city of stonnington
greville street precinct
Public Realm Design Development
December 2015
CONTENTS
Document Register:
Rev Date Distribution Reason for Issue Issued By
Stonnington Draft for initial review CR
P1 18.09.2015 Stonnington Design Development Stage 1 MR
P2 19.10.2015 Stonnington DD Progress MR
P3 30.10.2015 Stonnington Design Development Sitewide MR
P4 04.12.2015 Stonnington Design Development MR
Prepared for the City of Stonnington by:
rush  wright associates
Lvl 4, 105 Queen Street
Melbourne Vic Australia 3000
tel +61.3.9600 4255
fax +61.3.9600 4266
email inbox@rushwright.com
www.rushwright.com
Disclaimer:
While every reasonable effort has been made to ensure that
this document is correct at the time of printing. RWA has
relied on considerable third party information and disclaim
any and all liability to any person in respect of anything or
the consequences of anything done or omitted to be done
in reliance upon the whole or any part of this document.
8 TREES AND PLANTING  63
Key plant species selections
Stage 1
Stage 2
stage 3
stage 4
Stgae 5
Stage 6
			
9 LIGHTING DESIGN  79
Lighting inspirations
9.1 Catenary Design (Webb Report), refer Appendix A
9.2 Site wide lighting concepts (WGE report), refer
Appendix B
10 LANDSCAPE 				 83
Design Development Drawings, refer Appendix C
11 SERVICES DESIGN  85
Civil, Electrical, Hyrdraulic Design
refer Appendix D and Appendix E
12 TRAFFIC DESIGN 				 87
Traffic advice and reports, refer Appendix F
0 GREVILLE STREET PRECINCT - WHOLE OF SITE  3
Overall plan
Staging plan
1.0 STAGE 1: GRATTAN GARDENS 7
Current plans and renders

2.0 STAGE 2: GREVILLE STREET SHARED ZONE  19
Current plans and renders

3.0 STAGE 3: KING STREET CLOSURE  25
Current plans and renders
			
4.0 STAGE 4: PORTER STREET SHARED ZONE  29
Current plans and renders
5.0 STAGE 5: GREVILLE STREET IMPROVEMENTS 33
(EAST AND WEST) 
Current plans and renders
6.0 STAGE 6: PRAHRAN TOWN HALL FRONTAGE  39
Current plans and renders
7 DESIGN ELEMENTS 43
7.1 City of Stonnington - Standard urban design palette
7.2 Ground Plane
	 paving pattern design opportunities 
	 metal highlights
7.3 Walls and edges
7.4 Furniture
7.5 Planters
7.6 Bicycle racks/ Bollard elements
7.7 Public Art Opportunities
2
City of Stonnington Greville Street Precinct
Public Realm Design
Design Development Report, October 2015. Revision [P2].
3
greville street precinct : whole of site
0
4Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT OVERALL PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
GREVILLE STREET
CHATHAM STREET
GRATTAN
GARDENS
PRAHRAN TOWN HALL
PRAHRAN
STATION
LEGGETTS LANE
PRINCES CLOSE
KING STREET
STEDMONDSROAD
IZETTSTREET
CHAPELSTREET
LTCHAPELSTREET
GRATTANSTREET
PORTERSTREET
5Prepared for the City of Stonnington
by rushwright associates
STAGING PLAN
GREVILLE STREET PRECINCT : WHOLE OF SITE
STAGE 5
STAGE 3
KING STREET
CLOSURE
STAGE 5B
GREVILLE ST EAST
IMPROVEMENTS
STAGE 1
GRATTAN GARDENSSTAGE 5A
GREVILLE ST WEST
IMPROVEMENTS
STAGE 2
GREVILLE ST SHARED ZONE AND
IZETT STREET INTERSECTION
STAGE 4
PORTER STREET SHARED ZONE
+ COMMERCIAL ROAD SIGNALS
PLUS TEMPORARY GREVILLE ST
WEST ONE WAY INFRASTRUCTURE
STAGE 6
PRAHRAN TOWN HALL
FORECOURT
6Prepared for the City of Stonnington
by rushwright associates
7
stage 1: grattan gardens
1
8Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 1: GRATTAN GARDENSSTAGE 1: GRATTAN GARDENS
+EX 0.00
+RL 0.00
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
GRANITE PAVING - STEPS
STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING WALL TO RETAIN
ROUGH BASALT ROCKERY WALL
GLAZED BRICK PLANTER WALL
CONCRETE EDGE - FLUSH KERB
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
EXISTING TREE TO BE TRANSPLANTED (PALM)
WSUD TREEPIT WITH UNDERPLANTING
LARGE PLANTER WITH SEMI-ADVANCED TREES 
UNDERPLANTING
ADVANCED PALM PLANTING IN TURF / GARDEN BED
EXISTING GARDEN BED TO BE REPLANTED
NEW GARDEN BED
NEW TURF BED GREVILLE STREET
GRATTANSTREET
9Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT PLAN - GROUNDPLANE
STAGE 1: GRATTAN GARDENS
GREVILLE STREET
GRATTANSTREET
GREVILLE STREET
GREVILLE STREET
SHARED ZONE
GREVILLE STREET
FOOTPATH AND
TRADING ZONE
GRATTAN GARDENS
FORECOURT
GRATTAN GARDENS
GRASSED TERRACE
RESIDENTIAL LANEWAY
10Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT RENDER
STAGE 1: GRATTAN GARDENSSTAGE 1: GRATTAN GARDENS
GRATTAN STREET
GREVILLESTREET
11Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
12Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
13Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
14Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
GLAZED BRICK WALL
WITH BULLNOSE PROFILE
STEEL TREE SURROUND
GRATTAN GARDENS FORECOURT
GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS
IN WOVEN PAVING PATTERN
EXISTING WATER FEATURE
WITH STAINLESS STEEL GRATES
TO BE RETAINED
15Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
CONCRETE PLANTER SEAT
CLAD IN PAINTED STEEL
EXISTING WATER FEATURE
WITH STAINLESS STEEL GRATES
TO BE RETAINED
GRATTAN GARDENS FORECOURT
GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS
IN WOVEN PAVING PATTERN
GLAZED BRICK WALL
WITH BULLNOSE PROFILE
CATENARY POLE WITH
RIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
16Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
GRASSED TERRACE  PATHS
INCLINED EVENT LAWN
GRANITE STEPS WITH
STAINLESS STEEL HANDRAILS AND FEATURE LIGHTING
TO GRATTAN GARDENS FORECOURT
CATENARY POLE WITH
RIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
SEQUINED CATENARY
WITH LED STUDDED MESH BORDER
AT 8-METRE HEIGHT
BOTANICAL CATENARY
WITH FLORAL HOUSING TO FEATURE LIGHTS
AT 9.5-METRE HEIGHT
17Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
NEW STREET TREE
WAYFINDING AND
INFORMATION BEACON
EXISTING PERIMETER WALLS
TO BE RETAINED
CLEAN DOWN AND REPAINT
CONCRETE BOLLARD
CLAD IN TEXTURED
STAINLESS STEEL
INTEGRATION WORKS:
ASPHALT RAMP WITH RUBBER
KERBS AND LINE MARKINGS
CATENARY POLE WITH
RIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
18Prepared for the City of Stonnington
by rushwright associates
STAGE 1: GRATTAN GARDENS
NIGHT RENDER
CATENARY POLE WITH
RIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
SEQUINED CATENARY
WITH LED STUDDED MESH BORDER
AT 8-METRE HEIGHT
BOTANICAL CATENARY
WITH FLORAL HOUSING TO FEATURE LIGHTS
AT 9.5-METRE HEIGHT
CONCRETE PLANTER SEAT
CLAD IN PAINTED STEEL
CONCRETE SEAT
CLAD IN PAINTED STEEL
STAINLESS STEEL BIKE RACK
19
stage 2: greville street shared zone
2
20Prepared for the City of Stonnington
by rushwright associates
STAGE 2: GREVILLE STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLANDESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
ST.EDMONDSROAD
IZETTSTREET
GRATTANSTREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
VEHICULAR GRADE PERMEABLE PAVING
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
BLUESTONE MOUNTABLE KERB
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
REMOVABLE BOLLARD
PEDESTRIAN BARRIER
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
CATENARY SUPPORT POLE
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
21Prepared for the City of Stonnington
by rushwright associates
STAGE 2: GREVILLE STREET SHARED ZONE
22Prepared for the City of Stonnington
by rushwright associates
STAGE 2: GREVILLE STREET SHARED ZONE
WSUD TREE PIT
WITH FLUSH KERB FOR OVERLAND FLOW
AND INTERMITTENT RAISED KERB AS WHEEL STOP
BLUESTONE FOOTPATH AND TRADING ZONE
TO COUNCIL STANDARDS
PROPOSED STREET TREE
IN FLUSH KERB OUTSTAND WITH
INTERMITTENT RAISED KERB AS WHEEL STOP
CONCRETE PLANTER SEAT
CLAD IN PAINTED STEEL
GREVILLE STREET SHARED ZONE
GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS
IN WOVEN PAVING PATTERN
23Prepared for the City of Stonnington
by rushwright associates
STAGE 2: GREVILLE STREET SHARED ZONE
CONCRETE PLANTER SEAT
CLAD IN PAINTED STEEL
CONCRETE SEAT
CLAD IN PAINTED STEEL
STAINLESS STEEL BIKE RACKSTEEL TREE SURROUND
WITH GRANITE PAVING BAND
CATENARY POLE WITH
RIGGING FOR FUNCTIONAL LIGHTING
AND EVENT INFRASTRUCTURE
24Prepared for the City of Stonnington
by rushwright associates
25
stage 3: king street closure
3
26Prepared for the City of Stonnington
by rushwright associates
STAGE 3: KING STREET CLOSURE
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
KING STREET
REFER KING STREEET SECTION
GREVILLE STREET
LT.CHAPELSTREET
CHAPELSTREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
LINEAR BENCH SEAT TUBULAR STEEL AND MESH
CIRCULAR BOLLARD
REMOVABLE BOLLARD
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
VERTICAL CATENARY LIGHTING AND MESH STRUCTURE
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
GARDEN BED WITH CLIMBERS
27Prepared for the City of Stonnington
by rushwright associates
STAGE 3: KING STREET CLOSURE
NIGHT RENDER
VERTICAL SCREEN AND CATENARY
WITH FEATURE LIGHTING
AND CLIMBERS
MULTI-HEADED LIGHT POLE
WITH PROJECTIONS TO PAVING
PERFORATED STEEL MESH SEAT
WITH INTERNAL FEATURE LIGHTING
CAFE FURNITURE KING STREET PAVING
GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS
IN WOVEN PAVING PATTERN
28Prepared for the City of Stonnington
by rushwright associates
STAGE 3: KING STREET CLOSURE
DESIGN DEVELOPMENT SECTION
EXISTING KING STREET SECTION PROPOSED KING STREET SECTION
29
stage 4: porter street shared zone
4
30Prepared for the City of Stonnington
by rushwright associates
STAGE 4: PORTER STREET SHARED ZONE
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
PORTERSTREET
PORTERSTREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
GRANITE PAVING - SHARED ZONE
100 X 100 SETTS WITH COLOUR PATTERN
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
SE1: RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
PROPOSED NEW FENCE TO PLATFORM EDGE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
Add road markings and signs
for pedestrian crossing
including additional light pole
to match existing
31Prepared for the City of Stonnington
by rushwright associates
STAGE 4: PORTER STREET SHARED ZONE
WAYFINDING AND
INFORMATION BEACON
NEW STREET TREES NEW STREET LIGHTPOLE EXISTING PHOENIX PALM
PORTER STREET SHARED ZONE
GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS
IN WOVEN PAVING PATTERN
NEW STEEL PATTERNED FENCE
32Prepared for the City of Stonnington
by rushwright associates
33
stage 5: greville street improvements
(east and west )
5
34Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS
+EX 0.00
+RL 0.00
GREVILLE STREET
PORTERSTREET
GRATTANSTREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
35Prepared for the City of Stonnington
by rushwright associates
STAGE 5A: GREVILLE STREET IMPROVEMENTS
36Prepared for the City of Stonnington
by rushwright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
MACQUARIESTREET
IZETTSTREET
ST.EDMONDSROAD
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
CONTRASTING INTERSECTION THRESHOLD PAVING
BLUESTONE PAVING - FOOTPATH
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
RAISED BLUESTONE KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
BENCH SEAT WITH BACK AND ARMRESTS
SEAT WALL: MULTICOLOUR GLAZED BRICK
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
CIRCULAR BOLLARD
PEDESTRIAN BARRIER
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
37Prepared for the City of Stonnington
by rushwright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
DESIGN DEVELOPMENT CANOPY PLAN
+EX 0.00
+RL 0.00
GREVILLE STREET
CHAPELSTREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
EXISTING BLUESTONE PAVING - STEPS
BLUESTONE PAVING - FOOTPATH
STAINLESS STEEL TREE SURROUND
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING WALL TO RETAIN
GLAZED BRICK PLANTER WALL
STEEL BLADE WALL
CONCRETE EDGE - FLUSH KERB
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
LINEAR BENCH SEAT TUBULAR STEEL
BENCH SEAT WITH BACK AND ARMRESTS
PERFORATED MESH SEAT
RAISED PLANTER WITH SEATING
FEATURE SEAT / BUTTON BOLLARD
BOLLARD: STEEL CLAD CONCRETE THIMBLE
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
STRIP DRAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
WSUD TREEPIT WITH UNDERPLANTING
38Prepared for the City of Stonnington
by rushwright associates
STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
39
stage 6: prahran town hall forecourt
6
40Prepared for the City of Stonnington
by rushwright associates
DESIGN DEVELOPMENT CANOPY PLAN
STAGE 6: PRAHRAN TOWN HALL FORECOURT
+EX 0.00
+RL 0.00
GREVILLE STREET
CHAPELSTREET
KING STREET
HARDSCAPE KEY
EXTENT OF WORKS
EXISTING KERB
ASPHALT PAVING
BLUESTONE PAVING
TACTILE GROUND SURFACE INDICATORS (TGSI)
EXISTING KERB AND CHANNEL
OVERHEAD AWNING LINE
BICYCLE RACK
LINEAR BENCH SEAT TUBULAR STEEL
RECYCLING AND RUBBISH BIN SET
DRINKING FOUNTAIN
PROPOSED LIGHT POLE
EXISTING POLE WITH LIGHTING TO REMAIN
EXISTING POLE TO REMAIN WITH LIGHTING REMOVED
RELOCATED HERITAGE POLE
INGROUND LED
OVERSIZE PLANTER
BEACON: INFORMATION  WAYFINDING
EXISTING LEVEL
PROPOSED LEVEL
SOFTSCAPE KEY
EXISTING TREE TO BE RETAINED
LARGE PLANTER WITH SEMI-ADVANCED TREES 
UNDERPLANTING
41Prepared for the City of Stonnington
by rushwright associates
STAGE 6: PRAHRAN TOWN HALL FORECOURT
OVERSCALED RAISED PLANTERS
CONCRETE CLAD IN PAINTED STEEL
PERFORATED STEEL SEAT AND
CURVED STEEL TUBING
BENCH SEAT
EXISTING PLANE TREES
BLUESTONE PAVING WITH
METAL INLAY AND
IN-GROUND FEATURE LIGHTING
WAYFINDING AND
INFORMATION BEACON
42Prepared for the City of Stonnington
by rushwright associates
43
design elements  materials
7
44Prepared for the City of Stonnington
by rushwright associates
7.1 CITY OF STONNINGTON - STANDARD URBAN DESIGN PALETTE
DESIGN ELEMENTS
PartD:StandardPalette
length of
ections,
alking
eople are
r range)
er
edestrian
ure car /
tment.
49City of Stonnington / Chapel Street Palette  Guidelines 2013
PartD:StandardPalette
Standard Kerb  Channel Profile
Uncut bluestone pitchers, sawn bluestone gutterstone and sawn
bluestone kerb.
Sawn bluestone pitchers
uted along the
m
buted along
f kerbstone
distributed
annel forms
at sawn top
nnel stones
where that is
xisting kerb.
b.
Channel
Street
Pedestrian Zone Kerbstone Gutter-
stone
54 City of Stonnington / Chapel Street Palette  Guidelines 2013
PartD:StandardPalette
WSUD LINTEL
WSUD LINTEL
HEEL SAFE
GRATE
WSUD LINTEL
WSUD LINTEL
HEEL SAFE
GRATE
Plan of typical pit location
Section of typical water inlet
Standard Planting Palette
Description
WSUD Side Entry pit located along Chapel Street to act as a
primary watering system for the trees planted in footpath.
Pit to be covered with bicycle safe stormwater grate. Refer to
7.18 Street Pit Grate.
Application
To be distributed along Chapel street in close proximity to trees
planted in footpath.
Preference is to have one side entry pit per tree.
Dimensions
TBC
Installation
In kerb and channel to manufacturer recommendations.
Maintenance
Periodic inspection by Council’s Maintenance Department.
.
8.4 Standard Side Entry Pit
Standard Furniture Palette
7.11 Standard Water Station - Option A
Description
DDA compliant filtered water station with drinking fountain and
bottle refill dispenser.
Application
To be distributed at key public areas along Chapel Street,such
as pause points and village squares.
Where possible, the station should be installed adjacent to
garden bed areas where spilt and excess water can be used to
irrigate planting.
Materials and Finishes
Housing frame: Stainless steel (304)
Housing unit: Anodised aluminium
Water supply connection: 50mm PVC
Graphic Panels: 2mm thick polycarbonate sheet
Dimensions
Length: 598mm
Width: 327mm
Height: Custom height at 1050mm
Installation
Surface mount or sub surface mount to manufacturer
recommendations.
All plumbing and drainage work is to be done in accordance
with the local authority’s regulations and by a licensed
contractor.
Maintenance
Periodic inspection by Council’s Maintenance Department.
Filter to be replaced every 12-18 months.
Recommended Supplier or Similar
Arrow-Alpha Industries
Unit customised at
1050mm high
FOOTPTAHS+DRIVEWAYS
CityofStonnington
STANDARDPALETTE
FOOTPTAHS+SHAREWAYSFOOTPATHDETAILS,LANES+SHAREWA
Granite/BluestoneGranite/BluestoneGraniteSetts
450x450200x200100x100
Sawn bluestone pavers
Description
Pedestrian grade natural sawn bluestone paving
Application
To be distributed along the entire length of Chapel Street as the
primary pavement.
Materials and Finishes
Material: Bluestone
Colour: Natural
Finish: Sawn
Dimensions
Length: 595mm
Width: 595mm
Thickness: 40mm
Installation
Laid in a stretcher bond pattern perpendicular to kerb.
Provide a 5mm joint to paving.
The paving should be a consistent finish, level and flush with
adjacent pavement surfaces.
Provide construction, expansion and isolation joints to
engineer’s requirements.
Install on mortar bed and insitu concrete base to engineer’s
requirements.
Maintenance
Periodic inspection by Council’s Maintenance Department.
Supplier
Preference for Australian sourced bluestone
7.19 Standard Footpath Paving - Pedestrian Grade Zone
•	 bluestone kerb and channel
•	 rubbish and recycling bins •	 drinking fountain •	 wsud treepit
•	 bluestone paving
•	 pedestrian thresholds
45Prepared for the City of Stonnington
by rushwright associates
7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES
•	 moderately randomised pattern
•	 paving pattern incorporates high contrast paving strip
•	 pattern derived from the geomorphology of Victoria
•	 design development render
•	 woven pattern
•	 blended interface between paver sizes
•	 design development render
46Prepared for the City of Stonnington
by rushwright associates
7.2 GROUND PLANE : METAL HIGHLIGHTS
STAGE 1: DESIGN ELEMENTS
•	 design development render•	 tree surround
•	 tactile pattern•	 metal threads within groundplane •	 existing water feature
47Prepared for the City of Stonnington
by rushwright associates
7.3 WALLS  EDGES: COLOURS  MATERIALS
STAGE 1: DESIGN ELEMENTS
•	 design development render
•	 colour palette inspiration
•	 glazed brick palette •	 glazed brick walls •	 glazed brick detail coursing
•	 wall and planter forms inspired by heritage elements of Grattan Gardens
48Prepared for the City of Stonnington
by rushwright associates
7.5 PLANTERS AND BOLLARDS
STAGE 1: DESIGN ELEMENTS
•	 subtle variety•	 varying shapes and textures
•	 unique objects with consistent language •	 stainless steel and concrete bollard (thimble form) •	 button seat / bollard
•	 define paths and spaces within the shared zone•	 field of objects
49Prepared for the City of Stonnington
by rushwright associates
7.5 PLANTERS AND BOLLARDS
STAGE 1: DESIGN ELEMENTS
•	 design development render•	 seat planter plan
•	 seat planter section
50Prepared for the City of Stonnington
by rushwright associates
7.6 BICYCLE RACKS/ BOLLARD ELEMENTS
STAGE 1: DESIGN ELEMENTS
•	 design development render
•	 street furniture as bollard
•	 bicycle rack
•	 borrowed language•	 hoop bike rack
51Prepared for the City of Stonnington
by rushwright associates
7.4 MISCELLANEOUS AND STANDARD ELEMENTS
STAGE 1: DESIGN ELEMENTS
•	 seat backs on seating wall •	 stainless steel strip drain •	 design development render
•	 granite tactiles •	 stainless steel handrail •	 cafe furniture
52Prepared for the City of Stonnington
by rushwright associates
7.7 GREVILLE STREET SHARED ZONE ELEMENTS
STAGE 2: DESIGN ELEMENTS
•	 wsud tree pit •	 wsud tree pit
•	 line markings by colour contrast •	 pedestrian barrier•	 line markings by colour contrast
•	 design development render
53Prepared for the City of Stonnington
by rushwright associates
7.7 KING STREET ELEMENTS
STAGE 3: DESIGN ELEMENTS
•	 design development render
•	 paving pattern•	 lighting to enhance paving pattern and cast shadows•	 vertical screen and catenary •	 with some greening
•	 screen could provide interim pattern whilst climbers establish •	 effects through projection or art installation
•	 playful lighting effects
54Prepared for the City of Stonnington
by rushwright associates
7.7 PORTER STREET ELEMENTS
STAGE 4: DESIGN ELEMENTS
•	 design development render
•	 paving pattern •	 railway fence with deformed pickets
•	 fence panels with selected opacity and transparency
•	 inground LED to define pedestrian edges
•	 field of points to read at day and night
•	 railway fence graphic embedded in fence design
55Prepared for the City of Stonnington
by rushwright associates
7.7 GREVILLE STREET WEST  EAST
STAGE 5: DESIGN ELEMENTS
•	 wsud tree pit•	 bluestone footpath
•	 stainless steel seating in a variety of options •	 design development render
•	 tree pit grate
56Prepared for the City of Stonnington
by rushwright associates
7.7 PRAHRAN TOWN HALL LIBRARY ELEMENTS
STAGE 5: DESIGN ELEMENTS
•	 perforated steel for seating •	 design development render
•	 existing ramp and stair wall •	 steel blade wall•	 stainless steel seating benches
57Prepared for the City of Stonnington
by rushwright associates
7.7 PRAHRAN TOWN HALL FORECOURT ELEMENTS
STAGE 6: DESIGN ELEMENTS
•	 seating within chapel street language
•	 town hall frontage •	 design development render•	 in-ground LED strip
•	 stone paving with metal inlay
•	 seasonal planting opportunities •	 overscaled elements
58Prepared for the City of Stonnington
by rushwright associates
7.8 PUBLIC ART OPPORTUNITIES
PORTER STREET
1
3
2
1
2
3
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLLABORATION PROJECT: NEW STEEL FENCING TO PLATFORM
BOUNDARY COULD INTEGRATE CONTEMPORARY DESIGN ARTWORK
(REINTERPRET TRADITIONAL RAILWAY PICKET CONSTRUCTION
DETAILS.
COLLABORATION PROJECT: SHARED ZONE PAVING DESIGN AS
INTEGRATION OF HISTORIC CULTURAL ELEMENTS AND IDEAS
INCLUDING LIGHTING, IMAGE, TEXT, PAVING DESIGN IN GRANITE -
BLUESTONE PALETTE.
59Prepared for the City of Stonnington
by rushwright associates
7.8 PUBLIC ART OPPORTUNITIES
GRATTAN GARDENS
BEACON OBJECT SERIES: A REPEATED
STREET ELEMENT (REFER OTHER
PRECINCT PLAN MARKUPS) WHICH COULD
INVESTIGATE HISTORY, INTERPRETATION,
SOUND, LIGHT, LOCAL EVENT BULLETIN,
INTERACTIVE ELEMENTS.
CATENARY LIGHTPOLES WITH PROJECTION
CAPACITY FROM RIGGING (NOTE: STAGE 2
IMPLEMENTATION) IMAGE ART  SOUND
INSTALLATION
PERIOD OF THREE MONTH TRAFFIC
TRIAL WITH TEMPORARY FESTIVAL
INSTALLATION OF LIGHTING BY ARTISTS
OR STUDENTS FROM THE MELBOURNE
POLYTECHNIC DIPLOMA OF ‘LIVE
PRODUCTION  TECHNICAL SERVICES’ AT
PRAHRAN CAMPUS
1
2
3
1
2
3
3
60Prepared for the City of Stonnington
by rushwright associates
PRAHRAN TOWN HALL
7.8 PUBLIC ART OPPORTUNITIES
4
CHAPELSTREET
GREVILLE STREET
2
2
1
3
3
1
2
3
4
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT WITH TEMPORARY OR
PERMANENT LIGHT PROJECT SERIES
COLLABORATION PROJECT: LIBRARY AND TOWN HALL OFFICES
(FUTURE CIVIC FACILITY) SPECIAL OBJECT OR PAVING INSERTIONS
PRAHRAN TOWN HALL FORECOURT: SPECIAL ARTWORK
INTEGRATION FOR MARKING TOWN HALL SPACE ALONG CHAPEL
STREET
61Prepared for the City of Stonnington
by rushwright associates
KING STREET
7.8 PUBLIC ART OPPORTUNITIES
4 4 4 4 43 3 3 3
2 2
1
1
2
3
4
5
BEACON OBJECT SERIES (REFER GRATTAN GARDENS)
COLOUR - IMAGE WALL TREATMENT
SPECIAL GRANITE PAVING PATTERN SERIES
TEMPORARY OR PERMANENT LIGHT PROJECT SERIES ONTO PAVING
LIGHTING DESIGNER  ARTIST COLLABORATION
A. LIGHTING PROJECTS (REFER #4 ABOVE)
B. SEAT LIGHTING
C. LIGHT EFFECTS ONTO BUILDING PIERS
D. VERTICAL CATENARY LIGHTING DESIGN
E. GOBO PROJECTIONS
CHAPELSTREET
LT.CHAPELSTREET
GREVILLE
STREET
KING STREET
62Prepared for the City of Stonnington
by rushwright associates
63
trees

plantings8
64Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 1: GRATTAN GARDENS
Understory:
Agave americana, Aloe arborescens,
A. barberae, A. plicatilis, Dion
spinulosum, Yucca filamentosa or
Y. recurvifolia, Zamia furfuracea
Understory:
Agave americana, Aloe arborescens,
A. barberae, A. plicatilis, Dion
spinulosum, Yucca filamentosa or
Y. recurvifolia, Zamia furfuracea
Ficus platypoda
Existing Schinus molle var. areira
with new understorey planting
Transplanted Phoenix canariensis
Existing Phoenix canariensis
Chamaerops humilis
Cussonia spicata
Washingtonia robusta
Existing Melia azedarach
Ceiba sp.
Chamaerops humilis
Erythrina crista-galli
Jacaranda mimosifolia
Brachychiton populneus x
acerifolius ‘Jerilderie Red’
Brachychiton populneus x
acerifolius ‘Jerilderie Red’
65Prepared for the City of Stonnington
by rushwright associates
The fresh design prepared bythe design team for Grattan Gardensisbased on the conceptof“bringing
back the gardens” into Greville Street – a theme developed during the masterplan phase.
The park redesign is based on a reinterpretation of the original late 19th- early 20th Century
“gardenesque” layout of the gardens, while providing spaces for social interaction and informal
seating for the Prahran neighbourhood, serving contemporary needs and uses. Botanical interest
and diversity is central to the design ideas presented, following the nineteenth century and early 20th
Century ambition of curating a plant collection for the park that adds to a sense of public richness.
The current “symmetrical” order of a 7m wide path dividing 2 raised grass lawns and with only 3
tree species types has eroded the exuberance of the original garden and planting palette. There is
potential “delight” in diverse plantings which we believe are essential to any park experience.
The two existing Phoenix palms are not part of the original 19th century layout of the gardens. They
have probably already been transplanted once before, possibly as part of the current design. One
Palm was originally closer to Greville Street as seen in the photo below. The current symmetrical
design, framing an empty view, is akin to a domestic arrangement at a private house development or
suburban estate entry and does diminish and dominate the visual perception of the park today.
Functional issues:
The new design aims to provide equity of access up onto
a single grass terrace (this is not currently provided in
this area of the park).
This requires a ramped path edging the west side of
the park. The alignment of this path requires cutting
into and retaining the existing grades at its north and
south ends. Such a path cannot be located on the
east side due to existing electrical switching and pit
infrastructure on the NE corner. (It is undesirable to
land a ramped path in that area).
The existing NW palm is right against the alignment of the proposed ramped path edge wall and
requires relocation. Building a retaining wall against its swollen trunk base (bole) is not ideal due
to the scale of the current swelling and trunk, resulting in uncomfortable visual proximity (it will feel
too close). The palm requires a more generous space within a larger lawn area - hence the current
proposal to relocate to the SE area of the terrace. The edge to this pathway will be planted with new
Washingtonia robusta or Livistona chinensis palms and suitable understorey.
While we understand that Phoenix palms are very robust, a successful, diverse new planting for this
edge will be difficult to achieve horticulturally / aesthetically around the bole of the existing palm and
in elevation along the terrace edge and within the 2m cross section of the proposed garden. It will
feel ‘thin’ and too close to the wall system.
The current DD design drawings show planning that is not purely symmetrical. (Circular Planter sizes, forecourt
tree locations, catenary, non- ovoid grass shaping etc.) Retaining the symmetry of the existing palm locations
diminishes the potential of the new design and detracts from the long term potential of new plantings.
The proposed locations of the two Palms, one retained and one relocated establishes a larger plant scale on the
east side of the grass terrace with bold palm frond textures set against fine peppercorn foliage. The placement
allows the largest area of free grass space. The two palm specimens will become a linked pair of strong vertical
markers leading the eye and walkers off the forecourt, a kind of large scale pair of sentinels, inviting pedestrians
up to the terrace and the park beyond.
Transplanting of existing Phoenix canariensis within DD Grattan Gardens design.
The Palm (in question) on leftofpicture istherefore proposed
to be relocated on the east side of park against the existing
line of peppercorns (right). The space between the existing
White Cedar trees and the Palm is minimal to achieve a
compliant path/ ramp.
Future Location of Transplanted palms against existing
Peppercorns.
This is an important design move, and will take away the
sense of the palms feeling like symmetrical ‘goal posts’ –
a dull arrangement that commands too much attention,
framing as it does and empty view. Relocating the palm to
a side view, will totally transform the sense of the park for
users, helping to invite a walk around rather than presenting
the view of empty space. The palms will present in side view,
asapair,deepeningthesenseofperspectiveandmaximising
the sense of length and extension of the green space. This
also allows fresh plantings on the west side, and a balanced
asymmetry in the best of the gardenesque tradition.
We feel this is a very important design issue, and is based on some central design principles for the revised park
design. Retaining the palm in its current location is definitely not recommended, and will diminish and stultify
the fresh design if it is left as is.
66Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 2: GREVILLE STREET SHARED ZONE
Tilia cordata ‘Green Spire’ or
Acer truncatum x platanoides
Jacaranda mimosifolia
67Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 3: KING STREET CLOSURE
Existing Platanus orientalis ‘Digitata’
Existing Platanus orientalis ‘Digitata’
climbers to linear catenary mesh
Kennedia rubicunda
Parthenocissus quinquefolia
Vitis vinifera
68Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 4: PORTER STREET SHARED ZONE
Existing Phoenix canariensis
Tilia cordata ‘Green Spire’
or Acer truncatum x platanoides
Tipuana tipu or
Jacaranda mimosifolia
Jacaranda mimosifolia
69Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 5A: GREVILLE STREET WEST
Tilia cordata ‘Green Spire’
or Acer truncatum x platanoides
Jacaranda mimosifolia
70Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 5B: GREVILLE STREET EAST
Tilia cordata ‘Green Spire’
or Acer truncatum x platanoides
Tilia cordata ‘Green Spire’
or Acer truncatum x platanoides
Existing Platanus orientalis ‘Digitata’
71Prepared for the City of Stonnington
by rushwright associates
PLANTING KEY PLAN
STAGE 6: PRAHRAN TOWN HALL FORECOURT
Existing Platanus orientalis ‘Digitata’
Existing Platanus orientalis ‘Digitata’
Magnolia grandiflora ‘Kay Parris’
Magnolia grandiflora ‘Teddy Bear’
72Prepared for the City of Stonnington
by rushwright associates
STREET TREES
TREES AND PLANTING
Tilia cordata ‘Green Spire’ Linden Tree
Platanus orientalis ‘Digitata’ - Existing along Chapel StreetAcer truncatum x platanoides
Platanus orientalis ‘Digitata’ - Existing at Chapel Street
73Prepared for the City of Stonnington
by rushwright associates
PALMS
TREES AND PLANTING
Washingtonia robusta Mexican Fan Palm Washingtonia robusta Mexican Fan PalmPhoenix canariensis - Existing at Prahran Station
Phoenix canariensis - Existing in Grattan Gardens
74Prepared for the City of Stonnington
by rushwright associates
FEATURE TREES
TREES AND PLANTING
Brachychiton populneus x acerifolius ‘Jerilderie Red’ Brachychiton populneus x acerifolius ‘Jerilderie Red’Brachychiton populneus x acerifolius ‘Jerilderie Red’
Ceiba sp. Cussonia spicataChamaerops humilis
75Prepared for the City of Stonnington
by rushwright associates
FEATURE TREES
TREES AND PLANTING
Ficus platypoda
Tipuana tipu
Melia azedarach - Existing at Grattan GardensErythrina crista-galli
Schinus molle var. areira - Existing at Grattan Gardens
Jacaranda mimosifolia
76Prepared for the City of Stonnington
by rushwright associates
CLIMBERS
TREES AND PLANTING
Kennedia rubicunda Parthenocissus quinquefolia
Vitis vinifera
77Prepared for the City of Stonnington
by rushwright associates
UNDERSTOREY
TREES AND PLANTING
04F. Yucca filamentosa or Y. recurvifolia
Aloe plicatilisAgave americana Aloe arborescens Aloe barberae
04G. Dion spinulosum Zamia furfuracea
78Prepared for the City of Stonnington
by rushwright associates
79
lighting design
		
9
80Prepared for the City of Stonnington
by rushwright associates
LIGHTING INSPIRATIONS: GRATTAN GARDENS CATENARY
LIGHTING DESIGN
•	 sequined field
•	 simplified botanical light fitting
•	 simplified directional light fitting •	 design development render
•	 glomesh fabric field •	 studded clusters
81Prepared for the City of Stonnington
by rushwright associates
9.1 CATENARY DESIGN
LIGHTING DESIGN
REFER APPENDIX A: WEBB CATENARY LIGHTING
82Prepared for the City of Stonnington
by rushwright associates
9.2 SITE WIDE LIGHTING CONCEPTS
LIGHTING DESIGN
REFER APPENDIX B: WGE SITEWIDE LIGHTING
83
landscape drawings
design development stage
10
84Prepared for the City of Stonnington
by rushwright associates
10.1 DESIGN DEVELOPMENT DOCUMENTATION
LANDSCAPE DRAWINGS
REFER APPENDIX C: RWA LANDSCAPE DRAWINGS
85
services design
civil
hydraulic
electrical
11
86Prepared for the City of Stonnington
by rushwright associates
11.1 DESIGN DEVELOPMENT DOCUMENTATION
CIVIL, HYDRAULIC, AND ELECTRICAL DRAWINGS
REFER APPENDIX D: WGE SERVICES REPORT
AND APPENDIX E: WGE SERVUCES DRAWINGS
87
traffic design
12
88Prepared for the City of Stonnington
by rushwright associates
12.1 DESIGN DEVELOPMENT REPORT
TRAFFIC DESIGN
REFER APPENDIX F: OBT TRAFFIC REPORT

More Related Content

What's hot

150930 frith street boards
150930 frith street boards150930 frith street boards
150930 frith street boardsoliver_preece
 
Sherwin williams-land-use-programming
Sherwin williams-land-use-programmingSherwin williams-land-use-programming
Sherwin williams-land-use-programmingE'ville Eye
 
Conscient Elevate 9560168178.
Conscient Elevate  9560168178.Conscient Elevate  9560168178.
Conscient Elevate 9560168178.Kunal Mondal
 
Conscient Hines Elevate Contact- 9560168178.
Conscient Hines Elevate Contact- 9560168178.Conscient Hines Elevate Contact- 9560168178.
Conscient Hines Elevate Contact- 9560168178.Kunal Mondal
 
11. Galleria Interior Concept 17-02-16
11. Galleria Interior Concept 17-02-1611. Galleria Interior Concept 17-02-16
11. Galleria Interior Concept 17-02-16James Barsoum
 
Agora at Trinity Design Guidelines
Agora at Trinity Design GuidelinesAgora at Trinity Design Guidelines
Agora at Trinity Design GuidelinesLWP Property Group
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpE'ville Eye
 
Lennar sherwin-williams-architectural-fdp
Lennar sherwin-williams-architectural-fdpLennar sherwin-williams-architectural-fdp
Lennar sherwin-williams-architectural-fdpE'ville Eye
 
Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718mrstore
 
The goa land development and building 2010.
The goa land development and building 2010.The goa land development and building 2010.
The goa land development and building 2010.Joel Manoj
 
Floor Area Ratio-Bangladesh
Floor Area Ratio-BangladeshFloor Area Ratio-Bangladesh
Floor Area Ratio-Bangladeshshadhossen
 
5500, 5514 Broadway 200, 202, 206 Ellwood
5500, 5514  Broadway 200, 202, 206 Ellwood 5500, 5514  Broadway 200, 202, 206 Ellwood
5500, 5514 Broadway 200, 202, 206 Ellwood Marian Vargas Mendoza
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewoodahcitycouncil
 
20170131 pm bhw update final
20170131 pm bhw update final20170131 pm bhw update final
20170131 pm bhw update finalparkmercedvision
 
Item # 6 - 528 Normandy
Item # 6 - 528 NormandyItem # 6 - 528 Normandy
Item # 6 - 528 Normandyahcitycouncil
 
Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility ahcitycouncil
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study sessionE'ville Eye
 
Far , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapFar , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapisrafitulislam
 

What's hot (19)

150930 frith street boards
150930 frith street boards150930 frith street boards
150930 frith street boards
 
Sherwin williams-land-use-programming
Sherwin williams-land-use-programmingSherwin williams-land-use-programming
Sherwin williams-land-use-programming
 
Conscient Elevate 9560168178.
Conscient Elevate  9560168178.Conscient Elevate  9560168178.
Conscient Elevate 9560168178.
 
Conscient Hines Elevate Contact- 9560168178.
Conscient Hines Elevate Contact- 9560168178.Conscient Hines Elevate Contact- 9560168178.
Conscient Hines Elevate Contact- 9560168178.
 
11. Galleria Interior Concept 17-02-16
11. Galleria Interior Concept 17-02-1611. Galleria Interior Concept 17-02-16
11. Galleria Interior Concept 17-02-16
 
Agora at Trinity Design Guidelines
Agora at Trinity Design GuidelinesAgora at Trinity Design Guidelines
Agora at Trinity Design Guidelines
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdp
 
Lennar sherwin-williams-architectural-fdp
Lennar sherwin-williams-architectural-fdpLennar sherwin-williams-architectural-fdp
Lennar sherwin-williams-architectural-fdp
 
Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718
 
The goa land development and building 2010.
The goa land development and building 2010.The goa land development and building 2010.
The goa land development and building 2010.
 
Floor Area Ratio-Bangladesh
Floor Area Ratio-BangladeshFloor Area Ratio-Bangladesh
Floor Area Ratio-Bangladesh
 
5500, 5514 Broadway 200, 202, 206 Ellwood
5500, 5514  Broadway 200, 202, 206 Ellwood 5500, 5514  Broadway 200, 202, 206 Ellwood
5500, 5514 Broadway 200, 202, 206 Ellwood
 
Item # 8 - 203 E. Edgewood
Item # 8 - 203 E. EdgewoodItem # 8 - 203 E. Edgewood
Item # 8 - 203 E. Edgewood
 
20170131 pm bhw update final
20170131 pm bhw update final20170131 pm bhw update final
20170131 pm bhw update final
 
372 Blue Bonnet web packet
372 Blue Bonnet web packet372 Blue Bonnet web packet
372 Blue Bonnet web packet
 
Item # 6 - 528 Normandy
Item # 6 - 528 NormandyItem # 6 - 528 Normandy
Item # 6 - 528 Normandy
 
Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility Item # 4 - 820 Cambridge Compatibility
Item # 4 - 820 Cambridge Compatibility
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Far , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapFar , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicap
 

Similar to Greville and King St Concept Plans

2009 1209 Asce Powerpoint Presentation
2009 1209 Asce Powerpoint Presentation2009 1209 Asce Powerpoint Presentation
2009 1209 Asce Powerpoint PresentationSiobone
 
John Street Corridor Improvements - Stakeholder Meeting Presentation
John Street Corridor Improvements - Stakeholder Meeting PresentationJohn Street Corridor Improvements - Stakeholder Meeting Presentation
John Street Corridor Improvements - Stakeholder Meeting Presentationknelischer
 
Portfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_webPortfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_webAndreas Lebisch
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meetingknelischer
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development PortfolioChinh Phan Duc
 
Samuel's portfolio
Samuel's portfolioSamuel's portfolio
Samuel's portfoliosamuel zhang
 
Wills Display Boards
Wills Display BoardsWills Display Boards
Wills Display Boardspnpgroup
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteGrant Hepburn
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloE'ville Eye
 
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGEMill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGESin Byrne
 

Similar to Greville and King St Concept Plans (20)

2009 1209 Asce Powerpoint Presentation
2009 1209 Asce Powerpoint Presentation2009 1209 Asce Powerpoint Presentation
2009 1209 Asce Powerpoint Presentation
 
John Street Corridor Improvements - Stakeholder Meeting Presentation
John Street Corridor Improvements - Stakeholder Meeting PresentationJohn Street Corridor Improvements - Stakeholder Meeting Presentation
John Street Corridor Improvements - Stakeholder Meeting Presentation
 
Portfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_webPortfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_web
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
Lot 280 Bogdanich way
Lot 280 Bogdanich wayLot 280 Bogdanich way
Lot 280 Bogdanich way
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development Portfolio
 
Portfolio spreads
Portfolio spreadsPortfolio spreads
Portfolio spreads
 
Samuel's portfolio
Samuel's portfolioSamuel's portfolio
Samuel's portfolio
 
BOE Referendum Discussion 9-10-15
BOE Referendum Discussion 9-10-15BOE Referendum Discussion 9-10-15
BOE Referendum Discussion 9-10-15
 
Wills Display Boards
Wills Display BoardsWills Display Boards
Wills Display Boards
 
Eagles Nest Broucher
Eagles Nest BroucherEagles Nest Broucher
Eagles Nest Broucher
 
Haddonfield Facilities Overview
Haddonfield Facilities OverviewHaddonfield Facilities Overview
Haddonfield Facilities Overview
 
Form Based Code 101
Form Based Code 101Form Based Code 101
Form Based Code 101
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
 
QEN Portfolio CV Residential
QEN Portfolio CV ResidentialQEN Portfolio CV Residential
QEN Portfolio CV Residential
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Leisure Centre.
Leisure Centre.Leisure Centre.
Leisure Centre.
 
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGEMill 14-1-15 - Sheet - A100 - CONTENTS PAGE
Mill 14-1-15 - Sheet - A100 - CONTENTS PAGE
 

More from Stonnington Connect

Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Stonnington Connect
 
Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Stonnington Connect
 
Greville and King St Traffic Notifications
Greville and King St Traffic NotificationsGreville and King St Traffic Notifications
Greville and King St Traffic NotificationsStonnington Connect
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingStonnington Connect
 
Local Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsLocal Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsStonnington Connect
 
Princes Gardens Masterplan of Existing Conditions
 Princes Gardens Masterplan of Existing Conditions  Princes Gardens Masterplan of Existing Conditions
Princes Gardens Masterplan of Existing Conditions Stonnington Connect
 
Glenferrie Road- High Street Structure Plan Report
Glenferrie Road- High Street Structure Plan ReportGlenferrie Road- High Street Structure Plan Report
Glenferrie Road- High Street Structure Plan ReportStonnington Connect
 
Hawksburn Village Structure Plan Report
Hawksburn Village Structure Plan ReportHawksburn Village Structure Plan Report
Hawksburn Village Structure Plan ReportStonnington Connect
 
Greville and King Streets Improvement Plan
Greville and King Streets Improvement PlanGreville and King Streets Improvement Plan
Greville and King Streets Improvement PlanStonnington Connect
 
Aged Services Client Satisfaction
Aged Services Client SatisfactionAged Services Client Satisfaction
Aged Services Client SatisfactionStonnington Connect
 
Greville and King Engagement Analysis Report August 2015
Greville and King Engagement Analysis Report August 2015Greville and King Engagement Analysis Report August 2015
Greville and King Engagement Analysis Report August 2015Stonnington Connect
 
July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)Stonnington Connect
 
July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)Stonnington Connect
 
March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)Stonnington Connect
 
March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)Stonnington Connect
 
FAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanFAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanStonnington Connect
 

More from Stonnington Connect (20)

Windsor Siding Master Plan
Windsor Siding Master PlanWindsor Siding Master Plan
Windsor Siding Master Plan
 
Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016
 
Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016Windsor Siding Implementation Staging Plan June 2016
Windsor Siding Implementation Staging Plan June 2016
 
Greville and King St Traffic Notifications
Greville and King St Traffic NotificationsGreville and King St Traffic Notifications
Greville and King St Traffic Notifications
 
Capital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor SidingCapital Works Project Bulletin: Windsor Siding
Capital Works Project Bulletin: Windsor Siding
 
Local Law Permit in Greville/King Streets
Local Law Permit in Greville/King StreetsLocal Law Permit in Greville/King Streets
Local Law Permit in Greville/King Streets
 
November 2015: CCTV
November 2015: CCTVNovember 2015: CCTV
November 2015: CCTV
 
Location of Princes Gardens
Location of Princes GardensLocation of Princes Gardens
Location of Princes Gardens
 
Princes Gardens Masterplan of Existing Conditions
 Princes Gardens Masterplan of Existing Conditions  Princes Gardens Masterplan of Existing Conditions
Princes Gardens Masterplan of Existing Conditions
 
Glenferrie Road- High Street Structure Plan Report
Glenferrie Road- High Street Structure Plan ReportGlenferrie Road- High Street Structure Plan Report
Glenferrie Road- High Street Structure Plan Report
 
Hawksburn Village Structure Plan Report
Hawksburn Village Structure Plan ReportHawksburn Village Structure Plan Report
Hawksburn Village Structure Plan Report
 
Greville and King Streets Improvement Plan
Greville and King Streets Improvement PlanGreville and King Streets Improvement Plan
Greville and King Streets Improvement Plan
 
Aged Services Client Satisfaction
Aged Services Client SatisfactionAged Services Client Satisfaction
Aged Services Client Satisfaction
 
Open Space Strategy
Open Space StrategyOpen Space Strategy
Open Space Strategy
 
Greville and King Engagement Analysis Report August 2015
Greville and King Engagement Analysis Report August 2015Greville and King Engagement Analysis Report August 2015
Greville and King Engagement Analysis Report August 2015
 
July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)July 2015: Local Business (Connect Stonnington Group)
July 2015: Local Business (Connect Stonnington Group)
 
July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)July 2015: Sustainable Environment (Connect Stonnington Group)
July 2015: Sustainable Environment (Connect Stonnington Group)
 
March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)March 2015: Transport Safety (Connect Stonnington Group)
March 2015: Transport Safety (Connect Stonnington Group)
 
March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)March 2015: Sustainable Transport (Connect Stonnington Group)
March 2015: Sustainable Transport (Connect Stonnington Group)
 
FAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept PlanFAQS - Draft Gardiner Park Concept Plan
FAQS - Draft Gardiner Park Concept Plan
 

Recently uploaded

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 

Recently uploaded (20)

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 

Greville and King St Concept Plans

  • 1. city of stonnington greville street precinct Public Realm Design Development December 2015
  • 2. CONTENTS Document Register: Rev Date Distribution Reason for Issue Issued By Stonnington Draft for initial review CR P1 18.09.2015 Stonnington Design Development Stage 1 MR P2 19.10.2015 Stonnington DD Progress MR P3 30.10.2015 Stonnington Design Development Sitewide MR P4 04.12.2015 Stonnington Design Development MR Prepared for the City of Stonnington by: rush wright associates Lvl 4, 105 Queen Street Melbourne Vic Australia 3000 tel +61.3.9600 4255 fax +61.3.9600 4266 email inbox@rushwright.com www.rushwright.com Disclaimer: While every reasonable effort has been made to ensure that this document is correct at the time of printing. RWA has relied on considerable third party information and disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document. 8 TREES AND PLANTING 63 Key plant species selections Stage 1 Stage 2 stage 3 stage 4 Stgae 5 Stage 6 9 LIGHTING DESIGN 79 Lighting inspirations 9.1 Catenary Design (Webb Report), refer Appendix A 9.2 Site wide lighting concepts (WGE report), refer Appendix B 10 LANDSCAPE 83 Design Development Drawings, refer Appendix C 11 SERVICES DESIGN 85 Civil, Electrical, Hyrdraulic Design refer Appendix D and Appendix E 12 TRAFFIC DESIGN 87 Traffic advice and reports, refer Appendix F 0 GREVILLE STREET PRECINCT - WHOLE OF SITE 3 Overall plan Staging plan 1.0 STAGE 1: GRATTAN GARDENS 7 Current plans and renders 2.0 STAGE 2: GREVILLE STREET SHARED ZONE 19 Current plans and renders 3.0 STAGE 3: KING STREET CLOSURE 25 Current plans and renders 4.0 STAGE 4: PORTER STREET SHARED ZONE 29 Current plans and renders 5.0 STAGE 5: GREVILLE STREET IMPROVEMENTS 33 (EAST AND WEST) Current plans and renders 6.0 STAGE 6: PRAHRAN TOWN HALL FRONTAGE 39 Current plans and renders 7 DESIGN ELEMENTS 43 7.1 City of Stonnington - Standard urban design palette 7.2 Ground Plane paving pattern design opportunities metal highlights 7.3 Walls and edges 7.4 Furniture 7.5 Planters 7.6 Bicycle racks/ Bollard elements 7.7 Public Art Opportunities 2 City of Stonnington Greville Street Precinct Public Realm Design Design Development Report, October 2015. Revision [P2].
  • 3. 3 greville street precinct : whole of site 0
  • 4. 4Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT OVERALL PLAN GREVILLE STREET PRECINCT : WHOLE OF SITE GREVILLE STREET CHATHAM STREET GRATTAN GARDENS PRAHRAN TOWN HALL PRAHRAN STATION LEGGETTS LANE PRINCES CLOSE KING STREET STEDMONDSROAD IZETTSTREET CHAPELSTREET LTCHAPELSTREET GRATTANSTREET PORTERSTREET
  • 5. 5Prepared for the City of Stonnington by rushwright associates STAGING PLAN GREVILLE STREET PRECINCT : WHOLE OF SITE STAGE 5 STAGE 3 KING STREET CLOSURE STAGE 5B GREVILLE ST EAST IMPROVEMENTS STAGE 1 GRATTAN GARDENSSTAGE 5A GREVILLE ST WEST IMPROVEMENTS STAGE 2 GREVILLE ST SHARED ZONE AND IZETT STREET INTERSECTION STAGE 4 PORTER STREET SHARED ZONE + COMMERCIAL ROAD SIGNALS PLUS TEMPORARY GREVILLE ST WEST ONE WAY INFRASTRUCTURE STAGE 6 PRAHRAN TOWN HALL FORECOURT
  • 6. 6Prepared for the City of Stonnington by rushwright associates
  • 7. 7 stage 1: grattan gardens 1
  • 8. 8Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT CANOPY PLAN STAGE 1: GRATTAN GARDENSSTAGE 1: GRATTAN GARDENS +EX 0.00 +RL 0.00 HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING GRANITE PAVING - SHARED ZONE 100 X 100 SETTS WITH COLOUR PATTERN GRANITE PAVING - STEPS STEEL TREE SURROUND TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING WALL TO RETAIN ROUGH BASALT ROCKERY WALL GLAZED BRICK PLANTER WALL CONCRETE EDGE - FLUSH KERB EXISTING KERB AND CHANNEL OVERHEAD AWNING LINE BICYCLE RACK BENCH SEAT WITH BACK AND ARMRESTS SEAT WALL: MULTICOLOUR GLAZED BRICK RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN STRIP DRAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED CATENARY SUPPORT POLE BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED EXISTING TREE TO BE TRANSPLANTED (PALM) WSUD TREEPIT WITH UNDERPLANTING LARGE PLANTER WITH SEMI-ADVANCED TREES UNDERPLANTING ADVANCED PALM PLANTING IN TURF / GARDEN BED EXISTING GARDEN BED TO BE REPLANTED NEW GARDEN BED NEW TURF BED GREVILLE STREET GRATTANSTREET
  • 9. 9Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT PLAN - GROUNDPLANE STAGE 1: GRATTAN GARDENS GREVILLE STREET GRATTANSTREET GREVILLE STREET GREVILLE STREET SHARED ZONE GREVILLE STREET FOOTPATH AND TRADING ZONE GRATTAN GARDENS FORECOURT GRATTAN GARDENS GRASSED TERRACE RESIDENTIAL LANEWAY
  • 10. 10Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT RENDER STAGE 1: GRATTAN GARDENSSTAGE 1: GRATTAN GARDENS GRATTAN STREET GREVILLESTREET
  • 11. 11Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS
  • 12. 12Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS
  • 13. 13Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS
  • 14. 14Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS GLAZED BRICK WALL WITH BULLNOSE PROFILE STEEL TREE SURROUND GRATTAN GARDENS FORECOURT GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS IN WOVEN PAVING PATTERN EXISTING WATER FEATURE WITH STAINLESS STEEL GRATES TO BE RETAINED
  • 15. 15Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS CONCRETE PLANTER SEAT CLAD IN PAINTED STEEL EXISTING WATER FEATURE WITH STAINLESS STEEL GRATES TO BE RETAINED GRATTAN GARDENS FORECOURT GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS IN WOVEN PAVING PATTERN GLAZED BRICK WALL WITH BULLNOSE PROFILE CATENARY POLE WITH RIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
  • 16. 16Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS GRASSED TERRACE PATHS INCLINED EVENT LAWN GRANITE STEPS WITH STAINLESS STEEL HANDRAILS AND FEATURE LIGHTING TO GRATTAN GARDENS FORECOURT CATENARY POLE WITH RIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE SEQUINED CATENARY WITH LED STUDDED MESH BORDER AT 8-METRE HEIGHT BOTANICAL CATENARY WITH FLORAL HOUSING TO FEATURE LIGHTS AT 9.5-METRE HEIGHT
  • 17. 17Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS NEW STREET TREE WAYFINDING AND INFORMATION BEACON EXISTING PERIMETER WALLS TO BE RETAINED CLEAN DOWN AND REPAINT CONCRETE BOLLARD CLAD IN TEXTURED STAINLESS STEEL INTEGRATION WORKS: ASPHALT RAMP WITH RUBBER KERBS AND LINE MARKINGS CATENARY POLE WITH RIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
  • 18. 18Prepared for the City of Stonnington by rushwright associates STAGE 1: GRATTAN GARDENS NIGHT RENDER CATENARY POLE WITH RIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE SEQUINED CATENARY WITH LED STUDDED MESH BORDER AT 8-METRE HEIGHT BOTANICAL CATENARY WITH FLORAL HOUSING TO FEATURE LIGHTS AT 9.5-METRE HEIGHT CONCRETE PLANTER SEAT CLAD IN PAINTED STEEL CONCRETE SEAT CLAD IN PAINTED STEEL STAINLESS STEEL BIKE RACK
  • 19. 19 stage 2: greville street shared zone 2
  • 20. 20Prepared for the City of Stonnington by rushwright associates STAGE 2: GREVILLE STREET SHARED ZONE DESIGN DEVELOPMENT CANOPY PLANDESIGN DEVELOPMENT CANOPY PLAN +EX 0.00 +RL 0.00 GREVILLE STREET ST.EDMONDSROAD IZETTSTREET GRATTANSTREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING GRANITE PAVING - SHARED ZONE 100 X 100 SETTS WITH COLOUR PATTERN BLUESTONE PAVING - FOOTPATH VEHICULAR GRADE PERMEABLE PAVING TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL RAISED BLUESTONE KERB AND CHANNEL BLUESTONE MOUNTABLE KERB OVERHEAD AWNING LINE BICYCLE RACK BENCH SEAT WITH BACK AND ARMRESTS RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE CIRCULAR BOLLARD REMOVABLE BOLLARD PEDESTRIAN BARRIER RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN STRIP DRAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED CATENARY SUPPORT POLE BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED WSUD TREEPIT WITH UNDERPLANTING
  • 21. 21Prepared for the City of Stonnington by rushwright associates STAGE 2: GREVILLE STREET SHARED ZONE
  • 22. 22Prepared for the City of Stonnington by rushwright associates STAGE 2: GREVILLE STREET SHARED ZONE WSUD TREE PIT WITH FLUSH KERB FOR OVERLAND FLOW AND INTERMITTENT RAISED KERB AS WHEEL STOP BLUESTONE FOOTPATH AND TRADING ZONE TO COUNCIL STANDARDS PROPOSED STREET TREE IN FLUSH KERB OUTSTAND WITH INTERMITTENT RAISED KERB AS WHEEL STOP CONCRETE PLANTER SEAT CLAD IN PAINTED STEEL GREVILLE STREET SHARED ZONE GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS IN WOVEN PAVING PATTERN
  • 23. 23Prepared for the City of Stonnington by rushwright associates STAGE 2: GREVILLE STREET SHARED ZONE CONCRETE PLANTER SEAT CLAD IN PAINTED STEEL CONCRETE SEAT CLAD IN PAINTED STEEL STAINLESS STEEL BIKE RACKSTEEL TREE SURROUND WITH GRANITE PAVING BAND CATENARY POLE WITH RIGGING FOR FUNCTIONAL LIGHTING AND EVENT INFRASTRUCTURE
  • 24. 24Prepared for the City of Stonnington by rushwright associates
  • 25. 25 stage 3: king street closure 3
  • 26. 26Prepared for the City of Stonnington by rushwright associates STAGE 3: KING STREET CLOSURE DESIGN DEVELOPMENT CANOPY PLAN +EX 0.00 +RL 0.00 KING STREET REFER KING STREEET SECTION GREVILLE STREET LT.CHAPELSTREET CHAPELSTREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING CONTRASTING INTERSECTION THRESHOLD PAVING GRANITE PAVING - SHARED ZONE 100 X 100 SETTS WITH COLOUR PATTERN BLUESTONE PAVING - FOOTPATH TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL RAISED BLUESTONE KERB AND CHANNEL OVERHEAD AWNING LINE BICYCLE RACK BENCH SEAT WITH BACK AND ARMRESTS LINEAR BENCH SEAT TUBULAR STEEL AND MESH CIRCULAR BOLLARD REMOVABLE BOLLARD RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN STRIP DRAIN PROPOSED LIGHT POLE VERTICAL CATENARY LIGHTING AND MESH STRUCTURE BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED GARDEN BED WITH CLIMBERS
  • 27. 27Prepared for the City of Stonnington by rushwright associates STAGE 3: KING STREET CLOSURE NIGHT RENDER VERTICAL SCREEN AND CATENARY WITH FEATURE LIGHTING AND CLIMBERS MULTI-HEADED LIGHT POLE WITH PROJECTIONS TO PAVING PERFORATED STEEL MESH SEAT WITH INTERNAL FEATURE LIGHTING CAFE FURNITURE KING STREET PAVING GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS IN WOVEN PAVING PATTERN
  • 28. 28Prepared for the City of Stonnington by rushwright associates STAGE 3: KING STREET CLOSURE DESIGN DEVELOPMENT SECTION EXISTING KING STREET SECTION PROPOSED KING STREET SECTION
  • 29. 29 stage 4: porter street shared zone 4
  • 30. 30Prepared for the City of Stonnington by rushwright associates STAGE 4: PORTER STREET SHARED ZONE DESIGN DEVELOPMENT CANOPY PLAN +EX 0.00 +RL 0.00 GREVILLE STREET PORTERSTREET PORTERSTREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING CONTRASTING INTERSECTION THRESHOLD PAVING GRANITE PAVING - SHARED ZONE 100 X 100 SETTS WITH COLOUR PATTERN BLUESTONE PAVING - FOOTPATH TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL SE1: RAISED BLUESTONE KERB AND CHANNEL OVERHEAD AWNING LINE BENCH SEAT WITH BACK AND ARMRESTS SEAT WALL: MULTICOLOUR GLAZED BRICK RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE CIRCULAR BOLLARD PROPOSED NEW FENCE TO PLATFORM EDGE RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED WSUD TREEPIT WITH UNDERPLANTING Add road markings and signs for pedestrian crossing including additional light pole to match existing
  • 31. 31Prepared for the City of Stonnington by rushwright associates STAGE 4: PORTER STREET SHARED ZONE WAYFINDING AND INFORMATION BEACON NEW STREET TREES NEW STREET LIGHTPOLE EXISTING PHOENIX PALM PORTER STREET SHARED ZONE GRANITE SETTS IN 4 NEUTRAL GREY TONE COLOURS IN WOVEN PAVING PATTERN NEW STEEL PATTERNED FENCE
  • 32. 32Prepared for the City of Stonnington by rushwright associates
  • 33. 33 stage 5: greville street improvements (east and west ) 5
  • 34. 34Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT CANOPY PLAN STAGE 5A: GREVILLE STREET WEST IMPROVEMENTS +EX 0.00 +RL 0.00 GREVILLE STREET PORTERSTREET GRATTANSTREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING CONTRASTING INTERSECTION THRESHOLD PAVING BLUESTONE PAVING - FOOTPATH TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL RAISED BLUESTONE KERB AND CHANNEL OVERHEAD AWNING LINE BENCH SEAT WITH BACK AND ARMRESTS SEAT WALL: MULTICOLOUR GLAZED BRICK RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE CIRCULAR BOLLARD RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED WSUD TREEPIT WITH UNDERPLANTING
  • 35. 35Prepared for the City of Stonnington by rushwright associates STAGE 5A: GREVILLE STREET IMPROVEMENTS
  • 36. 36Prepared for the City of Stonnington by rushwright associates STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS DESIGN DEVELOPMENT CANOPY PLAN +EX 0.00 +RL 0.00 GREVILLE STREET MACQUARIESTREET IZETTSTREET ST.EDMONDSROAD HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING CONTRASTING INTERSECTION THRESHOLD PAVING BLUESTONE PAVING - FOOTPATH TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL RAISED BLUESTONE KERB AND CHANNEL OVERHEAD AWNING LINE BICYCLE RACK BENCH SEAT WITH BACK AND ARMRESTS SEAT WALL: MULTICOLOUR GLAZED BRICK RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE CIRCULAR BOLLARD PEDESTRIAN BARRIER RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED WSUD TREEPIT WITH UNDERPLANTING
  • 37. 37Prepared for the City of Stonnington by rushwright associates STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS DESIGN DEVELOPMENT CANOPY PLAN +EX 0.00 +RL 0.00 GREVILLE STREET CHAPELSTREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING EXISTING BLUESTONE PAVING - STEPS BLUESTONE PAVING - FOOTPATH STAINLESS STEEL TREE SURROUND TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING WALL TO RETAIN GLAZED BRICK PLANTER WALL STEEL BLADE WALL CONCRETE EDGE - FLUSH KERB EXISTING KERB AND CHANNEL OVERHEAD AWNING LINE BICYCLE RACK LINEAR BENCH SEAT TUBULAR STEEL BENCH SEAT WITH BACK AND ARMRESTS PERFORATED MESH SEAT RAISED PLANTER WITH SEATING FEATURE SEAT / BUTTON BOLLARD BOLLARD: STEEL CLAD CONCRETE THIMBLE RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN STRIP DRAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED WSUD TREEPIT WITH UNDERPLANTING
  • 38. 38Prepared for the City of Stonnington by rushwright associates STAGE 5B: GREVILLE STREET EAST IMPROVEMENTS
  • 39. 39 stage 6: prahran town hall forecourt 6
  • 40. 40Prepared for the City of Stonnington by rushwright associates DESIGN DEVELOPMENT CANOPY PLAN STAGE 6: PRAHRAN TOWN HALL FORECOURT +EX 0.00 +RL 0.00 GREVILLE STREET CHAPELSTREET KING STREET HARDSCAPE KEY EXTENT OF WORKS EXISTING KERB ASPHALT PAVING BLUESTONE PAVING TACTILE GROUND SURFACE INDICATORS (TGSI) EXISTING KERB AND CHANNEL OVERHEAD AWNING LINE BICYCLE RACK LINEAR BENCH SEAT TUBULAR STEEL RECYCLING AND RUBBISH BIN SET DRINKING FOUNTAIN PROPOSED LIGHT POLE EXISTING POLE WITH LIGHTING TO REMAIN EXISTING POLE TO REMAIN WITH LIGHTING REMOVED RELOCATED HERITAGE POLE INGROUND LED OVERSIZE PLANTER BEACON: INFORMATION WAYFINDING EXISTING LEVEL PROPOSED LEVEL SOFTSCAPE KEY EXISTING TREE TO BE RETAINED LARGE PLANTER WITH SEMI-ADVANCED TREES UNDERPLANTING
  • 41. 41Prepared for the City of Stonnington by rushwright associates STAGE 6: PRAHRAN TOWN HALL FORECOURT OVERSCALED RAISED PLANTERS CONCRETE CLAD IN PAINTED STEEL PERFORATED STEEL SEAT AND CURVED STEEL TUBING BENCH SEAT EXISTING PLANE TREES BLUESTONE PAVING WITH METAL INLAY AND IN-GROUND FEATURE LIGHTING WAYFINDING AND INFORMATION BEACON
  • 42. 42Prepared for the City of Stonnington by rushwright associates
  • 43. 43 design elements materials 7
  • 44. 44Prepared for the City of Stonnington by rushwright associates 7.1 CITY OF STONNINGTON - STANDARD URBAN DESIGN PALETTE DESIGN ELEMENTS PartD:StandardPalette length of ections, alking eople are r range) er edestrian ure car / tment. 49City of Stonnington / Chapel Street Palette Guidelines 2013 PartD:StandardPalette Standard Kerb Channel Profile Uncut bluestone pitchers, sawn bluestone gutterstone and sawn bluestone kerb. Sawn bluestone pitchers uted along the m buted along f kerbstone distributed annel forms at sawn top nnel stones where that is xisting kerb. b. Channel Street Pedestrian Zone Kerbstone Gutter- stone 54 City of Stonnington / Chapel Street Palette Guidelines 2013 PartD:StandardPalette WSUD LINTEL WSUD LINTEL HEEL SAFE GRATE WSUD LINTEL WSUD LINTEL HEEL SAFE GRATE Plan of typical pit location Section of typical water inlet Standard Planting Palette Description WSUD Side Entry pit located along Chapel Street to act as a primary watering system for the trees planted in footpath. Pit to be covered with bicycle safe stormwater grate. Refer to 7.18 Street Pit Grate. Application To be distributed along Chapel street in close proximity to trees planted in footpath. Preference is to have one side entry pit per tree. Dimensions TBC Installation In kerb and channel to manufacturer recommendations. Maintenance Periodic inspection by Council’s Maintenance Department. . 8.4 Standard Side Entry Pit Standard Furniture Palette 7.11 Standard Water Station - Option A Description DDA compliant filtered water station with drinking fountain and bottle refill dispenser. Application To be distributed at key public areas along Chapel Street,such as pause points and village squares. Where possible, the station should be installed adjacent to garden bed areas where spilt and excess water can be used to irrigate planting. Materials and Finishes Housing frame: Stainless steel (304) Housing unit: Anodised aluminium Water supply connection: 50mm PVC Graphic Panels: 2mm thick polycarbonate sheet Dimensions Length: 598mm Width: 327mm Height: Custom height at 1050mm Installation Surface mount or sub surface mount to manufacturer recommendations. All plumbing and drainage work is to be done in accordance with the local authority’s regulations and by a licensed contractor. Maintenance Periodic inspection by Council’s Maintenance Department. Filter to be replaced every 12-18 months. Recommended Supplier or Similar Arrow-Alpha Industries Unit customised at 1050mm high FOOTPTAHS+DRIVEWAYS CityofStonnington STANDARDPALETTE FOOTPTAHS+SHAREWAYSFOOTPATHDETAILS,LANES+SHAREWA Granite/BluestoneGranite/BluestoneGraniteSetts 450x450200x200100x100 Sawn bluestone pavers Description Pedestrian grade natural sawn bluestone paving Application To be distributed along the entire length of Chapel Street as the primary pavement. Materials and Finishes Material: Bluestone Colour: Natural Finish: Sawn Dimensions Length: 595mm Width: 595mm Thickness: 40mm Installation Laid in a stretcher bond pattern perpendicular to kerb. Provide a 5mm joint to paving. The paving should be a consistent finish, level and flush with adjacent pavement surfaces. Provide construction, expansion and isolation joints to engineer’s requirements. Install on mortar bed and insitu concrete base to engineer’s requirements. Maintenance Periodic inspection by Council’s Maintenance Department. Supplier Preference for Australian sourced bluestone 7.19 Standard Footpath Paving - Pedestrian Grade Zone • bluestone kerb and channel • rubbish and recycling bins • drinking fountain • wsud treepit • bluestone paving • pedestrian thresholds
  • 45. 45Prepared for the City of Stonnington by rushwright associates 7.2 GROUND PLANE : PAVING PATTERN DESIGN OPPORTUNITIES • moderately randomised pattern • paving pattern incorporates high contrast paving strip • pattern derived from the geomorphology of Victoria • design development render • woven pattern • blended interface between paver sizes • design development render
  • 46. 46Prepared for the City of Stonnington by rushwright associates 7.2 GROUND PLANE : METAL HIGHLIGHTS STAGE 1: DESIGN ELEMENTS • design development render• tree surround • tactile pattern• metal threads within groundplane • existing water feature
  • 47. 47Prepared for the City of Stonnington by rushwright associates 7.3 WALLS EDGES: COLOURS MATERIALS STAGE 1: DESIGN ELEMENTS • design development render • colour palette inspiration • glazed brick palette • glazed brick walls • glazed brick detail coursing • wall and planter forms inspired by heritage elements of Grattan Gardens
  • 48. 48Prepared for the City of Stonnington by rushwright associates 7.5 PLANTERS AND BOLLARDS STAGE 1: DESIGN ELEMENTS • subtle variety• varying shapes and textures • unique objects with consistent language • stainless steel and concrete bollard (thimble form) • button seat / bollard • define paths and spaces within the shared zone• field of objects
  • 49. 49Prepared for the City of Stonnington by rushwright associates 7.5 PLANTERS AND BOLLARDS STAGE 1: DESIGN ELEMENTS • design development render• seat planter plan • seat planter section
  • 50. 50Prepared for the City of Stonnington by rushwright associates 7.6 BICYCLE RACKS/ BOLLARD ELEMENTS STAGE 1: DESIGN ELEMENTS • design development render • street furniture as bollard • bicycle rack • borrowed language• hoop bike rack
  • 51. 51Prepared for the City of Stonnington by rushwright associates 7.4 MISCELLANEOUS AND STANDARD ELEMENTS STAGE 1: DESIGN ELEMENTS • seat backs on seating wall • stainless steel strip drain • design development render • granite tactiles • stainless steel handrail • cafe furniture
  • 52. 52Prepared for the City of Stonnington by rushwright associates 7.7 GREVILLE STREET SHARED ZONE ELEMENTS STAGE 2: DESIGN ELEMENTS • wsud tree pit • wsud tree pit • line markings by colour contrast • pedestrian barrier• line markings by colour contrast • design development render
  • 53. 53Prepared for the City of Stonnington by rushwright associates 7.7 KING STREET ELEMENTS STAGE 3: DESIGN ELEMENTS • design development render • paving pattern• lighting to enhance paving pattern and cast shadows• vertical screen and catenary • with some greening • screen could provide interim pattern whilst climbers establish • effects through projection or art installation • playful lighting effects
  • 54. 54Prepared for the City of Stonnington by rushwright associates 7.7 PORTER STREET ELEMENTS STAGE 4: DESIGN ELEMENTS • design development render • paving pattern • railway fence with deformed pickets • fence panels with selected opacity and transparency • inground LED to define pedestrian edges • field of points to read at day and night • railway fence graphic embedded in fence design
  • 55. 55Prepared for the City of Stonnington by rushwright associates 7.7 GREVILLE STREET WEST EAST STAGE 5: DESIGN ELEMENTS • wsud tree pit• bluestone footpath • stainless steel seating in a variety of options • design development render • tree pit grate
  • 56. 56Prepared for the City of Stonnington by rushwright associates 7.7 PRAHRAN TOWN HALL LIBRARY ELEMENTS STAGE 5: DESIGN ELEMENTS • perforated steel for seating • design development render • existing ramp and stair wall • steel blade wall• stainless steel seating benches
  • 57. 57Prepared for the City of Stonnington by rushwright associates 7.7 PRAHRAN TOWN HALL FORECOURT ELEMENTS STAGE 6: DESIGN ELEMENTS • seating within chapel street language • town hall frontage • design development render• in-ground LED strip • stone paving with metal inlay • seasonal planting opportunities • overscaled elements
  • 58. 58Prepared for the City of Stonnington by rushwright associates 7.8 PUBLIC ART OPPORTUNITIES PORTER STREET 1 3 2 1 2 3 BEACON OBJECT SERIES (REFER GRATTAN GARDENS) COLLABORATION PROJECT: NEW STEEL FENCING TO PLATFORM BOUNDARY COULD INTEGRATE CONTEMPORARY DESIGN ARTWORK (REINTERPRET TRADITIONAL RAILWAY PICKET CONSTRUCTION DETAILS. COLLABORATION PROJECT: SHARED ZONE PAVING DESIGN AS INTEGRATION OF HISTORIC CULTURAL ELEMENTS AND IDEAS INCLUDING LIGHTING, IMAGE, TEXT, PAVING DESIGN IN GRANITE - BLUESTONE PALETTE.
  • 59. 59Prepared for the City of Stonnington by rushwright associates 7.8 PUBLIC ART OPPORTUNITIES GRATTAN GARDENS BEACON OBJECT SERIES: A REPEATED STREET ELEMENT (REFER OTHER PRECINCT PLAN MARKUPS) WHICH COULD INVESTIGATE HISTORY, INTERPRETATION, SOUND, LIGHT, LOCAL EVENT BULLETIN, INTERACTIVE ELEMENTS. CATENARY LIGHTPOLES WITH PROJECTION CAPACITY FROM RIGGING (NOTE: STAGE 2 IMPLEMENTATION) IMAGE ART SOUND INSTALLATION PERIOD OF THREE MONTH TRAFFIC TRIAL WITH TEMPORARY FESTIVAL INSTALLATION OF LIGHTING BY ARTISTS OR STUDENTS FROM THE MELBOURNE POLYTECHNIC DIPLOMA OF ‘LIVE PRODUCTION TECHNICAL SERVICES’ AT PRAHRAN CAMPUS 1 2 3 1 2 3 3
  • 60. 60Prepared for the City of Stonnington by rushwright associates PRAHRAN TOWN HALL 7.8 PUBLIC ART OPPORTUNITIES 4 CHAPELSTREET GREVILLE STREET 2 2 1 3 3 1 2 3 4 BEACON OBJECT SERIES (REFER GRATTAN GARDENS) COLOUR - IMAGE WALL TREATMENT WITH TEMPORARY OR PERMANENT LIGHT PROJECT SERIES COLLABORATION PROJECT: LIBRARY AND TOWN HALL OFFICES (FUTURE CIVIC FACILITY) SPECIAL OBJECT OR PAVING INSERTIONS PRAHRAN TOWN HALL FORECOURT: SPECIAL ARTWORK INTEGRATION FOR MARKING TOWN HALL SPACE ALONG CHAPEL STREET
  • 61. 61Prepared for the City of Stonnington by rushwright associates KING STREET 7.8 PUBLIC ART OPPORTUNITIES 4 4 4 4 43 3 3 3 2 2 1 1 2 3 4 5 BEACON OBJECT SERIES (REFER GRATTAN GARDENS) COLOUR - IMAGE WALL TREATMENT SPECIAL GRANITE PAVING PATTERN SERIES TEMPORARY OR PERMANENT LIGHT PROJECT SERIES ONTO PAVING LIGHTING DESIGNER ARTIST COLLABORATION A. LIGHTING PROJECTS (REFER #4 ABOVE) B. SEAT LIGHTING C. LIGHT EFFECTS ONTO BUILDING PIERS D. VERTICAL CATENARY LIGHTING DESIGN E. GOBO PROJECTIONS CHAPELSTREET LT.CHAPELSTREET GREVILLE STREET KING STREET
  • 62. 62Prepared for the City of Stonnington by rushwright associates
  • 64. 64Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 1: GRATTAN GARDENS Understory: Agave americana, Aloe arborescens, A. barberae, A. plicatilis, Dion spinulosum, Yucca filamentosa or Y. recurvifolia, Zamia furfuracea Understory: Agave americana, Aloe arborescens, A. barberae, A. plicatilis, Dion spinulosum, Yucca filamentosa or Y. recurvifolia, Zamia furfuracea Ficus platypoda Existing Schinus molle var. areira with new understorey planting Transplanted Phoenix canariensis Existing Phoenix canariensis Chamaerops humilis Cussonia spicata Washingtonia robusta Existing Melia azedarach Ceiba sp. Chamaerops humilis Erythrina crista-galli Jacaranda mimosifolia Brachychiton populneus x acerifolius ‘Jerilderie Red’ Brachychiton populneus x acerifolius ‘Jerilderie Red’
  • 65. 65Prepared for the City of Stonnington by rushwright associates The fresh design prepared bythe design team for Grattan Gardensisbased on the conceptof“bringing back the gardens” into Greville Street – a theme developed during the masterplan phase. The park redesign is based on a reinterpretation of the original late 19th- early 20th Century “gardenesque” layout of the gardens, while providing spaces for social interaction and informal seating for the Prahran neighbourhood, serving contemporary needs and uses. Botanical interest and diversity is central to the design ideas presented, following the nineteenth century and early 20th Century ambition of curating a plant collection for the park that adds to a sense of public richness. The current “symmetrical” order of a 7m wide path dividing 2 raised grass lawns and with only 3 tree species types has eroded the exuberance of the original garden and planting palette. There is potential “delight” in diverse plantings which we believe are essential to any park experience. The two existing Phoenix palms are not part of the original 19th century layout of the gardens. They have probably already been transplanted once before, possibly as part of the current design. One Palm was originally closer to Greville Street as seen in the photo below. The current symmetrical design, framing an empty view, is akin to a domestic arrangement at a private house development or suburban estate entry and does diminish and dominate the visual perception of the park today. Functional issues: The new design aims to provide equity of access up onto a single grass terrace (this is not currently provided in this area of the park). This requires a ramped path edging the west side of the park. The alignment of this path requires cutting into and retaining the existing grades at its north and south ends. Such a path cannot be located on the east side due to existing electrical switching and pit infrastructure on the NE corner. (It is undesirable to land a ramped path in that area). The existing NW palm is right against the alignment of the proposed ramped path edge wall and requires relocation. Building a retaining wall against its swollen trunk base (bole) is not ideal due to the scale of the current swelling and trunk, resulting in uncomfortable visual proximity (it will feel too close). The palm requires a more generous space within a larger lawn area - hence the current proposal to relocate to the SE area of the terrace. The edge to this pathway will be planted with new Washingtonia robusta or Livistona chinensis palms and suitable understorey. While we understand that Phoenix palms are very robust, a successful, diverse new planting for this edge will be difficult to achieve horticulturally / aesthetically around the bole of the existing palm and in elevation along the terrace edge and within the 2m cross section of the proposed garden. It will feel ‘thin’ and too close to the wall system. The current DD design drawings show planning that is not purely symmetrical. (Circular Planter sizes, forecourt tree locations, catenary, non- ovoid grass shaping etc.) Retaining the symmetry of the existing palm locations diminishes the potential of the new design and detracts from the long term potential of new plantings. The proposed locations of the two Palms, one retained and one relocated establishes a larger plant scale on the east side of the grass terrace with bold palm frond textures set against fine peppercorn foliage. The placement allows the largest area of free grass space. The two palm specimens will become a linked pair of strong vertical markers leading the eye and walkers off the forecourt, a kind of large scale pair of sentinels, inviting pedestrians up to the terrace and the park beyond. Transplanting of existing Phoenix canariensis within DD Grattan Gardens design. The Palm (in question) on leftofpicture istherefore proposed to be relocated on the east side of park against the existing line of peppercorns (right). The space between the existing White Cedar trees and the Palm is minimal to achieve a compliant path/ ramp. Future Location of Transplanted palms against existing Peppercorns. This is an important design move, and will take away the sense of the palms feeling like symmetrical ‘goal posts’ – a dull arrangement that commands too much attention, framing as it does and empty view. Relocating the palm to a side view, will totally transform the sense of the park for users, helping to invite a walk around rather than presenting the view of empty space. The palms will present in side view, asapair,deepeningthesenseofperspectiveandmaximising the sense of length and extension of the green space. This also allows fresh plantings on the west side, and a balanced asymmetry in the best of the gardenesque tradition. We feel this is a very important design issue, and is based on some central design principles for the revised park design. Retaining the palm in its current location is definitely not recommended, and will diminish and stultify the fresh design if it is left as is.
  • 66. 66Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 2: GREVILLE STREET SHARED ZONE Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides Jacaranda mimosifolia
  • 67. 67Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 3: KING STREET CLOSURE Existing Platanus orientalis ‘Digitata’ Existing Platanus orientalis ‘Digitata’ climbers to linear catenary mesh Kennedia rubicunda Parthenocissus quinquefolia Vitis vinifera
  • 68. 68Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 4: PORTER STREET SHARED ZONE Existing Phoenix canariensis Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides Tipuana tipu or Jacaranda mimosifolia Jacaranda mimosifolia
  • 69. 69Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 5A: GREVILLE STREET WEST Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides Jacaranda mimosifolia
  • 70. 70Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 5B: GREVILLE STREET EAST Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides Tilia cordata ‘Green Spire’ or Acer truncatum x platanoides Existing Platanus orientalis ‘Digitata’
  • 71. 71Prepared for the City of Stonnington by rushwright associates PLANTING KEY PLAN STAGE 6: PRAHRAN TOWN HALL FORECOURT Existing Platanus orientalis ‘Digitata’ Existing Platanus orientalis ‘Digitata’ Magnolia grandiflora ‘Kay Parris’ Magnolia grandiflora ‘Teddy Bear’
  • 72. 72Prepared for the City of Stonnington by rushwright associates STREET TREES TREES AND PLANTING Tilia cordata ‘Green Spire’ Linden Tree Platanus orientalis ‘Digitata’ - Existing along Chapel StreetAcer truncatum x platanoides Platanus orientalis ‘Digitata’ - Existing at Chapel Street
  • 73. 73Prepared for the City of Stonnington by rushwright associates PALMS TREES AND PLANTING Washingtonia robusta Mexican Fan Palm Washingtonia robusta Mexican Fan PalmPhoenix canariensis - Existing at Prahran Station Phoenix canariensis - Existing in Grattan Gardens
  • 74. 74Prepared for the City of Stonnington by rushwright associates FEATURE TREES TREES AND PLANTING Brachychiton populneus x acerifolius ‘Jerilderie Red’ Brachychiton populneus x acerifolius ‘Jerilderie Red’Brachychiton populneus x acerifolius ‘Jerilderie Red’ Ceiba sp. Cussonia spicataChamaerops humilis
  • 75. 75Prepared for the City of Stonnington by rushwright associates FEATURE TREES TREES AND PLANTING Ficus platypoda Tipuana tipu Melia azedarach - Existing at Grattan GardensErythrina crista-galli Schinus molle var. areira - Existing at Grattan Gardens Jacaranda mimosifolia
  • 76. 76Prepared for the City of Stonnington by rushwright associates CLIMBERS TREES AND PLANTING Kennedia rubicunda Parthenocissus quinquefolia Vitis vinifera
  • 77. 77Prepared for the City of Stonnington by rushwright associates UNDERSTOREY TREES AND PLANTING 04F. Yucca filamentosa or Y. recurvifolia Aloe plicatilisAgave americana Aloe arborescens Aloe barberae 04G. Dion spinulosum Zamia furfuracea
  • 78. 78Prepared for the City of Stonnington by rushwright associates
  • 80. 80Prepared for the City of Stonnington by rushwright associates LIGHTING INSPIRATIONS: GRATTAN GARDENS CATENARY LIGHTING DESIGN • sequined field • simplified botanical light fitting • simplified directional light fitting • design development render • glomesh fabric field • studded clusters
  • 81. 81Prepared for the City of Stonnington by rushwright associates 9.1 CATENARY DESIGN LIGHTING DESIGN REFER APPENDIX A: WEBB CATENARY LIGHTING
  • 82. 82Prepared for the City of Stonnington by rushwright associates 9.2 SITE WIDE LIGHTING CONCEPTS LIGHTING DESIGN REFER APPENDIX B: WGE SITEWIDE LIGHTING
  • 84. 84Prepared for the City of Stonnington by rushwright associates 10.1 DESIGN DEVELOPMENT DOCUMENTATION LANDSCAPE DRAWINGS REFER APPENDIX C: RWA LANDSCAPE DRAWINGS
  • 86. 86Prepared for the City of Stonnington by rushwright associates 11.1 DESIGN DEVELOPMENT DOCUMENTATION CIVIL, HYDRAULIC, AND ELECTRICAL DRAWINGS REFER APPENDIX D: WGE SERVICES REPORT AND APPENDIX E: WGE SERVUCES DRAWINGS
  • 88. 88Prepared for the City of Stonnington by rushwright associates 12.1 DESIGN DEVELOPMENT REPORT TRAFFIC DESIGN REFER APPENDIX F: OBT TRAFFIC REPORT