SlideShare a Scribd company logo
1 of 4
Download to read offline
Open space
7 535sqm
Open space
3 798sqm
G. House
1 578sqm
18m
Road
CS
DATE: PROJECT: DRAWING: SCALE:
DRAWING NUMBER:
AUTHOR:
CLIENT: PLOT: SIGNED:
1:75 1:250 1:5000
PAGE:
CONTACT:
CLIENT ADDRESS:
G H
A1 (landscape)
+ 267 71 482929FLOOR PLANS, SITE/BLOCK PLAN +
LOCATION PLAN










NK-CMFR-A-01-R1
JAN 2012
1601 KASANE PLATEAUN KOPANE
UNIT 1
UNIT 2
UNIT 3
UNIT 4
UNIT 5
SHOP
FLOOR
OFFICE/STORE
STORE
TOILETS
SERVICECORRIDOR
ENTRANCE
FOYER
TO FIRST
FLOOR
SHOP
ENTRANCE
2
SHOP
ENTRANCE
1
WASTEAREA
UNIT 1
LOFT
TO
SECOND
FLOOR
TO
LOFT
PARKING
M
AIN
ROAD
SLIP
ROAD
SEW
ER
LINE
GROUND FLOOR PLAN 1:75 FIRST FLOOR PLAN 1:75 SECOND FLOOR PLAN 1:75
SITE/BLOCK PLAN 1:250
PEDESTRIAN
PATH
/
STORM
DRAIN
PEDESTRIANPATH/STORMDRAIN
12000
20000
12000
20000
12000
19999
SERVICE DUCT
LOCATION PLAN 1:5000
A
A
A
A
A
A
r.c. columns
to engineers
spec
r.c. column
to engineers
spec
service
duct
service
duct
service
duct
service
duct
service
duct
service
duct
r.c. columns
to engineers
spec
150X8 square
steel column
bolted to top
of r.c. column
C1
C1
C2
C2C4
C4
C4
C4
C4
C4
C4
C3 C3
C1
C1
C2
C2
C1
C1
C2
C2
PLATEAU
ROAD
I.C.
I.C.
SITE
N N N
N N
12000
2820
20000
2000
230 764 482 456 157 1126 460 1533 1025 230
580 900 900 1336 3364 2340 1200
230 115 115 230
619
230
230 230
580
230
31443724372437243724
230
230
230
230
230
33743954395439543954
6960 3770
580 3711 3594
230 230 230
4115
12000
3230 1665 1665
230 230
38243946 3770
230230
60006000100010006000
230
60012060
230
371018243946
230
55402302302302305540230
8000 2303770
230 7540 230 3770 230
12501150037481230
* PLAN SECTION TAKEN @ 1500mm ABOVE FLOOR LEVELS
554080005540
230
230
230
230
377038244176
230230230
500
1200
1015
285
4870230900
1430
120012001370
3770
1800
1250
4200
600010001750300075015006000
230
230
230
230
554080005540
230
25091100281667811862
230
230
230
115
2340
48942066
1230
1529
3366 3594
1400
2110
1170
2540
1000
4894
1836
3946
2961
4540
2110 500
1200
600
3364
3651
2098
1595
1611 993
915
1515
621
60001000600010006000
55401824394637952205
230
230
230
230
230
230
554055405540
8000 2303770
230 7540 230 3770 230
5540
12000 12001
PLUMBING
WASTE WATER DISPOSAL TO LINK TO
COUNCIL SEWER SYSTEM AS SHOWN.
ALL WASTE WATER PIPING TO
CONSIST 160mm PVC PIPING.
DOORS + WINDOWS
GROUND FLOOR
- SERVICE AREA WINDOWS TO
CONSIST OF STANDARD STEEL AND
INDUSTRIAL WINDOW FRAMESF ITTED
WITH 6mm GLASS
- SHOP WINDOWS TO CONSIST
ALUMINIUM SHOPFRONT FRAMES
FITTED WITH 8mm SAFETY GLASS TO
SPEC
- ALL INTERNAL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
- SHOP FRONT DOORS TO CONSIST
CUSTOM ALUMINIUM FRAME FOLDING
DOORS FITTED WITH 8mm SAFETY
GLASS
FIRST + SECOND FLOORS
- WINDOWS ON NORTH-EAST WALL
TO CONSIST STANDARD STEEL
WINDOW FRAMES FITTED WITH 4mm
GLASS
- SMALL WINDOWS TO CONSIST
500x500 CONC WINDOW FRAMES
FITTED WITH 6mm SAFETY GLASS
- MAIN WINDOWS/SLIDING DOORS TO
CONSIST CUSTOM MADE STAINLESS
STEEL FRAMES FITTED WITH 6mm
SAFETY GLASS
- ALL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
AREAS + SIZES
UNIT 1 : ± 70.8 m²
UNITS 2,3,4+5 : ± 72.0 m²
(ea)
SHOP+SERVICE AREA : ± 192.8 m²
CIRCULATION : ± 106.52 m²
GROUND FLOOR : 240.00 m²
FIRST FLOOR : 231.06 m²
SECOND FLOOR : 187.06 m²
FOOTPRINT : 240.00 m²
TOTAL(ALL FLOORS): 658.12 m²
WALKWAYS + BALUSTRADES
SECOND FLOOR WALKWAYS TO
CONSIST OF 50/75/150 STAINLESS
STEEL SECTION WITH BOLTED
CONNECTIONS INTO RINGBEAM
BALUSTRADES TO CONSIST 50/75
STAINLESS STEEL SQUARE SECTION
BOLTED TO FLOORSLAB AND
WALKWAY STRUCTURE
STAIRS
MAIN STAIRS TO BE CONSTRUCTED
OUT OF REINFORCED CONCRETE AND
FIRE PROTECTED/RESISTANT
STRUCTURE
LOFT STAIRS TO CONSIST STEEL
STRUCTURE AND TIMBER STAIRS
FIRE PROTECTION
BUILDING TO BE FITTED WITH FIRE
PROTECTION SYSTEMS.
• HOSE REEL ON EVERY FLOOR
• FIRE EXTINGUISHERS ON ALL
FLOORS
• AUTOMATIC OVERHEAD SPRAY
NOZZLES IN ALL CIRCULATION AND
PUBLIC SPACES
FINISHES
INTERNAL FINISHES TO VARY
DEPENDING ON TENANT/OWNER
PREFERENCE
EXTERNAL FINISHES TO CONSIST OF
FACEBRICK, PLASTER + RAW
CONCRETE COMPOSITION
NOTES & SPECIFICATIONS
5270615
1200
COLUMNS
COLUMN C1 - 345x345 R.C.
COLUMN C2 - 345x345 R.C.+STEEL
COLUMN C3 - 350 Ø R.C
COLUMN C4 - 580x230 R.C.+STEEL
* ALL COLUMNS, RINGBEAMS +
STRUCTURAL DETAILS TO BE DESIGNED
TO SPEC BY STRUCTURAL ENGINEER
FIRST REVISION (Jan 2012) - LIST OF CHANGES :
- 2 metre canopy above Ground Floor Level added.
- all windows on boundary adjoining Plot 1600 removed.
- additional fire plan.
PROPOSED MIXED USE COMMERCIAL OUTLET /
SELFCATERING HOLIDAY FLATS(SHORT TERM
ACCOMODATION)
P.O. BOX 404380
GABARONE
DATE: PROJECT: DRAWING: SCALE:
DRAWING NUMBER:
AUTHOR:
CLIENT: PLOT: SIGNED:
1 : 50
PAGE:
CONTACT:
CLIENT ADDRESS:
G H
A1 (landscape)
+ 267 71 482929SECTION AA
NK-CMFR-A-02-R11601 KASANE PLATEAUN KOPANE
PLUMBING
WASTE WATER DISPOSAL TO LINK TO
COUNCIL SEWER SYSTEM AS SHOWN.
ALL WASTE WATER PIPING TO
CONSIST 160mm PVC PIPING.
DOORS + WINDOWS
GROUND FLOOR
- SERVICE AREA WINDOWS TO
CONSIST OF STANDARD STEEL AND
INDUSTRIAL WINDOW FRAMESF ITTED
WITH 6mm GLASS
- SHOP WINDOWS TO CONSIST
ALUMINIUM SHOPFRONT FRAMES
FITTED WITH 8mm SAFETY GLASS TO
SPEC
- ALL INTERNAL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
- SHOP FRONT DOORS TO CONSIST
CUSTOM ALUMINIUM FRAME FOLDING
DOORS FITTED WITH 8mm SAFETY
GLASS
FIRST + SECOND FLOORS
- WINDOWS ON NORTH-EAST WALL
TO CONSIST STANDARD STEEL
WINDOW FRAMES FITTED WITH 4mm
GLASS
- SMALL WINDOWS TO CONSIST
500x500 CONC WINDOW FRAMES
FITTED WITH 6mm SAFETY GLASS
- MAIN WINDOWS/SLIDING DOORS TO
CONSIST CUSTOM MADE STAINLESS
STEEL FRAMES FITTED WITH 6mm
SAFETY GLASS
- ALL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
AREAS + SIZES
UNIT 1 : ± 70.8 m²
UNITS 2,3,4+5 : ± 72.0 m²
(ea)
SHOP+SERVICE AREA : ± 192.8 m²
CIRCULATION : ± 106.52 m²
GROUND FLOOR : 240.00 m²
FIRST FLOOR : 231.06 m²
SECOND FLOOR : 187.06 m²
FOOTPRINT : 240.00 m²
TOTAL(ALL FLOORS): 658.12 m²
IBR ROOF SHEETING FIXED TO 75x50
TIMBER PURLINS NAILED @ 750 CS
TO 228x50 TIMBER ROOF TRUSSES @
1500 CS MAX
22 T+G TIMBER FLOOR
BOARDS NAILED TO 75x50
JOISTS NAILED @ 360 CS
MAX TO 228x50 TIMBER
BEARERS @ 550 CS
250 REINFORCED
CONCRETE
FLOORSLAB TO
ENGINEERS SPEC
11920
250
200 REINFORCED
CONCRETE
FLOORSLAB TO
ENGINEERS SPEC
11767
11462
8300
5050
1250
FFL 2
FFL 1
FFL 3
NGL 1
11920FRL
200
450x230
REINFORCED
CONCRETE RING
BEAM TO
ENGINEERS SPEC
350x230
REINFORCED
CONCRETE BEAM
TO ENGINEERS
SPEC
200 REINFORCED
CONCRETE ROOF
SLAB TO
ENGINEERS SPEC
WITH MIN GRADIENT
0.2 °CONCRETE
FILLET
CUSTOM
TIMBER/ALUMINIUM
LOUVRES FIXED TO
TRUSS ENDS
16 GYPSUM CEILING
BOARD FIXED TO 38x38
TIMBER BRANDERS
NAILED @ 345 CS TO
U/SIDE OF 228x50
TIMBER ROOF TRUSSES
TIMBER
STUD WALL
500x230
REINFORCED
CONCRETE RING
BEAM TO
ENGINEERS SPEC
CUSTOM
TIMBER/ALUMINIUM
LOUVRES FIXED TO
RINGBEAM
20 SUSPENDED
CEILING FIXED TO
U/SIDE OF FLOOR
SLAB WITH ALUMINIUM
HANGERS
230
STRUCTURAL
BRICK WALL
250x900 REINFORCED
CONCRETE STEP
FOOTINGS TO
ENGINEERS SPEC @
MIN DEPTH 1200
BELOW NGL
2501400
GALVANISED
STEEL RIDGE
COVER
150
150 REINFORCED CONCRETE
FLOORSLAB ON COMPACTED
EARTH AND RUBBLE
BACKFILL TO SUIT
115 NON
STRUCTURAL
BRICK WALL
ON
THICKENED
SLAB
5°
355030503112
1389
10870
200
274133003486500509
2100
1250
25002675
2928
2627
2078
1254
512
2639
WALKWAYS + BALUSTRADES
SECOND FLOOR WALKWAYS TO
CONSIST OF 50/75/150 STAINLESS
STEEL SECTION WITH BOLTED
CONNECTIONS INTO RINGBEAM
BALUSTRADES TO CONSIST 50/75
STAINLESS STEEL SQUARE SECTION
BOLTED TO FLOORSLAB AND
WALKWAY STRUCTURE
STAIRS
MAIN STAIRS TO BE CONSTRUCTED
OUT OF REINFORCED CONCRETE AND
FIRE PROTECTED/RESISTANT
STRUCTURE
LOFT STAIRS TO CONSIST STEEL
STRUCTURE AND TIMBER STAIRS
FIRE PROTECTION
BUILDING TO BE FITTED WITH FIRE
PROTECTION SYSTEMS.
• HOSE REEL ON EVERY FLOOR
• FIRE EXTINGUISHERS ON ALL
FLOORS
• AUTOMATIC OVERHEAD SPRAY
NOZZLES IN ALL CIRCULATION AND
PUBLIC SPACES
FINISHES
INTERNAL FINISHES TO VARY
DEPENDING ON TENANT/OWNER
PREFERENCE
EXTERNAL FINISHES TO CONSIST OF
FACEBRICK, PLASTER + RAW
CONCRETE COMPOSITION
NOTES & SPECIFICATIONS
COLUMNS
COLUMN C1 - 345x345 R.C.
COLUMN C2 - 345x345 R.C.+STEEL
COLUMN C3 - 350 Ø R.C
COLUMN C4 - 580x230 R.C.+STEEL
* ALL COLUMNS, RINGBEAMS +
STRUCTURAL DETAILS TO BE DESIGNED
TO SPEC BY STRUCTURAL ENGINEER
SECTION AA 1:50











JAN 2012
2M STEEL + ALUMINIUM
CANOPY BOLTED TO
RINGBEAM AND STAYED
WITH STEEL CABLES
FIXED TO SECOND
FLOOR SLAB
FIRST REVISION (Jan 2012) - LIST OF CHANGES :
- 2 metre canopy above Ground Floor Level added.
- all windows on boundary adjoining Plot 1600 removed.
- additional fire plan
PROPOSED MIXED USE COMMERCIAL OUTLET /
SELFCATERING HOLIDAY FLATS(SHORT TERM
ACCOMODATION)
3630
P.O. BOX 404380
GABARONE
DATE: PROJECT: DRAWING: SCALE:
DRAWING NUMBER:
AUTHOR:
CLIENT: PLOT: SIGNED:
1:100
PAGE:
CONTACT:
CLIENT ADDRESS:
G H
A1 (landscape)
+ 267 71 482929ELEVATIONS
NK-CMFR-A-03-R11601 KASANE PLATEAUN KOPANE
SIDE ELEVATION 1:100SIDE ELEVATION 1:100
FRONT ELEVATION 1:100 REAR ELEVATION 1:100
PLUMBING
WASTE WATER DISPOSAL TO LINK TO
COUNCIL SEWER SYSTEM AS SHOWN.
ALL WASTE WATER PIPING TO
CONSIST 160mm PVC PIPING.
DOORS + WINDOWS
GROUND FLOOR
- SERVICE AREA WINDOWS TO
CONSIST OF STANDARD STEEL AND
INDUSTRIAL WINDOW FRAMESF ITTED
WITH 6mm GLASS
- SHOP WINDOWS TO CONSIST
ALUMINIUM SHOPFRONT FRAMES
FITTED WITH 8mm SAFETY GLASS TO
SPEC
- ALL INTERNAL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
- SHOP FRONT DOORS TO CONSIST
CUSTOM ALUMINIUM FRAME FOLDING
DOORS FITTED WITH 8mm SAFETY
GLASS
FIRST + SECOND FLOORS
- WINDOWS ON NORTH-EAST WALL
TO CONSIST STANDARD STEEL
WINDOW FRAMES FITTED WITH 4mm
GLASS
- SMALL WINDOWS TO CONSIST
500x500 CONC WINDOW FRAMES
FITTED WITH 6mm SAFETY GLASS
- MAIN WINDOWS/SLIDING DOORS TO
CONSIST CUSTOM MADE STAINLESS
STEEL FRAMES FITTED WITH 6mm
SAFETY GLASS
- ALL DOORS TO CONSIST
STANDARD STEEL FRAMES FITTED
WITH HARDWOOD DOORS
AREAS + SIZES
UNIT 1 : ± 70.8 m²
UNITS 2,3,4+5 : ± 72.0 m²
(ea)
SHOP+SERVICE AREA : ± 192.8 m²
CIRCULATION : ± 106.52 m²
GROUND FLOOR : 240.00 m²
FIRST FLOOR : 231.06 m²
SECOND FLOOR : 187.06 m²
FOOTPRINT : 240.00 m²
TOTAL(ALL FLOORS): 658.12 m²
WALKWAYS + BALUSTRADES
SECOND FLOOR WALKWAYS TO
CONSIST OF 50/75/150 STAINLESS
STEEL SECTION WITH BOLTED
CONNECTIONS INTO RINGBEAM
BALUSTRADES TO CONSIST 50/75
STAINLESS STEEL SQUARE SECTION
BOLTED TO FLOORSLAB AND
WALKWAY STRUCTURE
STAIRS
MAIN STAIRS TO BE CONSTRUCTED
OUT OF REINFORCED CONCRETE AND
FIRE PROTECTED/RESISTANT
STRUCTURE
LOFT STAIRS TO CONSIST STEEL
STRUCTURE AND TIMBER STAIRS
FIRE PROTECTION
BUILDING TO BE FITTED WITH FIRE
PROTECTION SYSTEMS.
• HOSE REEL ON EVERY FLOOR
• FIRE EXTINGUISHERS ON ALL
FLOORS
• AUTOMATIC OVERHEAD SPRAY
NOZZLES IN ALL CIRCULATION AND
PUBLIC SPACES
FINISHES
INTERNAL FINISHES TO VARY
DEPENDING ON TENANT/OWNER
PREFERENCE
EXTERNAL FINISHES TO CONSIST OF
FACEBRICK, PLASTER + RAW
CONCRETE COMPOSITION
NOTES & SPECIFICATIONS











PROPOSED MIXED USE COMMERCIAL OUTLET /
SELFCATERING HOLIDAY FLATS(SHORT TERM
ACCOMODATION)
JAN 2012
COLUMNS
COLUMN C1 - 345x345 R.C.
COLUMN C2 - 345x345 R.C.+STEEL
COLUMN C3 - 350 Ø R.C
COLUMN C4 - 580x230 R.C.+STEEL
* ALL COLUMNS, RINGBEAMS +
STRUCTURAL DETAILS TO BE DESIGNED
TO SPEC BY STRUCTURAL ENGINEER
FIRST REVISION (Jan 2012) - LIST OF CHANGES :
- 2 metre canopy above Ground Floor Level added.
- all windows on boundary adjoining Plot 1600 removed.
- additional fire plan
P.O. BOX 404380
GABARONE
A
S
S
S
S
S
S
S
FCP
DATE: PROJECT: DRAWING: SCALE:
DRAWING NUMBER:
AUTHOR:
NOTES &
SPECIFICATIONS
CLIENT: PLOT: SIGNED:
1:75
PAGE:
CONTACT:
CLIENT ADDRESS:
G H
A1 (landscape)
+ 267 71 482929FIRE PROTECTION LAYOUT PLANS










NK-CMFR-FPL
JAN 2011
1601 KASANE PLATEAUNTEMA KOPANE
P.O. BOX 404380
GABARONE
FIRE PROTECTION SYSTEM
THE FIRE PROTECTION SYSTEM IS TO
CONSIST OF AN OVERHEAD
SPRINKLER SYSTEM SERVICING ALL
PUBLIC AREAS, HOSE REELS WILL BE
LOCATED AT ADEQUATE POINTS SO AS
TO BE NO MORE THAN 25m OF ANY
POINT IN THE BUILDING, FIRE
EXTINGUISHERS WILL ALSO BE
LOCATED AT SUITABLE POINTS FOR
EASE AND SPEED OF ACCESS.
SMOKE DETECTORS WILL BE
INSTALLED IN ALL ROOMS, AS WILL
FIRE ALARM SWITCHES BE INSTALLED
IN SUITABLE LOCATIONS
THROUGHOUT THE BUILDING.
A SUITABLE ROOF TOP STORAGE TANK
DEDICATED TO SPRINKLER SUPPLY
WILL BE INSTALLED TO ENSURE
ADEQUATE PRESSURE AND
UNINTERRUPTED SUPPLY.
ALL FIRE SYSTEMS TO BE PASSED AND
INSTALLED BY FIRE PROTECTION
SPECIALIST.
SMOKE DETECTOR
FIRE EXTINGUISHER
HOSE REEL
SPRINKLER SYSTEM
PROPOSED MIXED USE COMMERCIAL OUTLET /
SELFCATERING HOLIDAY FLATS(SHORT TERM
ACCOMODATION)
FROM
FIRST
FLOOR
TO
SECOND
FLOOR
FROM
GROUND
FLOOR
TO
LOFT
TO
FIRST
FLOOR
20000
12000 12000 12000
2000
A
S
FIRE ALARM
FIRE ALARM SWITCH
N
FCP FIRE CONTROL PANEL

More Related Content

What's hot

Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure infoMatis Velt
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMark Thornton
 
11-Working details-cladding-cat alpolic guide-by Prof Dr. Ehab Ezzat 2019
11-Working details-cladding-cat alpolic  guide-by Prof Dr. Ehab Ezzat 201911-Working details-cladding-cat alpolic  guide-by Prof Dr. Ehab Ezzat 2019
11-Working details-cladding-cat alpolic guide-by Prof Dr. Ehab Ezzat 2019Faculty of fine arts -Cairo. Egypt.
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3Aden Saitabau Kumary
 
MARK THORNTON ISO CORNER SECTION DETAIL
MARK THORNTON ISO CORNER SECTION DETAILMARK THORNTON ISO CORNER SECTION DETAIL
MARK THORNTON ISO CORNER SECTION DETAILMark Thornton
 
Barndoorhardware.com Distributor of ABP Beyerle
Barndoorhardware.com Distributor of ABP BeyerleBarndoorhardware.com Distributor of ABP Beyerle
Barndoorhardware.com Distributor of ABP BeyerleBarn Door Hardware
 
Modules export eng oct2013
Modules export eng oct2013Modules export eng oct2013
Modules export eng oct2013Europaprefabri
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolioAndrew Johnson
 
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...IndiaMART InterMESH Limited
 

What's hot (20)

Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure info
 
Elevations & sections
Elevations & sectionsElevations & sections
Elevations & sections
 
Floor plans
Floor plansFloor plans
Floor plans
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWING
 
Presskey
PresskeyPresskey
Presskey
 
INTERNORM
INTERNORMINTERNORM
INTERNORM
 
11-Working details-cladding-cat alpolic guide-by Prof Dr. Ehab Ezzat 2019
11-Working details-cladding-cat alpolic  guide-by Prof Dr. Ehab Ezzat 201911-Working details-cladding-cat alpolic  guide-by Prof Dr. Ehab Ezzat 2019
11-Working details-cladding-cat alpolic guide-by Prof Dr. Ehab Ezzat 2019
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
HF 410
HF 410HF 410
HF 410
 
Portfolio
PortfolioPortfolio
Portfolio
 
Decorative Air Curtains Catalogue
Decorative Air Curtains CatalogueDecorative Air Curtains Catalogue
Decorative Air Curtains Catalogue
 
MARK THORNTON ISO CORNER SECTION DETAIL
MARK THORNTON ISO CORNER SECTION DETAILMARK THORNTON ISO CORNER SECTION DETAIL
MARK THORNTON ISO CORNER SECTION DETAIL
 
Sections and details
Sections and detailsSections and details
Sections and details
 
Floor plans
Floor plansFloor plans
Floor plans
 
Barndoorhardware.com Distributor of ABP Beyerle
Barndoorhardware.com Distributor of ABP BeyerleBarndoorhardware.com Distributor of ABP Beyerle
Barndoorhardware.com Distributor of ABP Beyerle
 
C&C_Man_Enclosure
C&C_Man_EnclosureC&C_Man_Enclosure
C&C_Man_Enclosure
 
Modules export eng oct2013
Modules export eng oct2013Modules export eng oct2013
Modules export eng oct2013
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolio
 
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...
Pushpak Products India Private Limited, Karnataka, Furniture & Material Handl...
 

Viewers also liked

Royal Mukuni Villas Concept
Royal Mukuni Villas ConceptRoyal Mukuni Villas Concept
Royal Mukuni Villas ConceptGrant Hepburn
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseGrant Hepburn
 
Kwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot ExpansionKwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot ExpansionGrant Hepburn
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As BuiltGrant Hepburn
 
Frayne House Extension
Frayne House ExtensionFrayne House Extension
Frayne House ExtensionGrant Hepburn
 
E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family ResidentialGrant Hepburn
 
Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush LodgeGrant Hepburn
 
Lebantsho Guesthouse
Lebantsho GuesthouseLebantsho Guesthouse
Lebantsho GuesthouseGrant Hepburn
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations BaseGrant Hepburn
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 

Viewers also liked (14)

Africa Avantu Lodge
Africa Avantu LodgeAfrica Avantu Lodge
Africa Avantu Lodge
 
Royal Mukuni Villas Concept
Royal Mukuni Villas ConceptRoyal Mukuni Villas Concept
Royal Mukuni Villas Concept
 
Bakwena Lodge Mgmt House
Bakwena Lodge Mgmt HouseBakwena Lodge Mgmt House
Bakwena Lodge Mgmt House
 
Kwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot ExpansionKwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot Expansion
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As Built
 
Bataleur Farm House
Bataleur Farm HouseBataleur Farm House
Bataleur Farm House
 
Frayne House Extension
Frayne House ExtensionFrayne House Extension
Frayne House Extension
 
E Clemence Multi Family Residential
E Clemence Multi Family ResidentialE Clemence Multi Family Residential
E Clemence Multi Family Residential
 
Blair House
Blair HouseBlair House
Blair House
 
Riggs House
Riggs HouseRiggs House
Riggs House
 
Last Eden Eco Bush Lodge
Last Eden Eco Bush LodgeLast Eden Eco Bush Lodge
Last Eden Eco Bush Lodge
 
Lebantsho Guesthouse
Lebantsho GuesthouseLebantsho Guesthouse
Lebantsho Guesthouse
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 

Similar to Kopane Courts Mixed Use

R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceDaniel Simpson
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceDale Thomas
 
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonrsarveshnassa11
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2XingYue0907
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentCraigFensham
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingMaja Myall
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development PortfolioChinh Phan Duc
 
Nitesh british columbia
Nitesh british columbiaNitesh british columbia
Nitesh british columbianitesh-estates
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Dave Teu
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 

Similar to Kopane Courts Mixed Use (20)

8 months work
8 months work8 months work
8 months work
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glance
 
R-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glanceR-MER Metal Roofing Systems - System at a glance
R-MER Metal Roofing Systems - System at a glance
 
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr
8826869222 ATS Tourmaline Sector 109 Dwarka Expressway Gurgaonr
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce Development
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development Portfolio
 
Nitesh british columbia
Nitesh british columbiaNitesh british columbia
Nitesh british columbia
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Ireo Victory Valley in Gurgaon
Ireo Victory Valley in GurgaonIreo Victory Valley in Gurgaon
Ireo Victory Valley in Gurgaon
 
Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
A PPT.pptx
A PPT.pptxA PPT.pptx
A PPT.pptx
 
958 sector 14 PPT.pdf
958 sector 14 PPT.pdf958 sector 14 PPT.pdf
958 sector 14 PPT.pdf
 

Kopane Courts Mixed Use

  • 1. Open space 7 535sqm Open space 3 798sqm G. House 1 578sqm 18m Road CS DATE: PROJECT: DRAWING: SCALE: DRAWING NUMBER: AUTHOR: CLIENT: PLOT: SIGNED: 1:75 1:250 1:5000 PAGE: CONTACT: CLIENT ADDRESS: G H A1 (landscape) + 267 71 482929FLOOR PLANS, SITE/BLOCK PLAN + LOCATION PLAN           NK-CMFR-A-01-R1 JAN 2012 1601 KASANE PLATEAUN KOPANE UNIT 1 UNIT 2 UNIT 3 UNIT 4 UNIT 5 SHOP FLOOR OFFICE/STORE STORE TOILETS SERVICECORRIDOR ENTRANCE FOYER TO FIRST FLOOR SHOP ENTRANCE 2 SHOP ENTRANCE 1 WASTEAREA UNIT 1 LOFT TO SECOND FLOOR TO LOFT PARKING M AIN ROAD SLIP ROAD SEW ER LINE GROUND FLOOR PLAN 1:75 FIRST FLOOR PLAN 1:75 SECOND FLOOR PLAN 1:75 SITE/BLOCK PLAN 1:250 PEDESTRIAN PATH / STORM DRAIN PEDESTRIANPATH/STORMDRAIN 12000 20000 12000 20000 12000 19999 SERVICE DUCT LOCATION PLAN 1:5000 A A A A A A r.c. columns to engineers spec r.c. column to engineers spec service duct service duct service duct service duct service duct service duct r.c. columns to engineers spec 150X8 square steel column bolted to top of r.c. column C1 C1 C2 C2C4 C4 C4 C4 C4 C4 C4 C3 C3 C1 C1 C2 C2 C1 C1 C2 C2 PLATEAU ROAD I.C. I.C. SITE N N N N N 12000 2820 20000 2000 230 764 482 456 157 1126 460 1533 1025 230 580 900 900 1336 3364 2340 1200 230 115 115 230 619 230 230 230 580 230 31443724372437243724 230 230 230 230 230 33743954395439543954 6960 3770 580 3711 3594 230 230 230 4115 12000 3230 1665 1665 230 230 38243946 3770 230230 60006000100010006000 230 60012060 230 371018243946 230 55402302302302305540230 8000 2303770 230 7540 230 3770 230 12501150037481230 * PLAN SECTION TAKEN @ 1500mm ABOVE FLOOR LEVELS 554080005540 230 230 230 230 377038244176 230230230 500 1200 1015 285 4870230900 1430 120012001370 3770 1800 1250 4200 600010001750300075015006000 230 230 230 230 554080005540 230 25091100281667811862 230 230 230 115 2340 48942066 1230 1529 3366 3594 1400 2110 1170 2540 1000 4894 1836 3946 2961 4540 2110 500 1200 600 3364 3651 2098 1595 1611 993 915 1515 621 60001000600010006000 55401824394637952205 230 230 230 230 230 230 554055405540 8000 2303770 230 7540 230 3770 230 5540 12000 12001 PLUMBING WASTE WATER DISPOSAL TO LINK TO COUNCIL SEWER SYSTEM AS SHOWN. ALL WASTE WATER PIPING TO CONSIST 160mm PVC PIPING. DOORS + WINDOWS GROUND FLOOR - SERVICE AREA WINDOWS TO CONSIST OF STANDARD STEEL AND INDUSTRIAL WINDOW FRAMESF ITTED WITH 6mm GLASS - SHOP WINDOWS TO CONSIST ALUMINIUM SHOPFRONT FRAMES FITTED WITH 8mm SAFETY GLASS TO SPEC - ALL INTERNAL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS - SHOP FRONT DOORS TO CONSIST CUSTOM ALUMINIUM FRAME FOLDING DOORS FITTED WITH 8mm SAFETY GLASS FIRST + SECOND FLOORS - WINDOWS ON NORTH-EAST WALL TO CONSIST STANDARD STEEL WINDOW FRAMES FITTED WITH 4mm GLASS - SMALL WINDOWS TO CONSIST 500x500 CONC WINDOW FRAMES FITTED WITH 6mm SAFETY GLASS - MAIN WINDOWS/SLIDING DOORS TO CONSIST CUSTOM MADE STAINLESS STEEL FRAMES FITTED WITH 6mm SAFETY GLASS - ALL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS AREAS + SIZES UNIT 1 : ± 70.8 m² UNITS 2,3,4+5 : ± 72.0 m² (ea) SHOP+SERVICE AREA : ± 192.8 m² CIRCULATION : ± 106.52 m² GROUND FLOOR : 240.00 m² FIRST FLOOR : 231.06 m² SECOND FLOOR : 187.06 m² FOOTPRINT : 240.00 m² TOTAL(ALL FLOORS): 658.12 m² WALKWAYS + BALUSTRADES SECOND FLOOR WALKWAYS TO CONSIST OF 50/75/150 STAINLESS STEEL SECTION WITH BOLTED CONNECTIONS INTO RINGBEAM BALUSTRADES TO CONSIST 50/75 STAINLESS STEEL SQUARE SECTION BOLTED TO FLOORSLAB AND WALKWAY STRUCTURE STAIRS MAIN STAIRS TO BE CONSTRUCTED OUT OF REINFORCED CONCRETE AND FIRE PROTECTED/RESISTANT STRUCTURE LOFT STAIRS TO CONSIST STEEL STRUCTURE AND TIMBER STAIRS FIRE PROTECTION BUILDING TO BE FITTED WITH FIRE PROTECTION SYSTEMS. • HOSE REEL ON EVERY FLOOR • FIRE EXTINGUISHERS ON ALL FLOORS • AUTOMATIC OVERHEAD SPRAY NOZZLES IN ALL CIRCULATION AND PUBLIC SPACES FINISHES INTERNAL FINISHES TO VARY DEPENDING ON TENANT/OWNER PREFERENCE EXTERNAL FINISHES TO CONSIST OF FACEBRICK, PLASTER + RAW CONCRETE COMPOSITION NOTES & SPECIFICATIONS 5270615 1200 COLUMNS COLUMN C1 - 345x345 R.C. COLUMN C2 - 345x345 R.C.+STEEL COLUMN C3 - 350 Ø R.C COLUMN C4 - 580x230 R.C.+STEEL * ALL COLUMNS, RINGBEAMS + STRUCTURAL DETAILS TO BE DESIGNED TO SPEC BY STRUCTURAL ENGINEER FIRST REVISION (Jan 2012) - LIST OF CHANGES : - 2 metre canopy above Ground Floor Level added. - all windows on boundary adjoining Plot 1600 removed. - additional fire plan. PROPOSED MIXED USE COMMERCIAL OUTLET / SELFCATERING HOLIDAY FLATS(SHORT TERM ACCOMODATION) P.O. BOX 404380 GABARONE
  • 2. DATE: PROJECT: DRAWING: SCALE: DRAWING NUMBER: AUTHOR: CLIENT: PLOT: SIGNED: 1 : 50 PAGE: CONTACT: CLIENT ADDRESS: G H A1 (landscape) + 267 71 482929SECTION AA NK-CMFR-A-02-R11601 KASANE PLATEAUN KOPANE PLUMBING WASTE WATER DISPOSAL TO LINK TO COUNCIL SEWER SYSTEM AS SHOWN. ALL WASTE WATER PIPING TO CONSIST 160mm PVC PIPING. DOORS + WINDOWS GROUND FLOOR - SERVICE AREA WINDOWS TO CONSIST OF STANDARD STEEL AND INDUSTRIAL WINDOW FRAMESF ITTED WITH 6mm GLASS - SHOP WINDOWS TO CONSIST ALUMINIUM SHOPFRONT FRAMES FITTED WITH 8mm SAFETY GLASS TO SPEC - ALL INTERNAL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS - SHOP FRONT DOORS TO CONSIST CUSTOM ALUMINIUM FRAME FOLDING DOORS FITTED WITH 8mm SAFETY GLASS FIRST + SECOND FLOORS - WINDOWS ON NORTH-EAST WALL TO CONSIST STANDARD STEEL WINDOW FRAMES FITTED WITH 4mm GLASS - SMALL WINDOWS TO CONSIST 500x500 CONC WINDOW FRAMES FITTED WITH 6mm SAFETY GLASS - MAIN WINDOWS/SLIDING DOORS TO CONSIST CUSTOM MADE STAINLESS STEEL FRAMES FITTED WITH 6mm SAFETY GLASS - ALL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS AREAS + SIZES UNIT 1 : ± 70.8 m² UNITS 2,3,4+5 : ± 72.0 m² (ea) SHOP+SERVICE AREA : ± 192.8 m² CIRCULATION : ± 106.52 m² GROUND FLOOR : 240.00 m² FIRST FLOOR : 231.06 m² SECOND FLOOR : 187.06 m² FOOTPRINT : 240.00 m² TOTAL(ALL FLOORS): 658.12 m² IBR ROOF SHEETING FIXED TO 75x50 TIMBER PURLINS NAILED @ 750 CS TO 228x50 TIMBER ROOF TRUSSES @ 1500 CS MAX 22 T+G TIMBER FLOOR BOARDS NAILED TO 75x50 JOISTS NAILED @ 360 CS MAX TO 228x50 TIMBER BEARERS @ 550 CS 250 REINFORCED CONCRETE FLOORSLAB TO ENGINEERS SPEC 11920 250 200 REINFORCED CONCRETE FLOORSLAB TO ENGINEERS SPEC 11767 11462 8300 5050 1250 FFL 2 FFL 1 FFL 3 NGL 1 11920FRL 200 450x230 REINFORCED CONCRETE RING BEAM TO ENGINEERS SPEC 350x230 REINFORCED CONCRETE BEAM TO ENGINEERS SPEC 200 REINFORCED CONCRETE ROOF SLAB TO ENGINEERS SPEC WITH MIN GRADIENT 0.2 °CONCRETE FILLET CUSTOM TIMBER/ALUMINIUM LOUVRES FIXED TO TRUSS ENDS 16 GYPSUM CEILING BOARD FIXED TO 38x38 TIMBER BRANDERS NAILED @ 345 CS TO U/SIDE OF 228x50 TIMBER ROOF TRUSSES TIMBER STUD WALL 500x230 REINFORCED CONCRETE RING BEAM TO ENGINEERS SPEC CUSTOM TIMBER/ALUMINIUM LOUVRES FIXED TO RINGBEAM 20 SUSPENDED CEILING FIXED TO U/SIDE OF FLOOR SLAB WITH ALUMINIUM HANGERS 230 STRUCTURAL BRICK WALL 250x900 REINFORCED CONCRETE STEP FOOTINGS TO ENGINEERS SPEC @ MIN DEPTH 1200 BELOW NGL 2501400 GALVANISED STEEL RIDGE COVER 150 150 REINFORCED CONCRETE FLOORSLAB ON COMPACTED EARTH AND RUBBLE BACKFILL TO SUIT 115 NON STRUCTURAL BRICK WALL ON THICKENED SLAB 5° 355030503112 1389 10870 200 274133003486500509 2100 1250 25002675 2928 2627 2078 1254 512 2639 WALKWAYS + BALUSTRADES SECOND FLOOR WALKWAYS TO CONSIST OF 50/75/150 STAINLESS STEEL SECTION WITH BOLTED CONNECTIONS INTO RINGBEAM BALUSTRADES TO CONSIST 50/75 STAINLESS STEEL SQUARE SECTION BOLTED TO FLOORSLAB AND WALKWAY STRUCTURE STAIRS MAIN STAIRS TO BE CONSTRUCTED OUT OF REINFORCED CONCRETE AND FIRE PROTECTED/RESISTANT STRUCTURE LOFT STAIRS TO CONSIST STEEL STRUCTURE AND TIMBER STAIRS FIRE PROTECTION BUILDING TO BE FITTED WITH FIRE PROTECTION SYSTEMS. • HOSE REEL ON EVERY FLOOR • FIRE EXTINGUISHERS ON ALL FLOORS • AUTOMATIC OVERHEAD SPRAY NOZZLES IN ALL CIRCULATION AND PUBLIC SPACES FINISHES INTERNAL FINISHES TO VARY DEPENDING ON TENANT/OWNER PREFERENCE EXTERNAL FINISHES TO CONSIST OF FACEBRICK, PLASTER + RAW CONCRETE COMPOSITION NOTES & SPECIFICATIONS COLUMNS COLUMN C1 - 345x345 R.C. COLUMN C2 - 345x345 R.C.+STEEL COLUMN C3 - 350 Ø R.C COLUMN C4 - 580x230 R.C.+STEEL * ALL COLUMNS, RINGBEAMS + STRUCTURAL DETAILS TO BE DESIGNED TO SPEC BY STRUCTURAL ENGINEER SECTION AA 1:50            JAN 2012 2M STEEL + ALUMINIUM CANOPY BOLTED TO RINGBEAM AND STAYED WITH STEEL CABLES FIXED TO SECOND FLOOR SLAB FIRST REVISION (Jan 2012) - LIST OF CHANGES : - 2 metre canopy above Ground Floor Level added. - all windows on boundary adjoining Plot 1600 removed. - additional fire plan PROPOSED MIXED USE COMMERCIAL OUTLET / SELFCATERING HOLIDAY FLATS(SHORT TERM ACCOMODATION) 3630 P.O. BOX 404380 GABARONE
  • 3. DATE: PROJECT: DRAWING: SCALE: DRAWING NUMBER: AUTHOR: CLIENT: PLOT: SIGNED: 1:100 PAGE: CONTACT: CLIENT ADDRESS: G H A1 (landscape) + 267 71 482929ELEVATIONS NK-CMFR-A-03-R11601 KASANE PLATEAUN KOPANE SIDE ELEVATION 1:100SIDE ELEVATION 1:100 FRONT ELEVATION 1:100 REAR ELEVATION 1:100 PLUMBING WASTE WATER DISPOSAL TO LINK TO COUNCIL SEWER SYSTEM AS SHOWN. ALL WASTE WATER PIPING TO CONSIST 160mm PVC PIPING. DOORS + WINDOWS GROUND FLOOR - SERVICE AREA WINDOWS TO CONSIST OF STANDARD STEEL AND INDUSTRIAL WINDOW FRAMESF ITTED WITH 6mm GLASS - SHOP WINDOWS TO CONSIST ALUMINIUM SHOPFRONT FRAMES FITTED WITH 8mm SAFETY GLASS TO SPEC - ALL INTERNAL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS - SHOP FRONT DOORS TO CONSIST CUSTOM ALUMINIUM FRAME FOLDING DOORS FITTED WITH 8mm SAFETY GLASS FIRST + SECOND FLOORS - WINDOWS ON NORTH-EAST WALL TO CONSIST STANDARD STEEL WINDOW FRAMES FITTED WITH 4mm GLASS - SMALL WINDOWS TO CONSIST 500x500 CONC WINDOW FRAMES FITTED WITH 6mm SAFETY GLASS - MAIN WINDOWS/SLIDING DOORS TO CONSIST CUSTOM MADE STAINLESS STEEL FRAMES FITTED WITH 6mm SAFETY GLASS - ALL DOORS TO CONSIST STANDARD STEEL FRAMES FITTED WITH HARDWOOD DOORS AREAS + SIZES UNIT 1 : ± 70.8 m² UNITS 2,3,4+5 : ± 72.0 m² (ea) SHOP+SERVICE AREA : ± 192.8 m² CIRCULATION : ± 106.52 m² GROUND FLOOR : 240.00 m² FIRST FLOOR : 231.06 m² SECOND FLOOR : 187.06 m² FOOTPRINT : 240.00 m² TOTAL(ALL FLOORS): 658.12 m² WALKWAYS + BALUSTRADES SECOND FLOOR WALKWAYS TO CONSIST OF 50/75/150 STAINLESS STEEL SECTION WITH BOLTED CONNECTIONS INTO RINGBEAM BALUSTRADES TO CONSIST 50/75 STAINLESS STEEL SQUARE SECTION BOLTED TO FLOORSLAB AND WALKWAY STRUCTURE STAIRS MAIN STAIRS TO BE CONSTRUCTED OUT OF REINFORCED CONCRETE AND FIRE PROTECTED/RESISTANT STRUCTURE LOFT STAIRS TO CONSIST STEEL STRUCTURE AND TIMBER STAIRS FIRE PROTECTION BUILDING TO BE FITTED WITH FIRE PROTECTION SYSTEMS. • HOSE REEL ON EVERY FLOOR • FIRE EXTINGUISHERS ON ALL FLOORS • AUTOMATIC OVERHEAD SPRAY NOZZLES IN ALL CIRCULATION AND PUBLIC SPACES FINISHES INTERNAL FINISHES TO VARY DEPENDING ON TENANT/OWNER PREFERENCE EXTERNAL FINISHES TO CONSIST OF FACEBRICK, PLASTER + RAW CONCRETE COMPOSITION NOTES & SPECIFICATIONS            PROPOSED MIXED USE COMMERCIAL OUTLET / SELFCATERING HOLIDAY FLATS(SHORT TERM ACCOMODATION) JAN 2012 COLUMNS COLUMN C1 - 345x345 R.C. COLUMN C2 - 345x345 R.C.+STEEL COLUMN C3 - 350 Ø R.C COLUMN C4 - 580x230 R.C.+STEEL * ALL COLUMNS, RINGBEAMS + STRUCTURAL DETAILS TO BE DESIGNED TO SPEC BY STRUCTURAL ENGINEER FIRST REVISION (Jan 2012) - LIST OF CHANGES : - 2 metre canopy above Ground Floor Level added. - all windows on boundary adjoining Plot 1600 removed. - additional fire plan P.O. BOX 404380 GABARONE
  • 4. A S S S S S S S FCP DATE: PROJECT: DRAWING: SCALE: DRAWING NUMBER: AUTHOR: NOTES & SPECIFICATIONS CLIENT: PLOT: SIGNED: 1:75 PAGE: CONTACT: CLIENT ADDRESS: G H A1 (landscape) + 267 71 482929FIRE PROTECTION LAYOUT PLANS           NK-CMFR-FPL JAN 2011 1601 KASANE PLATEAUNTEMA KOPANE P.O. BOX 404380 GABARONE FIRE PROTECTION SYSTEM THE FIRE PROTECTION SYSTEM IS TO CONSIST OF AN OVERHEAD SPRINKLER SYSTEM SERVICING ALL PUBLIC AREAS, HOSE REELS WILL BE LOCATED AT ADEQUATE POINTS SO AS TO BE NO MORE THAN 25m OF ANY POINT IN THE BUILDING, FIRE EXTINGUISHERS WILL ALSO BE LOCATED AT SUITABLE POINTS FOR EASE AND SPEED OF ACCESS. SMOKE DETECTORS WILL BE INSTALLED IN ALL ROOMS, AS WILL FIRE ALARM SWITCHES BE INSTALLED IN SUITABLE LOCATIONS THROUGHOUT THE BUILDING. A SUITABLE ROOF TOP STORAGE TANK DEDICATED TO SPRINKLER SUPPLY WILL BE INSTALLED TO ENSURE ADEQUATE PRESSURE AND UNINTERRUPTED SUPPLY. ALL FIRE SYSTEMS TO BE PASSED AND INSTALLED BY FIRE PROTECTION SPECIALIST. SMOKE DETECTOR FIRE EXTINGUISHER HOSE REEL SPRINKLER SYSTEM PROPOSED MIXED USE COMMERCIAL OUTLET / SELFCATERING HOLIDAY FLATS(SHORT TERM ACCOMODATION) FROM FIRST FLOOR TO SECOND FLOOR FROM GROUND FLOOR TO LOFT TO FIRST FLOOR 20000 12000 12000 12000 2000 A S FIRE ALARM FIRE ALARM SWITCH N FCP FIRE CONTROL PANEL