SlideShare a Scribd company logo
1 of 4
Download to read offline
INFRA STRUCTURE DRAFTSMAN
Page 1
BASHIR AHMED
Mob: 050-5245915
E-mail: bashkhan222@gmail.com
Key Qualification
12 years of practical working experience in the UAE (with total of
13 years experience including works in Pakistan) in Civil and Mechanical Engineering,
Fields of Infrastructure Water, Sewerage & Storm Water Pumping Stations and Pipeline
works, Irrigation, Buildings (Commercial & residential) and related Structures. I.e.
Expert in CAD draughting, preparation of survey layouts, profiles for pipe lines,
reinforcement drawings, expertise in structural draughting.
EDUCATION BACKGROUND
Diploma in Civil / Architectural Draftsman, 1994– 1997
Micro Station V8i
Course on Auto CAD
Microsoft word, Microsoft Excel, Microsoft project.
EXPERIENCE
EMPLOYMENT RECORD
Position held : Infrastructural Draftsman
Duration : May 2007 – Till date
Company : Dorsch Holding GmbH – DC Abu Dhabi.
Nature of work : Preparation of plan & profile drawings for sewerage networks,
storm water networks, irrigation networks, Pumping Station
drawings, Pressure line chambers, Gravity sewer structures, Storm
line chambers, building works and reinforcement drawings etc.
Completed a no. of projects worth millions of Dirham’s related to
sewerage, storm water and irrigation.Preparation of shop drawings
for the Abu Dhabi & Al Ain Municipality. By using AutoCAD and
Microstation V8i, Preparation of shop drawings GIS For TPD Abu
Dhabi Emirate of Abu Dhabi
ADSSC Contracts O-1463, O-1792 and O-1383.1 O-2535, O-2536
Sewerage Assets Enhancements Projects in Abu Dhabi City and
Musaffah Industrial Area with a projection for the year 2030
ADSSC Contracts O-11087
Military Directorate Projects
New Ghantoot Naval Base – Water Supply & Fire Networks
INFRA STRUCTURE DRAFTSMAN
Page 2
Extension in Abu Dhabi Air Base Water Supply & Fire Networks
Al Ain Housing Projects
H100 (Al Hilli)- Water Supply Networks for Public Housing project at Al Hilli area
in Al Ain
Y100 (Al Yahar) Water Supply Networks for Public Housing project at Al Yahar in
Al Ain
S100 (Al Salamat) Sewerage network for Public Housing project at Al Salamat area in
Al Ain
N100 (Al Neima) Sewerage network for Public Housing project at Neima area in Al
Ain – Phase I
N200 (Al Neima) Sewerage network for Public Housing project at Neima area in Al
Ain – Phase II
Emiratis Housing Development Jebel Hafeet - Al Ain
Position held : Civil Draftsman
Duration : Sept. 2002 – April 2007
Company : M/s. MACE Contractors Abu Dhabi
Projects Completed:
Contract - 71037 Abu Dhabi District Cooling Schemes D-029 & D-030 Chilled Water
Distribution Network,
Chilled waterline (Supply & return pipe) from T Plantroom P3 –
Zayed Militry Hopital & P3 to Bateen Air Base & NDM
Contract - 148/12 ADSS Relocation of Pumping Mains at Al-Ain Road & New Airport
Road Intersection.Description Relocation of 1 No. 1100Ø Irrigation
line & 2 Nos Sewage Pumping Mains(1200Ø) and Construction of
thrust blocks on the pumping main at Al-Ain Road.
Contract - 142/20 Miscellaneous Urgent Works Phase – 17
Miscellaneous works (Irrigation, Sewerage, Drainage, Sewage
Pumping main works.)
Contract - 509/6 Abu Dhabi Sewerage Scheme
Lowering Ground Water Table in Al Ajban and Al-Semeih Farms
Phase-1
Contract - 159/6 Abu Dhabi Sewerage Scheme
Storm Water Project Mina Zayed Phase III (Storm Water Line for
(300Ø to 700Ø Pipe)
INFRA STRUCTURE DRAFTSMAN
Page 3
Contract - 71250 GHQ District Cooling Schemes
Project No, AD-04/71160
Chilled Water Distribution Pipe line
Chilled Water Pipe line Routing layout
Contract - 147/9 Abu Dhabi Sewerage Scheme
Mussafah Sewerage Rehabilitation Project
Contract - 185/7 Abu Dhabi Sewerage Scheme Extension & Refurbishment of
irrigation Pumping Station 1& 2 Civil Works
Contract - 830 Abu Dhabi Sewerage Scheme
Project for Sewerage and Surface Water Drainage
Works at Mohammad Bin Zayed Residential City.
Contract - 186/3 Abu Dhabi Sewerage Scheme
Emergency by - Passes to Sewerage
Pumping Station & Proposed Gravity
Line from Ps 5/1 to Gravity Main near Mps 6
Position held: Civil Draftsman
Duration: January 2000 – August 2002
Company: M/s. Environmental Protection Society, Pakistan
Nature of Work: Worked as Draftsman in Technical Unit in (EPS)
Sanitation plan of Amankot and Mingora City, Survey and
Leveling of Kalam, Drafting and Site Supervision
Position held: CAD Instructor
Duration: January 2000 – August 2002
Company: Future Tech Computer Institute
Nature of Work: Teaching Auto Cad Part Time
Position held: Civil Draftsman
Duration: January 1998 – December 1999
Company: Civil Draftsman - Aalam Associate Architecture.
Construction Company Lahore Pakistan
Nature of work: Supervision of work as per drawings, Making Drawings,
models, (Plans, section Details, etc) on AutoCAD.
PERSONAL DETAILS
INFRA STRUCTURE DRAFTSMAN
Page 4
Date of Birth : 07 February 1976 Marital Status : Married
Nationality : Pakistan Religion : Islam
LANGUAGE PROFICIANCY
Read, Write & speak : English, Urdu and Pashto

More Related Content

What's hot

What's hot (20)

head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projects
 
Curriculum vita1
Curriculum vita1Curriculum vita1
Curriculum vita1
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
cv amr
cv amrcv amr
cv amr
 
cv (1) (1)
cv (1) (1)cv (1) (1)
cv (1) (1)
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Siemer_June 2016_updated
Siemer_June 2016_updatedSiemer_June 2016_updated
Siemer_June 2016_updated
 

Viewers also liked

Mahesh_Umanath_06_2015
Mahesh_Umanath_06_2015Mahesh_Umanath_06_2015
Mahesh_Umanath_06_2015Mahesh Rao
 
Researching current writters
Researching current writtersResearching current writters
Researching current writterst423utwqrqt
 
2015-06-05 AusIMM U conference presentation Final
2015-06-05 AusIMM U conference presentation Final2015-06-05 AusIMM U conference presentation Final
2015-06-05 AusIMM U conference presentation FinalRorie Gilligan
 
Max media Portfolio-1
Max media Portfolio-1Max media Portfolio-1
Max media Portfolio-1Max Media
 
Valentine's Day in Orlando - 2014
Valentine's Day in Orlando - 2014Valentine's Day in Orlando - 2014
Valentine's Day in Orlando - 2014Good Apple
 
Mεταμορφώσεις των αθηνών | κριτική αποτίμηση
Mεταμορφώσεις των αθηνών | κριτική αποτίμησηMεταμορφώσεις των αθηνών | κριτική αποτίμηση
Mεταμορφώσεις των αθηνών | κριτική αποτίμησηMariangela Dimaki
 
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...Rorie Gilligan
 
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.AmicsUAB
 
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...Patrick Barnhouse, E.I.T
 
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015Jennifer Neequaye
 

Viewers also liked (15)

Mahesh_Umanath_06_2015
Mahesh_Umanath_06_2015Mahesh_Umanath_06_2015
Mahesh_Umanath_06_2015
 
Industry Focus
Industry FocusIndustry Focus
Industry Focus
 
Resume
ResumeResume
Resume
 
Eikrem - ECV_Feb2015
Eikrem - ECV_Feb2015Eikrem - ECV_Feb2015
Eikrem - ECV_Feb2015
 
Researching current writters
Researching current writtersResearching current writters
Researching current writters
 
2015-06-05 AusIMM U conference presentation Final
2015-06-05 AusIMM U conference presentation Final2015-06-05 AusIMM U conference presentation Final
2015-06-05 AusIMM U conference presentation Final
 
Max media Portfolio-1
Max media Portfolio-1Max media Portfolio-1
Max media Portfolio-1
 
Valentine's Day in Orlando - 2014
Valentine's Day in Orlando - 2014Valentine's Day in Orlando - 2014
Valentine's Day in Orlando - 2014
 
Eikrem - NCV_Feb2015
Eikrem - NCV_Feb2015Eikrem - NCV_Feb2015
Eikrem - NCV_Feb2015
 
Mεταμορφώσεις των αθηνών | κριτική αποτίμηση
Mεταμορφώσεις των αθηνών | κριτική αποτίμησηMεταμορφώσεις των αθηνών | κριτική αποτίμηση
Mεταμορφώσεις των αθηνών | κριτική αποτίμηση
 
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...
Gilligan and Nikoloski 2016 The extraction of uranium from brannerite - ALTA ...
 
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.
Els canvi climàtic i els ecosistemes mediterranis. Ferran Rodà.
 
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...
Improving the Performance of Recycled Aggregate Pervious Concrete via Cement ...
 
My resume (2)
My resume (2)My resume (2)
My resume (2)
 
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015
J_Neequaye Resume (EY Consultant) Penultimate Ver 06182015
 

Similar to Experienced Infra Draftsman resume

Similar to Experienced Infra Draftsman resume (20)

Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
MCV
MCVMCV
MCV
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Ahmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CVAhmed Nagdy_Civil Engineer_CV
Ahmed Nagdy_Civil Engineer_CV
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Jamsheer P_CV (1)
Jamsheer P_CV (1)Jamsheer P_CV (1)
Jamsheer P_CV (1)
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
cv1
cv1cv1
cv1
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
 
eng.ramy
eng.ramy eng.ramy
eng.ramy
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
 
CV (Eng. Abdul Aziz)
CV (Eng. Abdul Aziz)CV (Eng. Abdul Aziz)
CV (Eng. Abdul Aziz)
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Vijayan-CV
Vijayan-CVVijayan-CV
Vijayan-CV
 

Experienced Infra Draftsman resume

  • 1. INFRA STRUCTURE DRAFTSMAN Page 1 BASHIR AHMED Mob: 050-5245915 E-mail: bashkhan222@gmail.com Key Qualification 12 years of practical working experience in the UAE (with total of 13 years experience including works in Pakistan) in Civil and Mechanical Engineering, Fields of Infrastructure Water, Sewerage & Storm Water Pumping Stations and Pipeline works, Irrigation, Buildings (Commercial & residential) and related Structures. I.e. Expert in CAD draughting, preparation of survey layouts, profiles for pipe lines, reinforcement drawings, expertise in structural draughting. EDUCATION BACKGROUND Diploma in Civil / Architectural Draftsman, 1994– 1997 Micro Station V8i Course on Auto CAD Microsoft word, Microsoft Excel, Microsoft project. EXPERIENCE EMPLOYMENT RECORD Position held : Infrastructural Draftsman Duration : May 2007 – Till date Company : Dorsch Holding GmbH – DC Abu Dhabi. Nature of work : Preparation of plan & profile drawings for sewerage networks, storm water networks, irrigation networks, Pumping Station drawings, Pressure line chambers, Gravity sewer structures, Storm line chambers, building works and reinforcement drawings etc. Completed a no. of projects worth millions of Dirham’s related to sewerage, storm water and irrigation.Preparation of shop drawings for the Abu Dhabi & Al Ain Municipality. By using AutoCAD and Microstation V8i, Preparation of shop drawings GIS For TPD Abu Dhabi Emirate of Abu Dhabi ADSSC Contracts O-1463, O-1792 and O-1383.1 O-2535, O-2536 Sewerage Assets Enhancements Projects in Abu Dhabi City and Musaffah Industrial Area with a projection for the year 2030 ADSSC Contracts O-11087 Military Directorate Projects New Ghantoot Naval Base – Water Supply & Fire Networks
  • 2. INFRA STRUCTURE DRAFTSMAN Page 2 Extension in Abu Dhabi Air Base Water Supply & Fire Networks Al Ain Housing Projects H100 (Al Hilli)- Water Supply Networks for Public Housing project at Al Hilli area in Al Ain Y100 (Al Yahar) Water Supply Networks for Public Housing project at Al Yahar in Al Ain S100 (Al Salamat) Sewerage network for Public Housing project at Al Salamat area in Al Ain N100 (Al Neima) Sewerage network for Public Housing project at Neima area in Al Ain – Phase I N200 (Al Neima) Sewerage network for Public Housing project at Neima area in Al Ain – Phase II Emiratis Housing Development Jebel Hafeet - Al Ain Position held : Civil Draftsman Duration : Sept. 2002 – April 2007 Company : M/s. MACE Contractors Abu Dhabi Projects Completed: Contract - 71037 Abu Dhabi District Cooling Schemes D-029 & D-030 Chilled Water Distribution Network, Chilled waterline (Supply & return pipe) from T Plantroom P3 – Zayed Militry Hopital & P3 to Bateen Air Base & NDM Contract - 148/12 ADSS Relocation of Pumping Mains at Al-Ain Road & New Airport Road Intersection.Description Relocation of 1 No. 1100Ø Irrigation line & 2 Nos Sewage Pumping Mains(1200Ø) and Construction of thrust blocks on the pumping main at Al-Ain Road. Contract - 142/20 Miscellaneous Urgent Works Phase – 17 Miscellaneous works (Irrigation, Sewerage, Drainage, Sewage Pumping main works.) Contract - 509/6 Abu Dhabi Sewerage Scheme Lowering Ground Water Table in Al Ajban and Al-Semeih Farms Phase-1 Contract - 159/6 Abu Dhabi Sewerage Scheme Storm Water Project Mina Zayed Phase III (Storm Water Line for (300Ø to 700Ø Pipe)
  • 3. INFRA STRUCTURE DRAFTSMAN Page 3 Contract - 71250 GHQ District Cooling Schemes Project No, AD-04/71160 Chilled Water Distribution Pipe line Chilled Water Pipe line Routing layout Contract - 147/9 Abu Dhabi Sewerage Scheme Mussafah Sewerage Rehabilitation Project Contract - 185/7 Abu Dhabi Sewerage Scheme Extension & Refurbishment of irrigation Pumping Station 1& 2 Civil Works Contract - 830 Abu Dhabi Sewerage Scheme Project for Sewerage and Surface Water Drainage Works at Mohammad Bin Zayed Residential City. Contract - 186/3 Abu Dhabi Sewerage Scheme Emergency by - Passes to Sewerage Pumping Station & Proposed Gravity Line from Ps 5/1 to Gravity Main near Mps 6 Position held: Civil Draftsman Duration: January 2000 – August 2002 Company: M/s. Environmental Protection Society, Pakistan Nature of Work: Worked as Draftsman in Technical Unit in (EPS) Sanitation plan of Amankot and Mingora City, Survey and Leveling of Kalam, Drafting and Site Supervision Position held: CAD Instructor Duration: January 2000 – August 2002 Company: Future Tech Computer Institute Nature of Work: Teaching Auto Cad Part Time Position held: Civil Draftsman Duration: January 1998 – December 1999 Company: Civil Draftsman - Aalam Associate Architecture. Construction Company Lahore Pakistan Nature of work: Supervision of work as per drawings, Making Drawings, models, (Plans, section Details, etc) on AutoCAD. PERSONAL DETAILS
  • 4. INFRA STRUCTURE DRAFTSMAN Page 4 Date of Birth : 07 February 1976 Marital Status : Married Nationality : Pakistan Religion : Islam LANGUAGE PROFICIANCY Read, Write & speak : English, Urdu and Pashto