SUBMITTAL
No.: 226
To
Attention
From
:
:
:
APP PROJECT MANAGEMENT
Mr. Dai
Nguyen Van Vuot
Pages
Date
Rev
:
:
:
01 attachments
02-Nov-2022
00
Project : PROPOSED DEVELOPMENT OF ECOPARK CAMPUS - BRITISH
UNIVERSITY VIETNAM – ECOPARK (PHASE 2A)
ADD: LOT GD – O1, VAN GIANG COMMERCIAL AND TOURISM
TOWNSHIP (ECOPARK), VAN GIANG DISTRICT, HUNG YEN
PROVINCE
Subject : Shop drawing for Masonry level 2 of Cafeteria
Document code : SHD
Trade : BP02
Contractor : TLC
Details Document:
BUV2A-BP02-SHD-035-REV 00
Forward For:
Approval Your Information Tender
Comment Use in Construction Quotation
As Request Other
Submitted By: Nguyen Van Vuot Received by:
Sign: Sign
Date: Date
Page 1 of 1
Project
PROPOSED DEVELOPMENT OF ECOPARK CAMPUS - BRITISH
UNIVERSITY VIETNAM – ECOPARK (PHASE 2A)
Package
MAIN BUILDING WORK FOR CAFETERIA EXTENSION
Contractor TLC
SHOP DRAWING SUBMISSION
Ref: BUV2A-BP02-SHD-035-REV 00
Trade (ID/MEP/ARCH/STRUCTURE): BP02
Drawing (Layout/Section/Detail/Other): Masonry level 2 of Cafeteria
Location: Cafeteria
Subject: Shop drawing for Masonry level 2 of Cafeteria
Drawing List:
SIGNED on behalf of contractor: Date:
APPROVAL STATUS CODE:
APPROVAL
STATUS
A APPROVED
B APPROVED SUBJECT TO COMMENTS
C NOT APPROVED, RESUBMIT
PROJECT MANAGEMENT COMMENT:
Signed for on behalf of APP Project Management
..............................................................................................
Date: ...................................................... Time: ..................................................................................
B
1) Please see comment in the drawing
2) Conner of column and wall for plastering work also follow comment
in the method of masonry work.
Digitally signed by TUNG
NGUYEN
DN: C=VN, OU=TUNG
NGUYEN, O=TUNG
NGUYEN, CN=TUNG
NGUYEN,
E=tung.nguyenvan@appmvn.
com
Reason:
Location:
Date: 2022-11-05 20:24:49
TUNG
NGUY
EN
E
L
E
C
T
EXISTING SPORT PAVILION HALL 1
E
L
E
C
T
OPEN AREA 2-2
EXISTING CLASSROOM 2-6
(LC)
EXISTING CANOPY TO BE MODIFIED
EXISTING CANOPY
EXISTING STAIR
EXISTING STUDY
AREA 2-2
(LL)
EXISTING
DISCUSSION
ROOM 2-2
EXISTING
DISCUSSION
ROOM 2-1
AC
EXISTING SPORT PAVILION LOUNGE 2-1
H
R
H
R
EXISTING TEACHER
ROOM 2-1
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1 DW 2
KITCHEN
DUCT
8A
7A
6A
5A
4A
3A
2A
1A
A7
A6
A5
A4
A3
A2
A1
D1
D2
D3
D4
D5
3F
3D
3E
C9
C10
C11
C12
C13
C14
C15
2
A.40.01
1
A.40.01
3
A.40.01
4
A.40.01
NEW INDOOR CAFETERIA
NEW STAIR 2
NEW STAIR 3
NEW OUTDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
NEW SERVERY AREA
NEW WASHING AREA
DN
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
Ø75 Ø75
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 4
HAND WASH
AREA 5
HAND WASH
AREA 6
HR
HR
HR
HR
HR
H
R
RAMP
GRADIENT 1 : 22.78
BT07
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT07
BT07
BT07
BT01
BT01
BT01
BT01
BT07
BT07
BT01
BT10
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
BT01
BT01
BT01 BT05
BT01
BT01
BT05
BT01
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT10
BT07
BT19
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
H= 2150
W=1060
FL=+11.00
LH=+13.98
BT07
BT07
BT01
BT01
BT07
BT18 BT07 BT07 BT07 BT07 BT07 BT07
BT18 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT18 BT18 BT08
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
LT1
LH=+13.16
H= 2130
W=960
FL=+11.00
LH=+13.16
H= 2130
W=660
FL=+11.00
LH=+13.18
H= 2150
W=960
FL=+11.00
LT8
LT6
BT07
BT07
LH=+13.18
H= 2150
W=1060
FL=+11.00
LH=+13.18
H= 2150
W=1060
FL=+11.00
LH=+13.16
H= 2130
W=960
FL=+11.00
LH=+13.18
H= 3000
W=600
FL=+10.95
H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
BT09
BT07
BT07
BT07
BT07
BT19
BT07
BT07
BT07
BT07
BT19
BT17
BT19
BT19
BT19
BT18 BT18
BT18 BT18
BT01
BT01
660
660
1270
BT01
2660
1760
1544
100
2995
1760
2345
1370
660
1240
660
1240
660
1369
2840
1760
2600
1370
1240
660
1240
660
1370
1820
660
1390
660
1820
100
100
200
1070
660
1240
1240
660
200 2594
200 3200
200 2820
200
2000
133
200
1956
200
2885
150
50
2513
200
3875
200 5210
1760
1748
660
1473
660
1473
660
1473
660
1473
660
1473
660
1473
660
1473
660
1348
1760
770
9
4
5
580
2
0
0
3
8
0
0
2
0
0
3
6
5
0
2
0
0
3
9
5
0
2
0
0
2
3
8
7
1
1
3
1
0
1
0
2350 4604
1350
1215
1812
50
100
1230
1020
1120
1120
2710
3050
1225 625
1065
1065
235
1020
290
1120
600
450
1350
1
0
1
1
2
0
0
2
8
5
1
2
0
0
2
9
9
3
2
0
0
536
1885
200
1320
BT07
BT07
LT6
1320 3000
200
3488
1508
2197
3112
2208
3599
100
786
1459
2379
94
LT13
LT13
LT14
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT3
RAMP 5
GRADIENT
1 : 25.32
200
BT07
BT20
BT21
1020
LH=+13.21
H= 2150
W=960
FL=+11.03
95
93
2
4
5
3
9
2
LT2
LT2A
100
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
LEVEL 2-BRICK WALL PLAN
101
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-BRICK WALL PLAN 2
kích thước
Xây gạch đặc
NG SPORT PAVILION HALL 1
EXISTING CANOPY TO BE MODIFIED
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1 DW 2
KITCHEN
DUCT
NEW INDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
NEW SERVERY AREA
NEW WASHING AREA
DN
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
Ø75 Ø75
Ø75
Ø7
5
Ø7
5
Ø7
5
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 6
HR
HR
HR
HR
H
R
BT07
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT10
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT09
BT07
BT07
BT07
BT01
BT01
BT01
BT01
BT07
BT07
BT01
BT10
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
H= 9300
W=450
FL=+5.90
BT01
BT01
BT01 BT05
BT01
BT01
BT05
BT01
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT10
BT07
BT19
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
H= 2150
W=1060
FL=+11.00
LH=+13.98
BT07
BT07
BT01
BT01
BT07
BT18 BT07 BT07 BT07 BT07 BT07 BT07
BT18 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT18 BT18 BT08
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
LT1
LH=+13.16
H= 2130
W=960
FL=+11.00
LH=+13.16
H= 2130
W=660
FL=+11.00
LH=+13.18
H= 2150
W=960
FL=+11.00
LT8
LT6
BT07
BT07
LH=+13.18
H= 2150
W=1060
FL=+11.00
LH=+13.18
H= 2150
W=1060
FL=+11.00
LH=+13.16
H= 2130
W=960
FL=+11.00
LH=+13.18
H= 3000
W=600
FL=+10.95
H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98 H= 3000
W=600
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
H= 3000
W=1700
FL=+10.95
LH=+13.98
BT09
BT07
BT07
BT07
BT07
BT19
BT18 BT18
BT18 BT18
BT01
BT01
660
660
1270
BT01
2660
1760
1544
100
2995
1760
2345
1370
660
1240
660
1240
660
1369
2840
1760
2600
1370
1240
660
1240
660
1370
1820
660
1390
660
1820
100
100
200
1070
660
1240
1240
660
200
2594
200 3200
200 2820
200
2000
133
200
1956
200
2885
150
50
2513
200
3875
200 5210
1760
1748
660
1473
660
1473
660
1473
660
1473
660
1473
660
1473
660
1473
660
1348
1760
770
9
4
5
580
2
0
0
3
8
0
0
2
0
0
3
6
5
0
2
0
0
3
9
5
0
2
0
0
2
3
8
7
1
1
3
1
0
1
0
2350 4604
1350
1215
1812
50
100
1230
1020
1120
1120
2710
3050
1225 625
1065
1065
235
1020
290
1120
600
450
1350
1
0
1
1
2
0
0
2
8
5
1
2
0
0
2
9
9
3
2
0
0
536
1885
200
1320
BT07
BT07
LT6
1320 3000
200
100
LT13
LT13
LT14
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT13
LT3
RAMP 5
GRADIENT
200
BT07
LT2
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
LEVEL 2-BRICK WALL PLAN
102
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-BRICK WALL PLAN 1
EXISTING STAIR
HAND WASH
AREA 4
HR
RAMP
GRADIENT 1 : 22.78
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT07
BT18
BT19
BT07
BT07
BT07
BT07 660
1270
2660
1760
1820
100
200
1070
660
1240
1240
660
200
2594
200
RAMP 5
GRADIENT
1 : 25.32
200
BT07
BT20
BT21
1020
LH=+13.21
H= 2150
W=960
FL=+11.03
95
93
2
4
5
3
9
2
LT2A
100
6A
5A
A1
BT19
BT17
BT19
BT19
BT19
3488
1508
2197
3112
2208
3599 786
1459
2379
94
8A
7A
A5
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
LEVEL 2-BRICK WALL PLAN
103
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-BRICK WALL PLAN 2
EXISTING CANOPY TO BE MODIFIED
EXISTING SPORT PAVILION HALL 1
EXISTING STAIR
H
R
DW 2
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1
KITCHEN
DUCT
8A
7A
6A
5A
4A
3A
2A
1A
A7
A6
A5
A4
A3
A2
A1
D1
D2
D3
D4
D5
3F
3E
C9
C10
C11
C12
C13
C14
C15
2
1
A.40.01
3
A.40.01
4
A.40.01
NEW OUTDOOR CAFETERIA
NEW SERVERY AREA
NEW INDOOR CAFETERIA
NEW STAIR 2
NEW STAIR 3
NEW OUTDOOR CAFETERIA
DN
NEW WASHING AREA
Ø75 Ø75
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 5
HAND WASH
AREA 6
E
L
E
C
T
E
L
E
C
T
OPEN AREA 2-2
AC
NEW OUTDOOR CAFETERIA
HAND WASH
AREA 4
GT1
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT3
GT2
GT2
GT2
GT2
GT2
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
104
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-INTERMEDIATE BEAM PLAN
LEVEL 2-INTERMEDIATE BEAM PLAN
4
A.40.01
GT3
EXISTING CANOPY TO BE MODIFIED
EXISTING SPORT PAVILION HALL 1
DW 2
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1
KITCHEN
DUCT
NEW SERVERY AREA
NEW INDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
DN
NEW WASHING AREA
Ø75 Ø75
Ø75
Ø7
5
Ø7
5
Ø7
5
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 6
GT1
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
GT2
A1
7A
6A
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
105
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-INTERMEDIATE BEAM PLAN
LEVEL 2-INTERMEDIATE BEAM PLAN 1
EXISTING SPORT PAVILION HALL 1
EXISTING CANOPY TO BE MODIFIED
EXISTING STAIR
H
R
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1 DW 2
KITCHEN
DUCT
8A
7A
6A
5A
4A
3A
2A
1A
D4
D5
C12
C13
C14
C15
2
A.40.01
3
A.40.01
4
A.40.01
NEW INDOOR CAFETERIA
NEW STAIR 2
NEW STAIR 3
NEW OUTDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
NEW SERVERY AREA
NEW WASHING AREA
DN
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
Ø75 Ø75
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 5
HAND WASH
AREA 6
4500
3112
2208
3488
3599 786
1508
2197
1459
2379
94
3020
610
610
1710
1630
10
00
200
2925
2270 1710
2635
200
1295
610
1290
610
1290
610
1295
200
2765
1710
2525
610
1290
610
1290
610
1295
200
1745
611
1439
610
1745
200
1295
200
200
1295
610
1290
610
1290
610
1295
1710
2702
200
11414
11963
5454
1710
1798
610
1523
610
1523
1523
610
1523
610
1523
1523
610
610
1523
1398
2735
920
1070 970
1170
W2
875 970 1150
W2
1070
W2
W1
W1
W1
W1
W2
W2
W2
W2
W2
W2
W2
W2
W3
W2 W2 W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
5688
225
E
L
E
C
T
E
L
E
C
T
EXISTING STAIR
AC
970
4
4
2
243
150
1111
150
2
4
5
A7
A6
A5
A4
A3
A2
A1
D1
D2
1
A.40.01 KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
106
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-MASONRY PLAN
LEVEL 2-MASONRY PLAN
4500
1745
200
200
1295
610
1290
610
1290
610
1295
1710
2702
200
W2
W2
W2
W3
5688
225
970
4
4
2
243
150
1111
150
2
4
5
EXISTING SPORT PAVILION HALL 1
EXISTING CANOPY TO BE MODIFIED
ELECT
SMOKE
SHAFT
TEL
AC CW
DW 1 DW 2
KITCHEN
DUCT
NEW INDOOR CAFETERIA
NEW OUTDOOR CAFETERIA
NEW SERVERY AREA
NEW WASHING AREA
DN
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
1
5
0
0
Ø75 Ø75
Ø75
Ø7
5
Ø7
5
Ø7
5
Ø100
Ø100
Ø100
Ø100
Ø75
Ø75
Ø75
Ø75
Ø100
Ø100
Ø100
Ø100
HAND WASH
AREA 6
3020
610
610
1710
1630
1
0
0
0
200
2925
2270 1710
2635
200
1295
610
1290
610
1290
610
1295
200
2765
1710
2525
610
1290
610
1290
610
1295
200
1745
611
1439
610
1745
200
1295
200
200
1295
610
1290
610
1290
610
1295
1710
2702
200
11414
11963
5454
1710
1798
610
1523
610
1523
1523
610
1523
610
1523
1523
610
610
1523
1398
2735
920
1070 970
1170
W2
875 970 1150
W2
1070
W2
W1
W1
W1
W1
W2
W2
W2
W2
W2
W2
W2
W2
W2 W2 W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
W2
5688
225
A1
6A
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
107
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
LEVEL 2-MASONRY PLAN
LEVEL 2-MASONRY PLAN 1
A4 A5
A3
A2
A1
+ 11.000
LEVEL 2
4200
3060
+ 10.950
ELEVATION 1
2345
1370
660
1240
660
1240
660
1369
2840
1760
2600
1370
660
1240
660
1240
660
1370
1820
660
1390
660
1820
7260
ROOF LEVEL
TRUSS LEVEL
+ 13.980
A4 A5 A6
A3
ELEVATION 1
1544
100
2995
1760
2345
1370
660
1240
660
1240
660
1369
2840
1760
2600
1370
660
1240
660
1240
660
1370
100
200
INTERMEDIATE BEAM
BỔ TRỤ
GIẰNG TƯỜNG GT01
STEEL COLUMN
RC STIFFENER
INTERMEDIATE BEAM
GIẰNG ĐỈNH TƯỜNG GT03
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
BRICK WALL PLAN
201
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
200
5210 1760 1748 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1348 1760 770
100
2150 900 7200 7200 8563
+ 11.000
LEVEL 2
+ 10.950
ROOF LEVEL
400
VAR
+ 13.980
2980
504
200
INTERMEDIATE BEAM
ELEVATION 3
INTERMEDIATE BEAM
GIẰNG TƯỜNG GT01
RC STIFFENER
BỔ TRỤ
GIẰNG ĐỈNH TƯỜNG GT03
100
200
1070 660 1240 660 1240 660 1270
200
1730 2640
6A 5A
9615
200
ROOF LEVEL
+ 11.000
LEVEL 2
TRUSS LEVEL
2980
3060
+ 10.950
ELEVATION 4
+ 13.980
VAR
2980
400
520
200
100
STEEL COLUMN
INTERMEDIATE BEAM
GIẰNG TƯỜNG GT01
RC STIFFENER
BỔ TRỤ
INTERMEDIATE BEAM
GIẰNG ĐỈNH TƯỜNG GT03
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
BRICK WALL PLAN
202
28 OCT 2022
REV.00
P2A-A.20.02-BP02-SHD-
200
160
50
1
4Ø10
Ø6a125
D
150
110
BT01
200
160
50
1
4Ø10
Ø6a125
D
100
60
BT07
200
120
50
1
4Ø10
Ø6a125
D
150
110
BT05
160
200
90
50
1
4Ø10
Ø6a125
D
100
60
BT19
130
230
140
50
1
4Ø10
Ø6a125
D
100
60
BT10
180
1
4Ø10
230
190
50
1
4Ø10
Ø6a125
D
150
110
LT1
( L=560mm )
230
190
50
1
4Ø10
Ø6a125
D
150
110
LT2
( L=1420mm )
200
160
50
1
4Ø10
Ø6a100
D
100
60
LT6
+13.16
( L=1120mm )
200
160
50
1
4Ø10
Ø6a100
D
100
60
LT8
+8.11
( L=1408mm )
230
190
50
Ø6a125
D
150
110
LT3
( L=1420mm )
50
1
4Ø10
Ø6a100
D
100
( L=780mm )
200
160
60
LT13
+15.28
200
160
1
4Ø10
50
Ø6a100
D
60
100
LT14
+13.18
( L=3000mm )
+13.18 +13.18
+13.18
155
50
90
1
4Ø10
Ø6a125
D
100
BT09
60
130
200
145
50
1
4Ø10
Ø6a125
D
100
60
BT17
185
245
100
53 95
48
100
93 100
48
100
245
205
50
Ø6a125
D1
60
60
50
Ø6a125
D2
60
1
4Ø10
353
50
Ø6a125
D1
60
155
50
Ø6a125
D2
60
BT20 BT21
230
190
50
1
4Ø10
Ø6a125
D
150
110
LT2A
( L=1308mm )
+13.21
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
L1.BI.04 DETAIL
301
28 OCT 2022
REV.00
P2A-BP02-SHD-
400
360
50
1
4Ø10
Ø6a225
D2
100
60
GT2
+13.980
Mortar
Mortar
25 150 25
200
Lanh tô
Lintol
CHI TIẾT CỬA ĐI
DOOR DETAIL
LH
FFL
H
5
(silicon)+25
(Motar)
Door
Bổ trụ
RC STIFFENER
Joint 10x10
See Door detail
brick wall
Structural member
( beam / slab )
Metal Lath
Nail @250
200
LH: CAO ĐỘ ĐÁY LANH TÔ/ BELOW
LINTOL LEVEL
H : CHIỀU CAO CỬA/ DOOR HEIGHT
W : BỀ RỘNG CỬA/ DOOR WIDTH
FL: CAO ĐỘ BỆ CỬA/ DOOR SILL LEVEL
Tường gạch
Brick wall
DETAIL
CONN. BETWEEN FLOOR BEAM/ SLAB AND BRICK WALL
5 (silicon)+25 (Motar)
W
5 (silicon)+25 (Motar)
INTERMEDIATE
BEAM
Hollow Brick wall
Vữa
Vữa
Giằng tường
Gạch ống rỗng
CHI TIẾT Ô CHỜ CỬA SỔ, Ô KÍNH CỐ ĐỊNH
FRAME FIXED TEMPERED GLASS PANEL, WINDOW OPENING TYPICAL DETAIL
brick wall
LH
H
5
(silicon)+25
(Motar)
30
Window
5 (silicon)+25 (Motar)
200
FFL
FL
TƯỜNG XÂY GẠCH ỐNG RỖNG, DÀY 100MM
HOLLOW BRICK WALL, 100MM THK
Lanh tô
Lintol
Bổ trụ
RC STIFFENER
Tường gạch
Brick wall
TL1
5 (silicon)+25 (Motar)
W
5 (silicon)+25 (Motar)
400
360
50
1
4Ø10
Ø6a225
D1
150
110
GT1
TƯỜNG XÂY KHÔNG ĐỤNG TRẦN
LOW WALL PARTITION
TƯỜNG XÂY GẠCH ỐNG RỖNG, DÀY 150MM
HOLLOW BRICK WALL, 150MM THK
200
Mortar
Mortar
25 100 25
150
W
3
INTERMEDIATE
BEAM
Hollow Brick wall
Vữa
Vữa
Giằng tường
Gạch ống rỗng
W
1
HOLLOW BRICK WALL
(ELEVATION)
LOW WALL PARTITION
(ELEVATION)
Hollow Brick wall
Gạch ống rỗng
Hollow Brick wall
Gạch ống rỗng
Mortar
25 VAR 25
INTERMEDIATE
BEAM GT3, GT4
Vữa
Giằng tường GT3, GT4
Brick wall
Tường gạch
W
2
HOLLOW BRICK WALL
(ELEVATION)
200
160
50
1
4Ø10
Ø6a225
D3
100
60
GT3
200
160
50
1
4Ø10
Ø6a225
D4
150
110
GT4
+13.980
KHUNG KÈO THÉP (XEM BVKC)
STEEL RAFTER (REFER STRUCTURAL DWG)
MÁI TÔN
METAL SHEET ROOFING
BRICK WALL
TƯỜNG XÂY
GIẰNG ĐỈNH TƯỜNG
INTERMEDIATE BEAM
Mortal
Solid Brick
Mortal
Non-slip tile
Water proofing
10
40
40
10
WATERPROFF DETAIL.
2
10 27.5
37.5
10
27.5
37.5
300MM(H) WATERPROOFING UPTURN;
1800MM(H) WATERPROOFING
UPTURN FOR SHOWER AREA
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
L1.BI.04 DETAIL
401
28 OCT 2022
REV.00
P2A-BP02-SHD-
Kéo dài đến giằng đỉnh
tường
PLANTS BY LANDSCAPE ARCHITECTS
5120
2
1
0
5
1
6
3
5
185
3
0
7
0
5255
PLAN
SCALE 1 : 30 L2.BI.04
R.C TABLE LEG IN CEMENT RENDER
WITH CLEAR COATING FINISH
CC01
70MM THK R.C SLAB TABLE TOP IN
SELECTED GRANITE TABLE TOP
FINISH G01
600
450
150
6
0
0
4
5
0
1
5
0
600
150
450
7
4
°
60°
7
2
°
59°
70MM THK R.C BARRIER IN GRANITE
FINISH G01
4
5
0
1
5
0
6
0
0
1
2
SECTION 01
SCALE 1 : 20 L1.BI.04
450MM CEMENT BOARD
TABLE TOP SET BACK
SK-01
150MM THK R.C TABLE LEG IN CLEAR
COATING FINISH
3MM THK X 100MM HT ALUMINUM
RECESSED SKIRTING
450
150
6230
CC01
5030
70MM THK R.C SLAB TABLE TOP IN
SELECTED GRANITE TABLE TOP FINISH
G01
450
150MM HT R.C BARRIER IN GRANITE
FINISH G01
150
RC STIFFENER TO ENGR'S
DETAIL
SOLID BRICK
980
1150
100
70
ANGLE ANGLE
50MM R.C SLAB TABLE TOP IN SELECTED
GRANITE TOP FINISH
70
450
450MM R.C SLAB TABLE TOP SET BACK
20MM HT GRANITE FINISH IN R.C SLAB
TABLE TOP
150MM HT R.C BARRIER IN SELECTED
GRANITE FINISH
150
150
150MM THK R.C TABLE LEG IN PLASTER
IN CLEAR COATED FINISH
CC01
DETAIL 01
SCALE 1 : 5 L1.BI.04
220
G01
G01
G01
CEMENT PLASTER AT BOTTOM OF SLAB
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
L1.BI.04 DETAIL
402
28 OCT 2022
REV.00
P2A-BP02-SHD-
EXPANDED METAL LATHE NAILED
TO RC COLUMN / BRICK WALL
RC COLUMN/ BRICKWALL TO
ENGR'S DETAIL
CEMENT / SAND (1:3)
SCREED BACKING
DETAIL 12
SCALE 1 : 2
PLASTERING (CORNER)
100MM THK BRICKWALL WITH
25MM THK PLASTER AND PAINT
ON BOTH SIDES
BRICK WALL DETAIL
SCALE 1 : 5
--
8 TILES WALL DETAIL 1
SCALE 1 : 5
--
9
PVC OR OTHER EQUIVALENT
REINFORCEMENT
BRICK WALL DETAIL
SCALE 1 : 5
--
11
RC STRUCTURE TO ENGR'S DETAIL
100MM THK BRICKWALL WITH
25MM THK PLASTER AND PAINT
ON BOTH SIDES
METAL LATH
100MM THK BRICKWALL WITH
25MM THK PLASTER AND PAINT
ON BOTH SIDES
WALL TILES TO ARCHITECT'S SELECTION
INSTALLED AS PER MANUFR'S DETAIL
MITER JOINT
100MM THK BRICKWALL WITH
25MM THK PLASTER AND PAINT
ON BOTH SIDES
TILES WALL DETAIL 2
SCALE 1 : 5
--
10
BATH / TOILET
COLOR GROUT TO
ARCHITECT'S SELECTION
SIKASIL INDUSTRIAL, PREMIUM SILICONE
ADHESIVE SEALANT - BLACK COLOR
TILES TO ARCHITECT'S
SELECTION
WATERPROOFING
VARIES
300
FINISH FLOOR LEVEL
FLOOR TILES ON SCREED TO FALL
STAINLESS STEEL ANGLE
TILES TO ARCH'S SELECTION
STAINLESS STEEL TILES TRAY TO BE SELECTED
FROM CATALOGUE
TILES INSERT SCUPPER DRAIN COVER DETAIL
SCALE 1 : 5
--
13
OUTDOOR CAFETERIA
20
25 Varies 25
Varies
25 Varies 25
Varies
25 Varies 25
Varies
KEY PLAN / MẶT BẰNG ĐỊNH VỊ
PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM
BUV PHASE 2A PROJECT
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
CLIENT / CHỦ ĐẦU TƯ
APPROCED BY / CHẤP THUẬN :
NGUYEN VAN VUOT
DRAWING BY / THỂ HIỆN :
LE VAN DOC
ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH:
FOR METHOD / BIỆN PHÁP
FOR APPROVAL / TRÌNH DUYỆT
FOR REFERENCE / THAM KHẢO
FOR CONSTRUCTION / THI CÔNG
FOR DESIGN / THIẾT KẾ
AS BUILT / HOÀN CÔNG
DRAWING NAME/
TÊN BẢN VẼ:
DRAWING NO/
SỐ HIỆU BẢN VẼ:
PACKAGE/
GÓI THI CÔNG:
DATE/
NGÀY LẬP BẢN VẼ:
WE FULFILL OUR PROMISES
REVISION/
CHỈNH SỬA:
BRITISH UNIVERSITY VIETNAM CO., LTD
PAGE SIZE / KHỔ GIẤY
A3
MAIN BUILDING WORK FOR
CAFETERIA EXTENSION PACKAGE
MAIN CONTRACTOR / NHÀ THẦU CHÍNH
TUANLE CONSTRUCTION CO.,LTD
VICTORY Tower, 3rd Floor, 12 Tan Trao Str,
Phu My Hung, Tan Phu Ward, District 7, HCMC,
Viet Nam
Tel:(84) (28) 37 85 81 81/ 37 85 83 83
Fax:(84) (28) 37 85 08 08
Email: Info@tuanle.com.vn
LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ
ASIAN PACIFIC PROJECTS
BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam
19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam
L1.BI.04 DETAIL
403
28 OCT 2022
REV.00
P2A-BP02-SHD-

More Related Content

Similar to Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf

Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxsyedaliabl2023
 
The Luxe KL
The Luxe KLThe Luxe KL
The Luxe KLAlan Mok
 
DA23-10-12.pdf
DA23-10-12.pdfDA23-10-12.pdf
DA23-10-12.pdfVQuangNam4
 
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdf
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdfBaladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdf
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdfAbdulkadirHassanMoha
 
CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel) CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel) CN Co., Ltd. (CNI)
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
Orientation Frame Assembly
Orientation Frame AssemblyOrientation Frame Assembly
Orientation Frame AssemblyEarl Schneider
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable India
 

Similar to Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf (15)

Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
The Luxe KL
The Luxe KLThe Luxe KL
The Luxe KL
 
Sld for pmcc
Sld for pmccSld for pmcc
Sld for pmcc
 
DA23-10-12.pdf
DA23-10-12.pdfDA23-10-12.pdf
DA23-10-12.pdf
 
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdf
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdfBaladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdf
Baladweyne-Irrigation-System__13m_3,690cbm_46,800Wp.pdf
 
CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel) CNI Spherical Tank (Pressure Vessel)
CNI Spherical Tank (Pressure Vessel)
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
Modelo 1
Modelo 1Modelo 1
Modelo 1
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Plumbing Design
Plumbing DesignPlumbing Design
Plumbing Design
 
Orientation Frame Assembly
Orientation Frame AssemblyOrientation Frame Assembly
Orientation Frame Assembly
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lll
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 

Recently uploaded (20)

KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 

Shopdrawing for masonry level 2 of Cafeteria 20221105 - signed.pdf

  • 1. SUBMITTAL No.: 226 To Attention From : : : APP PROJECT MANAGEMENT Mr. Dai Nguyen Van Vuot Pages Date Rev : : : 01 attachments 02-Nov-2022 00 Project : PROPOSED DEVELOPMENT OF ECOPARK CAMPUS - BRITISH UNIVERSITY VIETNAM – ECOPARK (PHASE 2A) ADD: LOT GD – O1, VAN GIANG COMMERCIAL AND TOURISM TOWNSHIP (ECOPARK), VAN GIANG DISTRICT, HUNG YEN PROVINCE Subject : Shop drawing for Masonry level 2 of Cafeteria Document code : SHD Trade : BP02 Contractor : TLC Details Document: BUV2A-BP02-SHD-035-REV 00 Forward For: Approval Your Information Tender Comment Use in Construction Quotation As Request Other Submitted By: Nguyen Van Vuot Received by: Sign: Sign Date: Date
  • 2. Page 1 of 1 Project PROPOSED DEVELOPMENT OF ECOPARK CAMPUS - BRITISH UNIVERSITY VIETNAM – ECOPARK (PHASE 2A) Package MAIN BUILDING WORK FOR CAFETERIA EXTENSION Contractor TLC SHOP DRAWING SUBMISSION Ref: BUV2A-BP02-SHD-035-REV 00 Trade (ID/MEP/ARCH/STRUCTURE): BP02 Drawing (Layout/Section/Detail/Other): Masonry level 2 of Cafeteria Location: Cafeteria Subject: Shop drawing for Masonry level 2 of Cafeteria Drawing List: SIGNED on behalf of contractor: Date: APPROVAL STATUS CODE: APPROVAL STATUS A APPROVED B APPROVED SUBJECT TO COMMENTS C NOT APPROVED, RESUBMIT PROJECT MANAGEMENT COMMENT: Signed for on behalf of APP Project Management .............................................................................................. Date: ...................................................... Time: .................................................................................. B 1) Please see comment in the drawing 2) Conner of column and wall for plastering work also follow comment in the method of masonry work. Digitally signed by TUNG NGUYEN DN: C=VN, OU=TUNG NGUYEN, O=TUNG NGUYEN, CN=TUNG NGUYEN, E=tung.nguyenvan@appmvn. com Reason: Location: Date: 2022-11-05 20:24:49 TUNG NGUY EN
  • 3. E L E C T EXISTING SPORT PAVILION HALL 1 E L E C T OPEN AREA 2-2 EXISTING CLASSROOM 2-6 (LC) EXISTING CANOPY TO BE MODIFIED EXISTING CANOPY EXISTING STAIR EXISTING STUDY AREA 2-2 (LL) EXISTING DISCUSSION ROOM 2-2 EXISTING DISCUSSION ROOM 2-1 AC EXISTING SPORT PAVILION LOUNGE 2-1 H R H R EXISTING TEACHER ROOM 2-1 ELECT SMOKE SHAFT TEL AC CW DW 1 DW 2 KITCHEN DUCT 8A 7A 6A 5A 4A 3A 2A 1A A7 A6 A5 A4 A3 A2 A1 D1 D2 D3 D4 D5 3F 3D 3E C9 C10 C11 C12 C13 C14 C15 2 A.40.01 1 A.40.01 3 A.40.01 4 A.40.01 NEW INDOOR CAFETERIA NEW STAIR 2 NEW STAIR 3 NEW OUTDOOR CAFETERIA NEW OUTDOOR CAFETERIA NEW OUTDOOR CAFETERIA NEW SERVERY AREA NEW WASHING AREA DN 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 Ø75 Ø75 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 4 HAND WASH AREA 5 HAND WASH AREA 6 HR HR HR HR HR H R RAMP GRADIENT 1 : 22.78 BT07 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT07 BT07 BT07 BT01 BT01 BT01 BT01 BT07 BT07 BT01 BT10 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 BT01 BT01 BT01 BT05 BT01 BT01 BT05 BT01 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT10 BT07 BT19 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 H= 2150 W=1060 FL=+11.00 LH=+13.98 BT07 BT07 BT01 BT01 BT07 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT18 BT18 BT08 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 LT1 LH=+13.16 H= 2130 W=960 FL=+11.00 LH=+13.16 H= 2130 W=660 FL=+11.00 LH=+13.18 H= 2150 W=960 FL=+11.00 LT8 LT6 BT07 BT07 LH=+13.18 H= 2150 W=1060 FL=+11.00 LH=+13.18 H= 2150 W=1060 FL=+11.00 LH=+13.16 H= 2130 W=960 FL=+11.00 LH=+13.18 H= 3000 W=600 FL=+10.95 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 BT09 BT07 BT07 BT07 BT07 BT19 BT07 BT07 BT07 BT07 BT19 BT17 BT19 BT19 BT19 BT18 BT18 BT18 BT18 BT01 BT01 660 660 1270 BT01 2660 1760 1544 100 2995 1760 2345 1370 660 1240 660 1240 660 1369 2840 1760 2600 1370 1240 660 1240 660 1370 1820 660 1390 660 1820 100 100 200 1070 660 1240 1240 660 200 2594 200 3200 200 2820 200 2000 133 200 1956 200 2885 150 50 2513 200 3875 200 5210 1760 1748 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1348 1760 770 9 4 5 580 2 0 0 3 8 0 0 2 0 0 3 6 5 0 2 0 0 3 9 5 0 2 0 0 2 3 8 7 1 1 3 1 0 1 0 2350 4604 1350 1215 1812 50 100 1230 1020 1120 1120 2710 3050 1225 625 1065 1065 235 1020 290 1120 600 450 1350 1 0 1 1 2 0 0 2 8 5 1 2 0 0 2 9 9 3 2 0 0 536 1885 200 1320 BT07 BT07 LT6 1320 3000 200 3488 1508 2197 3112 2208 3599 100 786 1459 2379 94 LT13 LT13 LT14 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT3 RAMP 5 GRADIENT 1 : 25.32 200 BT07 BT20 BT21 1020 LH=+13.21 H= 2150 W=960 FL=+11.03 95 93 2 4 5 3 9 2 LT2 LT2A 100 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam LEVEL 2-BRICK WALL PLAN 101 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-BRICK WALL PLAN 2 kích thước Xây gạch đặc
  • 4. NG SPORT PAVILION HALL 1 EXISTING CANOPY TO BE MODIFIED ELECT SMOKE SHAFT TEL AC CW DW 1 DW 2 KITCHEN DUCT NEW INDOOR CAFETERIA NEW OUTDOOR CAFETERIA NEW SERVERY AREA NEW WASHING AREA DN 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 Ø75 Ø75 Ø75 Ø7 5 Ø7 5 Ø7 5 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 6 HR HR HR HR H R BT07 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT10 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT09 BT07 BT07 BT07 BT01 BT01 BT01 BT01 BT07 BT07 BT01 BT10 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 H= 9300 W=450 FL=+5.90 BT01 BT01 BT01 BT05 BT01 BT01 BT05 BT01 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT10 BT07 BT19 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 H= 2150 W=1060 FL=+11.00 LH=+13.98 BT07 BT07 BT01 BT01 BT07 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT18 BT07 BT07 BT18 BT18 BT08 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 LT1 LH=+13.16 H= 2130 W=960 FL=+11.00 LH=+13.16 H= 2130 W=660 FL=+11.00 LH=+13.18 H= 2150 W=960 FL=+11.00 LT8 LT6 BT07 BT07 LH=+13.18 H= 2150 W=1060 FL=+11.00 LH=+13.18 H= 2150 W=1060 FL=+11.00 LH=+13.16 H= 2130 W=960 FL=+11.00 LH=+13.18 H= 3000 W=600 FL=+10.95 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=600 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 H= 3000 W=1700 FL=+10.95 LH=+13.98 BT09 BT07 BT07 BT07 BT07 BT19 BT18 BT18 BT18 BT18 BT01 BT01 660 660 1270 BT01 2660 1760 1544 100 2995 1760 2345 1370 660 1240 660 1240 660 1369 2840 1760 2600 1370 1240 660 1240 660 1370 1820 660 1390 660 1820 100 100 200 1070 660 1240 1240 660 200 2594 200 3200 200 2820 200 2000 133 200 1956 200 2885 150 50 2513 200 3875 200 5210 1760 1748 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1348 1760 770 9 4 5 580 2 0 0 3 8 0 0 2 0 0 3 6 5 0 2 0 0 3 9 5 0 2 0 0 2 3 8 7 1 1 3 1 0 1 0 2350 4604 1350 1215 1812 50 100 1230 1020 1120 1120 2710 3050 1225 625 1065 1065 235 1020 290 1120 600 450 1350 1 0 1 1 2 0 0 2 8 5 1 2 0 0 2 9 9 3 2 0 0 536 1885 200 1320 BT07 BT07 LT6 1320 3000 200 100 LT13 LT13 LT14 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT13 LT3 RAMP 5 GRADIENT 200 BT07 LT2 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam LEVEL 2-BRICK WALL PLAN 102 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-BRICK WALL PLAN 1
  • 5. EXISTING STAIR HAND WASH AREA 4 HR RAMP GRADIENT 1 : 22.78 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT07 BT18 BT19 BT07 BT07 BT07 BT07 660 1270 2660 1760 1820 100 200 1070 660 1240 1240 660 200 2594 200 RAMP 5 GRADIENT 1 : 25.32 200 BT07 BT20 BT21 1020 LH=+13.21 H= 2150 W=960 FL=+11.03 95 93 2 4 5 3 9 2 LT2A 100 6A 5A A1 BT19 BT17 BT19 BT19 BT19 3488 1508 2197 3112 2208 3599 786 1459 2379 94 8A 7A A5 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam LEVEL 2-BRICK WALL PLAN 103 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-BRICK WALL PLAN 2
  • 6. EXISTING CANOPY TO BE MODIFIED EXISTING SPORT PAVILION HALL 1 EXISTING STAIR H R DW 2 ELECT SMOKE SHAFT TEL AC CW DW 1 KITCHEN DUCT 8A 7A 6A 5A 4A 3A 2A 1A A7 A6 A5 A4 A3 A2 A1 D1 D2 D3 D4 D5 3F 3E C9 C10 C11 C12 C13 C14 C15 2 1 A.40.01 3 A.40.01 4 A.40.01 NEW OUTDOOR CAFETERIA NEW SERVERY AREA NEW INDOOR CAFETERIA NEW STAIR 2 NEW STAIR 3 NEW OUTDOOR CAFETERIA DN NEW WASHING AREA Ø75 Ø75 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 5 HAND WASH AREA 6 E L E C T E L E C T OPEN AREA 2-2 AC NEW OUTDOOR CAFETERIA HAND WASH AREA 4 GT1 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT3 GT2 GT2 GT2 GT2 GT2 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam 104 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-INTERMEDIATE BEAM PLAN LEVEL 2-INTERMEDIATE BEAM PLAN
  • 7. 4 A.40.01 GT3 EXISTING CANOPY TO BE MODIFIED EXISTING SPORT PAVILION HALL 1 DW 2 ELECT SMOKE SHAFT TEL AC CW DW 1 KITCHEN DUCT NEW SERVERY AREA NEW INDOOR CAFETERIA NEW OUTDOOR CAFETERIA DN NEW WASHING AREA Ø75 Ø75 Ø75 Ø7 5 Ø7 5 Ø7 5 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 6 GT1 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 GT2 A1 7A 6A KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam 105 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-INTERMEDIATE BEAM PLAN LEVEL 2-INTERMEDIATE BEAM PLAN 1
  • 8. EXISTING SPORT PAVILION HALL 1 EXISTING CANOPY TO BE MODIFIED EXISTING STAIR H R ELECT SMOKE SHAFT TEL AC CW DW 1 DW 2 KITCHEN DUCT 8A 7A 6A 5A 4A 3A 2A 1A D4 D5 C12 C13 C14 C15 2 A.40.01 3 A.40.01 4 A.40.01 NEW INDOOR CAFETERIA NEW STAIR 2 NEW STAIR 3 NEW OUTDOOR CAFETERIA NEW OUTDOOR CAFETERIA NEW SERVERY AREA NEW WASHING AREA DN 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 Ø75 Ø75 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 5 HAND WASH AREA 6 4500 3112 2208 3488 3599 786 1508 2197 1459 2379 94 3020 610 610 1710 1630 10 00 200 2925 2270 1710 2635 200 1295 610 1290 610 1290 610 1295 200 2765 1710 2525 610 1290 610 1290 610 1295 200 1745 611 1439 610 1745 200 1295 200 200 1295 610 1290 610 1290 610 1295 1710 2702 200 11414 11963 5454 1710 1798 610 1523 610 1523 1523 610 1523 610 1523 1523 610 610 1523 1398 2735 920 1070 970 1170 W2 875 970 1150 W2 1070 W2 W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 5688 225 E L E C T E L E C T EXISTING STAIR AC 970 4 4 2 243 150 1111 150 2 4 5 A7 A6 A5 A4 A3 A2 A1 D1 D2 1 A.40.01 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam 106 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-MASONRY PLAN LEVEL 2-MASONRY PLAN
  • 9. 4500 1745 200 200 1295 610 1290 610 1290 610 1295 1710 2702 200 W2 W2 W2 W3 5688 225 970 4 4 2 243 150 1111 150 2 4 5 EXISTING SPORT PAVILION HALL 1 EXISTING CANOPY TO BE MODIFIED ELECT SMOKE SHAFT TEL AC CW DW 1 DW 2 KITCHEN DUCT NEW INDOOR CAFETERIA NEW OUTDOOR CAFETERIA NEW SERVERY AREA NEW WASHING AREA DN 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 1 5 0 0 Ø75 Ø75 Ø75 Ø7 5 Ø7 5 Ø7 5 Ø100 Ø100 Ø100 Ø100 Ø75 Ø75 Ø75 Ø75 Ø100 Ø100 Ø100 Ø100 HAND WASH AREA 6 3020 610 610 1710 1630 1 0 0 0 200 2925 2270 1710 2635 200 1295 610 1290 610 1290 610 1295 200 2765 1710 2525 610 1290 610 1290 610 1295 200 1745 611 1439 610 1745 200 1295 200 200 1295 610 1290 610 1290 610 1295 1710 2702 200 11414 11963 5454 1710 1798 610 1523 610 1523 1523 610 1523 610 1523 1523 610 610 1523 1398 2735 920 1070 970 1170 W2 875 970 1150 W2 1070 W2 W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 5688 225 A1 6A KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam 107 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD- LEVEL 2-MASONRY PLAN LEVEL 2-MASONRY PLAN 1
  • 10. A4 A5 A3 A2 A1 + 11.000 LEVEL 2 4200 3060 + 10.950 ELEVATION 1 2345 1370 660 1240 660 1240 660 1369 2840 1760 2600 1370 660 1240 660 1240 660 1370 1820 660 1390 660 1820 7260 ROOF LEVEL TRUSS LEVEL + 13.980 A4 A5 A6 A3 ELEVATION 1 1544 100 2995 1760 2345 1370 660 1240 660 1240 660 1369 2840 1760 2600 1370 660 1240 660 1240 660 1370 100 200 INTERMEDIATE BEAM BỔ TRỤ GIẰNG TƯỜNG GT01 STEEL COLUMN RC STIFFENER INTERMEDIATE BEAM GIẰNG ĐỈNH TƯỜNG GT03 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam BRICK WALL PLAN 201 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD-
  • 11. 200 5210 1760 1748 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1473 660 1348 1760 770 100 2150 900 7200 7200 8563 + 11.000 LEVEL 2 + 10.950 ROOF LEVEL 400 VAR + 13.980 2980 504 200 INTERMEDIATE BEAM ELEVATION 3 INTERMEDIATE BEAM GIẰNG TƯỜNG GT01 RC STIFFENER BỔ TRỤ GIẰNG ĐỈNH TƯỜNG GT03 100 200 1070 660 1240 660 1240 660 1270 200 1730 2640 6A 5A 9615 200 ROOF LEVEL + 11.000 LEVEL 2 TRUSS LEVEL 2980 3060 + 10.950 ELEVATION 4 + 13.980 VAR 2980 400 520 200 100 STEEL COLUMN INTERMEDIATE BEAM GIẰNG TƯỜNG GT01 RC STIFFENER BỔ TRỤ INTERMEDIATE BEAM GIẰNG ĐỈNH TƯỜNG GT03 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam BRICK WALL PLAN 202 28 OCT 2022 REV.00 P2A-A.20.02-BP02-SHD-
  • 12. 200 160 50 1 4Ø10 Ø6a125 D 150 110 BT01 200 160 50 1 4Ø10 Ø6a125 D 100 60 BT07 200 120 50 1 4Ø10 Ø6a125 D 150 110 BT05 160 200 90 50 1 4Ø10 Ø6a125 D 100 60 BT19 130 230 140 50 1 4Ø10 Ø6a125 D 100 60 BT10 180 1 4Ø10 230 190 50 1 4Ø10 Ø6a125 D 150 110 LT1 ( L=560mm ) 230 190 50 1 4Ø10 Ø6a125 D 150 110 LT2 ( L=1420mm ) 200 160 50 1 4Ø10 Ø6a100 D 100 60 LT6 +13.16 ( L=1120mm ) 200 160 50 1 4Ø10 Ø6a100 D 100 60 LT8 +8.11 ( L=1408mm ) 230 190 50 Ø6a125 D 150 110 LT3 ( L=1420mm ) 50 1 4Ø10 Ø6a100 D 100 ( L=780mm ) 200 160 60 LT13 +15.28 200 160 1 4Ø10 50 Ø6a100 D 60 100 LT14 +13.18 ( L=3000mm ) +13.18 +13.18 +13.18 155 50 90 1 4Ø10 Ø6a125 D 100 BT09 60 130 200 145 50 1 4Ø10 Ø6a125 D 100 60 BT17 185 245 100 53 95 48 100 93 100 48 100 245 205 50 Ø6a125 D1 60 60 50 Ø6a125 D2 60 1 4Ø10 353 50 Ø6a125 D1 60 155 50 Ø6a125 D2 60 BT20 BT21 230 190 50 1 4Ø10 Ø6a125 D 150 110 LT2A ( L=1308mm ) +13.21 KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam L1.BI.04 DETAIL 301 28 OCT 2022 REV.00 P2A-BP02-SHD-
  • 13. 400 360 50 1 4Ø10 Ø6a225 D2 100 60 GT2 +13.980 Mortar Mortar 25 150 25 200 Lanh tô Lintol CHI TIẾT CỬA ĐI DOOR DETAIL LH FFL H 5 (silicon)+25 (Motar) Door Bổ trụ RC STIFFENER Joint 10x10 See Door detail brick wall Structural member ( beam / slab ) Metal Lath Nail @250 200 LH: CAO ĐỘ ĐÁY LANH TÔ/ BELOW LINTOL LEVEL H : CHIỀU CAO CỬA/ DOOR HEIGHT W : BỀ RỘNG CỬA/ DOOR WIDTH FL: CAO ĐỘ BỆ CỬA/ DOOR SILL LEVEL Tường gạch Brick wall DETAIL CONN. BETWEEN FLOOR BEAM/ SLAB AND BRICK WALL 5 (silicon)+25 (Motar) W 5 (silicon)+25 (Motar) INTERMEDIATE BEAM Hollow Brick wall Vữa Vữa Giằng tường Gạch ống rỗng CHI TIẾT Ô CHỜ CỬA SỔ, Ô KÍNH CỐ ĐỊNH FRAME FIXED TEMPERED GLASS PANEL, WINDOW OPENING TYPICAL DETAIL brick wall LH H 5 (silicon)+25 (Motar) 30 Window 5 (silicon)+25 (Motar) 200 FFL FL TƯỜNG XÂY GẠCH ỐNG RỖNG, DÀY 100MM HOLLOW BRICK WALL, 100MM THK Lanh tô Lintol Bổ trụ RC STIFFENER Tường gạch Brick wall TL1 5 (silicon)+25 (Motar) W 5 (silicon)+25 (Motar) 400 360 50 1 4Ø10 Ø6a225 D1 150 110 GT1 TƯỜNG XÂY KHÔNG ĐỤNG TRẦN LOW WALL PARTITION TƯỜNG XÂY GẠCH ỐNG RỖNG, DÀY 150MM HOLLOW BRICK WALL, 150MM THK 200 Mortar Mortar 25 100 25 150 W 3 INTERMEDIATE BEAM Hollow Brick wall Vữa Vữa Giằng tường Gạch ống rỗng W 1 HOLLOW BRICK WALL (ELEVATION) LOW WALL PARTITION (ELEVATION) Hollow Brick wall Gạch ống rỗng Hollow Brick wall Gạch ống rỗng Mortar 25 VAR 25 INTERMEDIATE BEAM GT3, GT4 Vữa Giằng tường GT3, GT4 Brick wall Tường gạch W 2 HOLLOW BRICK WALL (ELEVATION) 200 160 50 1 4Ø10 Ø6a225 D3 100 60 GT3 200 160 50 1 4Ø10 Ø6a225 D4 150 110 GT4 +13.980 KHUNG KÈO THÉP (XEM BVKC) STEEL RAFTER (REFER STRUCTURAL DWG) MÁI TÔN METAL SHEET ROOFING BRICK WALL TƯỜNG XÂY GIẰNG ĐỈNH TƯỜNG INTERMEDIATE BEAM Mortal Solid Brick Mortal Non-slip tile Water proofing 10 40 40 10 WATERPROFF DETAIL. 2 10 27.5 37.5 10 27.5 37.5 300MM(H) WATERPROOFING UPTURN; 1800MM(H) WATERPROOFING UPTURN FOR SHOWER AREA KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam L1.BI.04 DETAIL 401 28 OCT 2022 REV.00 P2A-BP02-SHD- Kéo dài đến giằng đỉnh tường
  • 14. PLANTS BY LANDSCAPE ARCHITECTS 5120 2 1 0 5 1 6 3 5 185 3 0 7 0 5255 PLAN SCALE 1 : 30 L2.BI.04 R.C TABLE LEG IN CEMENT RENDER WITH CLEAR COATING FINISH CC01 70MM THK R.C SLAB TABLE TOP IN SELECTED GRANITE TABLE TOP FINISH G01 600 450 150 6 0 0 4 5 0 1 5 0 600 150 450 7 4 ° 60° 7 2 ° 59° 70MM THK R.C BARRIER IN GRANITE FINISH G01 4 5 0 1 5 0 6 0 0 1 2 SECTION 01 SCALE 1 : 20 L1.BI.04 450MM CEMENT BOARD TABLE TOP SET BACK SK-01 150MM THK R.C TABLE LEG IN CLEAR COATING FINISH 3MM THK X 100MM HT ALUMINUM RECESSED SKIRTING 450 150 6230 CC01 5030 70MM THK R.C SLAB TABLE TOP IN SELECTED GRANITE TABLE TOP FINISH G01 450 150MM HT R.C BARRIER IN GRANITE FINISH G01 150 RC STIFFENER TO ENGR'S DETAIL SOLID BRICK 980 1150 100 70 ANGLE ANGLE 50MM R.C SLAB TABLE TOP IN SELECTED GRANITE TOP FINISH 70 450 450MM R.C SLAB TABLE TOP SET BACK 20MM HT GRANITE FINISH IN R.C SLAB TABLE TOP 150MM HT R.C BARRIER IN SELECTED GRANITE FINISH 150 150 150MM THK R.C TABLE LEG IN PLASTER IN CLEAR COATED FINISH CC01 DETAIL 01 SCALE 1 : 5 L1.BI.04 220 G01 G01 G01 CEMENT PLASTER AT BOTTOM OF SLAB KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam L1.BI.04 DETAIL 402 28 OCT 2022 REV.00 P2A-BP02-SHD-
  • 15. EXPANDED METAL LATHE NAILED TO RC COLUMN / BRICK WALL RC COLUMN/ BRICKWALL TO ENGR'S DETAIL CEMENT / SAND (1:3) SCREED BACKING DETAIL 12 SCALE 1 : 2 PLASTERING (CORNER) 100MM THK BRICKWALL WITH 25MM THK PLASTER AND PAINT ON BOTH SIDES BRICK WALL DETAIL SCALE 1 : 5 -- 8 TILES WALL DETAIL 1 SCALE 1 : 5 -- 9 PVC OR OTHER EQUIVALENT REINFORCEMENT BRICK WALL DETAIL SCALE 1 : 5 -- 11 RC STRUCTURE TO ENGR'S DETAIL 100MM THK BRICKWALL WITH 25MM THK PLASTER AND PAINT ON BOTH SIDES METAL LATH 100MM THK BRICKWALL WITH 25MM THK PLASTER AND PAINT ON BOTH SIDES WALL TILES TO ARCHITECT'S SELECTION INSTALLED AS PER MANUFR'S DETAIL MITER JOINT 100MM THK BRICKWALL WITH 25MM THK PLASTER AND PAINT ON BOTH SIDES TILES WALL DETAIL 2 SCALE 1 : 5 -- 10 BATH / TOILET COLOR GROUT TO ARCHITECT'S SELECTION SIKASIL INDUSTRIAL, PREMIUM SILICONE ADHESIVE SEALANT - BLACK COLOR TILES TO ARCHITECT'S SELECTION WATERPROOFING VARIES 300 FINISH FLOOR LEVEL FLOOR TILES ON SCREED TO FALL STAINLESS STEEL ANGLE TILES TO ARCH'S SELECTION STAINLESS STEEL TILES TRAY TO BE SELECTED FROM CATALOGUE TILES INSERT SCUPPER DRAIN COVER DETAIL SCALE 1 : 5 -- 13 OUTDOOR CAFETERIA 20 25 Varies 25 Varies 25 Varies 25 Varies 25 Varies 25 Varies KEY PLAN / MẶT BẰNG ĐỊNH VỊ PROJECT-LOCATION / CÔNG TRÌNH-ĐỊA ĐIỂM BUV PHASE 2A PROJECT BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam CLIENT / CHỦ ĐẦU TƯ APPROCED BY / CHẤP THUẬN : NGUYEN VAN VUOT DRAWING BY / THỂ HIỆN : LE VAN DOC ISSUED FOR / MỤC ĐÍCH PHÁT HÀNH: FOR METHOD / BIỆN PHÁP FOR APPROVAL / TRÌNH DUYỆT FOR REFERENCE / THAM KHẢO FOR CONSTRUCTION / THI CÔNG FOR DESIGN / THIẾT KẾ AS BUILT / HOÀN CÔNG DRAWING NAME/ TÊN BẢN VẼ: DRAWING NO/ SỐ HIỆU BẢN VẼ: PACKAGE/ GÓI THI CÔNG: DATE/ NGÀY LẬP BẢN VẼ: WE FULFILL OUR PROMISES REVISION/ CHỈNH SỬA: BRITISH UNIVERSITY VIETNAM CO., LTD PAGE SIZE / KHỔ GIẤY A3 MAIN BUILDING WORK FOR CAFETERIA EXTENSION PACKAGE MAIN CONTRACTOR / NHÀ THẦU CHÍNH TUANLE CONSTRUCTION CO.,LTD VICTORY Tower, 3rd Floor, 12 Tan Trao Str, Phu My Hung, Tan Phu Ward, District 7, HCMC, Viet Nam Tel:(84) (28) 37 85 81 81/ 37 85 83 83 Fax:(84) (28) 37 85 08 08 Email: Info@tuanle.com.vn LOCAL DESIGN CONSULTANT / TƯ VẤN THIẾT KẾ ASIAN PACIFIC PROJECTS BUV Ecopark Campus, Van Giang, Hung Yen, Vietnam 19 Bach Dang Str, Ward 2, Tan Binh Dist, HCMC, Vietnam L1.BI.04 DETAIL 403 28 OCT 2022 REV.00 P2A-BP02-SHD-