1. SABER ETABY ABED ALKADER
EL KERATEEN OSEEM CITY GIZA EGYPT
Tel: +2 01005816949 / +2 01110343696
Email: saberetaby@yahoo.com
Email: saberetaby@hotmail.com
Email:saberetaby2@skype.com
● PERSONAL DATA
Position super intendent piping , package boiler
Marital status Married
Nationality Egyptian
Language
Arabic : Mother tong
English : Good
Date of birth 23/04/1962
● EDUCATION & QUALIFICATION
Jun 1981
Industrial school
Jun 2006
Study course level 1of English
July 2006
Study course level 2of English
Diplôma of machinery (fitter section)
the American University in Cairo under khaled ebn el-walid library
the American University in Cairo under khaled ebn el-walid library
• Training
Nov 2008
osha safety training
Mar 2007
Completing the in house
seminar
January 2008
safety training in c.c.c co
June 2008
safety training in c.c.c co
National Occupational Safety & Health Centre ( in sudia Arabia )
awareness technology welding (in c.c.c co in Sudia Arabia )
Hawiyah NGL Recovery plant project (in sudia Arabia )
Khursaniyah Gas plant project Kgp (in sudia Arabia )
2. ● EXPIERIENCE SUMMARRY
•Twenty five years experience in overseeing on plot piping construction activities
multidiscipline project engineering with exposure to construction projects in Gas (LNG)
plant ,Oil plant(Refinery)chemical plant (Fertilization);power plant (Electric generation )
iron and steel co sector in several construction company.
•Working in piping fabrication and erection operations; erection of package boiler and
clearing punch list With client before hydro test
FROM SEP. 2008 to 2010 CONSOLATED CONTRACTORS. (CCC) Co.
Project : KHURSANIYAH GAS PLANT Project (SAUDI ARAMCO)
Client : PTJV (PECTEL & TACHNIP JOIN VENCHER) CO.
Job title : Super visor piping
DUTIES : Responsible piping erection operation as per ISO DWG and clear punch
items
FROM SEP. 2006 to 2008 CONSOLATED CONTRACTORS. (CCC) Co.
Project : Hawiyah NGL Project (SAUDI ARAMCO)
Client : JGC CO. (JAPANESE Co).
Job title : Supervisor piping
DUTIES : Responsible piping erection operation and clear punch items
With client to hydro- test
FROM NOV. 2005 TILL SEP 2006. ORASCOM Construction& Industries (OCI) Co
Project : Helwan fertilization company (Ammonia /Urea)
Client : UHDE Gmb CO.
Job title : supervisor Piping
Duties : Responsible for package boiler erection (piping; steel and equipment) and
Piping erection operation
FROM JUN.2005 TILL NOV. 2006.. ORASCOM Construction& Industries( OCI) Co
Project : Egyptian fertilization company suez 2 (Ammonia /Urea)
Client : UHDE Gmb CO.
Job title : Supervisor Piping
Duties : Responsible for package boiler erection (piping; steel and equipment)
3. FROM SEP. 2004TILL JUN. 2005 DSD Egyptian Co.
Project : Cairo north power station
Client : NEM Co.
Job title : Piping Forman
Duties : Responsible for piping fabrication and boiler erection
FROM SEP. 2003 TILL JUN. 2OO4 DODSAL (India co.) Co.
Project : LNG dominate Egypt
Client : DLC. CO.
Job title : Piping Forman
Duties : Responsible for piping erection, clear punch items with client before hydro
test And hydro test activities
FROM APRIL 2002TILL JUN. 2003 TechNet cimi mantoby Co.
Project : Port said power plant
Client : 3EC (France co.) Co.
Job title : Piping Forman
Duties : Responsible for erection of main boiler
FROM MAY 2000 TILL SEP. 2001 TechNet cimi mantoby Co.
Project : Alexandria mineral oils company (AMOC)
Client : Foster wheeler (FW) CO.
Job title : Piping Forman
Duties : Responsible for piping erection operation
.
FROM MAY 2000 TILL MAY 2001Orascom Construction Industrial (OCI). JV IMSEA CO.
Project : Alexandria mineral oils company (AMOC)
Client : Foster wheeler (FW) CO.
Job title : Piping Forman
Duties : Responsible for piping erection operation
FROM JUL. 1999 TILL MAY. 2000 IMSEA CO.
Project : Egyptian Fertilization Company suez 1 (ammonia /urea)
Client : KRUPP UHDE CO.
Job title : Piping Forman
Duties : Responsible for piping erection operation
4. FROM FEB.. 1990 TILL MAY. 1991FOST ALBN CO.
Project : Steel &iron Co.
Client : Fost albn CO.
Job title : mechanical Forman
Duties : Responsible for piping erection operation
FROM JUL. 1982 TILL MAY. 1998
.
Job title : Pipe fitter (fabrication and erection for CS, SS, and alloy steel)
Project : 1- Khalda Alsalam (gas station) - Petro jet Co.
- Glass factory 10Ramadan city -Angolan Italian Co.
3-Al korimat power plant - Nov Cini Mantoby Co
4 –Black carbon Alex. Co. - Migoco Co
5 –AL areesh power plant - kahromica Co.
6 – Cairo west power plant - Nov Cini Mantoby Co
7 - Shobra alkhma power plant - kahromica Co.
8 – Arasemco ceramic Co. - United Egyptian Co.
9 –Park factory Co. - United Egyptian Co.
10- Lang factory in 10 Ramadan city -El sheriff Co.
11 – Sugar corn in 10 Ramadan city - kahromica Co.
12 – Alfire silicon project -Metallic Co.
-COMPUTER SKILLS
- Oriented with Microsoft windows xp, vista, w7, w8.
- Oriented with Microsoft office.
- Using net utilities.
could join to your work team soon Wish I
Thanks for your time
Superintendent: Saber Etaby