Green Ambassador
Fairhill/MLK Project
Community Meeting
March 25, 2015
Agenda
• Welcome and Introductions
• Project Clean Lake
 Green & Gray Infrastructure
• Green Ambassador – Fairhill/MLK Pr...
Northeast Ohio Regional Sewer District
355square
miles
• Political subdivision of Ohio
• Created in 1972 by Court Order
– Code of Regulations
– Governed by seven Trustees
• Sepa...
• Sanitary & regional stormwater services to
Cleveland and 61 member communities
– 1 million customers
– 90+ billion gallo...
We Own and Operate 3 Wastewater
Treatment Plants
Westerly
Southerly
Easterly
6
Northeast Ohio Regional Sewer District
Responsibility
• $3 billion in 25 years
• Combined Sewer
Overflow (CSO) control
• S...
Northeast Ohio Regional Sewer District
Responsibility
• Regional flooding
and erosion issues
• Impervious
surface fee
• $3...
Project Clean Lake
The Sewer District: COMBINED SEWER OVERFLOW CONTROL
10 10
Dry Weather Flow
to treatment plant
Additional Conveyance
Capacity Available for
wet-weather
Combined Sewer
Overflow...
What is a Combined Sewer
Overflow?
How does a combined
sewer system work?
Separate Sewer System
Street Catch
Basins
Industrial
Wastewater
Domestic
Wastewater
Storm Sewer
WWTP
Flow to WWTP
Sanitary...
Combined Sewer Area
Separate
Sewer Area
NEORSD Service Area & Communities
Combined Sewer Area
126 CSO Locations
Throughout
Combined Sewer
Area
Consent Decree Requires Northeast
Ohio’s CSO Problem Reduced in 25
Years
98%
Capture
0
1
2
3
4
5
6
7
8
9
Baseline (1970s) ...
CSO Consent Decree
25 years of Tunnel Construction
Seven Tunnel Systems
– 21 Miles
– 17’ to 24’ in Diameter
– 100’ to 200’...
18
2011 – 2020
2021 – 2027
2019 – 2024
2026 –
2035
2017 –
2021
2024 – 2030
Complete
Project Clean
Lake
Project Clean Lake
Euclid Creek Tunnel
Project Clean Lake
Euclid Creek Tunnel
NEORSD GREEN INFRASTRUCTURE
Looking across combined sewer
area for opportunities to manage
stormwater before it enters
com...
While the Sewer District Does
Large Projects, You Can Also
Manage Your Runoff
On-Site Stormwater
Management Practices
On-Site Stormwater
Management Practices
• Rain Gardens
• Rain Barrels and Cisterns
• Pervious Pavement
• Vegetated Filter ...
• Add disconnection slideRaingarden
Pervious Pavement
Cistern
Retention Pond
Green roof
On-Site Stormwater Practices
Downs...
Project LocationProject Location Map
SHAKERHEIGHTS
Project Drainage Area
Combined Sewer
Inlet Laterals
Inlet
Inlet Laterals
Inlet
Storm Sewer
Combined Sewer
Green Infrastructure Concept
Green Infrastructure Concept
Overflow to
Doan Brook
Ponding Depths
0.75-inch rain event
· 1 foot of surface ponding
· 24-hour drawdown time
Rain events larger than 0.75 inche...
Green Infrastructure Concept
Doan Brook Bank Stabilization
Green Infrastructure Concept
Outlet Pipe to
Bioretention Area
Maximum Height
14 feet
Large Stones to Slow
Down Stormwater
Bioretention
Area
Exposed Agg...
NEORSD will maintain the following:
Maintenance Responsibilities
• New storm sewers and new street inlets
• Bioretention b...
Project Schedule
• Construction Start Date: March 2015
• Construction End Date: November 2016
Construction & Community Impact
Pre Construction Coordination
• Pre Construction Inspection/Photographs
• Coordination with residents for access to proper...
Maintenance of Traffic
• Tentative Plan (Subject to Change)
based on approval/schedule
• Major Components:
– West bound la...
Open Cut Construction
• Noise and dust limited to working hours.
Contractor is responsible for maintaining
work zone.
• Pa...
Open Cut Construction
Open Cut Construction
Open Cut Construction
Open Cut Construction
Questions/Discussion
Questions & Answers
Question: Where will bus route #48/#48A go?
How will the public be notified of RTA bus route
and/or bu...
Questions & Answers
Question: Who do I contact if I have a
question or concern?
NEORSD Customer Service Department
(216) 8...
Questions & Answers
Question: What impacts should I expect
from construction of the new storm sewers
within the public rig...
For more information:
• NEORSD Customer Service (216) 881-8247
• Project Clean Lake official homepage:
www.neorsd.org/cso....
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
Upcoming SlideShare
Loading in …5
×

Fairhill/MLK pre-construction public meeting 3-25-2015

3,497 views

Published on

Overview of the Fairhill/MLK green infrastructure ambassador project taking shape in Cleveland. Includes details on project history, improvements, Project Clean Lake, traffic patterns and impacts during construction, and more.

Published in: Education
  • Sex in your area is here: ♥♥♥ http://bit.ly/39mQKz3 ♥♥♥
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Follow the link, new dating source: ❤❤❤ http://bit.ly/39mQKz3 ❤❤❤
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • If you want to enjoy the Good Life: making money in the comfort of your own home with just your laptop, then this is for YOU...  http://t.cn/AieXAuZz
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • I'm sleeping so much better! Hi David, just a quick message to say thank you so much for this. I have been using a CPAP machine for 3 years and I absolutely hate it. It's so uncomfortable and I sleep worse with it on than I do without it. I'm now sleeping much better thanks to your program. And my wife is so much happier too! ★★★ https://bit.ly/37PhtTN
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • DOWNLOAD THIS BOOKS INTO AVAILABLE FORMAT (2019 Update) ......................................................................................................................... ......................................................................................................................... Download Full PDF EBOOK here { https://soo.gd/irt2 } ......................................................................................................................... Download Full EPUB Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download Full doc Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download PDF EBOOK here { https://soo.gd/irt2 } ......................................................................................................................... Download EPUB Ebook here { https://soo.gd/irt2 } ......................................................................................................................... Download doc Ebook here { https://soo.gd/irt2 } ......................................................................................................................... ......................................................................................................................... ................................................................................................................................... eBook is an electronic version of a traditional print book THIS can be read by using a personal computer or by using an eBook reader. (An eBook reader can be a software application for use on a computer such as Microsoft's free Reader application, or a book-sized computer THIS is used solely as a reading device such as Nuvomedia's Rocket eBook.) Users can purchase an eBook on diskette or CD, but the most popular method of getting an eBook is to purchase a downloadable file of the eBook (or other reading material) from a Web site (such as Barnes and Noble) to be read from the user's computer or reading device. Generally, an eBook can be downloaded in five minutes or less ......................................................................................................................... .............. Browse by Genre Available eBooks .............................................................................................................................. Art, Biography, Business, Chick Lit, Children's, Christian, Classics, Comics, Contemporary, Cookbooks, Manga, Memoir, Music, Mystery, Non Fiction, Paranormal, Philosophy, Poetry, Psychology, Religion, Romance, Science, Science Fiction, Self Help, Suspense, Spirituality, Sports, Thriller, Travel, Young Adult, Crime, Ebooks, Fantasy, Fiction, Graphic Novels, Historical Fiction, History, Horror, Humor And Comedy, ......................................................................................................................... ......................................................................................................................... .....BEST SELLER FOR EBOOK RECOMMEND............................................................. ......................................................................................................................... Blowout: Corrupted Democracy, Rogue State Russia, and the Richest, Most Destructive Industry on Earth,-- The Ride of a Lifetime: Lessons Learned from 15 Years as CEO of the Walt Disney Company,-- Call Sign Chaos: Learning to Lead,-- StrengthsFinder 2.0,-- Stillness Is the Key,-- She Said: Breaking the Sexual Harassment Story THIS Helped Ignite a Movement,-- Atomic Habits: An Easy & Proven Way to Build Good Habits & Break Bad Ones,-- Everything Is Figureoutable,-- What It Takes: Lessons in the Pursuit of Excellence,-- Rich Dad Poor Dad: What the Rich Teach Their Kids About Money THIS the Poor and Middle Class Do Not!,-- The Total Money Makeover: Classic Edition: A Proven Plan for Financial Fitness,-- Shut Up and Listen!: Hard Business Truths THIS Will Help You Succeed, ......................................................................................................................... .........................................................................................................................
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

Fairhill/MLK pre-construction public meeting 3-25-2015

  1. 1. Green Ambassador Fairhill/MLK Project Community Meeting March 25, 2015
  2. 2. Agenda • Welcome and Introductions • Project Clean Lake  Green & Gray Infrastructure • Green Ambassador – Fairhill/MLK Project Project Design Construction & Community Impacts • Questions & Discussion
  3. 3. Northeast Ohio Regional Sewer District 355square miles
  4. 4. • Political subdivision of Ohio • Created in 1972 by Court Order – Code of Regulations – Governed by seven Trustees • Separate and distinct from the City of Cleveland and Cuyahoga County Who We Are…
  5. 5. • Sanitary & regional stormwater services to Cleveland and 61 member communities – 1 million customers – 90+ billion gallons treated each year • Water quality monitoring • Lake Erie beach monitoring and maintenance What We Do…
  6. 6. We Own and Operate 3 Wastewater Treatment Plants Westerly Southerly Easterly 6
  7. 7. Northeast Ohio Regional Sewer District Responsibility • $3 billion in 25 years • Combined Sewer Overflow (CSO) control • Sewer fees • Regional flooding and erosion issues • Impervious surface fee
  8. 8. Northeast Ohio Regional Sewer District Responsibility • Regional flooding and erosion issues • Impervious surface fee • $3 billion in 25 years • Combined Sewer Overflow (CSO) control • Sewer fees
  9. 9. Project Clean Lake The Sewer District: COMBINED SEWER OVERFLOW CONTROL
  10. 10. 10 10 Dry Weather Flow to treatment plant Additional Conveyance Capacity Available for wet-weather Combined Sewer Overflow Discharge to Stream/Lake What is a Combined Sewer?
  11. 11. What is a Combined Sewer Overflow?
  12. 12. How does a combined sewer system work?
  13. 13. Separate Sewer System Street Catch Basins Industrial Wastewater Domestic Wastewater Storm Sewer WWTP Flow to WWTP Sanitary Sewer Lake Erie
  14. 14. Combined Sewer Area Separate Sewer Area NEORSD Service Area & Communities
  15. 15. Combined Sewer Area 126 CSO Locations Throughout Combined Sewer Area
  16. 16. Consent Decree Requires Northeast Ohio’s CSO Problem Reduced in 25 Years 98% Capture 0 1 2 3 4 5 6 7 8 9 Baseline (1970s) Current (2011) Target (2036) 9 4.5 0.494 TypicalYear CSOVolumeRemaining (BG) 0 to 4 overflows in typical year 0 to 80+ overflows in typical year
  17. 17. CSO Consent Decree 25 years of Tunnel Construction Seven Tunnel Systems – 21 Miles – 17’ to 24’ in Diameter – 100’ to 200’ in Depth
  18. 18. 18 2011 – 2020 2021 – 2027 2019 – 2024 2026 – 2035 2017 – 2021 2024 – 2030 Complete Project Clean Lake
  19. 19. Project Clean Lake Euclid Creek Tunnel
  20. 20. Project Clean Lake Euclid Creek Tunnel
  21. 21. NEORSD GREEN INFRASTRUCTURE Looking across combined sewer area for opportunities to manage stormwater before it enters combined system
  22. 22. While the Sewer District Does Large Projects, You Can Also Manage Your Runoff On-Site Stormwater Management Practices
  23. 23. On-Site Stormwater Management Practices • Rain Gardens • Rain Barrels and Cisterns • Pervious Pavement • Vegetated Filter Strips
  24. 24. • Add disconnection slideRaingarden Pervious Pavement Cistern Retention Pond Green roof On-Site Stormwater Practices Downspout Disconnection On-Site Stormwater Management = Disconnection and Distribution Bioretention
  25. 25. Project LocationProject Location Map SHAKERHEIGHTS
  26. 26. Project Drainage Area
  27. 27. Combined Sewer Inlet Laterals Inlet
  28. 28. Inlet Laterals Inlet Storm Sewer Combined Sewer
  29. 29. Green Infrastructure Concept
  30. 30. Green Infrastructure Concept Overflow to Doan Brook
  31. 31. Ponding Depths 0.75-inch rain event · 1 foot of surface ponding · 24-hour drawdown time Rain events larger than 0.75 inches · 3 feet of surface ponding · 24- to 36-hour drawdown time
  32. 32. Green Infrastructure Concept
  33. 33. Doan Brook Bank Stabilization
  34. 34. Green Infrastructure Concept
  35. 35. Outlet Pipe to Bioretention Area Maximum Height 14 feet Large Stones to Slow Down Stormwater Bioretention Area Exposed Aggregate Concrete Stamped & Stained Concrete Standard Concrete Stained Concrete
  36. 36. NEORSD will maintain the following: Maintenance Responsibilities • New storm sewers and new street inlets • Bioretention basins (includes storm sewer infrastructure within the bioretention basins) • Public plaza (includes facility maintenance, litter control, etc.)
  37. 37. Project Schedule • Construction Start Date: March 2015 • Construction End Date: November 2016
  38. 38. Construction & Community Impact
  39. 39. Pre Construction Coordination • Pre Construction Inspection/Photographs • Coordination with residents for access to property (typically exterior of the home photographed) • Residential Notification • 72-hour notification prior to commencement of work • Access To Property • Contractor to coordinate & maintain access to drives, if crossing is to occur • Maintained with steel road plate • Issues and Complaints • NEORSD Customer Service (216)881-8247 8AM-5PM
  40. 40. Maintenance of Traffic • Tentative Plan (Subject to Change) based on approval/schedule • Major Components: – West bound lane Fairhill Road closed. Detour to be established around Larchmere Blvd. to MLK Drive. – No left turn from E. 124th, E. 127th, Kemper Road and North Moreland Road – Intersection of MLK and Fairhill channelized to eastbound Fairhill, left turn only lane, to North MLK – Pedestrian sidewalk closed along north Fairhill Road – No street parking allowed
  41. 41. Open Cut Construction • Noise and dust limited to working hours. Contractor is responsible for maintaining work zone. • Partial restoration of road cuts when sewer work completed.
  42. 42. Open Cut Construction
  43. 43. Open Cut Construction
  44. 44. Open Cut Construction
  45. 45. Open Cut Construction
  46. 46. Questions/Discussion
  47. 47. Questions & Answers Question: Where will bus route #48/#48A go? How will the public be notified of RTA bus route and/or bus stop location changes? RTA service alerts are posted at http://www.riderta.com RTA Answerline (216) 621-9500 is also available to help answer RTA related questions.
  48. 48. Questions & Answers Question: Who do I contact if I have a question or concern? NEORSD Customer Service Department (216) 881-8247 8AM – 5PM
  49. 49. Questions & Answers Question: What impacts should I expect from construction of the new storm sewers within the public right-of-way? Temporary on-street parking limitations. Temporary lane closures, detours and limits to left turns onto Fairhill Road westbound. Temporary driveway access closures. Pedestrian sidewalk closures/detours. Construction dust & noise.
  50. 50. For more information: • NEORSD Customer Service (216) 881-8247 • Project Clean Lake official homepage: www.neorsd.org/cso.php

×