Youssef Moustafa Altaweel
Location: Dubai, UAE
Contact: +971 50 9173017
Email: Youssef_2413@yahoo.com
LinkedIn: https://www.linkedin.com/in/youssef-al-taweel
Skype ID: Youssef.altaweel
Date of Birth: November 6, 1959
MEP Manager/Senior Mechanical Engineer: Construction/ Oil & Gas/ Power
Qualified MEP Engineer with over 30 years of experience across diverse organizations, seeking challenging senior
managerial assignments with a reputed organization
Executive Summary
 Design, review design and supervise of high rise buildings for Mechanical
Systems as per relevant authorities’ regulations (DCD, DEWA, DM,
JAFZA, EHS, DTCM, etc.) furthermore national and international
standards/ codes IPC,NPC,PESD,ASPE, ASHRAE, SMACNA, NFPA,
ASME, ASTEM & BS, UAE Life &Safety Code,.
 Knowledge of green buildings requirements through ESTEDAM & LEED
guidelines in addition project contract conditions through FIDIC-editorial
1988 –further 1992 furthermore project managing through PMP revision-3.
 Knowledge of standard specifications hotels’ guidelines for Double Tree
Hilton, Hard Rock and IHG hotels
 Design, review design and supervise high rise buildings Mechanical
Systems such as HVAC, Drainage, Storm Water, Water Supply, Central
Hot Water, Firefighting, water filtration, recycle grey water treatment, LPG
system, kitchen hoods ventilation system, swimming pool station and
irrigation landscaping.
 Full knowledge of BMS based on project demands and requirements.
 Adept at ensuring compliance to project specifications and quality
procedures
 Proven ability in evaluation of drawings, specifications, BOQ and
highlighting discrepancies if any to superiors
 Well versed in enhancing operational efficiency through effective
resolution of snag points
 Knowledge of international work cultures by virtue of regular interaction
with Chinese and Emirati teams during multiple project implementations
 Follow-up all what is new for the building’s systems development of
artistic items or updated technical technique.
Education
•• B.Sc. Degree in Power Mechanical Engineering Faculty of Engineering Suez Canal University-Port Said, Egyp-1984
COURSES & TRANINGS
•• PMP third edition-Chicago Management Training Institute-U.A.E-January, 2009.
•• Microsoft Office, Microsoft Project, Primavera and Auto CAD-British Electronic Co.-A.R.E-2002
•• Introduction to Computer DOS and Basic Language-Computer Scientific Center-A.R.E-1991
•• Nile Cruiser "M/s RA" naval systems operation and maintenance in Dry Dock Yard -England-1989
•• Diesel marine engines operation and maintenance in Tempest Diesel Ltd.-Stamford-England-1985
Core Competencies
MEP Systems Design/review
• Code Compliance
• Technical Solutions
Project Management  Contract
Negotiation  Client & Stakeholder
Interaction 
Bid/Proposal/Tendering 
Payment Works  Infrastructure
Works  Cost Estimation &
Budget  FIDIC Knowledge 
Vendor & Supplier Management 
Procurement Management 
Statutory Regulations  Team
Leadership
SEMINARS
•• Single Stack Drainage Systems
•• Insulation and Sustainable Energy
•• Water conservation solution & Siphonic rainwater drainage system
•• Improve Efficiency in Water and Wastewater Systems.
•• Smoke Clearance, Car Parking Ventilation, CFD analysis &Explosion Proof Ventilation Systems
(In MICO ITALIA S.P.A. Company ITALY).
AREAS OF KNOWLEDGE AND EXPERTISE
•• Design
•• Review Design
•• Supervising skills
•• Standards Compliance
•• Budgeting / Cost Control
•• Team Leadership
•• Contract Negotiations
•• Planning & Scheduling
•• Cost Engineering
•• Risk Assessment
•• Project Analysis.
•• Efficiency Improvements
•• Proposal Generation
•• Baselines.
•• Performance Management
•• Program Management
•• Progress Monitoring
•• Risk Management
Professional Affiliations
•• Member of Egyptian Syndicate of Engineers.
•• Member of Society of Engineers –UAE.
•• Member of Marine Engineers Association in Alexandria-ARE.
COMPUTER SKILLS
Highly skilled with the following programs:
•• AutoCAD 2014&15 (2d).
•• HAP.
•• MS PROJECT & Primavera 5.
•• Windows XP, 7&8.
•• Microsoft Office.
•• IDCL
Personal Details
•• Date of Birth : 6th November, 1959
•• Languages Known : Arabic & English.
•• Nationality : Egyptian.
•• Address : Al-Kutbi Bld. Flat 506, Al-Nuaimiya, Ajman – UAE.
•• Passport Details : A07690624
•• Visa Status : Work Visa
OBJECTIVE
Join as MEP Manager/Senior Mechanical Engineer in
company that has vision for growth and advancement. I have
extensive years of experience and knowledge at Senior/MEP
Manager capacities, which I believe would be an asset to an
organization that aims for progress. In the long term, I aim to
reach my full potential and further my growth with your team
that will factor in the firm’s advancement.
Professional Experience
Sr. Mechanical Engineer @ National Engineering Bureau (NEB)
National Engineering Bureau (NEB), Architectural & Engineering Consultants, UAE  Novermber 2007 – till date
Senior Mechanical Engineer
Duties and Responsibilities:
•• Review and verification designs for all buildings’ mechanical systems to ensure process requirements, applying
knowledge of engineering principles.
•• Alters or modifies design to obtain specified functional and operational performance.
•• Assists drafter in developing structural design of product, using drafting tools or computer-assisted design/drafting
equipment and software.
•• Researches and analyzes data, such as customer design proposal, specifications, and manuals to determine feasibility
of design or application.
•• Managing the required design, prototyping and test activities in development of new tasks/work, including
subcontract and supplier activities and creating as well as maintaining and organizing project documentation.
•• Review for mechanical layout, design detailing and drafting, to challenge technical and approve final drawings of the
same.
•• Perform cost reduction measures and will also carry out relevant design analysis, using external expertise where
required.
•• Ability to design of systems incorporating pumps, compressors, heat exchangers, tanks, piping, firefighting system,
water filtration, water treatment stations instrumentation and controls into the overall facility design.
•• Review for design of piping and pipe support systems including material selection, Code calculations, stress analysis,
etc.,
•• Review, study and report the BMS to ensure compliance with project services systems requirements.
•• Ability to facilitate HVAC, in the project and control mechanical, plumbing and other related site works.
•• Read specifications, such as blueprints and data, to ensure/determine project requirements.
•• Ability to review B.O.Q for all facilities.
•• Responsible for combining, evaluating, and reasoning with information and data to make decisions and solve
problems.
•• Responsible for evaluating information against a set of standards and verifying that it is correct.
•• Responsible for conferring with Team members on site to discuss such matters as work procedures, complaints, and
project finalization/foundation problems.
•• Oversees installation to ensure machines and equipment are installed and functioning according to specifications.
•• Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
•• Inspects, evaluates, and arranges field installations and recommends design modifications to eliminate machine or
system malfunctions.
•• Investigates systems failures and difficulties, diagnoses faulty operation, and makes recommendations to
maintenance crew.
•• Confers with establishment personnel and engineers to implement operating procedures and resolve system
malfunctions, and to provide technical information/solution.
•• Ability to ensure technical and professional accuracy of project work.
•• Ability to deliver project work on time and within quality requirements.
•• Communicates clearly and concisely; both orally and in writing.
•• Responsible for Leading and managing a team of engineers.
•• Ability to contribute to project team and to be a team player.
•• Attend the site meetings to follow up the MEP issues.
•• Approval of materials, shop drawings and samples.
•• Managing the project progress & payment approval to the contractor accordingly.
•• Coordination with designer MEP consultant.
•• Coordination with client MEP staff.
•• Ensure the local authorities requirements.
•• Ensuring smooth handling over project to client or facility management agency after completion.
•• Involved in evaluating project performance, managing budgets/ financials, maintaining project delivery schedules
and other SLA parameters to enhance project profitability
•• Coordinate with team members in maintaining construction schedule, budget and contingency across assigned
projects involving earth works, culverts, infra structure, high rise, building works, power plant projects, piling
works, coffer dam, dewatering system and textile mills
•• Interact with design consultants for delivering construction documents; guide team members in processing tenders.
Follow up with contractors and suppliers in effectively maintaining procurement schedules/ other quality parameters
•• Evaluate data collated from project teams for producing appropriate project summary reports
MARINA 101  Apr 2008 – 2016
Running Projects: Sr. Mechanical Engineer
Project Profile:
Marina 101 is an iconic structure that will ascend high above the rest of Dubai's fast
changing skyline. Destined to be the world's tallest hotel and furnished apartments,
Marina 101 is Sheffield Holdings Limited flagship brand and the unique project is
designed of comprises 101 floors rising to 425 m (1,394 ft.) height and covering a built up
area of approximately 1.65 million square feet. Be developing with an investment of over
AED 1.2 billion.
Hotel operator is Hard Rock International – owner of one of the world’s most iconic and
recognized brands – along with Abu Dhabi Financial Group (ADFG), Hard Rock
International will operate the first 33 floors of the tower which will be the hotel section,
along with the 101st floor which will be converted in to a Hard Rock Café & Lounge with
a 360 degree view of the city, Marina 101 is considered the second tallest building in the
UAE after Burj Khalifa.
Marina 101
 Project: Marina101 Hotel & Residential Tower, Marsa Dubai, UAE. Plot No. : 392-207 (6B+G+101 Floors).
 Client: Sheffield Holdings Limited.
 Consultant: National Engineering Bureau-NEB.
 Main Contractor: TAV -Tepe Akeen Investment Construction & Operation.
 MEP Subcontractor: REMCO-Reliance Electro-Mechanical Contracting.
 Total Built Up Area: 1,656,800.00 Sq. Ft.
 Total Electric Load: 18 MW
 Total Construction Budget: AED 800,000,000.00 ($ 222, 000,000.00).
 MEP Budget: AED 200,000,000.00 ($ 55, 000,000.00).
 MEP Systems: 3600RT of Chillers plant, FF, WS, DR, BMS, LPG, filtration, Kitchen Hood, Central Hot Water,
Pools, CCTV, SMATV, Access Control, Public Address, BGM, Video Intercom, GRMS,BTU, Noise Control, etc.
 Website:vhttp://sheffieldholdings.com/web/public_projectdetails_view.htm
Safeer-1 & Safeer-2  Mar 2014 – 2016
Sr. Mechanical Engineer
Project Profile:
Running Projects:
Safeer-1 & Safeer-2 are residential buildings located in Business Bay; each tower contains
two basement, ground, Podium, 15 storeys and roof. Each building is adapted with
outdoor swimming pool; the project is being developed by Al Seeb Real Estate.
 Project: Safeer-1 & Safeer-2 each 2B+G+1P+15 Story Commercial and Residential
Buildings.
Safeer-1 Client: Al-Seeb Properties.
 Consultant: National Engineering Bureau-NEB
 Main Contractor: Al-Qabdah-QIC.
 MEP Subcontractor: Jalfar Star.
 Total Built Up Area Safeer-1: 271,000.00 Sq. Ft
 Total Built Up Area Safeer-1: 275,000.00 Sq. Ft
 Total Electric Load: 1.85 MW & 1.9 MW.
 Total Construction Budget Safeer-1: AED 57,730,000.00 ($ 16, 000,000.00)
 Total Construction Budget Safeer-2: AED 58,700,000.00 ($ 16,300,000.00)
 MEP Budget Safeer-1: AED 15,590,000.00 ($ 4, 300,000.00).
 MEP Budget Safeer-2: AED 16,200,000.00 ($ 4, 500,000.00).
 MEP Systems: 659RT &668RT of District Cooling Central AC System
(Empower), FF, WS, DR, LPG, CCTV, SMATV, Access Control, BGM, Public
Address, Intercom, Pool, etc.
 Website: http://www.dubai-businessbay.com/Business-Bay-Project/Business-
Bay/
Safeer-2
 Project: MARYLAND INTERNATIONAL 5 STARS- 4B+G+M+23
FLRS.+MECH+ROOF
 Client: Maryland International
 Consultant: National Engineering Bureau-NE
 Main Contractor: United Engineering Construction Co. L.L.C. (UNEC)
 MEP Consultant: Engineering Associates (PVT) LTD.
 MEP Subcontractor: Prime Star.
 Total Built Up Area: 488,196.70 Sq. Ft.
 Total Electric Load: 7360.5 Kw.
 Total Construction Budget
 MEP Budget
 MEP Systems: 2600RT Chiller Cooling Central AC System , FF, WS, DR, LPG,
CCTV, SMATV, Access Control, BGM, Public Address, Intercom, Pool, etc.
 Website:
Maryland Hotel 5 Stars
Al-Bateen Towers  Oct 2010 – Mar 2014
Sr. Mechanical Engineer
Project Completed Project Profile:
The Al Bateen Towers is a 2B+G+P+-49-storey luxury apartment rising to 209.6m (687.5 ft.)
height and a 2B+G+P+24-storey five-star Hilton Double Tree Hotel, the project was
designed to include swimming pools, landscaping, garden wall surround the ground floor
for protection furthermore business center, restaurants, health club, spa and beach club.
 Project: AL Bateen Jumeirah Towers @ JBR, Dubai, UAE.
o Tower 1 ( 2B+G+1F+49 Floor +M+ Roof ) Residential Tower
o Tower 2 (2B+G+1F+24 Floor +M+ Roof) Hilton Double Tree.
 Employer: H. H. Sheikh Hamdan Bin Zaed Al Nahyan.
 Client: M/s SEBA Real Estate.
 Developer: Al-Ain Properties.
 Consultant: National Engineering Bureau NEB.
 Contractor: Commodore Contracting Company CC
 MEP Subcontractor: MEP Commodore Contracting Co. LLC.
 Total Built Up Area: 1,303,829.00 Sq. Ft. approximately.
 Total Electric Load: 16 MW
 Total Construction Budget: AED 700,000,000.00 ($ 195, 000,000.00).
 MEP Budget: AED 140,000,000.00 ($ 39, 000,000.00).
 MEP Systems: 3600RT of District Cooling Central AC (Empower), FF,
WS, DR, BMS,LPG, Grey water treatment, filtration, Kitchen Hood,
Central Hot Water, Pools CCTV, SMATV, Access Control, Public
Address, BCM, Intercom, BTU, Noise Control etc.
 Website:http://www.solus4.com/portfolio/hospitality-residential/al-
bateen-tower-jumeirah-road-dubai
Mazaya Business Avenue Towers  Nov 2007 – Sep 2010
Sr. Mechanical Engineer
Project Profile:
Jumeirah Lakes Towers is a new self-sufficient and dynamic waterfront community
development aiming to respond to the continuous demand for strategically planned
districts in Dubai. Jumeirah Lakes Towers, also referred to as JLT, comprises of clusters of
tall towers that surround 4 man-made lakes. The total area covered by the project is
approximately 1.35 million sq. m., including the land and the 4 lakes.
Here, is a monument the business world can be proud of Mazaya Business Avenue, located
in JLT, and comprises of three commercial towers, each one rising to an imposing 45 storey.
 Project: Jumeriah Lake Towers Cluster AA1, BB1&BB2 Business Avenue Towers for
M/s Mazaya Business Avenue- (3 towers) 4B+G+M+3P+44+Mech-Offices &
commercial Buildings, JLT-PH2-AA1,BB1, BB2 Jumeirah Lake Towers, Dubai
 Client: Mazaya Real state.
 Consultant: National Engineering Bureau-NEB.
 Main Contractor: GCC-General Construction Company.
 MEP Subcontractor: Radiant
 Total Built Up Area: 3,350000 Sq. Ft. approximately.
 Total Construction Budget: AED 700,000000.00 ($ 195, 000,000.00).
 MEP Budget: AED 220,000000.00 ($ 61, 000,000.00).
Past Experience
Sr. Mechanical Engineer @ Elzahar-Civil & Environmental Engineering in ARE
Elzahar-Civil & Environmental Engineering in ARE,  Jan 2003 – Sep 2007
Duties & Responsibilities
•• Designs systems to meet process requirements, applying knowledge of engineering principles.
•• Oversees installation to ensure machines and equipment are installed and functioning according to
specifications.
•• Coordinates building, fabrication, and installation of product design, operation& maintenance, and repair
activities to utilize machines & equipment.
•• Specifies system components or directs modification of products to ensure conformance with engineering design
and performance specifications.
•• Ensuring the local authorities is being met.
•• Inspects, evaluates, and arranges field installations and recommends design modifications to eliminate machine
or system malfunctions
Project Completed
•• Under ground water tank in "Wady Almolak"-Ismaillia-Egypt.
•• Drainage Line System in El-Areesh Port includes:-
 Sewerage Pipe Line System  Pump Station.
 Ventilation Room.  Under Pressure Sewage Line.
•• Sewage Pump Station and Treatment Plant in Industry Area-Ismaillia-Egypt includes:-
 Water Treatment Plant.  Water Distribution Network.
 Pump Station.  Under Pressure Sewage Line.
•• Compact Treatment Plant in Sahle Eltena-North Sinae-Egypt.
•• El-Andalos Tower-Elarab District-Port Said-Egypt.
•• Zamam Tower-Elshark District-Port Said-Egypt.
•• High Class Towers-Elshark District-Port Said-Egypt.
Manager @ Technology Computer Center- TCC in ARE
•• Technology Computer Center- TCC in ARE,  Jan 1999 – Dec 2002
Project Completed
•• Jaguar Factory. •• Be’la Factory.
Mechanical Engineer
•• Houssam Trading Contracting Co., in KSA, Jan 1994 – Dec 1998
•• Port Said Government –ARE, Oct 1991 – Nov 1994
•• Eastmar Travel Co, in ARE, Sep 1988 – Feb 1990
•• Marine Sports Club in ARE,- Sep 1987 – Aug 1988
•• Cairo Trading & Contracting Co., ARE., Jun 1985 – Mar 1987
~ References Available Upon Request ~
 MEP Systems: 3000RT/each of District Cooling Central AC (PDC), FF, WS, DR,
BMS, LPG, filtration, CCTV, SMATV, AC, BTU, etc.
 Website: http://www.mazayabusinessave.com/index.html

More Related Content

What's hot (20)

James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
Steven's Resume 2015
Steven's Resume 2015Steven's Resume 2015
Steven's Resume 2015
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
AMR_SALAMA_CV
AMR_SALAMA_CVAMR_SALAMA_CV
AMR_SALAMA_CV
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
Resume Rafael Balboa
Resume  Rafael BalboaResume  Rafael Balboa
Resume Rafael Balboa
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016
 
Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016Narasimman Kuppusamy CV 2016
Narasimman Kuppusamy CV 2016
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
nestor
nestornestor
nestor
 

Similar to Youssef Altaweel- Resume -05-07-2016-

Similar to Youssef Altaweel- Resume -05-07-2016- (20)

CV Max KM
CV Max KMCV Max KM
CV Max KM
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
CV
CVCV
CV
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Tami_Strickland 8May15
Tami_Strickland 8May15Tami_Strickland 8May15
Tami_Strickland 8May15
 
Rishabh Resume
Rishabh ResumeRishabh Resume
Rishabh Resume
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15Mohammed Islam's Resume-05-20-15
Mohammed Islam's Resume-05-20-15
 
Robert Cahill Resume Pump Up
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
 
Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 
Ayman curriculum vitae2
Ayman curriculum vitae2Ayman curriculum vitae2
Ayman curriculum vitae2
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 

Youssef Altaweel- Resume -05-07-2016-

  • 1. Youssef Moustafa Altaweel Location: Dubai, UAE Contact: +971 50 9173017 Email: Youssef_2413@yahoo.com LinkedIn: https://www.linkedin.com/in/youssef-al-taweel Skype ID: Youssef.altaweel Date of Birth: November 6, 1959 MEP Manager/Senior Mechanical Engineer: Construction/ Oil & Gas/ Power Qualified MEP Engineer with over 30 years of experience across diverse organizations, seeking challenging senior managerial assignments with a reputed organization Executive Summary  Design, review design and supervise of high rise buildings for Mechanical Systems as per relevant authorities’ regulations (DCD, DEWA, DM, JAFZA, EHS, DTCM, etc.) furthermore national and international standards/ codes IPC,NPC,PESD,ASPE, ASHRAE, SMACNA, NFPA, ASME, ASTEM & BS, UAE Life &Safety Code,.  Knowledge of green buildings requirements through ESTEDAM & LEED guidelines in addition project contract conditions through FIDIC-editorial 1988 –further 1992 furthermore project managing through PMP revision-3.  Knowledge of standard specifications hotels’ guidelines for Double Tree Hilton, Hard Rock and IHG hotels  Design, review design and supervise high rise buildings Mechanical Systems such as HVAC, Drainage, Storm Water, Water Supply, Central Hot Water, Firefighting, water filtration, recycle grey water treatment, LPG system, kitchen hoods ventilation system, swimming pool station and irrigation landscaping.  Full knowledge of BMS based on project demands and requirements.  Adept at ensuring compliance to project specifications and quality procedures  Proven ability in evaluation of drawings, specifications, BOQ and highlighting discrepancies if any to superiors  Well versed in enhancing operational efficiency through effective resolution of snag points  Knowledge of international work cultures by virtue of regular interaction with Chinese and Emirati teams during multiple project implementations  Follow-up all what is new for the building’s systems development of artistic items or updated technical technique. Education •• B.Sc. Degree in Power Mechanical Engineering Faculty of Engineering Suez Canal University-Port Said, Egyp-1984 COURSES & TRANINGS •• PMP third edition-Chicago Management Training Institute-U.A.E-January, 2009. •• Microsoft Office, Microsoft Project, Primavera and Auto CAD-British Electronic Co.-A.R.E-2002 •• Introduction to Computer DOS and Basic Language-Computer Scientific Center-A.R.E-1991 •• Nile Cruiser "M/s RA" naval systems operation and maintenance in Dry Dock Yard -England-1989 •• Diesel marine engines operation and maintenance in Tempest Diesel Ltd.-Stamford-England-1985 Core Competencies MEP Systems Design/review • Code Compliance • Technical Solutions Project Management  Contract Negotiation  Client & Stakeholder Interaction  Bid/Proposal/Tendering  Payment Works  Infrastructure Works  Cost Estimation & Budget  FIDIC Knowledge  Vendor & Supplier Management  Procurement Management  Statutory Regulations  Team Leadership
  • 2. SEMINARS •• Single Stack Drainage Systems •• Insulation and Sustainable Energy •• Water conservation solution & Siphonic rainwater drainage system •• Improve Efficiency in Water and Wastewater Systems. •• Smoke Clearance, Car Parking Ventilation, CFD analysis &Explosion Proof Ventilation Systems (In MICO ITALIA S.P.A. Company ITALY). AREAS OF KNOWLEDGE AND EXPERTISE •• Design •• Review Design •• Supervising skills •• Standards Compliance •• Budgeting / Cost Control •• Team Leadership •• Contract Negotiations •• Planning & Scheduling •• Cost Engineering •• Risk Assessment •• Project Analysis. •• Efficiency Improvements •• Proposal Generation •• Baselines. •• Performance Management •• Program Management •• Progress Monitoring •• Risk Management Professional Affiliations •• Member of Egyptian Syndicate of Engineers. •• Member of Society of Engineers –UAE. •• Member of Marine Engineers Association in Alexandria-ARE. COMPUTER SKILLS Highly skilled with the following programs: •• AutoCAD 2014&15 (2d). •• HAP. •• MS PROJECT & Primavera 5. •• Windows XP, 7&8. •• Microsoft Office. •• IDCL Personal Details •• Date of Birth : 6th November, 1959 •• Languages Known : Arabic & English. •• Nationality : Egyptian. •• Address : Al-Kutbi Bld. Flat 506, Al-Nuaimiya, Ajman – UAE. •• Passport Details : A07690624 •• Visa Status : Work Visa OBJECTIVE Join as MEP Manager/Senior Mechanical Engineer in company that has vision for growth and advancement. I have extensive years of experience and knowledge at Senior/MEP Manager capacities, which I believe would be an asset to an organization that aims for progress. In the long term, I aim to reach my full potential and further my growth with your team that will factor in the firm’s advancement.
  • 3. Professional Experience Sr. Mechanical Engineer @ National Engineering Bureau (NEB) National Engineering Bureau (NEB), Architectural & Engineering Consultants, UAE  Novermber 2007 – till date Senior Mechanical Engineer Duties and Responsibilities: •• Review and verification designs for all buildings’ mechanical systems to ensure process requirements, applying knowledge of engineering principles. •• Alters or modifies design to obtain specified functional and operational performance. •• Assists drafter in developing structural design of product, using drafting tools or computer-assisted design/drafting equipment and software. •• Researches and analyzes data, such as customer design proposal, specifications, and manuals to determine feasibility of design or application. •• Managing the required design, prototyping and test activities in development of new tasks/work, including subcontract and supplier activities and creating as well as maintaining and organizing project documentation. •• Review for mechanical layout, design detailing and drafting, to challenge technical and approve final drawings of the same. •• Perform cost reduction measures and will also carry out relevant design analysis, using external expertise where required. •• Ability to design of systems incorporating pumps, compressors, heat exchangers, tanks, piping, firefighting system, water filtration, water treatment stations instrumentation and controls into the overall facility design. •• Review for design of piping and pipe support systems including material selection, Code calculations, stress analysis, etc., •• Review, study and report the BMS to ensure compliance with project services systems requirements. •• Ability to facilitate HVAC, in the project and control mechanical, plumbing and other related site works. •• Read specifications, such as blueprints and data, to ensure/determine project requirements. •• Ability to review B.O.Q for all facilities. •• Responsible for combining, evaluating, and reasoning with information and data to make decisions and solve problems. •• Responsible for evaluating information against a set of standards and verifying that it is correct. •• Responsible for conferring with Team members on site to discuss such matters as work procedures, complaints, and project finalization/foundation problems. •• Oversees installation to ensure machines and equipment are installed and functioning according to specifications. •• Inspect and review projects to monitor compliance with building and safety codes, and other regulations. •• Inspects, evaluates, and arranges field installations and recommends design modifications to eliminate machine or system malfunctions. •• Investigates systems failures and difficulties, diagnoses faulty operation, and makes recommendations to maintenance crew. •• Confers with establishment personnel and engineers to implement operating procedures and resolve system malfunctions, and to provide technical information/solution. •• Ability to ensure technical and professional accuracy of project work. •• Ability to deliver project work on time and within quality requirements. •• Communicates clearly and concisely; both orally and in writing. •• Responsible for Leading and managing a team of engineers. •• Ability to contribute to project team and to be a team player. •• Attend the site meetings to follow up the MEP issues. •• Approval of materials, shop drawings and samples. •• Managing the project progress & payment approval to the contractor accordingly. •• Coordination with designer MEP consultant. •• Coordination with client MEP staff. •• Ensure the local authorities requirements. •• Ensuring smooth handling over project to client or facility management agency after completion. •• Involved in evaluating project performance, managing budgets/ financials, maintaining project delivery schedules and other SLA parameters to enhance project profitability
  • 4. •• Coordinate with team members in maintaining construction schedule, budget and contingency across assigned projects involving earth works, culverts, infra structure, high rise, building works, power plant projects, piling works, coffer dam, dewatering system and textile mills •• Interact with design consultants for delivering construction documents; guide team members in processing tenders. Follow up with contractors and suppliers in effectively maintaining procurement schedules/ other quality parameters •• Evaluate data collated from project teams for producing appropriate project summary reports MARINA 101  Apr 2008 – 2016 Running Projects: Sr. Mechanical Engineer Project Profile: Marina 101 is an iconic structure that will ascend high above the rest of Dubai's fast changing skyline. Destined to be the world's tallest hotel and furnished apartments, Marina 101 is Sheffield Holdings Limited flagship brand and the unique project is designed of comprises 101 floors rising to 425 m (1,394 ft.) height and covering a built up area of approximately 1.65 million square feet. Be developing with an investment of over AED 1.2 billion. Hotel operator is Hard Rock International – owner of one of the world’s most iconic and recognized brands – along with Abu Dhabi Financial Group (ADFG), Hard Rock International will operate the first 33 floors of the tower which will be the hotel section, along with the 101st floor which will be converted in to a Hard Rock Café & Lounge with a 360 degree view of the city, Marina 101 is considered the second tallest building in the UAE after Burj Khalifa. Marina 101  Project: Marina101 Hotel & Residential Tower, Marsa Dubai, UAE. Plot No. : 392-207 (6B+G+101 Floors).  Client: Sheffield Holdings Limited.  Consultant: National Engineering Bureau-NEB.  Main Contractor: TAV -Tepe Akeen Investment Construction & Operation.  MEP Subcontractor: REMCO-Reliance Electro-Mechanical Contracting.  Total Built Up Area: 1,656,800.00 Sq. Ft.  Total Electric Load: 18 MW  Total Construction Budget: AED 800,000,000.00 ($ 222, 000,000.00).  MEP Budget: AED 200,000,000.00 ($ 55, 000,000.00).  MEP Systems: 3600RT of Chillers plant, FF, WS, DR, BMS, LPG, filtration, Kitchen Hood, Central Hot Water, Pools, CCTV, SMATV, Access Control, Public Address, BGM, Video Intercom, GRMS,BTU, Noise Control, etc.  Website:vhttp://sheffieldholdings.com/web/public_projectdetails_view.htm
  • 5. Safeer-1 & Safeer-2  Mar 2014 – 2016 Sr. Mechanical Engineer Project Profile: Running Projects: Safeer-1 & Safeer-2 are residential buildings located in Business Bay; each tower contains two basement, ground, Podium, 15 storeys and roof. Each building is adapted with outdoor swimming pool; the project is being developed by Al Seeb Real Estate.  Project: Safeer-1 & Safeer-2 each 2B+G+1P+15 Story Commercial and Residential Buildings. Safeer-1 Client: Al-Seeb Properties.  Consultant: National Engineering Bureau-NEB  Main Contractor: Al-Qabdah-QIC.  MEP Subcontractor: Jalfar Star.  Total Built Up Area Safeer-1: 271,000.00 Sq. Ft  Total Built Up Area Safeer-1: 275,000.00 Sq. Ft  Total Electric Load: 1.85 MW & 1.9 MW.  Total Construction Budget Safeer-1: AED 57,730,000.00 ($ 16, 000,000.00)  Total Construction Budget Safeer-2: AED 58,700,000.00 ($ 16,300,000.00)  MEP Budget Safeer-1: AED 15,590,000.00 ($ 4, 300,000.00).  MEP Budget Safeer-2: AED 16,200,000.00 ($ 4, 500,000.00).  MEP Systems: 659RT &668RT of District Cooling Central AC System (Empower), FF, WS, DR, LPG, CCTV, SMATV, Access Control, BGM, Public Address, Intercom, Pool, etc.  Website: http://www.dubai-businessbay.com/Business-Bay-Project/Business- Bay/ Safeer-2  Project: MARYLAND INTERNATIONAL 5 STARS- 4B+G+M+23 FLRS.+MECH+ROOF  Client: Maryland International  Consultant: National Engineering Bureau-NE  Main Contractor: United Engineering Construction Co. L.L.C. (UNEC)  MEP Consultant: Engineering Associates (PVT) LTD.  MEP Subcontractor: Prime Star.  Total Built Up Area: 488,196.70 Sq. Ft.  Total Electric Load: 7360.5 Kw.  Total Construction Budget  MEP Budget  MEP Systems: 2600RT Chiller Cooling Central AC System , FF, WS, DR, LPG, CCTV, SMATV, Access Control, BGM, Public Address, Intercom, Pool, etc.  Website: Maryland Hotel 5 Stars
  • 6. Al-Bateen Towers  Oct 2010 – Mar 2014 Sr. Mechanical Engineer Project Completed Project Profile: The Al Bateen Towers is a 2B+G+P+-49-storey luxury apartment rising to 209.6m (687.5 ft.) height and a 2B+G+P+24-storey five-star Hilton Double Tree Hotel, the project was designed to include swimming pools, landscaping, garden wall surround the ground floor for protection furthermore business center, restaurants, health club, spa and beach club.  Project: AL Bateen Jumeirah Towers @ JBR, Dubai, UAE. o Tower 1 ( 2B+G+1F+49 Floor +M+ Roof ) Residential Tower o Tower 2 (2B+G+1F+24 Floor +M+ Roof) Hilton Double Tree.  Employer: H. H. Sheikh Hamdan Bin Zaed Al Nahyan.  Client: M/s SEBA Real Estate.  Developer: Al-Ain Properties.  Consultant: National Engineering Bureau NEB.  Contractor: Commodore Contracting Company CC  MEP Subcontractor: MEP Commodore Contracting Co. LLC.  Total Built Up Area: 1,303,829.00 Sq. Ft. approximately.  Total Electric Load: 16 MW  Total Construction Budget: AED 700,000,000.00 ($ 195, 000,000.00).  MEP Budget: AED 140,000,000.00 ($ 39, 000,000.00).  MEP Systems: 3600RT of District Cooling Central AC (Empower), FF, WS, DR, BMS,LPG, Grey water treatment, filtration, Kitchen Hood, Central Hot Water, Pools CCTV, SMATV, Access Control, Public Address, BCM, Intercom, BTU, Noise Control etc.  Website:http://www.solus4.com/portfolio/hospitality-residential/al- bateen-tower-jumeirah-road-dubai Mazaya Business Avenue Towers  Nov 2007 – Sep 2010 Sr. Mechanical Engineer Project Profile: Jumeirah Lakes Towers is a new self-sufficient and dynamic waterfront community development aiming to respond to the continuous demand for strategically planned districts in Dubai. Jumeirah Lakes Towers, also referred to as JLT, comprises of clusters of tall towers that surround 4 man-made lakes. The total area covered by the project is approximately 1.35 million sq. m., including the land and the 4 lakes. Here, is a monument the business world can be proud of Mazaya Business Avenue, located in JLT, and comprises of three commercial towers, each one rising to an imposing 45 storey.  Project: Jumeriah Lake Towers Cluster AA1, BB1&BB2 Business Avenue Towers for M/s Mazaya Business Avenue- (3 towers) 4B+G+M+3P+44+Mech-Offices & commercial Buildings, JLT-PH2-AA1,BB1, BB2 Jumeirah Lake Towers, Dubai  Client: Mazaya Real state.  Consultant: National Engineering Bureau-NEB.  Main Contractor: GCC-General Construction Company.  MEP Subcontractor: Radiant  Total Built Up Area: 3,350000 Sq. Ft. approximately.  Total Construction Budget: AED 700,000000.00 ($ 195, 000,000.00).  MEP Budget: AED 220,000000.00 ($ 61, 000,000.00).
  • 7. Past Experience Sr. Mechanical Engineer @ Elzahar-Civil & Environmental Engineering in ARE Elzahar-Civil & Environmental Engineering in ARE,  Jan 2003 – Sep 2007 Duties & Responsibilities •• Designs systems to meet process requirements, applying knowledge of engineering principles. •• Oversees installation to ensure machines and equipment are installed and functioning according to specifications. •• Coordinates building, fabrication, and installation of product design, operation& maintenance, and repair activities to utilize machines & equipment. •• Specifies system components or directs modification of products to ensure conformance with engineering design and performance specifications. •• Ensuring the local authorities is being met. •• Inspects, evaluates, and arranges field installations and recommends design modifications to eliminate machine or system malfunctions Project Completed •• Under ground water tank in "Wady Almolak"-Ismaillia-Egypt. •• Drainage Line System in El-Areesh Port includes:-  Sewerage Pipe Line System  Pump Station.  Ventilation Room.  Under Pressure Sewage Line. •• Sewage Pump Station and Treatment Plant in Industry Area-Ismaillia-Egypt includes:-  Water Treatment Plant.  Water Distribution Network.  Pump Station.  Under Pressure Sewage Line. •• Compact Treatment Plant in Sahle Eltena-North Sinae-Egypt. •• El-Andalos Tower-Elarab District-Port Said-Egypt. •• Zamam Tower-Elshark District-Port Said-Egypt. •• High Class Towers-Elshark District-Port Said-Egypt. Manager @ Technology Computer Center- TCC in ARE •• Technology Computer Center- TCC in ARE,  Jan 1999 – Dec 2002 Project Completed •• Jaguar Factory. •• Be’la Factory. Mechanical Engineer •• Houssam Trading Contracting Co., in KSA, Jan 1994 – Dec 1998 •• Port Said Government –ARE, Oct 1991 – Nov 1994 •• Eastmar Travel Co, in ARE, Sep 1988 – Feb 1990 •• Marine Sports Club in ARE,- Sep 1987 – Aug 1988 •• Cairo Trading & Contracting Co., ARE., Jun 1985 – Mar 1987 ~ References Available Upon Request ~  MEP Systems: 3000RT/each of District Cooling Central AC (PDC), FF, WS, DR, BMS, LPG, filtration, CCTV, SMATV, AC, BTU, etc.  Website: http://www.mazayabusinessave.com/index.html