ARCHITECTURAL FDP
SHERWIN WILLIAMS
Emeryville APRIL 27, 2017
Project No. 1132-0007 Architecture + Design
01SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
SHEET INDEX & DESIGN NARRATIVE
SHEET INDEX
00	Cover
01	 Sheet Index & Design Narrative
02	Project Summary
03	Overall Site Plan: First Floor
04	Overall Site Plan: Second Floor
05	Overall Site Plan: Third Floor
06	Overall Site Plan: Fourth Floor
07	 Overall Site Plan: Fifth Floor
08	Overall Site Plan: Sixth Floor
09	Overall Site Plan: Seventh Floor
10	 Building B1 Floor Plans: Building Summary
11	 Building B1 Floor Plans: First & Second Floor
12	 Building B1 Floor Plans: Floors Three through Six
13	 Building B2 Floor Plans: Building Summary
14	 Building B2 Floor Plans: First Floor
15	 Building B2 Floor Plans: Floors Two through Four
16	 Building B2 Floor Plans: Fifth Floor
17	 Building B2 Floor Plans: Sixth Floor
18	 Building B2 Floor Plans: Seventh Floor
19	 Building C Floor Plans: Building Summary
20	Building C Floor Plans: First Floor
21	 Building C Floor Plans: Second Floor
22	 Building C Floor Plans: Floors Three through Six
23	 Building D Floor Plans: Building Summary
24	 Building D Floor Plans: First Floor
25	 Building D Floor Plans: Second Floor
26	 Building D Floor Plans: Third Floor
27	 Building D Floor Plans: Floors Four through Seven
28	 Perspective Renderings: View from Sherwin Ave & Hubbard St
29	 Perspective Renderings: View from Park
30	Perspective Renderings: View from Park
31	 Perspective Renderings: View from Hubbard Street
32	 Perspective Renderings: View from Hubbard Street
33	 Perspective Renderings: View of Gallery Space from Horton & 46th St
34	 Perspective Renderings: View of Building D from 46th St
35	 Perspective Renderings: View from Emeryville Greenway
36	 Perspective Renderings: View from Sherwin Avenue
ARCHITECTURAL DESIGN NARRATIVE
The design vision for Sherwin Williams reflects the eclectic blend of Emeryville’s industrial heritage
and its vocabulary of distinctive artistic mixed-use buildings with modern sensibilities. The building
facades complement the neighborhood and utilize a varied, but cohesive, vocabulary of quality building
materials that respect the scale and character of the district. Materials common to structures in the Park
Avenue District, such as masonry, plaster, brick, metal and concrete, are combined with more modern
applications to extend the industrial and eclectic fabric of the neighborhood.
In order to create cohesive architectural variety, the Sherwin Williams development is comprised of
three architectural building styles, each acknowledging Emeryville’s industrial heritage while celebrating
the City’s future. Buildings B1 and B2 reflect the historic warehouse character of the original site and
are in close proximity to the only remaining building from the original Sherwin Williams paint factory.
Building B1 re-envisions a traditional warehouses loading dock into outdoor living ares for live work lofts.
Architectural details from past eras have been re-purposed to address contemporary lifestyles.
Building C is reminiscent of its industrial heritage at the base of the building and looks to the future with
a contemporary addition on the upper levels. Glossy metal panels contrast the rustic brick base and
express new and bold contemporary forms. The clean simple volumes serve as an elegant backdrop to
the projects main feature, open park space.
The project shares a close relationship and history to the adjacent railways. Building D is specifically
influenced by the style of the railroad industrial era. Strong vertical expressions through expressed
structure and ribbed metal panels add to the skin's rich character and texture. The building makes a
strong statement at the terminus of Hubbard Street and serves as a gateway to the site form Horton
Landing Park.
B1 B2
C
D
02SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PROJECT DATA SUMMARY
SHERWIN WILLIAMS - MIXED USE DEVELOPMENT
Overall Site Summary
Site Data:
Parcel Area (SF): 226,948 SF 32,670 SF 22,651 SF 64,469 SF 44,867 SF 62,291 SF
Parcel Area (Acres): 5.21 Acres 0.75 Acres 0.52 Acres 1.48 Acres 1.03 Acres 1.43 Acres
Unit Count: 500 Units 0 Units 74 Units 122 Units 131 Units 173 Units
FAR: 3 2.20 3.83 2.61 3.49 3.15
Density: 96 Units/Acre 0.00 Units/Acre 142.31 Units/Acre 82.43 Units/Acre 127.18 Units/Acre 120.98 Units/Acre
Building Data:
Gross Building Area: 932,740 SF 72,000 SF 86,713 SF 338,468 SF 156,765 SF 195,984 SF
FAR Building Area: 679,489 SF 72,000 SF 86,713 SF 168,027 SF 175,645 SF 259,914 SF
Residential Area: 548,028 SF - SF 82,448 SF 127,081 SF 146,940 SF 191,559 SF
Residential Amenities: 26,965 SF SF 2,215 SF 14,950 SF 5,375 SF 4,425 SF
Office Area: 72,000 SF 72,000 SF SF SF SF SF
Retail Area: 5,866 SF SF 2,050 SF 2,916 SF 900 SF - SF
Parking Area: 253,251 SF - SF - SF 170,441 SF 18,880 SF 63,930 SF
Unit Mix:
Total: 500 Units 74 Units 122 Units 131 Units 173 Units
Live/Work 13 Units 3% 5 Units 7% - Units 0% 8 Units 6% - Units 0%
Studio 24 Units 5% 8 Units 11% 3 Units 2% 13 Units 10% - Units 0%
1 Bedroom 202 Units 40% 24 Units 32% 52 Units 43% 40 Units 31% 86 Units 50%
2 Bedroom 182 Units 36% 26 Units 35% 48 Units 39% 50 Units 38% 58 Units 34%
3 Bedroom 79 Units 16% 11 Units 15% 19 Units 16% 20 Units 15% 29 Units 17%
Parking Data:
Parking Required 695 Spaces 116 Spaces 78 Spaces 197 Spaces 131 Spaces 173 Spaces
Total Parking Provided 752 Spaces - Spaces - Spaces 504 Spaces 48 Spaces 172 Spaces
On-Street Parking Hubbard Street: 17 Spaces
46th Street: 11 Spaces
Open Space:
Open Space Required 27,720 SF - SF 3,720 SF 6,360 SF 7,300 SF 10,340 SF
Open Space Provided 54,348 SF - SF 7,249 SF 16,602 SF 12,237 SF 18,260 SF
Parcel C Parcel D
Emeryville, CA
Parcel B1Development Total Parcel B2Parcel A
03SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
First Floor
UP
336' - 0"
120'-0"
336' - 7"
163'-11"
161'-4"
370' - 2"
130' - 9"
162'-2"
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 1ST FLOOR
DIAGRAMS
S1
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
Scale: 1" = 100'-0"
HUBBARD STREET
HORTON STREET
46THSTREET
SHERWINAVENUE
04SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Second Floor
172' - 0"
38'-6"
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 2ND FLOOR
DIAGRAMS
S2
1132-0007
03/14/17
1" 50'-0"
SCALE: 1" 50'-0"
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
05SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Third Floor
80' - 0"
91'-0"
76' - 0"
56'-0"
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 3RD FLOOR
DIAGRAMS
S3
1132-0007
04/18/17
1" = 50'-0"
SCALE: 1" = 50'-0"
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
06SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Fourth Floor
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 4TH FLOOR
DIAGRAMS
S4
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
07SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Fifth Floor
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 5TH FLOOR
DIAGRAMS
S5
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
08SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Sixth Floor
C
B2
D
B1
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 6TH FLOOR
DIAGRAMS
S6
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
12" = 1'-0"
COLOR LEGEND Copy 1
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
09SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
OVERALL SITE PLAN
Seventh Floor
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
Scale: 1" = 100'-0"
HORTON STREET
46THSTREET
SHERWINAVENUE
HUBBARD STREET
10SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B1 FLOOR PLANS
Building Summary
SHERWIN WILLIAMS - MIXED USE DEVELOPMENT
Parcel B1 Summary
Parcel Data:
22,651 SF 0.52 Acres 142.3 Units/Acre
Building Area
86,713 SF 86,713 SF Total: 84,663 SF Total: 2,050 SF Total: - SF
Res. Amenity: 2,215 SF Retail: 2,050 SF
Net Rentable: 69,935 SF Support: 0 SF
Res. Support: 12,513 SF
Unit Mix
Total: 74 Units Overall: 1,022 SF
Live/Work 7% 5 Units 1,170 SF
Studio 11% 8 Units 569 SF
1 Bedroom 32% 24 Units 768 SF
2 Bedroom 35% 26 Units 1,238 SF
3 Bedroom 15% 11 Units 1,328 SF
Parking Data: Parking for Building B1 is provided in shared parking garage as part of Building B2
78 Spaces - Spaces 74 Spaces 4 Spaces
Open Space
3,720 SF 7,249 SF 5,249 SF 2,000 SF
Parking Area
3.8
Emeryville, CA
Residential Parking Required Retail Parking RequiredTotal Parking Required Total Parking Provided
Unit Count Average Unit Size
Parcel Area Density
Residential Area Commercial Area (Retail)FAR Building AreaGross Building Area
Open Space Required Open Space Provided Unit Balconies Common Open Space
FAR
B1 B2
C
D
11SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B1 FLOOR PLANS
First & Second Floor
DN
UNIT
LW1
UNIT
LW1
UNIT
B1
UNIT
LW1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
D1
MAIL
TRASH
ELECTRICAL
ELEV
STAIRSTAIR
GAS METERS
LOBBY
SERVICE
19'X39'
WATER & FIRE PUMP
8'-6" X 17' (EA)
BIKE
18' X 44
UNIT
LW1
RETAIL
UNIT
C2
130' - 9"
162'-2"
UNIT
A1
UNIT
A1
UNIT
C1
UNIT
C1
UNIT
C3
UNIT
C3
UNIT
B1
UNIT
B1
UNIT
D1
UNIT
D1
UNIT
C2
UNIT
B1
UNIT
B1
ELEV
STAIRSTAIR
IDF/ELECT.
9' X 9'
TRASH
9'-6" X 7'-6"
VENT. SHAFT 3' X 3'
VENT. SHAFT 3' X 3'
UNIT
C2
DATE:
PROJECT NO:
SCALE:
SHEET:
FT
0
n Williams Mixed Use
B1
FLOORS 1 AND 2 DIAGRAMS
B1-1
1132-0007
04-18-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
1" = 30'-0" 1FLOOR 1
1" = 30'-0" 2FLOOR 2
UNIT SCHEDULE
Name Count
NIT C3 2
BDRM
NIT B1 24
BDRM: 24
BDRM
NIT C1 10
NIT C2 10
NIT C3 12
BDRM: 32
BDRM
NIT D1 12
BDRM: 12
VE/WORK
NIT LW1 6
VE/WORK: 6
TUDIO
NIT A1 6
NIT A2 2
TUDIO: 8
and total: 84
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
12SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B1 FLOOR PLANS
Floors Three through Six
UNIT
B1
UNIT
B1
UNIT
D1
UNIT
D1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C3
UNIT
C1
UNIT
A2
UNIT
A2
ELEV
STAIRSTAIR
IDF/ELECT.
9' X 9'
TRASH
9'-6" X 7'-6"
VENT. SHAFT 3' X 3'
VENT. SHAFT 3' X 3'
UNIT
C3
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
D1
UNIT
D1
UNIT
C1
UNIT
C3
STAIRSTAIR
UNIT
C3
UNIT
C1
ELEV
IDF/ELECT.
9' X 9'
TRASH
9'-6" X 7'-6"
VENT. SHAFT 3' X 3'
VENT. SHAFT 3' X 3'
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
D1
UNIT
B1
UNIT
B1
UNIT
A1
UNIT
A1
UNIT
C3
UNIT
C2
UNIT
C2
UNIT
C3
STAIR
ELEV
STAIR
IDF/ELECT.
9' X 9'
TRASH
9'-6" X 7'-6"
DATE:
PROJECT NO:
SCALE:
SHEET:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B1
FLOORS 3-6 DIAGRAMS
B1-2
1132-0007
04-18-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
1" = 30'-0" 5FLOOR 5
1" = 30'-0" 6FLOOR 6
1" = 30'-0" 3FLOORS 3-4
Scale: 1" = 30'-0"
13SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
SHERWIN WILLIAMS - MIXED USE DEVELOPMENT
Parcel B2 Summary
Parcel Data:
64,469 SF 1.48 Acres 82.4 Units/Acre
Building Area
338,468 SF 168,027 SF Total: 165,111 SF Total: 2,916 SF Total: 170,441 SF
Res. Amenity: 14,950 SF Retail: 2,916 SF
Net Rentable: 116,351 SF Support: 0 SF
Res. Support: 10,730 SF
Unit Mix
Total: 122 Units Overall: 971 SF
Live/Work 0% 0 Units - SF
Studio 2% 3 Units 576 SF
1 Bedroom 43% 52 Units 684 SF
2 Bedroom 39% 48 Units 1,141 SF
3 Bedroom 16% 19 Units 1,390 SF
Parking Data: Building B2 garage includes parking for Building A, Building B1, Building C,
197 Spaces 504 Spaces 122 Spaces - Spaces and Building D
Open Space
6,360 SF 16,602 SF 6,177 SF 10,425 SF
Emeryville, CA
Parcel Area FAR Density
2.6
Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area
Open Space Required Open Space Provided Unit Balconies Common Open Space
Unit Count Average Unit Size
Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required
BUILDING B2 FLOOR PLAN
Building Summary
B1 B2
C
D
14SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B2 FLOOR PLAN
First Floor Scale: 1" = 30'-0"
UNIT
C1
UNIT
C1
UNIT
B1
GARAGE
ENTRY
MAINTENANCE
BIKE
LOUNGE
CO-WORKING
LOADING
2846 SF
GALLERY
LEASING
LOBBY
ELEV
STAIR
STAIR
STAIR
MAIL
SERVICE
PARKING
TRASH
RESIDENTIAL
CAFE
TRASH
ELECTRICAL
GASMETERS
AV
ELECTRICAL
FIRE
PUMP
WATER
SERVICE
24' x 17'-6"
20' x 17'
37' x 18'
17' x 8'-6"
(EACH)
24' x 14'-6"
EXHAUST
SHAFT
11' x 8'-6"
BIKE
PARKING
LOBBY
STAIR
FAN
ROOM
ELEV
ELEV
ENTRANCE
336' - 7"
163'-11"
230'-3"
80' - 1"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B2
FLOOR 1 DIAGRAM
1132-0007
4/18/2017
SCALE: 1" = 30'-0"
1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
15SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B2 FLOOR PLAN
Floors Two through Four Scale: 1" = 30'-0"
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
B1
UNIT
B1
UNIT
B1
PARKING
UNIT
D2
UNIT
D2
UNIT
B3UNIT
A1
UNIT
C1
ELEV
STAIR
STAIR
STAIR
STAIR
UNIT
B1
TRASH 7'-6" X 10'-6"
IDF
7' X 4'
IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT
IDF
5' X 4'-6"
4'-6" X 3'
VENTILATION
SHAFT
TRASH
13'-6" X 9'
EXHAUST SHAFT
11' X 8'-6"
VENTILATION
SHAFT
7' X 5'
336' - 7"
163'-11"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B2
TYPICAL FLOORS 2-4
DIAGRAM
1132-0007
4/18/2017
SCALE: 1" = 30'-0"
1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
16SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B2 FLOOR PLAN
Fifth Floor Scale: 1" = 30'-0"
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
B1
UNIT
B1
PARKING
UNIT
D2
ELEV ELEV
STAIR
STAIR
STAIR
STAIR
TRASH 7'-6" X 10'-6"
IDF
7' X 4'
IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT
IDF
5' X 4'-6"
4'-6" X 3'
VENTILATION
SHAFT
TRASH
13'-6" X 9'
EXHAUST SHAFT
11' X 8'-6"
VENTILATION
SHAFT
7' X 5'
336' - 7"
162'-3"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B2
FLOOR 5 DIAGRAM
1132-0007
4/18/2017
SCALE: 1" = 30'-0"
1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
17SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B2 FLOOR PLAN
Sixth Floor
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
B1
UNIT
B1
UNIT
D2
UNIT
C1
UNIT
C1
UNIT
D1
STAIR
ELEV ELEV
STAIR STAIR
STAIR
PARKING
UNIT
C1
TRASH 7'-6" X 10'-6"
IDF
7' X 4'
IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT
IDF
5' X 4'-6"
4'-6" X 3'
VENTILATION
SHAFT
TRASH
13'-6" X 9'
EXHAUST SHAFT
11' X 8'-6"
VENTILATION
SHAFT
7' X 5'
ELEV
BOILER
336' - 7"
162'-3"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B2
FLOOR 6 DIAGRAM
1132-0007
4/18/2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
18SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING B2 FLOOR PLAN
Seventh Floor Scale: 1" = 15'-0"
UNIT
B4
UNIT
B4
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
B4
POOL
@ + 4'-0"
STOR ELEV
3301 SF
CLUBHOUSE RR
SHWR
STAIR
STAIR
STAIR
STAIR
6453 SF
ROOF
TERRACE
ELEV
UNIT
C1
UNIT
C1
UNIT
B4
TRASH
7'-6" X 10'-6"
IDF 7' X 4'
IDF 7' X 4'
3' X 3'
VENTILATION
SHAFT
3' X 3' VENTILATION SHAFT
IDF
5' X 4'-6"
4'-6" X 3'
VENTILATION
SHAFT
TRASH
13'-6" X 9'
EXHAUST
SHAFT
11' X 8'-6"
ELECTRICAL/IDF
7' X 8'-6"
POOL
EQUIP
VENTILATION
SHAFT
7' X 5'
UNIT
B4
UNIT
B4
UNIT
B4
UNIT
B4
OPEN TO PARKING BELOW
336' - 5"
162'-1"
100' - 0"
73'-0"
3972 SF
ROOF
TERRACE
ELEV
119' - 3"
39'-3"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING B2
FLOOR 7 DIAGRAM
1132-0007
4/18/2017
SCALE: 1" = 30'-0"
1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
19SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING C FLOOR PLAN
Building Summary
SHERWIN WILLIAMS - MIXED USE DEVELOPMENT
Parcel C Summary
Parcel Data:
44,867 SF 1.03 Acres 127.2 Units/Acre
Building Area
175,645 SF 156,765 SF Total: 155,865 SF Total: 900 SF Total: 18,880 SF
Res. Amenity: 5,375 SF Retail: 900 SF
Net Rentable: 128,360 SF Support: 0 SF
Res. Support: 18,580 SF
Unit Mix
Total: 131 Units Overall: 999 SF
Live/Work 6% 8 Units 1,000 SF
Studio 10% 13 Units 639 SF
1 Bedroom 31% 40 Units 713 SF
2 Bedroom 38% 50 Units 1,162 SF
3 Bedroom 15% 20 Units 1,369 SF
Parking Data: Additional parking for Building C provided in shared garage in Building B2
131 Spaces 48 Spaces 131 Spaces - Spaces
Open Space
7,300 SF 12,237 SF 4,880 SF 7,357 SF
Emeryville, CA
Parcel Area FAR Density
3.5
Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area
Open Space Required Open Space Provided Unit Balconies Common Open Space
Unit Count Average Unit Size
Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required
B1 B2
C
D
20SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING C FLOOR PLAN
First Floor
UNIT
LW1
UNIT
LW1
UNIT
LW1
UNIT
LW1
UNIT
LW1
UNIT
LW1
RETAIL
UNIT
LW1
TRASH
ELECTRICAL
MAILELEV
STAIR
LOBBY
PET
BIKE
FITNESS STAIR
ELEV
FAN
ROOM
EX
SHAFT
PARKING
LOBBY
GAS METERS
UNIT
LW1
WATER & FIRE PUMP
8'-6" X 17' (EA)
SERVICE
TRASH
336' - 0"
120'-0"
ENTRANCE
UNIT
LW1
DATE:
PROJECT NO:
SCALE:
SHEET:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING C
FLOOR 1 DIAGRAM
C-1
1132-0007
04-17-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Parking Schedule
Level Type Count Comments
1st Floor
1st Floor 8.5' x 18' - 90 deg 47
1st Floor 9' x 18' - 90 deg 2
1st Floor: 49
Grand total: 49
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
21SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING C FLOOR PLAN
Second Floor
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
C4
UNIT
C4
UNIT
D1
UNIT
C4
UNIT
C4
UNIT
B2
UNIT
D1
UNIT
B2
UNIT
D2
UNIT
B2
UNIT
B2
UNIT
A1
CORRIDOR
UNIT
C3
STAIR
UNIT
C3
STAIR
RES
STOR
ELEV
UTIL
ELEV
TRASH
EX
SHAFT
7357 SF
COURTYARD
336' - 0"
120'-0"
172' - 0"
38'-6"
RES
STOR
DATE:
PROJECT NO:
SCALE:
SHEET:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING C
FLOOR 2 DIAGRAM
C-2
1132-0007
04-17-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
UNIT SCHEDULE
Name Count
1 BDRM
UNIT B1 20
UNIT B2 15
UNIT B3 8
1 BDRM: 43
2 BDRM
UNIT C1 20
UNIT C2 6
UNIT C3 4
UNIT C4 20
2 BDRM: 50
3 BDRM
UNIT D1 15
UNIT D2 5
3 BDRM: 20
LIVE/WORK
UNIT LW1 10
LIVE/WORK: 10
STUDIO
UNIT A1 5
UNIT B2 5
STUDIO: 10
Grand total: 133
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
22SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING C FLOOR PLAN
Floors Three through Six
336' - 0"
120'-0"
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
B1
UNIT
C1
UNIT
C1
UNIT
D1
UNIT
C1
UNIT
C1
UNIT
C4
UNIT
C4
UNIT
D1
UNIT
C4
UNIT
C4
UNIT
B2
UNIT
D1
UNIT
B2
UNIT
D2
UNIT
B2
UNIT
B2
UNIT
A1
UNIT
C3
STAIR
UNIT
C3
STAIR
UNIT
B3
ELEV
EX
SHAFT
ELEV
TRASH
UNIT
B3
EX
SHAFT
RES
STOR
RES
STOR
DATE:
PROJECT NO:
SCALE:
SHEET:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING C
TYPICAL FLOORS 3-6
DIAGRAM
C-3
1132-0007
04-17-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
23SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING D FLOOR PLAN
Building Summary
SHERWIN WILLIAMS - MIXED USE DEVELOPMENT
Parcel D Summary
Parcel Data:
62,291 SF 1.43 Acres 121.0 Units/Acre
Building Area
259,914 SF 195,984 SF Total: 195,984 SF Total: - SF Total: 63,930 SF
Res. Amenity: 4,425 SF Retail: - SF
Net Rentable: 163,389 SF Support: 0 SF
Res. Support: 28,170 SF
Unit Mix
Total: 173 Units Overall: 965 SF
Live/Work 0% 0 Units - SF
Studio 0% 0 Units - SF
1 Bedroom 50% 86 Units 720 SF
2 Bedroom 34% 58 Units 1,139 SF
3 Bedroom 17% 29 Units 1,343 SF
Parking Data: Additional parking for Building D provided in shared garage in Building B2
173 Spaces 172 Spaces 173 Spaces - Spaces
Open Space
10,340 SF 18,260 SF 6,275 SF 11,985 SF
Emeryville, CA
Parcel Area FAR Density
3.1
Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area
Open Space Required Open Space Provided Unit Balconies Common Open Space
Unit Count Average Unit Size
Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required
B1 B2
C
D
24SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING D FLOOR PLAN
First Floor
CORRIDOR
ENTRANCE
RAMP UP
LOADING
LOBBY
PARKING
MAIL
ELEC.
TRASH
FAN
ROOM
BIKES
PET
UNIT
D3
UNIT
B2
UNIT
B2
UNIT
B2
UNIT
D3
WATER & FIRE PUMP
8' X 17' (EA)
STAIR
LOUNGE
STAIR
STAIR
UTIL.
ELEV ELEVSTAIR
STORAGESERVICE
370' - 2"
161'-4"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING D
FLOOR 1 DIAGRAM
1132-0007
04-18-2017
SCALE: 1' = 30'-0"
1' = 30'-0"
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
25SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING D FLOOR PLAN
Second Floor
OPEN TO
BELOW
RAMP DOWN
UNIT
B2
UNIT
D3
UNIT
B2
UNIT
B2
UNIT
D3
STAIR
FAN
ROOM
EXHAUST
SHAFT
6' X 9'
TRASH SHAFT
STAIR
STAIR
STAIR ELEV ELEV
370' - 2"
161'-4"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING D
FLOOR 2 DIAGRAM
1132-0007
04-18-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Scale: 1" = 15'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
26SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING D FLOOR PLAN
Third Floor
TRASH
6'-6" X 14'-6"IDF
5' X 5'-6"
EXHAUST SHAFT
6'-6" X 14'-6"
VENTILATION SHAFT
5' X 8'-6"
VENTILATION
SHAFT
7' X 4'-6"
IDF
7' X 4'-6"
UNIT
C1
UNIT
C1
UNIT
C2
UNIT
C2
RES
STOR
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
RES
STOR
UNIT
D1
UNIT
D1
UNIT
D1
UNIT
D3
UNIT
D3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B1
UNIT
B2
UNIT
B2
UNIT
B2
UNIT
B2
UNIT
B3
UNIT
B3
UNIT
B1
TRASH
STAIR
STAIR
STAIR
370' - 1"
80' - 0"
91'-0"
76' - 0"
56'-0"
161'-4"
7369 SF
COURTYARD
4616 SF
COURTYARD
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING D
FLOOR 3 DIAGRAM
1132-0007
04-18-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
27SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
BUILDING D FLOOR PLAN
Floors Four through Seven
TRASH
6'-6" X 14'-6"IDF
5' X 5'-6"
EXHAUST SHAFT
6'-6" X 14'-6"
VENTILATION SHAFT
5' X 8'-6"
VENTILATION
SHAFT
7' X 4'-6"
IDF
7' X 4'-6"
UNIT
C1
UNIT
C1
UNIT
C2
UNIT
C2
UNIT
C2
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C1
UNIT
C2
UNIT
D1
UNIT
D1
UNIT
D1
UNIT
D3
UNIT
D3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B3
UNIT
B1
UNIT
B2
UNIT
B2
UNIT
B2
UNIT
B2
UNIT
B3
UNIT
B3
UNIT
B1
TRASH
STAIR
STAIR
STAIR
370' - 1"
161'-4"
DATE:
PROJECT NO:
SCALE:
FT
0
Sherwin Williams Mixed Use
Emeryville, CA
BUILDING D
TYPICAL FLOORS 4-7
DIAGRAM
1132-0007
04-18-2017
SCALE: 1" = 30'-0"
1" = 30'-0"
Scale: 1" = 30'-0"
POOL
OPEN TO
PARKING
BELOW
C
B2
D
B1
72'-0"
100' - 0"
119' - 3"
39'-3"
COLOR LEGEND
LIVE/WORK UNITS
1 BDRM UNITS
2 BDRM UNITS
3 BDRM UNITS
RESIDENTIAL AMENITIES
RETAIL
PARKING
GALLERY
SUPPORT/UTILITIES
COURTYARD/ROOF TERRACE
BIKES
CIRCULATION
PROJECT PARKING SUMMARY
28 STREET SPACES
0 SPACES
513 SPACES
50 SPACES
172 SPACES
SITE A
SITE B1
SITE B2
SITE C
SITE D
763 SPACESTOTAL
PROJECT UNIT MIX
LIVE/WORK UNITS (3.0%)
STUDIO UNITS (6.6%)
1 BDRM UNITS (37.6%)
2 BDRM UNITS (36.2%)
3 BDRM UNITS (16.6%)
15
33
188
181
83
UNITS TOTAL500
STUDIOS
FT
0
DATE:
PROJECT NO:
SCALE:
SHEET:
Sherwin Williams Mixed Use
Emeryville, CA
Combined Buildings
COMBINED 7TH FLOOR
DIAGRAMS
S7
1132-0007
03/14/17
1" = 50'-0"
SCALE: 1" = 50'-0"
28SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Sherwin Ave & Hubbard St
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
1
6
5
8
7
5
29SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Park
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
7
5
1
1
5
5
5
3
2
8
8
30SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Park
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
1
3
2
7
10 9
5
8
31SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Hubbard Street
DRAFT
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
3
77
1
1
4
5
32SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Hubbard Street
DRAFT
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
2
6
4
10 9
1
5
6
8
7
7
7
33SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View of Gallery Space from Horton & 46th St
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
2
1
8
3
7
5
34SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View of Building D from 46th St
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
4
4
3
11
5
6
10
35SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Emeryville Greenway
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
4 3
3
10 10
6
8
5
11
36SHERWIN WILLIAMS │ EMERYVILLE
APRIL 27, 2017Project No. 1132-0007
Architecture + Design
PERSPECTIVE RENDERING
View from Sherwin Ave
BUILDING MATERIALS
1	 THIN BRICK VENEER
2	 COMPOSITE METAL PANELS
3	 FIBER CEMENT SIDING
4	 RIBBED METAL PANEL
5	 CEMENT PLASTER
6	 METAL RAILINGS
7	 ALUMINUM STOREFRONT
8	 VINYL WINDOWS
9	 METAL CANOPIES
10	 METAL TRIM
11	 EXPOSED CONCRETE
1
1
5
5
8
7
6
9

More Related Content

What's hot

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Item # 6 - PPT 237 Argo
Item # 6 - PPT 237 ArgoItem # 6 - PPT 237 Argo
Item # 6 - PPT 237 Argoahcitycouncil
 
Work Samples - Michael Griffin
Work Samples - Michael GriffinWork Samples - Michael Griffin
Work Samples - Michael Griffingriff7533
 
Item # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine CtItem # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine Ctahcitycouncil
 
Blanc De Bierges Freemans Meadow
Blanc De Bierges Freemans MeadowBlanc De Bierges Freemans Meadow
Blanc De Bierges Freemans Meadowruperio
 
A_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedInA_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedInAmy Oeth
 
Item # 5 - PPT 301 Encino
Item # 5 - PPT 301 EncinoItem # 5 - PPT 301 Encino
Item # 5 - PPT 301 Encinoahcitycouncil
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder PortfolioDominic Holder
 
Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Ashal
 
20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update Final20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update FinalJeremy Chin
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilioahmed nagy
 
V Tech C Building Presentation
V  Tech  C Building PresentationV  Tech  C Building Presentation
V Tech C Building PresentationVasconEngineers
 
Item # 6 - PPT 301 College
Item # 6 - PPT 301 CollegeItem # 6 - PPT 301 College
Item # 6 - PPT 301 Collegeahcitycouncil
 

What's hot (19)

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Item # 6 - PPT 237 Argo
Item # 6 - PPT 237 ArgoItem # 6 - PPT 237 Argo
Item # 6 - PPT 237 Argo
 
Work Samples - Michael Griffin
Work Samples - Michael GriffinWork Samples - Michael Griffin
Work Samples - Michael Griffin
 
Item # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine CtItem # 7 - PPT Katherine Ct
Item # 7 - PPT Katherine Ct
 
Blanc De Bierges Freemans Meadow
Blanc De Bierges Freemans MeadowBlanc De Bierges Freemans Meadow
Blanc De Bierges Freemans Meadow
 
Item #5 PPT Broadway Ellwood
Item #5   PPT Broadway EllwoodItem #5   PPT Broadway Ellwood
Item #5 PPT Broadway Ellwood
 
Item #3 PPT 320 Alta
Item #3  PPT 320 AltaItem #3  PPT 320 Alta
Item #3 PPT 320 Alta
 
A_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedInA_Oeth_Portfolio_LinkedIn
A_Oeth_Portfolio_LinkedIn
 
Item # 5 - PPT 301 Encino
Item # 5 - PPT 301 EncinoItem # 5 - PPT 301 Encino
Item # 5 - PPT 301 Encino
 
Item #5 ppt 220 grove
Item #5   ppt 220 groveItem #5   ppt 220 grove
Item #5 ppt 220 grove
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Portfolio spreads
Portfolio spreadsPortfolio spreads
Portfolio spreads
 
Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021Hosam Abdeltawab portfolio 2021
Hosam Abdeltawab portfolio 2021
 
Item #7 PPT Broadway Ellwood Replat
Item #7   PPT Broadway Ellwood ReplatItem #7   PPT Broadway Ellwood Replat
Item #7 PPT Broadway Ellwood Replat
 
20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update Final20170515 Parkmerced Resident Update Final
20170515 Parkmerced Resident Update Final
 
My Architectural Portfilio
My Architectural PortfilioMy Architectural Portfilio
My Architectural Portfilio
 
V Tech C Building Presentation
V  Tech  C Building PresentationV  Tech  C Building Presentation
V Tech C Building Presentation
 
Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012
 
Item # 6 - PPT 301 College
Item # 6 - PPT 301 CollegeItem # 6 - PPT 301 College
Item # 6 - PPT 301 College
 

Similar to Lennar sherwin-williams-architectural-fdp

Final Portfolio Layout
Final Portfolio LayoutFinal Portfolio Layout
Final Portfolio LayoutMichael Mulvey
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Item # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine CourtItem # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine Courtahcitycouncil
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study sessionE'ville Eye
 
Undergrad Architecture portfolio, Selected works
Undergrad Architecture portfolio, Selected worksUndergrad Architecture portfolio, Selected works
Undergrad Architecture portfolio, Selected worksToffik Abdela Hassen
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project MatthewSelleck1
 
Structure report
Structure reportStructure report
Structure reportElaine Bong
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014Martin Pauly
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationE'ville Eye
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
John R. Scanlon AIA
John R. Scanlon AIAJohn R. Scanlon AIA
John R. Scanlon AIAjrscanlon
 
Town planning report northroad 20121210 a
Town planning report northroad 20121210 aTown planning report northroad 20121210 a
Town planning report northroad 20121210 aAnne Kim
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)ahcitycouncil
 
Eric Burnside Portfolio 2017
Eric Burnside Portfolio 2017Eric Burnside Portfolio 2017
Eric Burnside Portfolio 2017Eric Burnside
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5Campus
 
HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2Hafiz Waheed
 

Similar to Lennar sherwin-williams-architectural-fdp (20)

Final Portfolio Layout
Final Portfolio LayoutFinal Portfolio Layout
Final Portfolio Layout
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Item # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine CourtItem # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine Court
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Undergrad Architecture portfolio, Selected works
Undergrad Architecture portfolio, Selected worksUndergrad Architecture portfolio, Selected works
Undergrad Architecture portfolio, Selected works
 
f7
f7f7
f7
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
Structure report
Structure reportStructure report
Structure report
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
A. Besharat Portfolio 2015
A. Besharat Portfolio 2015A. Besharat Portfolio 2015
A. Besharat Portfolio 2015
 
TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
John R. Scanlon AIA
John R. Scanlon AIAJohn R. Scanlon AIA
John R. Scanlon AIA
 
Town planning report northroad 20121210 a
Town planning report northroad 20121210 aTown planning report northroad 20121210 a
Town planning report northroad 20121210 a
 
Item # 5 301 College (Compatibility)
Item # 5   301 College (Compatibility)Item # 5   301 College (Compatibility)
Item # 5 301 College (Compatibility)
 
Eric Burnside Portfolio 2017
Eric Burnside Portfolio 2017Eric Burnside Portfolio 2017
Eric Burnside Portfolio 2017
 
Ck21 presentation team 5
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
 
HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2
 
EmCarroll Portfolio
EmCarroll PortfolioEmCarroll Portfolio
EmCarroll Portfolio
 

More from E'ville Eye

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdfE'ville Eye
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfE'ville Eye
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfE'ville Eye
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfE'ville Eye
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]E'ville Eye
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfE'ville Eye
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportE'ville Eye
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election PetitionE'ville Eye
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packetE'ville Eye
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0E'ville Eye
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in EmeryvilleE'ville Eye
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20E'ville Eye
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloE'ville Eye
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement noticeE'ville Eye
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020E'ville Eye
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance programE'ville Eye
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measureE'ville Eye
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...E'ville Eye
 
2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_dE'ville Eye
 
06 28-2019 plans stamped approved for dr19-009
06 28-2019 plans stamped approved for dr19-00906 28-2019 plans stamped approved for dr19-009
06 28-2019 plans stamped approved for dr19-009E'ville Eye
 

More from E'ville Eye (20)

legal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdflegal-Complaint-emery-unified-assault.pdf
legal-Complaint-emery-unified-assault.pdf
 
EUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdfEUSD Superintendent Goals 2021-2023.pdf
EUSD Superintendent Goals 2021-2023.pdf
 
SeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdfSeaWallsMap-UPDATE.pdf
SeaWallsMap-UPDATE.pdf
 
EGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdfEGR-WOAK_BART_Preso_1024.pdf
EGR-WOAK_BART_Preso_1024.pdf
 
City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]City of Emeryville 2023-2031 Housing Element [Public Draft]
City of Emeryville 2023-2031 Housing Element [Public Draft]
 
Wood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdfWood Street Engagement Sessions FAQ.pdf
Wood Street Engagement Sessions FAQ.pdf
 
Item 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff reportItem 9.2 bay street emeryville grocery store staff report
Item 9.2 bay street emeryville grocery store staff report
 
2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition2021 Emeryville Special Election Petition
2021 Emeryville Special Election Petition
 
Wdwg press packet
Wdwg press packetWdwg press packet
Wdwg press packet
 
8 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_08 6 updated_reopeningschoolsdata_0
8 6 updated_reopeningschoolsdata_0
 
History and Innovation in Emeryville
History and Innovation in EmeryvilleHistory and Innovation in Emeryville
History and Innovation in Emeryville
 
Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20Onni deemed withdrawn letter 07 22-20
Onni deemed withdrawn letter 07 22-20
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Tejada retirement notice
Tejada retirement noticeTejada retirement notice
Tejada retirement notice
 
Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020Fy 2019 21 mid-cycle budget review 5-14-2020
Fy 2019 21 mid-cycle budget review 5-14-2020
 
2020.03.19 covid-19 emergency rental assistance program
2020.03.19   covid-19 emergency rental assistance program2020.03.19   covid-19 emergency rental assistance program
2020.03.19 covid-19 emergency rental assistance program
 
Dec 3 2019 cc meeting proposed sales tax measure
Dec 3 2019 cc meeting   proposed sales tax measureDec 3 2019 cc meeting   proposed sales tax measure
Dec 3 2019 cc meeting proposed sales tax measure
 
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
Ac fr ogdxe1o77gyvrw6rruvtw7lusdahpeh-u_k0fz0g0qzdx80n9wtveg4_p2c17d1b-r2m4zv...
 
2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d
 
06 28-2019 plans stamped approved for dr19-009
06 28-2019 plans stamped approved for dr19-00906 28-2019 plans stamped approved for dr19-009
06 28-2019 plans stamped approved for dr19-009
 

Recently uploaded

(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...ranjana rawat
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIVYA) Call Girls Wakad ( 7001035870 ) HI-Fi Pune Escorts Service
 

Lennar sherwin-williams-architectural-fdp

  • 1. ARCHITECTURAL FDP SHERWIN WILLIAMS Emeryville APRIL 27, 2017 Project No. 1132-0007 Architecture + Design
  • 2. 01SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design SHEET INDEX & DESIGN NARRATIVE SHEET INDEX 00 Cover 01 Sheet Index & Design Narrative 02 Project Summary 03 Overall Site Plan: First Floor 04 Overall Site Plan: Second Floor 05 Overall Site Plan: Third Floor 06 Overall Site Plan: Fourth Floor 07 Overall Site Plan: Fifth Floor 08 Overall Site Plan: Sixth Floor 09 Overall Site Plan: Seventh Floor 10 Building B1 Floor Plans: Building Summary 11 Building B1 Floor Plans: First & Second Floor 12 Building B1 Floor Plans: Floors Three through Six 13 Building B2 Floor Plans: Building Summary 14 Building B2 Floor Plans: First Floor 15 Building B2 Floor Plans: Floors Two through Four 16 Building B2 Floor Plans: Fifth Floor 17 Building B2 Floor Plans: Sixth Floor 18 Building B2 Floor Plans: Seventh Floor 19 Building C Floor Plans: Building Summary 20 Building C Floor Plans: First Floor 21 Building C Floor Plans: Second Floor 22 Building C Floor Plans: Floors Three through Six 23 Building D Floor Plans: Building Summary 24 Building D Floor Plans: First Floor 25 Building D Floor Plans: Second Floor 26 Building D Floor Plans: Third Floor 27 Building D Floor Plans: Floors Four through Seven 28 Perspective Renderings: View from Sherwin Ave & Hubbard St 29 Perspective Renderings: View from Park 30 Perspective Renderings: View from Park 31 Perspective Renderings: View from Hubbard Street 32 Perspective Renderings: View from Hubbard Street 33 Perspective Renderings: View of Gallery Space from Horton & 46th St 34 Perspective Renderings: View of Building D from 46th St 35 Perspective Renderings: View from Emeryville Greenway 36 Perspective Renderings: View from Sherwin Avenue ARCHITECTURAL DESIGN NARRATIVE The design vision for Sherwin Williams reflects the eclectic blend of Emeryville’s industrial heritage and its vocabulary of distinctive artistic mixed-use buildings with modern sensibilities. The building facades complement the neighborhood and utilize a varied, but cohesive, vocabulary of quality building materials that respect the scale and character of the district. Materials common to structures in the Park Avenue District, such as masonry, plaster, brick, metal and concrete, are combined with more modern applications to extend the industrial and eclectic fabric of the neighborhood. In order to create cohesive architectural variety, the Sherwin Williams development is comprised of three architectural building styles, each acknowledging Emeryville’s industrial heritage while celebrating the City’s future. Buildings B1 and B2 reflect the historic warehouse character of the original site and are in close proximity to the only remaining building from the original Sherwin Williams paint factory. Building B1 re-envisions a traditional warehouses loading dock into outdoor living ares for live work lofts. Architectural details from past eras have been re-purposed to address contemporary lifestyles. Building C is reminiscent of its industrial heritage at the base of the building and looks to the future with a contemporary addition on the upper levels. Glossy metal panels contrast the rustic brick base and express new and bold contemporary forms. The clean simple volumes serve as an elegant backdrop to the projects main feature, open park space. The project shares a close relationship and history to the adjacent railways. Building D is specifically influenced by the style of the railroad industrial era. Strong vertical expressions through expressed structure and ribbed metal panels add to the skin's rich character and texture. The building makes a strong statement at the terminus of Hubbard Street and serves as a gateway to the site form Horton Landing Park. B1 B2 C D
  • 3. 02SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PROJECT DATA SUMMARY SHERWIN WILLIAMS - MIXED USE DEVELOPMENT Overall Site Summary Site Data: Parcel Area (SF): 226,948 SF 32,670 SF 22,651 SF 64,469 SF 44,867 SF 62,291 SF Parcel Area (Acres): 5.21 Acres 0.75 Acres 0.52 Acres 1.48 Acres 1.03 Acres 1.43 Acres Unit Count: 500 Units 0 Units 74 Units 122 Units 131 Units 173 Units FAR: 3 2.20 3.83 2.61 3.49 3.15 Density: 96 Units/Acre 0.00 Units/Acre 142.31 Units/Acre 82.43 Units/Acre 127.18 Units/Acre 120.98 Units/Acre Building Data: Gross Building Area: 932,740 SF 72,000 SF 86,713 SF 338,468 SF 156,765 SF 195,984 SF FAR Building Area: 679,489 SF 72,000 SF 86,713 SF 168,027 SF 175,645 SF 259,914 SF Residential Area: 548,028 SF - SF 82,448 SF 127,081 SF 146,940 SF 191,559 SF Residential Amenities: 26,965 SF SF 2,215 SF 14,950 SF 5,375 SF 4,425 SF Office Area: 72,000 SF 72,000 SF SF SF SF SF Retail Area: 5,866 SF SF 2,050 SF 2,916 SF 900 SF - SF Parking Area: 253,251 SF - SF - SF 170,441 SF 18,880 SF 63,930 SF Unit Mix: Total: 500 Units 74 Units 122 Units 131 Units 173 Units Live/Work 13 Units 3% 5 Units 7% - Units 0% 8 Units 6% - Units 0% Studio 24 Units 5% 8 Units 11% 3 Units 2% 13 Units 10% - Units 0% 1 Bedroom 202 Units 40% 24 Units 32% 52 Units 43% 40 Units 31% 86 Units 50% 2 Bedroom 182 Units 36% 26 Units 35% 48 Units 39% 50 Units 38% 58 Units 34% 3 Bedroom 79 Units 16% 11 Units 15% 19 Units 16% 20 Units 15% 29 Units 17% Parking Data: Parking Required 695 Spaces 116 Spaces 78 Spaces 197 Spaces 131 Spaces 173 Spaces Total Parking Provided 752 Spaces - Spaces - Spaces 504 Spaces 48 Spaces 172 Spaces On-Street Parking Hubbard Street: 17 Spaces 46th Street: 11 Spaces Open Space: Open Space Required 27,720 SF - SF 3,720 SF 6,360 SF 7,300 SF 10,340 SF Open Space Provided 54,348 SF - SF 7,249 SF 16,602 SF 12,237 SF 18,260 SF Parcel C Parcel D Emeryville, CA Parcel B1Development Total Parcel B2Parcel A
  • 4. 03SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN First Floor UP 336' - 0" 120'-0" 336' - 7" 163'-11" 161'-4" 370' - 2" 130' - 9" 162'-2" C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 1ST FLOOR DIAGRAMS S1 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0" Scale: 1" = 100'-0" HUBBARD STREET HORTON STREET 46THSTREET SHERWINAVENUE
  • 5. 04SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Second Floor 172' - 0" 38'-6" C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 2ND FLOOR DIAGRAMS S2 1132-0007 03/14/17 1" 50'-0" SCALE: 1" 50'-0" Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 6. 05SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Third Floor 80' - 0" 91'-0" 76' - 0" 56'-0" C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 3RD FLOOR DIAGRAMS S3 1132-0007 04/18/17 1" = 50'-0" SCALE: 1" = 50'-0" Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 7. 06SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Fourth Floor C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 4TH FLOOR DIAGRAMS S4 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0" Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 8. 07SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Fifth Floor C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 5TH FLOOR DIAGRAMS S5 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0" Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 9. 08SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Sixth Floor C B2 D B1 COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 6TH FLOOR DIAGRAMS S6 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0" 12" = 1'-0" COLOR LEGEND Copy 1 Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 10. 09SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design OVERALL SITE PLAN Seventh Floor POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0" Scale: 1" = 100'-0" HORTON STREET 46THSTREET SHERWINAVENUE HUBBARD STREET
  • 11. 10SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B1 FLOOR PLANS Building Summary SHERWIN WILLIAMS - MIXED USE DEVELOPMENT Parcel B1 Summary Parcel Data: 22,651 SF 0.52 Acres 142.3 Units/Acre Building Area 86,713 SF 86,713 SF Total: 84,663 SF Total: 2,050 SF Total: - SF Res. Amenity: 2,215 SF Retail: 2,050 SF Net Rentable: 69,935 SF Support: 0 SF Res. Support: 12,513 SF Unit Mix Total: 74 Units Overall: 1,022 SF Live/Work 7% 5 Units 1,170 SF Studio 11% 8 Units 569 SF 1 Bedroom 32% 24 Units 768 SF 2 Bedroom 35% 26 Units 1,238 SF 3 Bedroom 15% 11 Units 1,328 SF Parking Data: Parking for Building B1 is provided in shared parking garage as part of Building B2 78 Spaces - Spaces 74 Spaces 4 Spaces Open Space 3,720 SF 7,249 SF 5,249 SF 2,000 SF Parking Area 3.8 Emeryville, CA Residential Parking Required Retail Parking RequiredTotal Parking Required Total Parking Provided Unit Count Average Unit Size Parcel Area Density Residential Area Commercial Area (Retail)FAR Building AreaGross Building Area Open Space Required Open Space Provided Unit Balconies Common Open Space FAR B1 B2 C D
  • 12. 11SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B1 FLOOR PLANS First & Second Floor DN UNIT LW1 UNIT LW1 UNIT B1 UNIT LW1 UNIT B1 UNIT B1 UNIT B1 UNIT D1 MAIL TRASH ELECTRICAL ELEV STAIRSTAIR GAS METERS LOBBY SERVICE 19'X39' WATER & FIRE PUMP 8'-6" X 17' (EA) BIKE 18' X 44 UNIT LW1 RETAIL UNIT C2 130' - 9" 162'-2" UNIT A1 UNIT A1 UNIT C1 UNIT C1 UNIT C3 UNIT C3 UNIT B1 UNIT B1 UNIT D1 UNIT D1 UNIT C2 UNIT B1 UNIT B1 ELEV STAIRSTAIR IDF/ELECT. 9' X 9' TRASH 9'-6" X 7'-6" VENT. SHAFT 3' X 3' VENT. SHAFT 3' X 3' UNIT C2 DATE: PROJECT NO: SCALE: SHEET: FT 0 n Williams Mixed Use B1 FLOORS 1 AND 2 DIAGRAMS B1-1 1132-0007 04-18-2017 SCALE: 1" = 30'-0" 1" = 30'-0" 1" = 30'-0" 1FLOOR 1 1" = 30'-0" 2FLOOR 2 UNIT SCHEDULE Name Count NIT C3 2 BDRM NIT B1 24 BDRM: 24 BDRM NIT C1 10 NIT C2 10 NIT C3 12 BDRM: 32 BDRM NIT D1 12 BDRM: 12 VE/WORK NIT LW1 6 VE/WORK: 6 TUDIO NIT A1 6 NIT A2 2 TUDIO: 8 and total: 84 Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 13. 12SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B1 FLOOR PLANS Floors Three through Six UNIT B1 UNIT B1 UNIT D1 UNIT D1 UNIT B1 UNIT B1 UNIT C1 UNIT C3 UNIT C1 UNIT A2 UNIT A2 ELEV STAIRSTAIR IDF/ELECT. 9' X 9' TRASH 9'-6" X 7'-6" VENT. SHAFT 3' X 3' VENT. SHAFT 3' X 3' UNIT C3 UNIT B1 UNIT B1 UNIT B1 UNIT B1 UNIT D1 UNIT D1 UNIT C1 UNIT C3 STAIRSTAIR UNIT C3 UNIT C1 ELEV IDF/ELECT. 9' X 9' TRASH 9'-6" X 7'-6" VENT. SHAFT 3' X 3' VENT. SHAFT 3' X 3' UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT D1 UNIT B1 UNIT B1 UNIT A1 UNIT A1 UNIT C3 UNIT C2 UNIT C2 UNIT C3 STAIR ELEV STAIR IDF/ELECT. 9' X 9' TRASH 9'-6" X 7'-6" DATE: PROJECT NO: SCALE: SHEET: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B1 FLOORS 3-6 DIAGRAMS B1-2 1132-0007 04-18-2017 SCALE: 1" = 30'-0" 1" = 30'-0" 1" = 30'-0" 5FLOOR 5 1" = 30'-0" 6FLOOR 6 1" = 30'-0" 3FLOORS 3-4 Scale: 1" = 30'-0"
  • 14. 13SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design SHERWIN WILLIAMS - MIXED USE DEVELOPMENT Parcel B2 Summary Parcel Data: 64,469 SF 1.48 Acres 82.4 Units/Acre Building Area 338,468 SF 168,027 SF Total: 165,111 SF Total: 2,916 SF Total: 170,441 SF Res. Amenity: 14,950 SF Retail: 2,916 SF Net Rentable: 116,351 SF Support: 0 SF Res. Support: 10,730 SF Unit Mix Total: 122 Units Overall: 971 SF Live/Work 0% 0 Units - SF Studio 2% 3 Units 576 SF 1 Bedroom 43% 52 Units 684 SF 2 Bedroom 39% 48 Units 1,141 SF 3 Bedroom 16% 19 Units 1,390 SF Parking Data: Building B2 garage includes parking for Building A, Building B1, Building C, 197 Spaces 504 Spaces 122 Spaces - Spaces and Building D Open Space 6,360 SF 16,602 SF 6,177 SF 10,425 SF Emeryville, CA Parcel Area FAR Density 2.6 Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area Open Space Required Open Space Provided Unit Balconies Common Open Space Unit Count Average Unit Size Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required BUILDING B2 FLOOR PLAN Building Summary B1 B2 C D
  • 15. 14SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B2 FLOOR PLAN First Floor Scale: 1" = 30'-0" UNIT C1 UNIT C1 UNIT B1 GARAGE ENTRY MAINTENANCE BIKE LOUNGE CO-WORKING LOADING 2846 SF GALLERY LEASING LOBBY ELEV STAIR STAIR STAIR MAIL SERVICE PARKING TRASH RESIDENTIAL CAFE TRASH ELECTRICAL GASMETERS AV ELECTRICAL FIRE PUMP WATER SERVICE 24' x 17'-6" 20' x 17' 37' x 18' 17' x 8'-6" (EACH) 24' x 14'-6" EXHAUST SHAFT 11' x 8'-6" BIKE PARKING LOBBY STAIR FAN ROOM ELEV ELEV ENTRANCE 336' - 7" 163'-11" 230'-3" 80' - 1" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B2 FLOOR 1 DIAGRAM 1132-0007 4/18/2017 SCALE: 1" = 30'-0" 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 16. 15SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B2 FLOOR PLAN Floors Two through Four Scale: 1" = 30'-0" UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT B1 UNIT B1 UNIT B1 PARKING UNIT D2 UNIT D2 UNIT B3UNIT A1 UNIT C1 ELEV STAIR STAIR STAIR STAIR UNIT B1 TRASH 7'-6" X 10'-6" IDF 7' X 4' IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT IDF 5' X 4'-6" 4'-6" X 3' VENTILATION SHAFT TRASH 13'-6" X 9' EXHAUST SHAFT 11' X 8'-6" VENTILATION SHAFT 7' X 5' 336' - 7" 163'-11" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B2 TYPICAL FLOORS 2-4 DIAGRAM 1132-0007 4/18/2017 SCALE: 1" = 30'-0" 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 17. 16SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B2 FLOOR PLAN Fifth Floor Scale: 1" = 30'-0" UNIT B1 UNIT B1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT B1 UNIT B1 PARKING UNIT D2 ELEV ELEV STAIR STAIR STAIR STAIR TRASH 7'-6" X 10'-6" IDF 7' X 4' IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT IDF 5' X 4'-6" 4'-6" X 3' VENTILATION SHAFT TRASH 13'-6" X 9' EXHAUST SHAFT 11' X 8'-6" VENTILATION SHAFT 7' X 5' 336' - 7" 162'-3" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B2 FLOOR 5 DIAGRAM 1132-0007 4/18/2017 SCALE: 1" = 30'-0" 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 18. 17SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B2 FLOOR PLAN Sixth Floor UNIT B1 UNIT B1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT B1 UNIT B1 UNIT C1 UNIT B1 UNIT B1 UNIT D2 UNIT C1 UNIT C1 UNIT D1 STAIR ELEV ELEV STAIR STAIR STAIR PARKING UNIT C1 TRASH 7'-6" X 10'-6" IDF 7' X 4' IDF 7' X 4'3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT IDF 5' X 4'-6" 4'-6" X 3' VENTILATION SHAFT TRASH 13'-6" X 9' EXHAUST SHAFT 11' X 8'-6" VENTILATION SHAFT 7' X 5' ELEV BOILER 336' - 7" 162'-3" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B2 FLOOR 6 DIAGRAM 1132-0007 4/18/2017 SCALE: 1" = 30'-0" 1" = 30'-0" Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 19. 18SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING B2 FLOOR PLAN Seventh Floor Scale: 1" = 15'-0" UNIT B4 UNIT B4 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT B4 POOL @ + 4'-0" STOR ELEV 3301 SF CLUBHOUSE RR SHWR STAIR STAIR STAIR STAIR 6453 SF ROOF TERRACE ELEV UNIT C1 UNIT C1 UNIT B4 TRASH 7'-6" X 10'-6" IDF 7' X 4' IDF 7' X 4' 3' X 3' VENTILATION SHAFT 3' X 3' VENTILATION SHAFT IDF 5' X 4'-6" 4'-6" X 3' VENTILATION SHAFT TRASH 13'-6" X 9' EXHAUST SHAFT 11' X 8'-6" ELECTRICAL/IDF 7' X 8'-6" POOL EQUIP VENTILATION SHAFT 7' X 5' UNIT B4 UNIT B4 UNIT B4 UNIT B4 OPEN TO PARKING BELOW 336' - 5" 162'-1" 100' - 0" 73'-0" 3972 SF ROOF TERRACE ELEV 119' - 3" 39'-3" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING B2 FLOOR 7 DIAGRAM 1132-0007 4/18/2017 SCALE: 1" = 30'-0" 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 20. 19SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING C FLOOR PLAN Building Summary SHERWIN WILLIAMS - MIXED USE DEVELOPMENT Parcel C Summary Parcel Data: 44,867 SF 1.03 Acres 127.2 Units/Acre Building Area 175,645 SF 156,765 SF Total: 155,865 SF Total: 900 SF Total: 18,880 SF Res. Amenity: 5,375 SF Retail: 900 SF Net Rentable: 128,360 SF Support: 0 SF Res. Support: 18,580 SF Unit Mix Total: 131 Units Overall: 999 SF Live/Work 6% 8 Units 1,000 SF Studio 10% 13 Units 639 SF 1 Bedroom 31% 40 Units 713 SF 2 Bedroom 38% 50 Units 1,162 SF 3 Bedroom 15% 20 Units 1,369 SF Parking Data: Additional parking for Building C provided in shared garage in Building B2 131 Spaces 48 Spaces 131 Spaces - Spaces Open Space 7,300 SF 12,237 SF 4,880 SF 7,357 SF Emeryville, CA Parcel Area FAR Density 3.5 Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area Open Space Required Open Space Provided Unit Balconies Common Open Space Unit Count Average Unit Size Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required B1 B2 C D
  • 21. 20SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING C FLOOR PLAN First Floor UNIT LW1 UNIT LW1 UNIT LW1 UNIT LW1 UNIT LW1 UNIT LW1 RETAIL UNIT LW1 TRASH ELECTRICAL MAILELEV STAIR LOBBY PET BIKE FITNESS STAIR ELEV FAN ROOM EX SHAFT PARKING LOBBY GAS METERS UNIT LW1 WATER & FIRE PUMP 8'-6" X 17' (EA) SERVICE TRASH 336' - 0" 120'-0" ENTRANCE UNIT LW1 DATE: PROJECT NO: SCALE: SHEET: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING C FLOOR 1 DIAGRAM C-1 1132-0007 04-17-2017 SCALE: 1" = 30'-0" 1" = 30'-0" Parking Schedule Level Type Count Comments 1st Floor 1st Floor 8.5' x 18' - 90 deg 47 1st Floor 9' x 18' - 90 deg 2 1st Floor: 49 Grand total: 49 Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 22. 21SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING C FLOOR PLAN Second Floor UNIT B1 UNIT B1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT C4 UNIT C4 UNIT D1 UNIT C4 UNIT C4 UNIT B2 UNIT D1 UNIT B2 UNIT D2 UNIT B2 UNIT B2 UNIT A1 CORRIDOR UNIT C3 STAIR UNIT C3 STAIR RES STOR ELEV UTIL ELEV TRASH EX SHAFT 7357 SF COURTYARD 336' - 0" 120'-0" 172' - 0" 38'-6" RES STOR DATE: PROJECT NO: SCALE: SHEET: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING C FLOOR 2 DIAGRAM C-2 1132-0007 04-17-2017 SCALE: 1" = 30'-0" 1" = 30'-0" UNIT SCHEDULE Name Count 1 BDRM UNIT B1 20 UNIT B2 15 UNIT B3 8 1 BDRM: 43 2 BDRM UNIT C1 20 UNIT C2 6 UNIT C3 4 UNIT C4 20 2 BDRM: 50 3 BDRM UNIT D1 15 UNIT D2 5 3 BDRM: 20 LIVE/WORK UNIT LW1 10 LIVE/WORK: 10 STUDIO UNIT A1 5 UNIT B2 5 STUDIO: 10 Grand total: 133 Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 23. 22SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING C FLOOR PLAN Floors Three through Six 336' - 0" 120'-0" UNIT B1 UNIT B1 UNIT B1 UNIT B1 UNIT C1 UNIT C1 UNIT D1 UNIT C1 UNIT C1 UNIT C4 UNIT C4 UNIT D1 UNIT C4 UNIT C4 UNIT B2 UNIT D1 UNIT B2 UNIT D2 UNIT B2 UNIT B2 UNIT A1 UNIT C3 STAIR UNIT C3 STAIR UNIT B3 ELEV EX SHAFT ELEV TRASH UNIT B3 EX SHAFT RES STOR RES STOR DATE: PROJECT NO: SCALE: SHEET: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING C TYPICAL FLOORS 3-6 DIAGRAM C-3 1132-0007 04-17-2017 SCALE: 1" = 30'-0" 1" = 30'-0" Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 24. 23SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING D FLOOR PLAN Building Summary SHERWIN WILLIAMS - MIXED USE DEVELOPMENT Parcel D Summary Parcel Data: 62,291 SF 1.43 Acres 121.0 Units/Acre Building Area 259,914 SF 195,984 SF Total: 195,984 SF Total: - SF Total: 63,930 SF Res. Amenity: 4,425 SF Retail: - SF Net Rentable: 163,389 SF Support: 0 SF Res. Support: 28,170 SF Unit Mix Total: 173 Units Overall: 965 SF Live/Work 0% 0 Units - SF Studio 0% 0 Units - SF 1 Bedroom 50% 86 Units 720 SF 2 Bedroom 34% 58 Units 1,139 SF 3 Bedroom 17% 29 Units 1,343 SF Parking Data: Additional parking for Building D provided in shared garage in Building B2 173 Spaces 172 Spaces 173 Spaces - Spaces Open Space 10,340 SF 18,260 SF 6,275 SF 11,985 SF Emeryville, CA Parcel Area FAR Density 3.1 Gross Building Area FAR Building Area Residential Area Commercial Area (Retail) Parking Area Open Space Required Open Space Provided Unit Balconies Common Open Space Unit Count Average Unit Size Total Parking Required Total Parking Provided Residential Parking Required Retail Parking Required B1 B2 C D
  • 25. 24SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING D FLOOR PLAN First Floor CORRIDOR ENTRANCE RAMP UP LOADING LOBBY PARKING MAIL ELEC. TRASH FAN ROOM BIKES PET UNIT D3 UNIT B2 UNIT B2 UNIT B2 UNIT D3 WATER & FIRE PUMP 8' X 17' (EA) STAIR LOUNGE STAIR STAIR UTIL. ELEV ELEVSTAIR STORAGESERVICE 370' - 2" 161'-4" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING D FLOOR 1 DIAGRAM 1132-0007 04-18-2017 SCALE: 1' = 30'-0" 1' = 30'-0" Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 26. 25SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING D FLOOR PLAN Second Floor OPEN TO BELOW RAMP DOWN UNIT B2 UNIT D3 UNIT B2 UNIT B2 UNIT D3 STAIR FAN ROOM EXHAUST SHAFT 6' X 9' TRASH SHAFT STAIR STAIR STAIR ELEV ELEV 370' - 2" 161'-4" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING D FLOOR 2 DIAGRAM 1132-0007 04-18-2017 SCALE: 1" = 30'-0" 1" = 30'-0" Scale: 1" = 15'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 27. 26SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING D FLOOR PLAN Third Floor TRASH 6'-6" X 14'-6"IDF 5' X 5'-6" EXHAUST SHAFT 6'-6" X 14'-6" VENTILATION SHAFT 5' X 8'-6" VENTILATION SHAFT 7' X 4'-6" IDF 7' X 4'-6" UNIT C1 UNIT C1 UNIT C2 UNIT C2 RES STOR UNIT C1 UNIT C1 UNIT C1 UNIT C1 UNIT C1 UNIT C1 RES STOR UNIT D1 UNIT D1 UNIT D1 UNIT D3 UNIT D3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B1 UNIT B2 UNIT B2 UNIT B2 UNIT B2 UNIT B3 UNIT B3 UNIT B1 TRASH STAIR STAIR STAIR 370' - 1" 80' - 0" 91'-0" 76' - 0" 56'-0" 161'-4" 7369 SF COURTYARD 4616 SF COURTYARD DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING D FLOOR 3 DIAGRAM 1132-0007 04-18-2017 SCALE: 1" = 30'-0" 1" = 30'-0" Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 28. 27SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design BUILDING D FLOOR PLAN Floors Four through Seven TRASH 6'-6" X 14'-6"IDF 5' X 5'-6" EXHAUST SHAFT 6'-6" X 14'-6" VENTILATION SHAFT 5' X 8'-6" VENTILATION SHAFT 7' X 4'-6" IDF 7' X 4'-6" UNIT C1 UNIT C1 UNIT C2 UNIT C2 UNIT C2 UNIT C1 UNIT C1 UNIT C1 UNIT C1 UNIT C1 UNIT C1 UNIT C2 UNIT D1 UNIT D1 UNIT D1 UNIT D3 UNIT D3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B3 UNIT B1 UNIT B2 UNIT B2 UNIT B2 UNIT B2 UNIT B3 UNIT B3 UNIT B1 TRASH STAIR STAIR STAIR 370' - 1" 161'-4" DATE: PROJECT NO: SCALE: FT 0 Sherwin Williams Mixed Use Emeryville, CA BUILDING D TYPICAL FLOORS 4-7 DIAGRAM 1132-0007 04-18-2017 SCALE: 1" = 30'-0" 1" = 30'-0" Scale: 1" = 30'-0" POOL OPEN TO PARKING BELOW C B2 D B1 72'-0" 100' - 0" 119' - 3" 39'-3" COLOR LEGEND LIVE/WORK UNITS 1 BDRM UNITS 2 BDRM UNITS 3 BDRM UNITS RESIDENTIAL AMENITIES RETAIL PARKING GALLERY SUPPORT/UTILITIES COURTYARD/ROOF TERRACE BIKES CIRCULATION PROJECT PARKING SUMMARY 28 STREET SPACES 0 SPACES 513 SPACES 50 SPACES 172 SPACES SITE A SITE B1 SITE B2 SITE C SITE D 763 SPACESTOTAL PROJECT UNIT MIX LIVE/WORK UNITS (3.0%) STUDIO UNITS (6.6%) 1 BDRM UNITS (37.6%) 2 BDRM UNITS (36.2%) 3 BDRM UNITS (16.6%) 15 33 188 181 83 UNITS TOTAL500 STUDIOS FT 0 DATE: PROJECT NO: SCALE: SHEET: Sherwin Williams Mixed Use Emeryville, CA Combined Buildings COMBINED 7TH FLOOR DIAGRAMS S7 1132-0007 03/14/17 1" = 50'-0" SCALE: 1" = 50'-0"
  • 29. 28SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Sherwin Ave & Hubbard St BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 1 6 5 8 7 5
  • 30. 29SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Park BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 7 5 1 1 5 5 5 3 2 8 8
  • 31. 30SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Park BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 1 3 2 7 10 9 5 8
  • 32. 31SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Hubbard Street DRAFT BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 3 77 1 1 4 5
  • 33. 32SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Hubbard Street DRAFT BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 2 6 4 10 9 1 5 6 8 7 7 7
  • 34. 33SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View of Gallery Space from Horton & 46th St BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 2 1 8 3 7 5
  • 35. 34SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View of Building D from 46th St BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 4 4 3 11 5 6 10
  • 36. 35SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Emeryville Greenway BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 4 3 3 10 10 6 8 5 11
  • 37. 36SHERWIN WILLIAMS │ EMERYVILLE APRIL 27, 2017Project No. 1132-0007 Architecture + Design PERSPECTIVE RENDERING View from Sherwin Ave BUILDING MATERIALS 1 THIN BRICK VENEER 2 COMPOSITE METAL PANELS 3 FIBER CEMENT SIDING 4 RIBBED METAL PANEL 5 CEMENT PLASTER 6 METAL RAILINGS 7 ALUMINUM STOREFRONT 8 VINYL WINDOWS 9 METAL CANOPIES 10 METAL TRIM 11 EXPOSED CONCRETE 1 1 5 5 8 7 6 9