Eastside Rail Corridor
Regional Trail Master Plan Project
UPDATE | JANUARY 2015
1
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
2
January 2015 Status
•	 Work completed
•	 Work in progress
•	 What’s next
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
3
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
4
Coordinating Efforts
Sound Transit
•	 East Link light rail
•	 Operations and Maintenance			
Facility (OMSF) final design
•	 Sound Transit Phase 3 plan
Puget Sound Energy
•	 Energize Eastside process
City of Kirkland
City of Redmond
Washington State Dept. of
Transportation
Others
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
5
Master Plan Progress
•	 Corridor inventories complete
•	 Ecological resources
•	 Narrow right-of-way/
encroachments
•	 Intersections/crossings
•	 Steep slopes
•	 Historic resources
•	 Adjacent land uses
•	 Coordinating with partner
jurisdictions to finalize trail
connection studies
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
6
77 WETLANDS
37 STREAMS
28 JURISDICTIONAL DITCHES
MAJOR STREAM CROSSINGS:
MAY CREEK
COAL CREEK
STURTEVANT CREEK
W.TRIB KELSEY CREEK
Ecological Resources
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
7
3.1 MILES LESS THAN 50’ WIDTH
2.3 MILES 50’-75’ WIDTH
6.8 MILES 75’-100’
4 MILES 100’+
Narrow Right-Of-Way/
Encroachments
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
8
19 ROADS
(11 ARTERIALS, 8 LOCAL ROADS)
18 DRIVEWAYS
MAJOR ROAD CROSSINGS:
SE 1ST ST (BELLEVUE)
NE 6TH ST (BELLEVUE)
NE 8TH ST (BELLEVUE)
WILLOWS ROAD (WOODINVILLE)
Intersections/Crossings
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
9
Steep Slopes
9.3 MILES OVER 20% SIDE-SLOPE
•	 7.8 MILES 20%-40% SIDE-SLOPE
•	 1.5 MILES OVER 40% SIDE-SLOPE
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
10
Historic Resources
•	 Railroad artifacts throughout
the corridor- signs, switches,
signals, tracks and ties.
•	 Wilburton Trestle historically
significant.
•	 Railroad story is an opportunity
for interpretation and design
expression.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
11
Adjacent Land Uses
(including both sides of ROW)
13.5 MILES RESIDENTIAL
10 MILES INDUSTRIAL
5.3 MILES COMMERCIAL/
OFFICE
1.5 MILES AGRICULTURE
1.1 MILES PARKS & OPEN SPACE
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
12
Combined Corridor Constraints
3.1 MILES UNCONSTRAINED CORRIDOR
(Over 75’ width, no water resources, under 20% slope)
•	 3.1 miles less than 50’ width
•	 6.5 miles adjacent to water resources
•	 6.6 miles over 20% side-slope
Master Planning -
Progressing from corridor inventory to
an adopted trail plan.
13
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
14
Master Plan Development
•	 Begins with RAC vision and goals
-- Long-term vision
-- Multiple uses
•	 Specific to Regional Trail Master Plan
-- Fits in corridor with respective
multiple uses
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
15
Opportunities:
•	 Non-motorized transportation
•	 Recreational opportunities and
equitable access
•	 Community economic development/
quality of life
Guiding Principles:
•	 Plan for a Regional Trail without
Precluding Future Use for Transit and
Utilities
•	 Meet Railbanking obligations
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
16
MULTIPLE USE PLANNING ENVELOPES
18’
20’
98’
35’
25’
REGIONAL TRAIL
MINIMUM STANDARD
Baseline Space Needs
MULTIPLE USE PLANNING ENVELOPES
18’
SEWER GAS
20’
98’
35’
25’
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
17
Narrow, Sloping Corridor
•	 In this narrow section, all uses
can only be accommodated with
elevated light rail tracks.
60’60’
60’
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
18
Narrow, Sloping Corridor: Existing Condition
Existing section shows railbed
with adjacent road and residences.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
19
Narrow, Sloping Corridor: Multiple Use Option
Elevated light rail may allow
space for both heavy rail and
utilities along with a trail.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
20
Narrow, Sloping Corridor: Trail Placement Alternatives
Trail off railbed may allow future
uses without relocating trail.
Trail on railbed would likely
need relocation to allow
other uses.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
21
75’
75’
75’
Sloping Corridor with Wetland
Potential multi-use layouts locate a
trail on boardwalk in the wetland area,
with rail uses upslope and power lines
downslope. It may not be possible to
accommodate all uses with
at-grade light rail.
75’
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
22
Sloping Corridor with Wetland: Existing Condition
Existing section shows forested wetland
and adjacent commercial use.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
23
Sloping Corridor with Wetland: Multi-Use Option I
One multi-use scenario includes
at-grade light rail and trail
on elevated boardwalk
along with power
transmission.
Future reestablishment of
freight rail may require
relocation of trail or
power lines.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
24
Sloping Corridor with Wetland: Multi-Use Option II
Elevated light rail could allow
space for light rail, heavy rail,
trail, and power transmission.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
25
Sloping Corridor with Wetland: Trail Placement Alternatives
Trail developed on boardwalk preserves
railbed for potential future uses.
Trail developed on the railbed
avoids wetland impacts prior to
development of other uses.
EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT
26
VISIONING
∙ Engage public and stakeholders
∙ Communicate RAC Vision
∙ Develop and communicate KC
Parks vision and goals
ANALYSIS
∙ Engage public and stakeholders
∙ Begin SEPA scoping
∙ Identify alternatives for achieving
goals and objectives
∙ Evaluate tradeoffs and impacts
DELIVERABLES
∙ Engage public and stakeholders
∙ Issue Draft Master Plan/EIS
∙ Review comments
∙ Discuss implementation strategies
and priorities
∙ Select preferred alternative
∙ Issue Final Master Plan/EIS
∙ Council adoption (Q3, 2016)
1ST AND 2ND QUARTER 2015 1ST AND 2ND QUARTER 20163RD AND 4TH QUARTER 2015

More Related Content

What's hot

Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsFairfax County
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Riddhi Dash
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agradeeksha sharma
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Polavaram project
Polavaram projectPolavaram project
Polavaram projectHari Harish
 
Jal manthan 16 april 2016
Jal manthan  16 april 2016Jal manthan  16 april 2016
Jal manthan 16 april 2016Jaspreet Aulakh
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectFabiha Rahman
 
Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123kamlesh
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfrontshiv404
 
College Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCollege Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCity of College Station
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...Rajesh Prasad
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)Oswar Mungkasa
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water managementhydrologyproject2
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 

What's hot (20)

Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
dam
damdam
dam
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Polavaram Irrigation Project
Polavaram Irrigation ProjectPolavaram Irrigation Project
Polavaram Irrigation Project
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
Jal manthan 16 april 2016
Jal manthan  16 april 2016Jal manthan  16 april 2016
Jal manthan 16 april 2016
 
Dams%20report
Dams%20reportDams%20report
Dams%20report
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
 
POLAVARAM PROJECT
POLAVARAM PROJECTPOLAVARAM PROJECT
POLAVARAM PROJECT
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfront
 
College Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCollege Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation Update
 
Construction of joka majherhat phase-i metro corridor considering the requir...
Construction of joka  majherhat phase-i metro corridor considering the requir...Construction of joka  majherhat phase-i metro corridor considering the requir...
Construction of joka majherhat phase-i metro corridor considering the requir...
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
Improving Water Security in Water Stressed Bagmati River Basin, Nepal (2)
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 

Viewers also liked

30th Street Green Corridor
30th Street Green Corridor30th Street Green Corridor
30th Street Green CorridorLu Zhu
 
Euclid Escarpment Run Natural Setting
Euclid Escarpment Run Natural SettingEuclid Escarpment Run Natural Setting
Euclid Escarpment Run Natural SettingBluestone Heights
 
Euclid Creek 5 Green Corridor
Euclid Creek 5 Green CorridorEuclid Creek 5 Green Corridor
Euclid Creek 5 Green CorridorBluestone Heights
 
Brochure Europese Corridors& Poster
Brochure Europese Corridors& PosterBrochure Europese Corridors& Poster
Brochure Europese Corridors& PosterTheovdSluis
 
Creating Urban Green Stream Corridors
Creating Urban Green Stream CorridorsCreating Urban Green Stream Corridors
Creating Urban Green Stream CorridorsBluestone Heights
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boardsGardinerEast
 
Corridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteCorridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteAmman Institute
 
Green corridor horse trails in the Minnesota River Valley
Green corridor horse trails in the Minnesota River ValleyGreen corridor horse trails in the Minnesota River Valley
Green corridor horse trails in the Minnesota River Valleycolleenmarcus
 

Viewers also liked (11)

A2-Poster-2Jun2016
A2-Poster-2Jun2016A2-Poster-2Jun2016
A2-Poster-2Jun2016
 
30th Street Green Corridor
30th Street Green Corridor30th Street Green Corridor
30th Street Green Corridor
 
Team 1 final
Team 1   finalTeam 1   final
Team 1 final
 
Euclid Escarpment Run Natural Setting
Euclid Escarpment Run Natural SettingEuclid Escarpment Run Natural Setting
Euclid Escarpment Run Natural Setting
 
Euclid Creek 5 Green Corridor
Euclid Creek 5 Green CorridorEuclid Creek 5 Green Corridor
Euclid Creek 5 Green Corridor
 
Brochure Europese Corridors& Poster
Brochure Europese Corridors& PosterBrochure Europese Corridors& Poster
Brochure Europese Corridors& Poster
 
Urban-life corridors
Urban-life corridorsUrban-life corridors
Urban-life corridors
 
Creating Urban Green Stream Corridors
Creating Urban Green Stream CorridorsCreating Urban Green Stream Corridors
Creating Urban Green Stream Corridors
 
Remove jcfo boards
Remove jcfo boardsRemove jcfo boards
Remove jcfo boards
 
Corridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman InstituteCorridor Intensification Strategy (CIS) | Amman Institute
Corridor Intensification Strategy (CIS) | Amman Institute
 
Green corridor horse trails in the Minnesota River Valley
Green corridor horse trails in the Minnesota River ValleyGreen corridor horse trails in the Minnesota River Valley
Green corridor horse trails in the Minnesota River Valley
 

Similar to King_County_Trail_Master_Plan

VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014SCVTA
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber finalRobertsBankRailCorridor
 
Development of road network
Development of road networkDevelopment of road network
Development of road networkkishan korat
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguTEGA ODOGU
 
CAP Metro Update 6/15/17
CAP Metro Update 6/15/17CAP Metro Update 6/15/17
CAP Metro Update 6/15/17City of Leander
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESASHWIN KUMAR
 
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...Virtual ULI
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2StittsvilleCentral.ca
 
highway enginering geometric design .ppt
highway enginering geometric design .ppthighway enginering geometric design .ppt
highway enginering geometric design .pptSaurabhAbhishek9
 
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhav
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhavNaya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhav
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhavAnmol Taneja
 
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC @ CSUSB
 
Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesTiE Bangalore
 

Similar to King_County_Trail_Master_Plan (20)

VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014VTA North County Open House Presentation April 2014
VTA North County Open House Presentation April 2014
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
RBRC Presentation oct 18_11_langley chamber final
RBRC Presentation  oct 18_11_langley chamber finalRBRC Presentation  oct 18_11_langley chamber final
RBRC Presentation oct 18_11_langley chamber final
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Development of road network
Development of road networkDevelopment of road network
Development of road network
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.Odogu
 
CAP Metro Update 6/15/17
CAP Metro Update 6/15/17CAP Metro Update 6/15/17
CAP Metro Update 6/15/17
 
Unseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURESUnseen heroes - SMART CITY MEASURES
Unseen heroes - SMART CITY MEASURES
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
PMBP SALIENTS
PMBP SALIENTSPMBP SALIENTS
PMBP SALIENTS
 
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
Edge City to Real City. The Transformation of Tysons Corner VA and White Flin...
 
GATrailSummitPrez
GATrailSummitPrezGATrailSummitPrez
GATrailSummitPrez
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
highway enginering geometric design .ppt
highway enginering geometric design .ppthighway enginering geometric design .ppt
highway enginering geometric design .ppt
 
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhav
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhavNaya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhav
Naya raipur final ppt by anmol taneja, hatim ali, manmohan, vaibhav
 
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
 
Energy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building EnvelopesEnergy Efficiency: Thinking beyond Building Envelopes
Energy Efficiency: Thinking beyond Building Envelopes
 

King_County_Trail_Master_Plan

  • 1. Eastside Rail Corridor Regional Trail Master Plan Project UPDATE | JANUARY 2015 1
  • 2. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 2 January 2015 Status • Work completed • Work in progress • What’s next
  • 3. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 3
  • 4. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 4 Coordinating Efforts Sound Transit • East Link light rail • Operations and Maintenance Facility (OMSF) final design • Sound Transit Phase 3 plan Puget Sound Energy • Energize Eastside process City of Kirkland City of Redmond Washington State Dept. of Transportation Others
  • 5. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 5 Master Plan Progress • Corridor inventories complete • Ecological resources • Narrow right-of-way/ encroachments • Intersections/crossings • Steep slopes • Historic resources • Adjacent land uses • Coordinating with partner jurisdictions to finalize trail connection studies
  • 6. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 6 77 WETLANDS 37 STREAMS 28 JURISDICTIONAL DITCHES MAJOR STREAM CROSSINGS: MAY CREEK COAL CREEK STURTEVANT CREEK W.TRIB KELSEY CREEK Ecological Resources
  • 7. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 7 3.1 MILES LESS THAN 50’ WIDTH 2.3 MILES 50’-75’ WIDTH 6.8 MILES 75’-100’ 4 MILES 100’+ Narrow Right-Of-Way/ Encroachments
  • 8. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 8 19 ROADS (11 ARTERIALS, 8 LOCAL ROADS) 18 DRIVEWAYS MAJOR ROAD CROSSINGS: SE 1ST ST (BELLEVUE) NE 6TH ST (BELLEVUE) NE 8TH ST (BELLEVUE) WILLOWS ROAD (WOODINVILLE) Intersections/Crossings
  • 9. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 9 Steep Slopes 9.3 MILES OVER 20% SIDE-SLOPE • 7.8 MILES 20%-40% SIDE-SLOPE • 1.5 MILES OVER 40% SIDE-SLOPE
  • 10. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 10 Historic Resources • Railroad artifacts throughout the corridor- signs, switches, signals, tracks and ties. • Wilburton Trestle historically significant. • Railroad story is an opportunity for interpretation and design expression.
  • 11. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 11 Adjacent Land Uses (including both sides of ROW) 13.5 MILES RESIDENTIAL 10 MILES INDUSTRIAL 5.3 MILES COMMERCIAL/ OFFICE 1.5 MILES AGRICULTURE 1.1 MILES PARKS & OPEN SPACE
  • 12. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 12 Combined Corridor Constraints 3.1 MILES UNCONSTRAINED CORRIDOR (Over 75’ width, no water resources, under 20% slope) • 3.1 miles less than 50’ width • 6.5 miles adjacent to water resources • 6.6 miles over 20% side-slope
  • 13. Master Planning - Progressing from corridor inventory to an adopted trail plan. 13
  • 14. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 14 Master Plan Development • Begins with RAC vision and goals -- Long-term vision -- Multiple uses • Specific to Regional Trail Master Plan -- Fits in corridor with respective multiple uses
  • 15. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 15 Opportunities: • Non-motorized transportation • Recreational opportunities and equitable access • Community economic development/ quality of life Guiding Principles: • Plan for a Regional Trail without Precluding Future Use for Transit and Utilities • Meet Railbanking obligations
  • 16. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 16 MULTIPLE USE PLANNING ENVELOPES 18’ 20’ 98’ 35’ 25’ REGIONAL TRAIL MINIMUM STANDARD Baseline Space Needs MULTIPLE USE PLANNING ENVELOPES 18’ SEWER GAS 20’ 98’ 35’ 25’
  • 17. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 17 Narrow, Sloping Corridor • In this narrow section, all uses can only be accommodated with elevated light rail tracks. 60’60’ 60’
  • 18. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 18 Narrow, Sloping Corridor: Existing Condition Existing section shows railbed with adjacent road and residences.
  • 19. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 19 Narrow, Sloping Corridor: Multiple Use Option Elevated light rail may allow space for both heavy rail and utilities along with a trail.
  • 20. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 20 Narrow, Sloping Corridor: Trail Placement Alternatives Trail off railbed may allow future uses without relocating trail. Trail on railbed would likely need relocation to allow other uses.
  • 21. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 21 75’ 75’ 75’ Sloping Corridor with Wetland Potential multi-use layouts locate a trail on boardwalk in the wetland area, with rail uses upslope and power lines downslope. It may not be possible to accommodate all uses with at-grade light rail. 75’
  • 22. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 22 Sloping Corridor with Wetland: Existing Condition Existing section shows forested wetland and adjacent commercial use.
  • 23. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 23 Sloping Corridor with Wetland: Multi-Use Option I One multi-use scenario includes at-grade light rail and trail on elevated boardwalk along with power transmission. Future reestablishment of freight rail may require relocation of trail or power lines.
  • 24. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 24 Sloping Corridor with Wetland: Multi-Use Option II Elevated light rail could allow space for light rail, heavy rail, trail, and power transmission.
  • 25. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 25 Sloping Corridor with Wetland: Trail Placement Alternatives Trail developed on boardwalk preserves railbed for potential future uses. Trail developed on the railbed avoids wetland impacts prior to development of other uses.
  • 26. EASTSIDE RAIL CORRIDOR REGIONAL TRAIL MASTER PLAN PROJECT 26 VISIONING ∙ Engage public and stakeholders ∙ Communicate RAC Vision ∙ Develop and communicate KC Parks vision and goals ANALYSIS ∙ Engage public and stakeholders ∙ Begin SEPA scoping ∙ Identify alternatives for achieving goals and objectives ∙ Evaluate tradeoffs and impacts DELIVERABLES ∙ Engage public and stakeholders ∙ Issue Draft Master Plan/EIS ∙ Review comments ∙ Discuss implementation strategies and priorities ∙ Select preferred alternative ∙ Issue Final Master Plan/EIS ∙ Council adoption (Q3, 2016) 1ST AND 2ND QUARTER 2015 1ST AND 2ND QUARTER 20163RD AND 4TH QUARTER 2015