This document provides details about a new residential condominium project located in The Big Apple at Veritown Fort, Global City. It will be a 43-floor tower with 738 residential units ranging from 1-3 bedrooms and 350 parking slots. Construction is scheduled to begin in January 2015 with completion and turnover targeted for December 2018. The document includes floor plans, unit layouts, specifications and payment terms.
5. Launch Date Jan 09, 2014
Location Corner of 38th
Street and
6th
Avenue, The Big
Apple at Veritown Fort,
Global City
No. of floors 43 flrs (mktg)
42 flrs (const)
With 3 basement
No. of units
(Residential)
738
Unit Mix
1BR
2BR
2BR Skygarden
39 to 42 sq.m
55 to 80 sq.m
55 to 100 sq.m
No. of Parking
Slots 350
Turnover Dec 2018
6. FLOOR
STACKING PLAN
Construction Marketing
42/F 43/F HOLD
41/F HIGHZONE 42/F HOLD
40/F LEVELS 41/F SKygarden OPEN
39/F 40/F OPEN
38/F 39/F OPEN
37/F 38/F OPEN
36/F 37/F OPEN
35/F 36/F OPEN
34/F 35/F OPEN
33/F 34/F OPEN
32/F 33/F OPEN
31/F 32/F OPEN
30/F 31/F OPEN
29/F 30/F HOLD
28/F 29/F SKyGarden HOLD
27/F 28/F HOLD
26/F 27/F HOLD
25/F MIDZONE 26/F HOLD
24/F LEVELS 25/F HOLD
23/F 24/F OPEN
22/F 23/F OPEN
21/F 22/F HOLD
20/F 21/F HOLD
19/F 20/F HOLD
18/F 19/F OPEN
17/F 18/F OPEN
16/F LOWZONE 17/F SKyGarden HOLD
15/F LEVELS 16/F OPEN
14/F 15/F OPEN
13/F 14/F OPEN
12/F 12/F OPEN
11/F 11/F OPEN
10/F 10/F OPEN
9/F 9/F OPEN
8/F 8/F HOLD
7/F 7/F HOLD
6/F 6/F Amenities
5/F 5/F Podium Parking
4/F 4/F Podium Parking
3/F 3/F Podium Parking
2/F 2/F Retail
G/F G/F Lobby/ Retail
B1 B1
Drop-off/ Lobby and Basement
Parking
B2 B2 Basement Parking
B3 B3 Basement Parking
7. Product Mix
Unit Type Unit Sizes No. of Units % of Total
1-BR 39 to 42 570 77%
2-BR 51 to 89 156 21%
2-BR with Skygarden 55 to 100 12 2%
Total 738 100%
16. • Automatic Fire Suppression System
• Fire Detection Alarm System
• Elevators
Six (6) Elevators
Emergency Power Generator
100% Back-up for common areas
10% - 15% Back-up for residential units
• Mail Box Area
45. • Bedroom
Modular Closet
• Kitchen
Base cabinet with Granite Countertop
Overhead cabinet
• Toilet & Bath
Lavatory with granite countertop
Water closet, Shower set, Shower enclosure
• Balcony
Steel railing with paint finish
46. Window
• Powder coated aluminum frame
• Glass pane, 6mm thick
Provisions provided
• Telephone lines
• Cable TV
• Mechanical vent in kitchen area and T&B
Provision for Window type Air-con except for the following units:
Units A, C, G, H, J, M, O, R, U at 7th
-16th
, 20th
-28th
& 32nd
to 40th
Split-type AC provision
Units A, C, F, G, H, K, M, P, S at 17th
, 29th
& 41st
Split-type AC provision
Units A, C, F, G, H, K, M, P, S at 18th
-19th
, 30th
-31st
& 42nd
-43rd
Split-type AC provision
• Provision for water heater
Fixtures
• House entry communication phone
47.
48. SRP
Discount
C2 CASH in 30 Days 15%
C1 50% DP (less RF) - 50% (48) 7.5%
B3 30% DP (in 30 days) - 70% BF 13%
A1 10% DP, 20%(48), 70% LS or BF 2%
A3 (1BR)
15T (12), 19T(12), 24T(12),
28T(12), balance LS or BF
A3 (2BR &
Above)
5%(12), 6%(12), 7%(12), 8.5%(12),
balance LS or BF
51. Project TimetableProject Timetable
• Start of ConstructionStart of Construction Jan 2015Jan 2015
• Target CompletionTarget Completion Dec 2018Dec 2018
and Turnoverand Turnover