ENGENIUS
ERECTORS
PRIVATE
LIMITED
Chennai(1986 to
June-1999)
This Company is basically involved in the Erection,
Commissioning & Overhauling of Turbo, Generators, Turbo
Blowers, Compressors, Gas Turbines, and TG-Auxilaries at
Nuclear Power Plants & Thermal Power Plants. It is also involved
in the Fertilizer Industry
My Responsibilities at various sites is as Follows:
 1986-1990-Worked as Engineer in Erection of 3x30MW
Turbo Blowers & Erection of Boiler feed pumps (7 Nos) &
Auxiliaries at Visakhapatnam steel plant.
 1991-1992-Overhauling of Turbo Blowers (3x30 MW) at
Visakhapatnam Steel Plant.
 1993-Worked as a Senior Engineer in
 Erection of Ammonia Converter & Removal of
Converter and loading of catalyst & Commissioning
at Coromandal Fertilizer Limited.
 Overhauling of Auxiliaries Pumps at Sulphuric
Acid Plant.
 Replacement of HP Module of 1x120MW at Orissa
CPP-Nalco.Angul
 Overhauling of TG-18.5 MW at TNPL, Karur.
 1994-Worked as a Resident Engineer in
 Overhauling of 7.5 MW Back Pressure Turbine &
Auxiliaries at Visakhapatnam Steel Plant.
 Overhauling 30 MW Turbo-Blowers at
Visakhapatnam steel plant.
 Overhauling of 2x60MW Turbo-Genartaors at
Visakhapatnam Steel Plant.
 Overhauling of 18.5 MW Turbine at TNPL-
Karur
 Erection of 20TPH Bowl Mill at Coromandel
Fertilizer Limited.
 1995-Worked as a Project manager in
 Revamping of Turbo Blower at Coromandel
Fertilizer Limited-Sulpharic Acid Plant
 Revamping of Pumps & Loading of Catalyst at
Sulphuric acid plant for Nicco Corporation
 Overhauling of 18.5 x2 MW TG & Auxilaries at
Nalco-Daman Jodi,Orissa
 Erection of Indurating Plants & Fans at Essar
Plant-Visakhapatnam
 Erection,Testing & Commissioning of 16.5 MW
Turbo-Generator at JK Paper Mill Rayagada-Orissa.
 Erection of 0.5 MW Turbine in Ammonia Plant at
Coromandel Fertilizer Limited.
 OverHauling of Turbine,Pumps & Mini Boilers at
Chokani Shipping Corporation Visakhapatnam port.
Brothers Engg and
Erectors Ltd July
(1999 to 2009
October )
 1996-Worked as a Project Manager
 Overhauling of 235MW Turbine
Generator at Atomic Power –Kalpakkam
 Overhauling of 60MW Turbine-Generator
and it auxiliaries at Visakhapatnam steel plant.
 Overhauling of 2x4.5MW TG at JK
Paper Mill-Rayagada
 1997-Worked as a Project Manager
 Erection of 2x235MW Turbine Generator
surface condenser,TG-Auxiliaries at Kaiga Nuclear
Power Project.
 Erection of 31.5 MW Gas Turbine &
Steam Turbines and its Auxiliaries at ONGC
Gandhar.
 Overhauling of 235MW HP and LP
Module inspection at Kakarpar Nuclear Power
Project-Gujarat.
 Worked as a Project Manager in the
Erection of 210 MW TG & Its Auxilaries at
Wanakbori Unit 7-Gujarat.
This Company is Basically involved in the Erection,
Commissioning & Overhauling of Boiler, Turbo-Generator, gas
Turbines, TG Auxiliaries and erection of ESP Bowl millstone
mills, Fans and Boiler Erection and Pressure parts overhauling.
This Company having office at abroad also.
 1999: Worked as a Project Manager in Erection of
1x120 MW combined cycle steam turbine & its auxiliaries
including critical PPG of HRSG Boiler. At Kyccp,
Kayamgulam ,kerala
 2000: Worked as Project Manager Erection of
2x250MW ESP and rotating machinery and other related work
at STPS, Suratgarh Unit-III & IV.
 2003:Worked as a Project manager erection of 1x250
MW ESP and rotating machine at STPS suratgarh Rajasthan
Unit-V
 Erection of 1x250 MW TG & its auxilaries of
STPS Unit-V
 Erection of 1x250 MW Ash Handling system
Fabrication and Erection at STPS, Suratgarh Unit-V
for Energo Engg Projects Ltd.Delhi.
 Involved in Overhauling and maintenance work
5x250MW at STPS Suratgarh in the area of Bowl
Mills fans BFP Pumps ASH handling system duct and
Dambers mills feeding system and burners for
RVUNL Rajasthan
 R&D work for installing Sofa System in Unit-I
1x250 MW pressure parts and Erection of Ducting
system through BHEL Trichy(R&D) dept at Suratgarh
Rajasthan.
 2004:Worked As a Regional Manager-
NR
 Erection of CFBC Boiler and
ESP Rotating Parts 1x125 MW at Giral Rajasthan.
 Overhauling of steam turbine in
1x65 MW at Rajghat Delhi.
 2005:Involved in the
Erection of following Area as a Regional manager
 CFBC Boiler Erection 1x125MW Giral Rajasthan.
 Erection of 1x125MW TG & its auxiliaries of Giral
Rajasthan.
 Fabrication and Erection of 55TPH Limestone
Handling system 1x125 MW at GLTPP Barmer
Rajasthan for FFE Minerals Chennai.
 Retro Fitting of ESP 60MW at IP Station Delhi.
 Erection of ESP and rotating machine of 2x250 MW
of Lehra Mohammad Bathinda Panjab.
 Maintenance of 5x250 MW Mills Fans Ash handling
system, BFP pumps duct & Damper of STPS
Surathgarh Rajasthan.
 Erection of 4x20MW Ash handling system of Jindal
Rajgarh for Energo Engg Project Ltd Delhi.
 2006:
Working as a Regional Manger looking after the Following
Projects.
 2x12
5 MW CFBC Boilers at GLTPP Barmer.
 2x25
0 MW ESP rotating Batinda Panjab.
 Erec
tion of 1x125 MW TG & Auxilaries.at Giral
 Erec
tion of 1x60 MW ESP retrofits in IP station Delhi.
 55T
PH Limestone handling system 2x125 MW Giral
Rajasthan.
 Wen
t to abroad Muscat and UAE for a Business trip to
develop this company and open our branch office at
Karoma Dubai UAE
* 2007-08: Looking after the following project as a Regional
Manager(NR)
> 2x 125MW CFBC Boiler at Barmer
> 2x 250MW ESP and Rotating Parts Bathinda,Punjab
> 1x 60 MW Retroffitting of ESP at Delhi ,Pragati
> 55 TPH Limstone ,Handling Fab & Erection at Giral
RRVUNL for FLSMIDTH
>1x250MW TG and Auxiliaries UNIT-6 at STPS,
Suratgarh, Rajasthan
>1x 500 MW TG and Connected piping at NTPC,
Dadri. UP
* 2009 as a Regional Manager (NR)
> closing of Barmer 2x 125 MW CFBC BOILER
> closing of Bathinda 2x 250MW ESP
.> closing of Delhi IP project
. > 1x 250 MW TG Erection and Closing of Final Bill
> 1x 500 MW TG at Dadri, NTPC
> 1x 300 MW Turbine & Generator for Sanghai Electr.
Company at Rosa Power Plant at Shajahanpur-UP for
Reliance Energy
> Co- coordinator for the on going Project at North
Chennai 2 x 500 MW ESP
*From Nov 2009-2010
> Joined in M/s.Karpara project Engg Pvt.Ltd as a
Sr.Dgm.(Projects) and looking after the following projects this
company also involved Power plants for past 32 years
> 1x 250 MW Boiler and ESP and other related works
And TG and other Auxiliaries At santaldih (WB)
> 2x150MW of Boiler and TG and other auxiliaries at
SEPL,GUDUR (AP) for Greenasol AT Nellore ,AP
>1x120MW TG and Auxiliaries at Jojobera for TATA
POWER at Jamshedpur
*2011 as a GENERAL MANAGER (Projects) and looking after
the following projects Head in Kolkata Easter region
>2x270 MW TG and auxiliaries at APNRL,Jamshedpur
Jharkhand
>1x270MW TG and auxiluries at ABHIJEET at Latihar
Chandwa, Jharkhand.
>1x500MW TG& auxiliaries at MARWA Jhangir Dist.
Chhattisgarh
>2x600MW TG & auxiliaries at ESSAR MAHAN at
Madhyapradesh near-Vedan
>53MW combined cycle at North East at Dibrugarh
HRSG,Utility Boiler and Gas turbine and steam turbine
BPCL ,Assam
*2012 to tiill date working as a Associate Vice President
(Projects) and looking after the following projects
>1x102MW combined Cycle Gas Turbine and Steam
And HRSG & Utility Boiler Piping at IOCL,Paradip
For BHEL,PSER (completed)
> 2x250MW TG and Other Related Aux. and piping at
Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR
(Completed)
>2x600MW TG and Related Auxiluries, Piping Erc at DB
At DB POWER ChatishGarh for BHEL,PSWR(Compl)
>2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at
JAY BEE,BINA for BHEL,PSWR(completed)
>1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka
for Gujart Electricity Board ,BHEL,PSWR (completed)
>1x 250MW TG and other Related auxiliaries at New Parli
BEED,District, MAHAGENCO. for BHEL.PSWR(comp)
>2x500 MW TG and Other Auxiliaries AT Marwa,Jangir
Champa, Chhatisgarh. For BHEL,PSER (completed)
From March-2015 looking after above mentioned Projects final
bills submission and closing of all the site activities. from October-
2015 and I am sitting idle and looking forward for better
opportunity of working with any other Company doing my best
service.
Date: 16.12.2015
Place: Chennai R.Karthikeyan.
>1x500MW TG& auxiliaries at MARWA Jhangir Dist.
Chhattisgarh
>2x600MW TG & auxiliaries at ESSAR MAHAN at
Madhyapradesh near-Vedan
>53MW combined cycle at North East at Dibrugarh
HRSG,Utility Boiler and Gas turbine and steam turbine
BPCL ,Assam
*2012 to tiill date working as a Associate Vice President
(Projects) and looking after the following projects
>1x102MW combined Cycle Gas Turbine and Steam
And HRSG & Utility Boiler Piping at IOCL,Paradip
For BHEL,PSER (completed)
> 2x250MW TG and Other Related Aux. and piping at
Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR
(Completed)
>2x600MW TG and Related Auxiluries, Piping Erc at DB
At DB POWER ChatishGarh for BHEL,PSWR(Compl)
>2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at
JAY BEE,BINA for BHEL,PSWR(completed)
>1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka
for Gujart Electricity Board ,BHEL,PSWR (completed)
>1x 250MW TG and other Related auxiliaries at New Parli
BEED,District, MAHAGENCO. for BHEL.PSWR(comp)
>2x500 MW TG and Other Auxiliaries AT Marwa,Jangir
Champa, Chhatisgarh. For BHEL,PSER (completed)
From March-2015 looking after above mentioned Projects final
bills submission and closing of all the site activities. from October-
2015 and I am sitting idle and looking forward for better
opportunity of working with any other Company doing my best
service.
Date: 16.12.2015
Place: Chennai R.Karthikeyan.

More Related Content

What's hot

NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivankshivank Kumar
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORTAnkur Pal
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingAbhitendra Singh
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportIshan Khandelwal
 

What's hot (20)

NTPC Barh ppt by Shivank
NTPC Barh ppt by ShivankNTPC Barh ppt by Shivank
NTPC Barh ppt by Shivank
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
project -2
project -2project -2
project -2
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
NTPC Auraiya Industrial Training
NTPC Auraiya Industrial TrainingNTPC Auraiya Industrial Training
NTPC Auraiya Industrial Training
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
 

Similar to FIELD EXPERIENCE RK

Similar to FIELD EXPERIENCE RK (20)

CVIPL-PROFILE
CVIPL-PROFILECVIPL-PROFILE
CVIPL-PROFILE
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
 
Alstom india
Alstom indiaAlstom india
Alstom india
 
kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar kalisindh thermal report by hariom nagar
kalisindh thermal report by hariom nagar
 
Company profile MAPS TG
Company profile MAPS TGCompany profile MAPS TG
Company profile MAPS TG
 
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH) 941453...
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH)  941453...Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH)  941453...
Ramgarh-gas-thermal-power-plant- by swai singh godara BAYTU-(RAMGARH) 941453...
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
selfcv NEw
selfcv NEwselfcv NEw
selfcv NEw
 
rajpanday
rajpandayrajpanday
rajpanday
 
N.Saravanan
N.SaravananN.Saravanan
N.Saravanan
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
bpcl
bpclbpcl
bpcl
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Goindwal sahib thermal power plant
Goindwal sahib thermal power plantGoindwal sahib thermal power plant
Goindwal sahib thermal power plant
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Resume spsoni 1965
Resume spsoni 1965Resume spsoni 1965
Resume spsoni 1965
 

FIELD EXPERIENCE RK

  • 1. ENGENIUS ERECTORS PRIVATE LIMITED Chennai(1986 to June-1999) This Company is basically involved in the Erection, Commissioning & Overhauling of Turbo, Generators, Turbo Blowers, Compressors, Gas Turbines, and TG-Auxilaries at Nuclear Power Plants & Thermal Power Plants. It is also involved in the Fertilizer Industry My Responsibilities at various sites is as Follows:  1986-1990-Worked as Engineer in Erection of 3x30MW Turbo Blowers & Erection of Boiler feed pumps (7 Nos) & Auxiliaries at Visakhapatnam steel plant.  1991-1992-Overhauling of Turbo Blowers (3x30 MW) at Visakhapatnam Steel Plant.  1993-Worked as a Senior Engineer in  Erection of Ammonia Converter & Removal of Converter and loading of catalyst & Commissioning at Coromandal Fertilizer Limited.  Overhauling of Auxiliaries Pumps at Sulphuric Acid Plant.  Replacement of HP Module of 1x120MW at Orissa CPP-Nalco.Angul  Overhauling of TG-18.5 MW at TNPL, Karur.  1994-Worked as a Resident Engineer in  Overhauling of 7.5 MW Back Pressure Turbine & Auxiliaries at Visakhapatnam Steel Plant.  Overhauling 30 MW Turbo-Blowers at Visakhapatnam steel plant.  Overhauling of 2x60MW Turbo-Genartaors at Visakhapatnam Steel Plant.  Overhauling of 18.5 MW Turbine at TNPL- Karur  Erection of 20TPH Bowl Mill at Coromandel Fertilizer Limited.  1995-Worked as a Project manager in  Revamping of Turbo Blower at Coromandel Fertilizer Limited-Sulpharic Acid Plant  Revamping of Pumps & Loading of Catalyst at Sulphuric acid plant for Nicco Corporation  Overhauling of 18.5 x2 MW TG & Auxilaries at Nalco-Daman Jodi,Orissa  Erection of Indurating Plants & Fans at Essar Plant-Visakhapatnam  Erection,Testing & Commissioning of 16.5 MW Turbo-Generator at JK Paper Mill Rayagada-Orissa.  Erection of 0.5 MW Turbine in Ammonia Plant at Coromandel Fertilizer Limited.  OverHauling of Turbine,Pumps & Mini Boilers at Chokani Shipping Corporation Visakhapatnam port.
  • 2. Brothers Engg and Erectors Ltd July (1999 to 2009 October )  1996-Worked as a Project Manager  Overhauling of 235MW Turbine Generator at Atomic Power –Kalpakkam  Overhauling of 60MW Turbine-Generator and it auxiliaries at Visakhapatnam steel plant.  Overhauling of 2x4.5MW TG at JK Paper Mill-Rayagada  1997-Worked as a Project Manager  Erection of 2x235MW Turbine Generator surface condenser,TG-Auxiliaries at Kaiga Nuclear Power Project.  Erection of 31.5 MW Gas Turbine & Steam Turbines and its Auxiliaries at ONGC Gandhar.  Overhauling of 235MW HP and LP Module inspection at Kakarpar Nuclear Power Project-Gujarat.  Worked as a Project Manager in the Erection of 210 MW TG & Its Auxilaries at Wanakbori Unit 7-Gujarat. This Company is Basically involved in the Erection, Commissioning & Overhauling of Boiler, Turbo-Generator, gas Turbines, TG Auxiliaries and erection of ESP Bowl millstone mills, Fans and Boiler Erection and Pressure parts overhauling. This Company having office at abroad also.  1999: Worked as a Project Manager in Erection of 1x120 MW combined cycle steam turbine & its auxiliaries including critical PPG of HRSG Boiler. At Kyccp, Kayamgulam ,kerala  2000: Worked as Project Manager Erection of 2x250MW ESP and rotating machinery and other related work at STPS, Suratgarh Unit-III & IV.  2003:Worked as a Project manager erection of 1x250 MW ESP and rotating machine at STPS suratgarh Rajasthan Unit-V  Erection of 1x250 MW TG & its auxilaries of STPS Unit-V  Erection of 1x250 MW Ash Handling system Fabrication and Erection at STPS, Suratgarh Unit-V for Energo Engg Projects Ltd.Delhi.  Involved in Overhauling and maintenance work 5x250MW at STPS Suratgarh in the area of Bowl
  • 3. Mills fans BFP Pumps ASH handling system duct and Dambers mills feeding system and burners for RVUNL Rajasthan  R&D work for installing Sofa System in Unit-I 1x250 MW pressure parts and Erection of Ducting system through BHEL Trichy(R&D) dept at Suratgarh Rajasthan.  2004:Worked As a Regional Manager- NR  Erection of CFBC Boiler and ESP Rotating Parts 1x125 MW at Giral Rajasthan.  Overhauling of steam turbine in 1x65 MW at Rajghat Delhi.  2005:Involved in the Erection of following Area as a Regional manager  CFBC Boiler Erection 1x125MW Giral Rajasthan.  Erection of 1x125MW TG & its auxiliaries of Giral Rajasthan.  Fabrication and Erection of 55TPH Limestone Handling system 1x125 MW at GLTPP Barmer Rajasthan for FFE Minerals Chennai.  Retro Fitting of ESP 60MW at IP Station Delhi.  Erection of ESP and rotating machine of 2x250 MW of Lehra Mohammad Bathinda Panjab.  Maintenance of 5x250 MW Mills Fans Ash handling system, BFP pumps duct & Damper of STPS Surathgarh Rajasthan.  Erection of 4x20MW Ash handling system of Jindal Rajgarh for Energo Engg Project Ltd Delhi.  2006: Working as a Regional Manger looking after the Following Projects.  2x12 5 MW CFBC Boilers at GLTPP Barmer.  2x25 0 MW ESP rotating Batinda Panjab.  Erec tion of 1x125 MW TG & Auxilaries.at Giral  Erec tion of 1x60 MW ESP retrofits in IP station Delhi.  55T PH Limestone handling system 2x125 MW Giral Rajasthan.  Wen t to abroad Muscat and UAE for a Business trip to
  • 4. develop this company and open our branch office at Karoma Dubai UAE * 2007-08: Looking after the following project as a Regional Manager(NR) > 2x 125MW CFBC Boiler at Barmer > 2x 250MW ESP and Rotating Parts Bathinda,Punjab > 1x 60 MW Retroffitting of ESP at Delhi ,Pragati > 55 TPH Limstone ,Handling Fab & Erection at Giral RRVUNL for FLSMIDTH >1x250MW TG and Auxiliaries UNIT-6 at STPS, Suratgarh, Rajasthan >1x 500 MW TG and Connected piping at NTPC, Dadri. UP * 2009 as a Regional Manager (NR) > closing of Barmer 2x 125 MW CFBC BOILER > closing of Bathinda 2x 250MW ESP .> closing of Delhi IP project . > 1x 250 MW TG Erection and Closing of Final Bill > 1x 500 MW TG at Dadri, NTPC > 1x 300 MW Turbine & Generator for Sanghai Electr. Company at Rosa Power Plant at Shajahanpur-UP for Reliance Energy > Co- coordinator for the on going Project at North Chennai 2 x 500 MW ESP *From Nov 2009-2010 > Joined in M/s.Karpara project Engg Pvt.Ltd as a Sr.Dgm.(Projects) and looking after the following projects this company also involved Power plants for past 32 years > 1x 250 MW Boiler and ESP and other related works And TG and other Auxiliaries At santaldih (WB) > 2x150MW of Boiler and TG and other auxiliaries at SEPL,GUDUR (AP) for Greenasol AT Nellore ,AP >1x120MW TG and Auxiliaries at Jojobera for TATA POWER at Jamshedpur *2011 as a GENERAL MANAGER (Projects) and looking after the following projects Head in Kolkata Easter region >2x270 MW TG and auxiliaries at APNRL,Jamshedpur Jharkhand >1x270MW TG and auxiluries at ABHIJEET at Latihar Chandwa, Jharkhand.
  • 5. >1x500MW TG& auxiliaries at MARWA Jhangir Dist. Chhattisgarh >2x600MW TG & auxiliaries at ESSAR MAHAN at Madhyapradesh near-Vedan >53MW combined cycle at North East at Dibrugarh HRSG,Utility Boiler and Gas turbine and steam turbine BPCL ,Assam *2012 to tiill date working as a Associate Vice President (Projects) and looking after the following projects >1x102MW combined Cycle Gas Turbine and Steam And HRSG & Utility Boiler Piping at IOCL,Paradip For BHEL,PSER (completed) > 2x250MW TG and Other Related Aux. and piping at Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR (Completed) >2x600MW TG and Related Auxiluries, Piping Erc at DB At DB POWER ChatishGarh for BHEL,PSWR(Compl) >2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at JAY BEE,BINA for BHEL,PSWR(completed) >1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka for Gujart Electricity Board ,BHEL,PSWR (completed) >1x 250MW TG and other Related auxiliaries at New Parli BEED,District, MAHAGENCO. for BHEL.PSWR(comp) >2x500 MW TG and Other Auxiliaries AT Marwa,Jangir Champa, Chhatisgarh. For BHEL,PSER (completed) From March-2015 looking after above mentioned Projects final bills submission and closing of all the site activities. from October- 2015 and I am sitting idle and looking forward for better opportunity of working with any other Company doing my best service. Date: 16.12.2015 Place: Chennai R.Karthikeyan.
  • 6. >1x500MW TG& auxiliaries at MARWA Jhangir Dist. Chhattisgarh >2x600MW TG & auxiliaries at ESSAR MAHAN at Madhyapradesh near-Vedan >53MW combined cycle at North East at Dibrugarh HRSG,Utility Boiler and Gas turbine and steam turbine BPCL ,Assam *2012 to tiill date working as a Associate Vice President (Projects) and looking after the following projects >1x102MW combined Cycle Gas Turbine and Steam And HRSG & Utility Boiler Piping at IOCL,Paradip For BHEL,PSER (completed) > 2x250MW TG and Other Related Aux. and piping at Chhabra, Motipura,Rajasthan for RRVUNL,BHEL,PSNR (Completed) >2x600MW TG and Related Auxiluries, Piping Erc at DB At DB POWER ChatishGarh for BHEL,PSWR(Compl) >2x250 Boiler,ESP,Piping & TG AT JAY BEE ,BIna at JAY BEE,BINA for BHEL,PSWR(completed) >1x250MWBOILER,,ESP,Piping &TG at Jamnager,Sikka for Gujart Electricity Board ,BHEL,PSWR (completed) >1x 250MW TG and other Related auxiliaries at New Parli BEED,District, MAHAGENCO. for BHEL.PSWR(comp) >2x500 MW TG and Other Auxiliaries AT Marwa,Jangir Champa, Chhatisgarh. For BHEL,PSER (completed) From March-2015 looking after above mentioned Projects final bills submission and closing of all the site activities. from October- 2015 and I am sitting idle and looking forward for better opportunity of working with any other Company doing my best service. Date: 16.12.2015 Place: Chennai R.Karthikeyan.