SlideShare a Scribd company logo
1 of 7
Bruce Drake
1549 Kunzman Lane
Mosinee, WI 54455
715.693.6820 (Home)
715.574.8022 (Mobile)
Pdra7@mtc.net
www.linkedin.com/pub/bruce-drake/6/6b3/185
SUMMARY OF QUALIFICATIONS
A highly experienced Civil Superintendent (Craft) and Wisconsin Carpenter’s Union
member with more than 16 years of experience managing and leading multiple
construction projects using numerous construction methods. Experience includes
Civil Construction, Project Management, Operations, Nuclear, Safety, OSHA,
Budgets, Labor Negotiations and Management, Contracts, Union Relations and
Workforce Planning. Experienced in site development, medical facilities,
commercial, residential, retail, restaurant, big box, industrial, federal buildings,
prisons and dams. Specialized in nuclear and fossil fuel plant construction working
on improvement/remodeling efforts in a variety of power plants. Experienced in
managing multiple trades and craft to ensure safe and on time project completion.
Led crews of up to 110 employees as well as subcontractors while ensuring safe and
on time project completion for union and non-union employers. Experience with
proper disposal of hazardous waste and site management and storm water pollution
protection requirements.
PROFESSIONAL MEMBERSHIP
North Central States Regional Council of Carpenters
PROFESSIONAL EXPERIENCE
Boldt Construction 02/15 to present
Scaffold Specialist
Weston 3 React Project. Designed, built and safely implemented scaffolding for craft
in a complex and risky environment.
CB&I 02/14 to 2/15
Crew Lead / Safety Lead / Safety Mentor/Crane Lift Director
Lead a crew to design, build and safely implement specialty scaffolding for craft in a
complex and risky environment at Flint Hills Refinery. Promoted to Safety Lead,
Crew Lead and Crew Lead Safety Mentor. Training classes and DOE security
clearance is required for this assignment.
C.G. Schmidt 12/13 to 01/14
Concrete and Millwork Finishing
Bruce Drake Page 2 of 6
Assigned to Aspirus Wausau Hospital. Constructed cabinets and installed specialty
trim for addition and remodeling. Forms and concrete for initial phase of addition.
Peterson Industrial Scaffolding 10/13 to 11/13
Scaffold Specialist
Assigned to Weston Power Plant. Designed, built and safely implemented scaffolding
for craft in a complex and risky environment.
Immel Construction 06/13 to 10/13
Superintendent
Assigned to CWA Airport. Served as the working superintendent to complete new
addition and remodeling. Schedules, DCRs, reported to the project manager.
Managed subcontractors which included electricians, plumbers, and carpenters,
masons, flooring craft, dry wall, fire protection, excavators and demolition. TSA
clearance was required for this assignment.
Northern States Power Company 02/13 to 05/13
Scaffold Specialist
Assigned to Monticello Nuclear Plant. Designed, built and safely implemented
scaffolding for craft in a complex and risky environment. Training classes and DOE
security clearance was required for this assignment.
C.G. Schmidt 12/12 to 01/13
Journeyman Carpenter
Assigned to Aspirus Wausau Hospital. Responsible for concrete and forms for
addition.
Day & Zimmerman 10/12 to 01/13
Scaffold Specialist
Assigned to Point Beach Nuclear Plant. Designed, built and safely implemented
scaffolding for craft in a complex and risky environment. Training classes and DOE
security clearance was required for this assignment.
Bechtel 01/12 to 07/12
Civil Superintendent
Assigned to Turkey Point Nuclear Plant. Managed the Total Plant Cooling Water
(TPCW), ISO Phase and Turbine Deck as well as all of the pumping stations and the
mechanical plumbing. Managed site safety, craft, subcontractors, and construction
schedule for the Extended Power Upgrade (EPU). Approved design changes and
ensured that correct work orders were executed on time and within budget and
environmental compliance. Managed a crew of 60 carpenters and provided backup
support to the field construction manager. Adverted potential safety hazard.
Discovered that the team that was working on the scaffolding construction had the
wrong work orders. Retrieved correct work orders, conducted a new Job Safety
Analysis (JSA) and Job Hazard Analysis (JHA) and supervised the completion of the
job without incident. Created a system to handle the high volume of work orders
and a work order method to accommodate multiple requests which allowed the
completion of JSA/JHAs at one time. Cut administrative costs and man hours while
managing 1500+ requests. Security clearance was required for this assignment.
Bruce Drake Page 3 of 6
Bechtel 10/10 to 12/11
Foreman
Assigned to Point Beach Nuclear Plant. Served as the journeyman carpenter and
quickly elevated to foreman to oversee the trades for the EPU. Directed scaffolding,
concrete, radiation protection, dry wall and finishing projects. Led a crew of 110.
Training classes and DOE security clearance was required for this position.
Norcon Corporation 05/05 to 10/10
Superintendent
Served as a working Superintendent/Project Manager that traveled to various sites
with tools and equipment to perform, direct and manage a variety of different
projects. Secured project from theft and weather damage. Hired and directed
crews of up to 50 which included electricians, plumbers, HVAC and landscapers while
meeting budget and timeline requirements. Maintained budget, permits,
subcontractor compliance, daily/weekly reports, timecards, material
orders/purchases, project startup/turnover meetings and met with inspectors.
Projects Included:
U.S. Border Station in International Falls, MN
• Responsible for the exterior renovation. Security clearance required for this
assignment. Secured additional work through contract review. GSA contract to
remodel border station. Work required dismantling and replacing all security
cameras, which was not covered under the contract. Created estimates of
additional scope of work and secured GSA approval. Added additional
revenue to contract completion. Crossed the Canadian border for
materials/tools.
Red Granite Correctional Institution in Red Granite, WI
• Progressively executed and completed remodeling in compliance with ADA
stipulations. Federal Security clearance required for this assignment.
University of Wisconsin in Milwaukee, WI
• Designed and built various walking platforms to state specifications. Also
performed extensive steam tunnel repair (Spawling), ceiling replacement and
concrete structural replacement.
Weston Village Aquatic Center in Schofield, WI
• Expansion, joint repair and Stay Brite repair, Hydro Restoration.
Lake Sherburne Dam in Babb, Montana
• GSA, Department of Interior Dam and Reservoir Renovation. Blackfoot Indian
Reservation. Demolition relined flow tubes. During demolition of 300 foot
flow tubes under Lake Sherburne reservoir, there was insufficient air flow with
use of gas operated saws. Crew was forced to come up to surface frequently
Bruce Drake Page 4 of 6
for air, impacting schedule and QC (quality control). Purchased natural gas
machine which alleviated the air quality concerns and meeting deadlines.
FBI Building, GSA in Milwaukee, WI
• Historic restoration and renovation. FBI Security Clearance required with
ability to work in all federal buildings including Judge's Chambers and FBI
buildings.
Federal Building, GSA in Chicago, IL
• Constructed water cooling tower platform. GSA security clearance required for
this assignment.
Federal Building, GSA in Eau Claire, WI
• Performed historic restoration. GSA security clearance required for this
assignment.
Federal Building, GSA in Chicago, IL
• Renovated sub-basement waste water, plumbing, transfer station and filled
entire sub-basement in flow able fill. GSA security clearance required for this
assignment.
M.A. Mortenson 2001 to 2005
Foreman
Led work crews and trades in building cancer centers and hospitals’ including
Wisconsin Rapids Heart Center, Wausau Heart Center, Ministry Saint Mary’s Hospital
and Saint Clare’s Hospital. Directed crews of 50 or more craft and budgets up to
$300M.
California Construction 2001
Assistant Foreman
Led work crew of 15 carpenters, laborers and electricians in Kmart to Big K
renovation project throughout Wisconsin. Floor planning and fixtures.
Altimate Construction 2000
Journeyman Carpenter
Ground up construction of McDonald’s Restaurant
M. A. Mortenson 1999 to 2000
Foreman
Served as Journeyman Carpenter and elevated to Foreman for ground-up
construction of Stanley Hospital and the Crandon Medical Clinic. Directed crews of
50 or more craft.
D.B. Construction
Owner / Project Manager
Estimated, budgeted, permits and proper disposal of materials. Met with owner and
inspectors, ordered materials, and was hands-on from start to finish. Built over 30
residential homes. Completed remodels and additions to include flooring, drywall,
Bruce Drake Page 5 of 6
decks, and painting. Split and renovated a 5,000 sq. ft. space to accommodate and
build a deli and tanning salon. Renovated a convenience store/gas station. Built an
addition to expand a bar and restaurant.
CERTIFICATIONS & TRAINING
Journeyman Carpenter
Wisconsin How to Build Green, Start Here
Scaffold Erector Qualification
Safety Conscious Work Environment
Fall Protection Anchor Point
Environmental Awareness
Utility Employee FME Training
Smart Mark Standardized Safety and Health Course – 10 hour Hazard Awareness
Fleet Clearance Holder
Asbestos Awareness
Engineer Required Training
Carpenter Required Training
Nuclear Fleet Employee Training
Radiation Requalification
Plant Access Training
Enhanced RAD Worker – Skills & Knowledge Lab
FME Monitor
Foreign Material Exclusion
Radiation Worker – Initial Training in Nantel
Human Performance Tools
Fall Protection
Confined Space Entry
Ladders and Scaffolds
Fleet Clearance Process
Scaffold User
Dwelling Contractor Qualifier/Water Heater Systems/Erosion Sediment Control/Home
Improvement Trade Practices/ OSHA Requirements Asbestos
Human Performance DLA and JFG
Scaffold Competent Person
Scaffold Estimator
Qualified Scaffolding Specialist
Certified Federal and OSHA Requirements; Certificate of Erector – Competent Person
User Safety and Material Estimator
Advanced Blueprint Reading
Concrete Superintendent – Forms, Layout, Specification Adherence
Class 1 Finish Carpenter – Journeyman Carpenter
Hydro Experience (Concrete) – Reservoirs, Dams, etc.
LMS Certified Training in Safety and Environmental (Nuclear Superintendent)
Extensive Experience Healthcare Construction – Foreman
Lead and Asbestos Certification
OSHA 10 10 + and 16 Safety OSHA 30
Millwright 16 Hour Safety
Forklift Operations
Bruce Drake Page 6 of 6
TWIC/TSA Certification
Certified Crane Signaler CB&I
PRO-10
Safety Lead/Crew Lead - Manual & Non Manual Safety Mentor
FBI Security Clearance (Federal Buildings including Judge's Chambers and FBI
Buildings)
Nuclear Clearance (Grade 9 and in control rooms)
TSA Clearance – (Airports)
DOE Clearance – (Nuclear plants, Petrochemical, Oil and Gas)
CB&I Crane Lift Director
Bruce Drake Page 6 of 6
TWIC/TSA Certification
Certified Crane Signaler CB&I
PRO-10
Safety Lead/Crew Lead - Manual & Non Manual Safety Mentor
FBI Security Clearance (Federal Buildings including Judge's Chambers and FBI
Buildings)
Nuclear Clearance (Grade 9 and in control rooms)
TSA Clearance – (Airports)
DOE Clearance – (Nuclear plants, Petrochemical, Oil and Gas)
CB&I Crane Lift Director

More Related Content

What's hot (20)

resume 2014
resume 2014resume 2014
resume 2014
 
Resume November 2016
Resume November 2016Resume November 2016
Resume November 2016
 
Final Design Report
Final Design ReportFinal Design Report
Final Design Report
 
Adam_Hodgson_resume Oct'15
Adam_Hodgson_resume Oct'15Adam_Hodgson_resume Oct'15
Adam_Hodgson_resume Oct'15
 
20100730 Jordan Cv
20100730 Jordan Cv20100730 Jordan Cv
20100730 Jordan Cv
 
Resume APT
Resume APTResume APT
Resume APT
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
 
Professional Experience
Professional ExperienceProfessional Experience
Professional Experience
 
Stephen_LeeAlmond
Stephen_LeeAlmondStephen_LeeAlmond
Stephen_LeeAlmond
 
Ben Williams Resume 2016
Ben Williams Resume 2016Ben Williams Resume 2016
Ben Williams Resume 2016
 
DVCV060715
DVCV060715DVCV060715
DVCV060715
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 
AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)
 
Dennis L Crews
Dennis L CrewsDennis L Crews
Dennis L Crews
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
1. Main CV pics
1. Main CV pics1. Main CV pics
1. Main CV pics
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
 

Similar to Bruce Drake Resume and Certifications

Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager ResumeJack Dickerson
 
Neil Curra Resume.
Neil Curra Resume.Neil Curra Resume.
Neil Curra Resume.Neil Curra
 
Michael W Busch
Michael W BuschMichael W Busch
Michael W BuschMike Busch
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx currentEdward Budney
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3mike shost
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPaul Newby
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2clinton collier
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRGary Davis
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume Michael Craig
 
Vincent salines resume 12 2016
Vincent salines resume 12 2016Vincent salines resume 12 2016
Vincent salines resume 12 2016Vincent Salines
 
al dabney resume
al dabney resumeal dabney resume
al dabney resumealcdabney
 
Combine cover letter and resume
Combine cover letter and resumeCombine cover letter and resume
Combine cover letter and resumeRich St.Cyr
 

Similar to Bruce Drake Resume and Certifications (20)

Resume
ResumeResume
Resume
 
Paul R 2015
Paul R 2015Paul R 2015
Paul R 2015
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Neil Curra Resume.
Neil Curra Resume.Neil Curra Resume.
Neil Curra Resume.
 
Michael W Busch
Michael W BuschMichael W Busch
Michael W Busch
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx current
 
ShostMike_MEP.docx 3
ShostMike_MEP.docx 3ShostMike_MEP.docx 3
ShostMike_MEP.docx 3
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Zekes Resume update
Zekes Resume updateZekes Resume update
Zekes Resume update
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
resume-clinton-collier-revision-2
resume-clinton-collier-revision-2resume-clinton-collier-revision-2
resume-clinton-collier-revision-2
 
Davis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIRDavis Gary 0415 PM-LIR
Davis Gary 0415 PM-LIR
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume
 
Vincent salines resume 12 2016
Vincent salines resume 12 2016Vincent salines resume 12 2016
Vincent salines resume 12 2016
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
al dabney resume
al dabney resumeal dabney resume
al dabney resume
 
Combine cover letter and resume
Combine cover letter and resumeCombine cover letter and resume
Combine cover letter and resume
 
Resume with System 3
Resume with System 3Resume with System 3
Resume with System 3
 

Bruce Drake Resume and Certifications

  • 1. Bruce Drake 1549 Kunzman Lane Mosinee, WI 54455 715.693.6820 (Home) 715.574.8022 (Mobile) Pdra7@mtc.net www.linkedin.com/pub/bruce-drake/6/6b3/185 SUMMARY OF QUALIFICATIONS A highly experienced Civil Superintendent (Craft) and Wisconsin Carpenter’s Union member with more than 16 years of experience managing and leading multiple construction projects using numerous construction methods. Experience includes Civil Construction, Project Management, Operations, Nuclear, Safety, OSHA, Budgets, Labor Negotiations and Management, Contracts, Union Relations and Workforce Planning. Experienced in site development, medical facilities, commercial, residential, retail, restaurant, big box, industrial, federal buildings, prisons and dams. Specialized in nuclear and fossil fuel plant construction working on improvement/remodeling efforts in a variety of power plants. Experienced in managing multiple trades and craft to ensure safe and on time project completion. Led crews of up to 110 employees as well as subcontractors while ensuring safe and on time project completion for union and non-union employers. Experience with proper disposal of hazardous waste and site management and storm water pollution protection requirements. PROFESSIONAL MEMBERSHIP North Central States Regional Council of Carpenters PROFESSIONAL EXPERIENCE Boldt Construction 02/15 to present Scaffold Specialist Weston 3 React Project. Designed, built and safely implemented scaffolding for craft in a complex and risky environment. CB&I 02/14 to 2/15 Crew Lead / Safety Lead / Safety Mentor/Crane Lift Director Lead a crew to design, build and safely implement specialty scaffolding for craft in a complex and risky environment at Flint Hills Refinery. Promoted to Safety Lead, Crew Lead and Crew Lead Safety Mentor. Training classes and DOE security clearance is required for this assignment. C.G. Schmidt 12/13 to 01/14 Concrete and Millwork Finishing
  • 2. Bruce Drake Page 2 of 6 Assigned to Aspirus Wausau Hospital. Constructed cabinets and installed specialty trim for addition and remodeling. Forms and concrete for initial phase of addition. Peterson Industrial Scaffolding 10/13 to 11/13 Scaffold Specialist Assigned to Weston Power Plant. Designed, built and safely implemented scaffolding for craft in a complex and risky environment. Immel Construction 06/13 to 10/13 Superintendent Assigned to CWA Airport. Served as the working superintendent to complete new addition and remodeling. Schedules, DCRs, reported to the project manager. Managed subcontractors which included electricians, plumbers, and carpenters, masons, flooring craft, dry wall, fire protection, excavators and demolition. TSA clearance was required for this assignment. Northern States Power Company 02/13 to 05/13 Scaffold Specialist Assigned to Monticello Nuclear Plant. Designed, built and safely implemented scaffolding for craft in a complex and risky environment. Training classes and DOE security clearance was required for this assignment. C.G. Schmidt 12/12 to 01/13 Journeyman Carpenter Assigned to Aspirus Wausau Hospital. Responsible for concrete and forms for addition. Day & Zimmerman 10/12 to 01/13 Scaffold Specialist Assigned to Point Beach Nuclear Plant. Designed, built and safely implemented scaffolding for craft in a complex and risky environment. Training classes and DOE security clearance was required for this assignment. Bechtel 01/12 to 07/12 Civil Superintendent Assigned to Turkey Point Nuclear Plant. Managed the Total Plant Cooling Water (TPCW), ISO Phase and Turbine Deck as well as all of the pumping stations and the mechanical plumbing. Managed site safety, craft, subcontractors, and construction schedule for the Extended Power Upgrade (EPU). Approved design changes and ensured that correct work orders were executed on time and within budget and environmental compliance. Managed a crew of 60 carpenters and provided backup support to the field construction manager. Adverted potential safety hazard. Discovered that the team that was working on the scaffolding construction had the wrong work orders. Retrieved correct work orders, conducted a new Job Safety Analysis (JSA) and Job Hazard Analysis (JHA) and supervised the completion of the job without incident. Created a system to handle the high volume of work orders and a work order method to accommodate multiple requests which allowed the completion of JSA/JHAs at one time. Cut administrative costs and man hours while managing 1500+ requests. Security clearance was required for this assignment.
  • 3. Bruce Drake Page 3 of 6 Bechtel 10/10 to 12/11 Foreman Assigned to Point Beach Nuclear Plant. Served as the journeyman carpenter and quickly elevated to foreman to oversee the trades for the EPU. Directed scaffolding, concrete, radiation protection, dry wall and finishing projects. Led a crew of 110. Training classes and DOE security clearance was required for this position. Norcon Corporation 05/05 to 10/10 Superintendent Served as a working Superintendent/Project Manager that traveled to various sites with tools and equipment to perform, direct and manage a variety of different projects. Secured project from theft and weather damage. Hired and directed crews of up to 50 which included electricians, plumbers, HVAC and landscapers while meeting budget and timeline requirements. Maintained budget, permits, subcontractor compliance, daily/weekly reports, timecards, material orders/purchases, project startup/turnover meetings and met with inspectors. Projects Included: U.S. Border Station in International Falls, MN • Responsible for the exterior renovation. Security clearance required for this assignment. Secured additional work through contract review. GSA contract to remodel border station. Work required dismantling and replacing all security cameras, which was not covered under the contract. Created estimates of additional scope of work and secured GSA approval. Added additional revenue to contract completion. Crossed the Canadian border for materials/tools. Red Granite Correctional Institution in Red Granite, WI • Progressively executed and completed remodeling in compliance with ADA stipulations. Federal Security clearance required for this assignment. University of Wisconsin in Milwaukee, WI • Designed and built various walking platforms to state specifications. Also performed extensive steam tunnel repair (Spawling), ceiling replacement and concrete structural replacement. Weston Village Aquatic Center in Schofield, WI • Expansion, joint repair and Stay Brite repair, Hydro Restoration. Lake Sherburne Dam in Babb, Montana • GSA, Department of Interior Dam and Reservoir Renovation. Blackfoot Indian Reservation. Demolition relined flow tubes. During demolition of 300 foot flow tubes under Lake Sherburne reservoir, there was insufficient air flow with use of gas operated saws. Crew was forced to come up to surface frequently
  • 4. Bruce Drake Page 4 of 6 for air, impacting schedule and QC (quality control). Purchased natural gas machine which alleviated the air quality concerns and meeting deadlines. FBI Building, GSA in Milwaukee, WI • Historic restoration and renovation. FBI Security Clearance required with ability to work in all federal buildings including Judge's Chambers and FBI buildings. Federal Building, GSA in Chicago, IL • Constructed water cooling tower platform. GSA security clearance required for this assignment. Federal Building, GSA in Eau Claire, WI • Performed historic restoration. GSA security clearance required for this assignment. Federal Building, GSA in Chicago, IL • Renovated sub-basement waste water, plumbing, transfer station and filled entire sub-basement in flow able fill. GSA security clearance required for this assignment. M.A. Mortenson 2001 to 2005 Foreman Led work crews and trades in building cancer centers and hospitals’ including Wisconsin Rapids Heart Center, Wausau Heart Center, Ministry Saint Mary’s Hospital and Saint Clare’s Hospital. Directed crews of 50 or more craft and budgets up to $300M. California Construction 2001 Assistant Foreman Led work crew of 15 carpenters, laborers and electricians in Kmart to Big K renovation project throughout Wisconsin. Floor planning and fixtures. Altimate Construction 2000 Journeyman Carpenter Ground up construction of McDonald’s Restaurant M. A. Mortenson 1999 to 2000 Foreman Served as Journeyman Carpenter and elevated to Foreman for ground-up construction of Stanley Hospital and the Crandon Medical Clinic. Directed crews of 50 or more craft. D.B. Construction Owner / Project Manager Estimated, budgeted, permits and proper disposal of materials. Met with owner and inspectors, ordered materials, and was hands-on from start to finish. Built over 30 residential homes. Completed remodels and additions to include flooring, drywall,
  • 5. Bruce Drake Page 5 of 6 decks, and painting. Split and renovated a 5,000 sq. ft. space to accommodate and build a deli and tanning salon. Renovated a convenience store/gas station. Built an addition to expand a bar and restaurant. CERTIFICATIONS & TRAINING Journeyman Carpenter Wisconsin How to Build Green, Start Here Scaffold Erector Qualification Safety Conscious Work Environment Fall Protection Anchor Point Environmental Awareness Utility Employee FME Training Smart Mark Standardized Safety and Health Course – 10 hour Hazard Awareness Fleet Clearance Holder Asbestos Awareness Engineer Required Training Carpenter Required Training Nuclear Fleet Employee Training Radiation Requalification Plant Access Training Enhanced RAD Worker – Skills & Knowledge Lab FME Monitor Foreign Material Exclusion Radiation Worker – Initial Training in Nantel Human Performance Tools Fall Protection Confined Space Entry Ladders and Scaffolds Fleet Clearance Process Scaffold User Dwelling Contractor Qualifier/Water Heater Systems/Erosion Sediment Control/Home Improvement Trade Practices/ OSHA Requirements Asbestos Human Performance DLA and JFG Scaffold Competent Person Scaffold Estimator Qualified Scaffolding Specialist Certified Federal and OSHA Requirements; Certificate of Erector – Competent Person User Safety and Material Estimator Advanced Blueprint Reading Concrete Superintendent – Forms, Layout, Specification Adherence Class 1 Finish Carpenter – Journeyman Carpenter Hydro Experience (Concrete) – Reservoirs, Dams, etc. LMS Certified Training in Safety and Environmental (Nuclear Superintendent) Extensive Experience Healthcare Construction – Foreman Lead and Asbestos Certification OSHA 10 10 + and 16 Safety OSHA 30 Millwright 16 Hour Safety Forklift Operations
  • 6. Bruce Drake Page 6 of 6 TWIC/TSA Certification Certified Crane Signaler CB&I PRO-10 Safety Lead/Crew Lead - Manual & Non Manual Safety Mentor FBI Security Clearance (Federal Buildings including Judge's Chambers and FBI Buildings) Nuclear Clearance (Grade 9 and in control rooms) TSA Clearance – (Airports) DOE Clearance – (Nuclear plants, Petrochemical, Oil and Gas) CB&I Crane Lift Director
  • 7. Bruce Drake Page 6 of 6 TWIC/TSA Certification Certified Crane Signaler CB&I PRO-10 Safety Lead/Crew Lead - Manual & Non Manual Safety Mentor FBI Security Clearance (Federal Buildings including Judge's Chambers and FBI Buildings) Nuclear Clearance (Grade 9 and in control rooms) TSA Clearance – (Airports) DOE Clearance – (Nuclear plants, Petrochemical, Oil and Gas) CB&I Crane Lift Director