This chapter is for future as we start doing intensive water related agriculture. Flat primary canal 4 is proposed with the intention of utilizing the river Brahmaputra water to the land which is below 250 or 300 meters above the mean sea level. In this chapter the the 'proximal declining canal of flat primary canal 4' (primary canal 4) is mentioned.