SlideShare a Scribd company logo
1 of 3
KAZI FERDOUSUL KARIMKAZI FERDOUSUL KARIM
PG Diploma in Thermal Power Plant Engineering (NPTI Course) and B.TECH
(Electrical Engineering)
E-mail:E-mail: ferdouskarimkazi@gmail.com / ferdous.kazi@rediffmail.com
Mobile:Mobile: +91-8096256648/+91-8096256648/++91-892747924391-8927479243
PG Diploma in Thermal Power Plant Engg. (NPTI Course) and B.TECH (Electrical Engg) with 3 Year 3
months experience (continuing) in Power Plant Operation
ApercuApercu
 Presently working in Simhapuri Energy Limited (Madhucon Projects), Nellore, Andhra
Pradesh and looking after Operation of Boiler, Turbine of 600 MW(4*150MW).
 Successfully completed training at Pragati Power having 330 MW Combined Cycle Gas
Turbine Plant of GE make Turbine (2 x 104 MW Frame 9-E Gas Turbine and 1 x 122 MW STG Unit).
 Having Knowledge of Rankine cycle, Brayton cycle Reheat cycle, Sub critical and Super critical boiler, PF
boiler, Regeneration cycle, Turbine, Pump, Fan, Condenser and cooling tower etc.
 Successfully completed Simulator Training Programme (210 MW).
 Having full-fledged knowledge of large scale Thermal Power Plant and Combined Cycle Power
Plant.
 Ability to analyse and interpret unique problems, with a combination of training experience and logical
thinking to find the right solutions.
 Acquired knowledge and understanding of subjects like; Electrical Machines, Power System, Power plant
Engineering etc.
 Excellent relationship management, analytical and negotiation skills.
Job RecordJob Record
1. Company :- Simhapuri Energy Limited (Madhucon Group)
Address :- Thamminapatnam, Nellore, Andhra Pradesh
Duration :- October, 2012 to Present
Designation :- Engineer-Operation
2. Company :- Super Smelters Ltd (SAI Group)
Address :- Asansol, Jamuria, West Bengal
Duration :- June, 2011 to September, 2011
Designation :- GET-Power Plant Operation
Present Job ProfilePresent Job Profile
Now, I am working in Simhapuri Energy Limited, Nellore, Andhra Pradesh having 600 MW
(4*150MW) CFBC Unit as Engineer- Operation from October, 2012.
Boiler maker: Wuxi Huaguang Boiler Co., Ltd
Boiler type: High pressures with intermediate reheat single drum natural circulation CFBC.
Steam Generation Capacity (MCR): 487 TPH.
Working pressure & Temperature: 137 Kg/cm2
& 540+5 o
c.
Turbine make: Harbine Turbine Company
Turbine type: subcritical with super high pressure, single reheat, double casing double flow
condensing turbine.
Generator: Shandong Jinan Power Equipments (air cooled)
DCS: Zhejiang Supcon Technology co ltd
Job Profile:
Associated with Boiler and Turbine Operation of 3X150 MW & commissioning of 1 x150 MW
 Safe start- up, shut down of boiler and turbine from both hot and cold conditions
 Smooth and Efficient Operation of Unit and it’s auxiliaries by producing steam and power as
per the budget.
 To operate the units by operating the recommended parameters within the designed values.
 To reduce the downtime of unit and its auxiliaries by avoiding tripping.
 Handling of normal and emergency condition of the Boiler/Turbine operation.
 Ensuring smooth running of boiler feed pumps and its auxiliaries.
 Efficiency Monitoring of Boiler & Turbine and its auxiliary are for routine daily basis
 Following changeover schedules of equipment’s as per manufacturer’s standard.
 Load Control Monitoring.
 Preparation and carrying out of Hydro test as per IBR norms during annual shutdown.
 Preparation of Daily log Sheets and daily report.
 Communication with field operator.
 Actively participated in commissioning activities like refractory dry out, chemical cleaning,
alkali blow out, steam blowing etc of 150 MW (Unit-4).
Academic CredentialsAcademic Credentials
Examination
Passed
University/Board College/Institute College/Institute
recognised by
Marks & Year
of Passing
PG Diploma in
Thermal Power
Plant Engineering
Central Board of
Irrigation & Power
(CBIP)
Central Board of
Irrigation & Power
(CBIP)
Ministry of Power &
Central Electricity
Authority(CEA)
74.20%
(2012)
B.TECH in Electrical
Engineering
West Bengal
University of
Technology
Guru Nanak
Institute of
Technology
All India Council for
Technical Education
(AICTE)
7.94(CGPA)
(2011)
12th
West Bengal Council
of Higher Secondary
Examination
Chaltakhali RGBC
Institution(Al
Ameen Mission)
Government of West
Bengal
80.00%
(2007)
10th
West Bengal Board of
Secondary
Examination
Akuni B G Biharilal
Institution
Government of West
Bengal
80.75%
(2005)
Academic Project DetailsAcademic Project Details
Title :- Optimization of Auxiliary Power Consumption (APC) in Thermal Power Plant.
Title :- New simplified inverter topology for DC to AC conversion using a H Bridge stage with an
Auxiliary
Bidirectional switch.
Industrial TrainingIndustrial Training
SL No. Name of Training Name of Industry Duration
1 Simulator Training
(210 MW)
West Bengal Power Development Corporation Ltd,
(Govt. of West Bengal)
1 week
2 Scheme Tracing(210 MW) NTPC, Badarpur (Govt. of India) 1 month
3 Rotational on job operation
(210 MW)
NTPC, Badarpur (Govt. of India) 1 month
4 Rotational on job operation &
maintenance(330 MW)
Pragati Power (Gas Power Plant Frame 9-E )
(Govt. of NCR, Delhi)
3 month
5 Vocational Training SAIL,Durgapur (Govt. of India) 2 weeks
6 Vocational Training West Bengal State Electricity Transmission
Company Ltd. (Govt. of West Bengal)
2 weeks
Other DetailsOther Details
Achievement : Played football in Zonal Level (Under Srerampore Subdivision)
Strength : Hard working, Energetic, Fixed determined
Hobbies : Socialising with people, recreational fishing
Personal DossierPersonal Dossier
Address : S/O-KAZI HAFIZUL KARIM
VILL & P.O- Akuni
Police Station- Chanditala
District- Hooghly
State- West Bengal
Pin-712701, India
Date of Birth : 03-05-1990
Sex : Male
Nationality : Indian
Languages Known : English, Bengali & Hindi
Passport No : J1001275 Valid till 2020
PAN No. : BSDPK7094Q
DeclarationDeclaration
I am confident of my ability and ready to work in a team. I hereby declare that the information furnished
above is true to the best of my knowledge.
Date : -------------------------------
Place: (KAZI FERDOUSUL KARIM)

More Related Content

What's hot

RESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical EngineerRESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical EngineerManvendra Kumar
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cvHamad Talhaa
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPCRahul Kurapati
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownNitin Mahalle
 

What's hot (20)

RESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical EngineerRESUME- Manvendra_Mechanical Engineer
RESUME- Manvendra_Mechanical Engineer
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
RESUME
RESUMERESUME
RESUME
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
JPCL,Internship Report
JPCL,Internship ReportJPCL,Internship Report
JPCL,Internship Report
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Gsecl report
Gsecl reportGsecl report
Gsecl report
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 

Viewers also liked (18)

Mukesh kumar Singh ..
Mukesh kumar Singh ..Mukesh kumar Singh ..
Mukesh kumar Singh ..
 
C.V._GouriShankar
C.V._GouriShankarC.V._GouriShankar
C.V._GouriShankar
 
ayman's CV
ayman's CVayman's CV
ayman's CV
 
KBAKS-Resume Oct2014
KBAKS-Resume  Oct2014KBAKS-Resume  Oct2014
KBAKS-Resume Oct2014
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Combined Cycle Gas Turbine Operations
Combined Cycle Gas Turbine Operations Combined Cycle Gas Turbine Operations
Combined Cycle Gas Turbine Operations
 
QA Spec
QA SpecQA Spec
QA Spec
 
Pro per energy services/ Gas Turbine Operation and Maintenance
Pro per energy services/ Gas Turbine Operation and MaintenancePro per energy services/ Gas Turbine Operation and Maintenance
Pro per energy services/ Gas Turbine Operation and Maintenance
 
TCL Gas Turbine Control Systems
TCL Gas Turbine Control SystemsTCL Gas Turbine Control Systems
TCL Gas Turbine Control Systems
 
1. Gas Turbine (9E03)
1. Gas Turbine (9E03)1. Gas Turbine (9E03)
1. Gas Turbine (9E03)
 
Mark VI ST Control Product Overview GEH 6127
Mark VI ST Control Product Overview GEH 6127Mark VI ST Control Product Overview GEH 6127
Mark VI ST Control Product Overview GEH 6127
 
nkp resume
nkp resumenkp resume
nkp resume
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume
ResumeResume
Resume
 
Experience Cert..PDF
Experience Cert..PDFExperience Cert..PDF
Experience Cert..PDF
 
Training presentation
Training presentation Training presentation
Training presentation
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
Raghvendra Resume-8+
Raghvendra Resume-8+Raghvendra Resume-8+
Raghvendra Resume-8+
 

Similar to Thermal Engineer Resume

OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationJoydeep Paul
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)Amit Mukherjee
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report Rahul Raj
 
Resume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, ElectricalResume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, Electricalgaurav gaur
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resumeamrit pattanaik
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil Singh
 
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house pptEr Sagar
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 
Ect dielsel-engine-whr-gmr
Ect dielsel-engine-whr-gmrEct dielsel-engine-whr-gmr
Ect dielsel-engine-whr-gmrcircuscreative
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorNAVAL KISHOR
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility EngineerAshish Sojaliya
 

Similar to Thermal Engineer Resume (20)

reseume ccr
reseume ccrreseume ccr
reseume ccr
 
OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generation
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
GSECL TPS SIKKA
GSECL TPS SIKKAGSECL TPS SIKKA
GSECL TPS SIKKA
 
AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)AMIT MUKHERJEE (2) (1)
AMIT MUKHERJEE (2) (1)
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
gopi recent
gopi recentgopi recent
gopi recent
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report
 
Resume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, ElectricalResume of Gaurav Gaur, Electrical
Resume of Gaurav Gaur, Electrical
 
Amrit kumar pattanaik resume
Amrit kumar pattanaik resumeAmrit kumar pattanaik resume
Amrit kumar pattanaik resume
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house ppt
 
rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
Ect dielsel-engine-whr-gmr
Ect dielsel-engine-whr-gmrEct dielsel-engine-whr-gmr
Ect dielsel-engine-whr-gmr
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Resume
ResumeResume
Resume
 
resume
resumeresume
resume
 
Maintenance and Utility Engineer
Maintenance and Utility EngineerMaintenance and Utility Engineer
Maintenance and Utility Engineer
 

Thermal Engineer Resume

  • 1. KAZI FERDOUSUL KARIMKAZI FERDOUSUL KARIM PG Diploma in Thermal Power Plant Engineering (NPTI Course) and B.TECH (Electrical Engineering) E-mail:E-mail: ferdouskarimkazi@gmail.com / ferdous.kazi@rediffmail.com Mobile:Mobile: +91-8096256648/+91-8096256648/++91-892747924391-8927479243 PG Diploma in Thermal Power Plant Engg. (NPTI Course) and B.TECH (Electrical Engg) with 3 Year 3 months experience (continuing) in Power Plant Operation ApercuApercu  Presently working in Simhapuri Energy Limited (Madhucon Projects), Nellore, Andhra Pradesh and looking after Operation of Boiler, Turbine of 600 MW(4*150MW).  Successfully completed training at Pragati Power having 330 MW Combined Cycle Gas Turbine Plant of GE make Turbine (2 x 104 MW Frame 9-E Gas Turbine and 1 x 122 MW STG Unit).  Having Knowledge of Rankine cycle, Brayton cycle Reheat cycle, Sub critical and Super critical boiler, PF boiler, Regeneration cycle, Turbine, Pump, Fan, Condenser and cooling tower etc.  Successfully completed Simulator Training Programme (210 MW).  Having full-fledged knowledge of large scale Thermal Power Plant and Combined Cycle Power Plant.  Ability to analyse and interpret unique problems, with a combination of training experience and logical thinking to find the right solutions.  Acquired knowledge and understanding of subjects like; Electrical Machines, Power System, Power plant Engineering etc.  Excellent relationship management, analytical and negotiation skills. Job RecordJob Record 1. Company :- Simhapuri Energy Limited (Madhucon Group) Address :- Thamminapatnam, Nellore, Andhra Pradesh Duration :- October, 2012 to Present Designation :- Engineer-Operation 2. Company :- Super Smelters Ltd (SAI Group) Address :- Asansol, Jamuria, West Bengal Duration :- June, 2011 to September, 2011 Designation :- GET-Power Plant Operation Present Job ProfilePresent Job Profile Now, I am working in Simhapuri Energy Limited, Nellore, Andhra Pradesh having 600 MW (4*150MW) CFBC Unit as Engineer- Operation from October, 2012. Boiler maker: Wuxi Huaguang Boiler Co., Ltd Boiler type: High pressures with intermediate reheat single drum natural circulation CFBC. Steam Generation Capacity (MCR): 487 TPH. Working pressure & Temperature: 137 Kg/cm2 & 540+5 o c. Turbine make: Harbine Turbine Company Turbine type: subcritical with super high pressure, single reheat, double casing double flow
  • 2. condensing turbine. Generator: Shandong Jinan Power Equipments (air cooled) DCS: Zhejiang Supcon Technology co ltd Job Profile: Associated with Boiler and Turbine Operation of 3X150 MW & commissioning of 1 x150 MW  Safe start- up, shut down of boiler and turbine from both hot and cold conditions  Smooth and Efficient Operation of Unit and it’s auxiliaries by producing steam and power as per the budget.  To operate the units by operating the recommended parameters within the designed values.  To reduce the downtime of unit and its auxiliaries by avoiding tripping.  Handling of normal and emergency condition of the Boiler/Turbine operation.  Ensuring smooth running of boiler feed pumps and its auxiliaries.  Efficiency Monitoring of Boiler & Turbine and its auxiliary are for routine daily basis  Following changeover schedules of equipment’s as per manufacturer’s standard.  Load Control Monitoring.  Preparation and carrying out of Hydro test as per IBR norms during annual shutdown.  Preparation of Daily log Sheets and daily report.  Communication with field operator.  Actively participated in commissioning activities like refractory dry out, chemical cleaning, alkali blow out, steam blowing etc of 150 MW (Unit-4). Academic CredentialsAcademic Credentials Examination Passed University/Board College/Institute College/Institute recognised by Marks & Year of Passing PG Diploma in Thermal Power Plant Engineering Central Board of Irrigation & Power (CBIP) Central Board of Irrigation & Power (CBIP) Ministry of Power & Central Electricity Authority(CEA) 74.20% (2012) B.TECH in Electrical Engineering West Bengal University of Technology Guru Nanak Institute of Technology All India Council for Technical Education (AICTE) 7.94(CGPA) (2011) 12th West Bengal Council of Higher Secondary Examination Chaltakhali RGBC Institution(Al Ameen Mission) Government of West Bengal 80.00% (2007) 10th West Bengal Board of Secondary Examination Akuni B G Biharilal Institution Government of West Bengal 80.75% (2005) Academic Project DetailsAcademic Project Details Title :- Optimization of Auxiliary Power Consumption (APC) in Thermal Power Plant. Title :- New simplified inverter topology for DC to AC conversion using a H Bridge stage with an Auxiliary Bidirectional switch.
  • 3. Industrial TrainingIndustrial Training SL No. Name of Training Name of Industry Duration 1 Simulator Training (210 MW) West Bengal Power Development Corporation Ltd, (Govt. of West Bengal) 1 week 2 Scheme Tracing(210 MW) NTPC, Badarpur (Govt. of India) 1 month 3 Rotational on job operation (210 MW) NTPC, Badarpur (Govt. of India) 1 month 4 Rotational on job operation & maintenance(330 MW) Pragati Power (Gas Power Plant Frame 9-E ) (Govt. of NCR, Delhi) 3 month 5 Vocational Training SAIL,Durgapur (Govt. of India) 2 weeks 6 Vocational Training West Bengal State Electricity Transmission Company Ltd. (Govt. of West Bengal) 2 weeks Other DetailsOther Details Achievement : Played football in Zonal Level (Under Srerampore Subdivision) Strength : Hard working, Energetic, Fixed determined Hobbies : Socialising with people, recreational fishing Personal DossierPersonal Dossier Address : S/O-KAZI HAFIZUL KARIM VILL & P.O- Akuni Police Station- Chanditala District- Hooghly State- West Bengal Pin-712701, India Date of Birth : 03-05-1990 Sex : Male Nationality : Indian Languages Known : English, Bengali & Hindi Passport No : J1001275 Valid till 2020 PAN No. : BSDPK7094Q DeclarationDeclaration I am confident of my ability and ready to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge. Date : ------------------------------- Place: (KAZI FERDOUSUL KARIM)