R. Karthikeyan has over 30 years of experience in the erection, commissioning, and overhauling of power generation equipment. He has worked on projects in India involving turbines, generators, boilers, and other auxiliary equipment at various thermal and nuclear power plants. Most recently, he served as Associate Vice President overseeing multiple projects until October 2015, and is currently seeking new opportunities.
1. ENGENIUS
ERECTORS
PRIVATE
LIMITED
Chennai(1986 to
June-1999)
This Company is basically involved in the Erection,
Commissioning & Overhauling of Turbo, Generators, Turbo
Blowers, Compressors, Gas Turbines, and TG-Auxilaries at
Nuclear Power Plants & Thermal Power Plants. It is also involved
in the Fertilizer Industry
My Responsibilities at various sites is as Follows:
1986-1990-Worked as Engineer in Erection of 3x30MW
Turbo Blowers & Erection of Boiler feed pumps (7 Nos) &
Auxiliaries at Visakhapatnam steel plant.
1991-1992-Overhauling of Turbo Blowers (3x30 MW) at
Visakhapatnam Steel Plant.
1993-Worked as a Senior Engineer in
Erection of Ammonia Converter & Removal of
Converter and loading of catalyst & Commissioning
at Coromandal Fertilizer Limited.
Overhauling of Auxiliaries Pumps at Sulphuric
Acid Plant.
Replacement of HP Module of 1x120MW at Orissa
CPP-Nalco.Angul
Overhauling of TG-18.5 MW at TNPL, Karur.
1994-Worked as a Resident Engineer in
Overhauling of 7.5 MW Back Pressure Turbine &
Auxiliaries at Visakhapatnam Steel Plant.
Overhauling 30 MW Turbo-Blowers at
Visakhapatnam steel plant.
Overhauling of 2x60MW Turbo-Genartaors at
Visakhapatnam Steel Plant.
Overhauling of 18.5 MW Turbine at TNPL-
Karur
Erection of 20TPH Bowl Mill at Coromandel
Fertilizer Limited.
1995-Worked as a Project manager in
Revamping of Turbo Blower at Coromandel
Fertilizer Limited-Sulpharic Acid Plant
Revamping of Pumps & Loading of Catalyst at
Sulphuric acid plant for Nicco Corporation
Overhauling of 18.5 x2 MW TG & Auxilaries at
Nalco-Daman Jodi,Orissa
Erection of Indurating Plants & Fans at Essar
Plant-Visakhapatnam
Erection,Testing & Commissioning of 16.5 MW
Turbo-Generator at JK Paper Mill Rayagada-Orissa.
Erection of 0.5 MW Turbine in Ammonia Plant at
Coromandel Fertilizer Limited.
OverHauling of Turbine,Pumps & Mini Boilers at
Chokani Shipping Corporation Visakhapatnam port.
2. Brothers Engg and
Erectors Ltd July
(1999 to 2009
October )
1996-Worked as a Project Manager
Overhauling of 235MW Turbine
Generator at Atomic Power –Kalpakkam
Overhauling of 60MW Turbine-Generator
and it auxiliaries at Visakhapatnam steel plant.
Overhauling of 2x4.5MW TG at JK
Paper Mill-Rayagada
1997-Worked as a Project Manager
Erection of 2x235MW Turbine Generator
surface condenser,TG-Auxiliaries at Kaiga Nuclear
Power Project.
Erection of 31.5 MW Gas Turbine &
Steam Turbines and its Auxiliaries at ONGC
Gandhar.
Overhauling of 235MW HP and LP
Module inspection at Kakarpar Nuclear Power
Project-Gujarat.
Worked as a Project Manager in the
Erection of 210 MW TG & Its Auxilaries at
Wanakbori Unit 7-Gujarat.
This Company is Basically involved in the Erection,
Commissioning & Overhauling of Boiler, Turbo-Generator, gas
Turbines, TG Auxiliaries and erection of ESP Bowl millstone
mills, Fans and Boiler Erection and Pressure parts overhauling.
This Company having office at abroad also.
1999: Worked as a Project Manager in Erection of
1x120 MW combined cycle steam turbine & its auxiliaries
including critical PPG of HRSG Boiler. At Kyccp,
Kayamgulam ,kerala
2000: Worked as Project Manager Erection of
2x250MW ESP and rotating machinery and other related work
at STPS, Suratgarh Unit-III & IV.
2003:Worked as a Project manager erection of 1x250
MW ESP and rotating machine at STPS suratgarh Rajasthan
Unit-V
Erection of 1x250 MW TG & its auxilaries of
STPS Unit-V
Erection of 1x250 MW Ash Handling system
Fabrication and Erection at STPS, Suratgarh Unit-V
for Energo Engg Projects Ltd.Delhi.
Involved in Overhauling and maintenance work
5x250MW at STPS Suratgarh in the area of Bowl
3. Mills fans BFP Pumps ASH handling system duct and
Dambers mills feeding system and burners for
RVUNL Rajasthan
R&D work for installing Sofa System in Unit-I
1x250 MW pressure parts and Erection of Ducting
system through BHEL Trichy(R&D) dept at Suratgarh
Rajasthan.
2004:Worked As a Regional Manager-
NR
Erection of CFBC Boiler and
ESP Rotating Parts 1x125 MW at Giral Rajasthan.
Overhauling of steam turbine in
1x65 MW at Rajghat Delhi.
2005:Involved in the
Erection of following Area as a Regional manager
CFBC Boiler Erection 1x125MW Giral Rajasthan.
Erection of 1x125MW TG & its auxiliaries of Giral
Rajasthan.
Fabrication and Erection of 55TPH Limestone
Handling system 1x125 MW at GLTPP Barmer
Rajasthan for FFE Minerals Chennai.
Retro Fitting of ESP 60MW at IP Station Delhi.
Erection of ESP and rotating machine of 2x250 MW
of Lehra Mohammad Bathinda Panjab.
Maintenance of 5x250 MW Mills Fans Ash handling
system, BFP pumps duct & Damper of STPS
Surathgarh Rajasthan.
Erection of 4x20MW Ash handling system of Jindal
Rajgarh for Energo Engg Project Ltd Delhi.
2006:
Working as a Regional Manger looking after the Following
Projects.
2x12
5 MW CFBC Boilers at GLTPP Barmer.
2x25
0 MW ESP rotating Batinda Panjab.
Erec
tion of 1x125 MW TG & Auxilaries.at Giral
Erec
tion of 1x60 MW ESP retrofits in IP station Delhi.
55T
PH Limestone handling system 2x125 MW Giral
Rajasthan.
Wen
t to abroad Muscat and UAE for a Business trip to
4. develop this company and open our branch office at
Karoma Dubai UAE
* 2007-08: Looking after the following project as a Regional
Manager(NR)
> 2x 125MW CFBC Boiler at Barmer
> 2x 250MW ESP and Rotating Parts Bathinda,Punjab
> 1x 60 MW Retroffitting of ESP at Delhi ,Pragati
> 55 TPH Limstone ,Handling Fab & Erection at Giral
RRVUNL for FLSMIDTH
>1x250MW TG and Auxiliaries UNIT-6 at STPS,
Suratgarh, Rajasthan
>1x 500 MW TG and Connected piping at NTPC,
Dadri. UP
* 2009 as a Regional Manager (NR)
> closing of Barmer 2x 125 MW CFBC BOILER
> closing of Bathinda 2x 250MW ESP
.> closing of Delhi IP project
. > 1x 250 MW TG Erection and Closing of Final Bill
> 1x 500 MW TG at Dadri, NTPC
> 1x 300 MW Turbine & Generator for Sanghai Electr.
Company at Rosa Power Plant at Shajahanpur-UP for
Reliance Energy
> Co- coordinator for the on going Project at North
Chennai 2 x 500 MW ESP
*From Nov 2009-2010
> Joined in M/s.Karpara project Engg Pvt.Ltd as a
Sr.Dgm.(Projects) and looking after the following projects this
company also involved Power plants for past 32 years
> 1x 250 MW Boiler and ESP and other related works
And TG and other Auxiliaries At santaldih (WB)
> 2x150MW of Boiler and TG and other auxiliaries at
SEPL,GUDUR (AP) for Greenasol AT Nellore ,AP
>1x120MW TG and Auxiliaries at Jojobera for TATA
POWER at Jamshedpur
*2011 as a GENERAL MANAGER (Projects) and looking after
the following projects Head in Kolkata Easter region
>2x270 MW TG and auxiliaries at APNRL,Jamshedpur
Jharkhand
>1x270MW TG and auxiluries at ABHIJEET at Latihar
Chandwa, Jharkhand.
5. >1x500MW TG& auxiliaries at MARWA Jhangir Dist.
Chhattisgarh
>2x600MW TG & auxiliaries at ESSAR MAHAN at
Madhyapradesh near-Vedan
>53MW combined cycle at North East at Dibrugarh
HRSG,Utility Boiler and Gas turbine and steam turbine
BPCL ,Assam
*2012 to tiill date working as a Associate Vice President
(Projects) and looking after the following projects
>1x102MW combined Cycle Gas Turbine and Steam
And HRSG & Utility Boiler Piping at IOCL,Paradip
For BHEL,PSER (completed)
> 2x250MW TG and Other Related Aux. and piping at
Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR
(Completed)
>2x600MW TG and Related Auxiluries, Piping Erc at DB
At DB POWER ChatishGarh for BHEL,PSWR(Compl)
>2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at
JAY BEE,BINA for BHEL,PSWR(completed)
>1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka
for Gujart Electricity Board ,BHEL,PSWR (completed)
>1x 250MW TG and other Related auxiliaries at New Parli
BEED,District, MAHAGENCO. for BHEL.PSWR(comp)
>2x500 MW TG and Other Auxiliaries AT Marwa,Jangir
Champa, Chhatisgarh. For BHEL,PSER (completed)
From March-2015 looking after above mentioned Projects final
bills submission and closing of all the site activities. from October-
2015 and I am sitting idle and looking forward for better
opportunity of working with any other Company doing my best
service.
Date: 16.12.2015
Place: Chennai R.Karthikeyan.
6. >1x500MW TG& auxiliaries at MARWA Jhangir Dist.
Chhattisgarh
>2x600MW TG & auxiliaries at ESSAR MAHAN at
Madhyapradesh near-Vedan
>53MW combined cycle at North East at Dibrugarh
HRSG,Utility Boiler and Gas turbine and steam turbine
BPCL ,Assam
*2012 to tiill date working as a Associate Vice President
(Projects) and looking after the following projects
>1x102MW combined Cycle Gas Turbine and Steam
And HRSG & Utility Boiler Piping at IOCL,Paradip
For BHEL,PSER (completed)
> 2x250MW TG and Other Related Aux. and piping at
Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR
(Completed)
>2x600MW TG and Related Auxiluries, Piping Erc at DB
At DB POWER ChatishGarh for BHEL,PSWR(Compl)
>2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at
JAY BEE,BINA for BHEL,PSWR(completed)
>1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka
for Gujart Electricity Board ,BHEL,PSWR (completed)
>1x 250MW TG and other Related auxiliaries at New Parli
BEED,District, MAHAGENCO. for BHEL.PSWR(comp)
>2x500 MW TG and Other Auxiliaries AT Marwa,Jangir
Champa, Chhatisgarh. For BHEL,PSER (completed)
From March-2015 looking after above mentioned Projects final
bills submission and closing of all the site activities. from October-
2015 and I am sitting idle and looking forward for better
opportunity of working with any other Company doing my best
service.
Date: 16.12.2015
Place: Chennai R.Karthikeyan.