontal deflection •The installed horizontal displacement sensor (H) will able to detect the dynamic movement of the bending moment of the mega structure •The datum of the horizontal displacement sensor is refer to the floor level which is no direct link to the mega structure
  • 32. Proposal for mega structure deflection measurement Central Monitoring System On-site Measurement Station Mega Structure #1 Mega Structure #28 •The On-site Measurement Station (MS) will collect all the dynamic info and send it back to the Central Monitoring System (CMS) •When receiving info from MS, the CMS will do: •Check and analysis the data •Display the info on the CMS display •Send alert/ warning when info is breaching design limit •Achieve data to database
  • 33. SysEng (s) Pte. Ltd Thank You