1. April 10 through 12, 2014
“21 for 21”
A 21st Century Green Vision for the 21st
Street Corridor
Study Area A
Study Area B
Study Area C
http://www.southsidegreen.com
Contributors
Tom Batroney
Jeremy Brown
Kathy Chavara
Heather Fuller
Jen Kullgren
Tim Prevost
Patrick Roberts
Mike Takacs
Anna Werle
Megan Zeigler
Study Area A – Team 1
2. April 10 through 12, 2014
• Goals:
– Accommodate Pedestrian, Bicycle and Vehicles
– Traffic calming and safety
– Cycling as transportation
– Minimize parking impacts
– Balance access and circulation
– Stormwater capture for 1” of rainfall runoff
– Separate stormwater system
4. April 10 through 12, 2014
Study Area A – Transportation Design Features
http://www.southsidegreen.com
• Pedestrian, Bicycle, and Business Friendly and Integrated
– Two Way Bicycle Traffic
– Loading Docks Accommodated
– Reallocating Two Parking Spaces
15. April 10 through 12, 2014
Study Area A – Stormwater Design Features
http://www.southsidegreen.com
• Designed Ground Level Impervious Area and Building Roof Area
– Permeable Paver Subsurface Storage
– Bioinfiltration Rain Gardens
– Stormwater Day Lighting and Stepped Wetlands
Stormwater Management of 1.1 inches
3.5’ Deep
16. April 10 through 12, 2014
Study Area A – Stormwater Design Features
http://www.southsidegreen.com
• Increased Green Space Area – 5000 Sq Ft Added
– Landscaped Traffic Calming Bumpouts
– Planter Boxes and Trees
• Additional Tree Canopy – Approx. 38 Trees Total
• ~23 Large Sized Trees and ~15 Smaller Size
17. April 10 through 12, 2014
Staghorn Sumac Sweetbay Magnolia Bald Cypress
BlackgumAmerican HophornbeamSwamp White Oak