2. Q u i n c e y N i x o n
P O R T F O L I O
Hospitality + Leisure + Residential
http://www.slideshare.net/quinceynixon
http://www.linkedin.com/in/quinceynixon
09. 03 Jacobs Mentre Residence – East Hampton, New York
08. 01 Hottenroth and Joseph Architects, New York, New York
Project architect, co-designer and manager for $11 million, total 16,500 s.f., new construction of 9,200 s.f. main house, 7,300 s.f.
detached cottages, pool house, pool and garage buildings on 8 acres along the shore of Gardiner’s Bay. Role included development
of residential compound site plans, conceptual and schematic development of building massing, elevations, floor plans and interior
architecture. As project architect and designer, mange a project team of two and consultants for 13 months from schematic design
through construction documentation; coordinating development of the site plan, architecture, structure, details, consultants, vendors
and interior FF&E coordination. Project under construction.
Owner - Tick Tock LLC
Operator - Tick Tock LLC
Scope - Main House
Pool and Pool Cottage
5 Residential Cottages
2 Guest Cottages
Storage Cottage
Laundry Cottage
Garage Cottage
Site Amenities
Services - Site Planning
Architecture
Interior Design
Construction Management
Interior FF&E coordination
Publications and Awards
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28. Q u i n c e y N i x o n
N e w Y o r k C i t y N e w Y o r k
qnixon@nyc.rr.com
P O R T F O L I O
Hospitality + Leisure + Residential
http://www.slideshare.net/quinceynixon
http://www.linkedin.com/in/quinceynixon
09. 03 Schnitzer Residence (Otto Residence) – New York City, New York
04. 00 Alexandra Champalimaud and Associates New York City, New York and Montreal, Quebec
Project architect and co-designer for a $12.95 million exterior and interior renovation of an 8,000 s.f., eight story, c.1860 townhouse and
garden for a private client. Role involved development and renovation of exterior facades, garden, building structure and new mechanical
systems. Interior architecture role included coordination of extensive millwork contract, FF&E development and installation. As project
architect, managed a project team of two for 24 months from construction documentation through construction administration. As project
construction manager, oversaw construction administration and coordination with general contractor and consultants while managing vario
interior trades, vendors and millwork fabricators. Project completed.
Owner - Private Client
Operator - Private Client
Scope - Façade Studies
Façade Renovation
Garden Landscape
Roof Garden
Interior gut renovation
Finishes
Furniture
Custom millwork
Custom Lighting fixtures
Select one offs
Services - Façade Architecture
Interior Architecture
Interior Design
Custom Millwork
Interior FF&E
Facing an Edward Durrell Stone landmarked townhouse across the street and neighbor to Phillip Johnsons townhouse on the same
block, the original 8 story townhouse was owned by the film director Otto Preminger and had been remodeled into an early 60’s
modern townhouse on the exterior and interior.
A little more than $1.0 Million of custom millwork was fabricated and installed. Original Azuleja Tile and Stone was purchased from
country homes in Portugal and install at the residence by Portuguese craftsmen hosted by the client for the installation.
Logs of Cerejera Brazilian Cherry were imported, cut into wide boards and custom culled on the clients behalf for installation on
floors and select boards for millwork fabrication and veneers.
Publications and Awards
62. Q u i n c e y N i x o n
N e w Y o r k C i t y N e w Y o r k
qnixon@nyc.rr.com
P O R T F O L I O
Hospitality + Leisure + Residential
http://www.slideshare.net/quinceynixon
http://www.linkedin.com/in/quinceynixon
07. 05 Irving Place Development – New York City, New York
04. 02 Hart Howerton Architects, New York City, New York
Conceptual team member for new 11 story residential façade and lobby design. Project completed through conceptual development studie
Owner - PMJ Properties
Operator - Irving Place Development
Scope - Façade Studies
Lobby Studies
Valet Drop off
Underground Parking
Services - Building façade studies
Interior Architecture
Programming
Publications and Awards
63.
64.
65.
66.
67.
68.
69.
70. LEGEND
J
K
L
A
B
C
D
E
F G
H
I
L
C
D
A
TERRACE
STAIR
HALL
EGRESS
STAIR
LIVING / MEDIA
FRONT
ROOM
HALL
MASTER
BATHROOM
WALK-IN
CLOSET
GUEST
BATHROOM
EGRESS
STAIR
MASTER
BEDROOM
LAUNDRY
/ STORAGE
BEDROOM
02
BEDROOM
03
STAIR
ALCOVE
PLAN NOTES:
POWER / DATA NOTES:
LEGEND
ROOF TERRACE
A
B
C
D
E
F G
H
I
PANTRY
STORAGE
DINING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
ROOF
BELOW
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
BELOW
EXISTING
BUILDING
ROOF
BELOW
TERRACE BELOW
TERRACE CANOPY
BELOW
NEW BLDG ROOF
A
B
C
D
E
F G
H
I
J
K
L
EXISTING
BUILDING
EXISTING
BUILDING
BELOW
EXISTING
BUILDING
EXISTING
BUILDING
BELOW
EXISTING
BUILDING
BELOW
EXISTING
BUILDING
ROOF
BELOW
MECHANICAL
ROOM
EGRESS
STAIR
KITCHEN
SHELVING/
STORAGE
L
INTERIOR FINISH NOTES:
2
4TH FLOOR/PENTHOUSE PLAN PROPOSED FINISH & FURNITURE
1
ROOF/TERRACE PLAN PROPOSED FINISH & FURNITURE
N
3
3RD FLOOR PLAN PROPOSED FINISH & FURNITURE
N
N
71.
72. A B
H
C D
G
E
SCALE : 3
1
2 21 23
A
D A F O F T F O F
E A
C
L
2 24 4
12 24
2 24 4
13 12 24
2 24 4
4 12 24
3 24 4
1 12 24
2 24 4
11 12 24
C
2 24 4
11 12 24
2 24 4
F
1 24 4
12 24
32 12 24
2 24 4
12 12 24
2 24 4
11 12 24
ASTER BATHR TILE : ELE ATION PATTERN LAYOUT T 24 4 4 H / T 12 24 114 H
24
4
24
4
12
24
12
24
12
24
12
24
24
4
24
4
24
4
24
4
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
24
4
24
4
12
24
12
24
12
24
12
24
12
24
12
24
24
4
24
4
12
24
12
24
12
24
12
24
24
4
24
4
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
12
24
73. SCALE : 3
1
2 21 23
ASTER BATHR TILE : PLAN
D A F O F T F O F
SHOWER
STONE SADDLE
WALL BASE
WD TRI
3
GLASS DOOR
SHOWER
GLASS DOOR
TOILET
D
G
C
H C
DOOR
B
H
E
A
A
DOOR
DOOR
STONE SADDLE
TYP DOOR
WD TRI & CASING
WALL BASE
WD TRI
4
POCKET DOOR
WD TRI & CASING
TILE I C L G / DO IRLG244 24 4 11
32
TILE I C L G / DO IRLG1224 12 24 11
32
TILE PLAN SCHE E T 24 4
ANITY CENTER
CEILING PLAN SCHE E
L L
ANITY CENTER
C
L
C
L C
L
C
L
C
L
C
L
C
L
2 24 4
F
F
1 12 24
TOTAL
76. LI ING
DINING
KITCHEN
STORAGE POWDER R
LI ING
HALL
KITCHEN
STORAGE POWDER R
BDR
BDR
STR HALL BATHROO
BDR
BDR
STR HALL
TERRACE GARDEN DE O NOTES: TERRACE GARDEN NOTES:
CLOSET
CLOSET
CLOSET
BATHROO
CLOSET
LEGEND
GENERAL DE O NOTES:
LEGEND
PLAN NOTES:
S
S
S
S
LAUNDRY
ECH CLOSET
ECH CLOSET
LAUNDRY
GENERAL DE O NOTES CONT :
2
2ND FLOOR NEW CONSTRUCTION PLAN
1
1ST FLOOR NEW CONSTRUCTION PLAN
N N
N
N
4
2ND FLOOR E ISTING / DE OLITION PLAN
3
1ST FLOOR E ISTING / DE OLITION PLAN
78. POWDER ROOM WALLS
BATHROOM
FINISH NOTES:
BATHROOM ENTRY TOILET
POWDER ROOM PLAN
BATHROOM PLAN
BATHROOM SHOWER INTERIOR
BATHROOM VANITY ELEVATION
POWDER ROOM WALLS
POWDER ROOM WALLS
BATHROOM VANITY SECTION BATHROOM VANITY PLAN
TOILET A NOTES:
TOILET ACCESSORIES
BATHROOM SHOWER BATHROOM SHOWER
BATHROOM VANITY ELEVATION
PLUMBING CONNECTION
BATHROOM VANITY SECTION
PLUMBING CONNECTION
BATHROOM VANITY PLAN
PLUMBING CONNECTION
1
31
1
FOR
CONSTRUCTION
ISSUE
DATE
DESCRIPTION
1
POWDER R TILE PLAN AND ELE ATIONS
R
2
BATHROO TILE PLAN AND ELE ATIONS
3
ANITY ILWORK
4
ANITY PLU BING CONNECTION
79. RCP NOTES:
CONTRACTOR SHALL INCLUDE IN BID AN ALLOWANCE TO SHIFT DE ICES
UP / DOWN AS RE UIRED TO ACHI E FINAL OUNTING HEIGHT T B D
FINISH NOTES:
LEGEND
ISSUE
DATE
DESCRIPTION
13
1
FOR
PRICING
1
INTERIOR ELE ATION SOUTH PROPOSED NEW
R
2
STONE TOP
PANTRY
3
STONE TOP
ISLAND
2 00
STONE TOP
KITCHEN
2 20
STONE TOP
TOTAL
2
STONE TOP
BATHROOM
BATHROOM VANITY
ELEVATION
BATHROOM VANITY
SECTION
KITCHEN ISLAND
ELEVATION
BATHROOM PLAN
KITCHEN / DINING PLAN
ISSUE DATE DESCRIPTION
2 21 1 FOR PRICING
R 1
RCP NOTES:
CONTRACTOR SHALL INCLUDE IN BID AN ALLOWANCE TO SHIFT DE ICES
UP / DOWN AS RE UIRED TO ACHI E FINAL OUNTING HEIGHT T B D
FINISH NOTES:
LEGEND
ISSUE
DATE
DESCRIPTION
13
1
FOR
PRICING
1
INTERIOR ELE ATION NORTH PROPOSED NEW
R
2
BDR
BDR
STR HALL
LI ING
DINING
KITCHEN
STORAGE POWDER R
ISSUE DATE DESCRIPTION
12 1 1 FOR RE IEW
1
GROUND FLOOR FURNITURE PLAN N
2
SECOND FLOOR FURNITURE PLAN
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100. SOUTH ELEVATION OPTION 01 EAST ELEVATION OPTION 01
SOUTH ELEVATION OPTION 02
SOUTH ELEVATION DEMOLITION EAST ELEVATION DEMOLITION
NORTH ELEVATION OPTION 01
NORTH ELEVATION OPTION 02
NORTH ELEVATION DEMOLITION
EAST ELEVATION OPTION 02
NEW
ENCLOSED
PORCH
221.7 sq ft
EXISTING
EXISTING
NEW
ENCLOSED
PORCH
221.7 sq ft
EXISTING
NEW EXISTING
NEW
ENCLOSED
PORCH
221.7 sq ft
EXISTING NEW
EXISTING
EXISTING
EXISTING
NEW
ENCLOSED
PORCH
221.7 sq ft
EXISTING
NEW EXISTING
EXISTING
DECK
141.3 sq ft
EXISTING DEMO
EXISTING
EXISTING
EXISTING
DEMO EXISTING
DEMO EXISTING
EXISTING
DECK
141.3 sq ft
LOT LENGTH NEW
EXISTING
GARAGE
DEMO
DEMO
EXISTING
NEW
NEW
SIDE YARD
ENTRY
REAR YARD
ENTRY
a r c h i t e c t s
1
PROPOSED/NEW PORCH/ELEVATIONS OPTION 01
3
EXISTING/DEMO DECK/ELEVATIONS
2
PROPOSED/NEW PORCH/ELEVATIONS OPTION 02
101. EAST ELEVATION OPTION 01
SIDE YARD
ENTRY
EXISTING ELEVATION
AND ROOF
To Remain As Is
Ex. Yard Elev. Ht.
NEW ENCLOSED
SCREEN PORCH
EXISTING CELLAR
STAIR AND RAIL
To Remain Beyond
SOUTH ELEVATION OPTION 01
EXISTING ELEVATION
AND ROOF
To Remain As Is
Ex. Yard Elev. Ht.
NEW ENCLOSED
SCREEN PORCH
NORTH ELEVATION OPTION 01
EXIST. CELLAR
STAIR AND RAIL
To Remain
EXISTING ELEVATION
AND ROOF
To Remain As Is
Ex. Yard Elev. HT.
Ex. Yard Elev. Ht.
& Steps To Rear
NEW ENCLOSED
SCREEN PORCH
SIDE
YARD
ENTRY
a r c h i t e c t s
1
PROPOSED/NEW PORCH/ELEVATIONS OPTION 01
102. EAST ELEVATION OPTION 01
EXISTING ELEVATION
AND ROOF
NEW PORCH ADDITION
ROOF AND METAL SCREEN
REAR YARD
ENTRY STAIR
2" WIDE PORCH
SLATS /3" OPEN
EXISTING ELEVATION
2" WIDE PORCH
SLATS /3" OPEN
WIRE METAL
MESH SCREEN
WIRE METAL
MESH SCREEN
SIDE YARD
STAIR ENTRY
EXISTING ENTRY
TO CELLAR
To Remain
a r c h i t e c t s
2
PROPOSED/NEW PORCH/ SOUTH ELEVATION OPTION 01
1
PROPOSED/NEW PORCH/ EAST ELEVATION OPTION 01
3
PROPOSED/NEW PORCH/ NORTH ELEVATION OPTION 01