AGGREGATE PLANNING
Dr Aarti Khanchandani
Assistant Professor
Lachoo Memorial College of Science and
Technology(Autonomous)
• Aggregate planning is a big picture approach to
production planning.
• It is a production plan to meet the demand throughout
the year.
• It is not concerned with individual products, but with a
single aggregate product representing all products.
• For example, in a TV manufacturing plant, the aggregate
planning does not go into all models and sizes. It only
deals with a single representative aggregate TV.
• All models are lumped together and represent a single
product; hence the term aggregate planning is used.
Aggregate Planning
Aggregate Planning
 A logical overall (aggregate) unit for
measuring sales and output
 A forecast of demand for an intermediate
planning period in these aggregate terms
 A method for determining the costs
 An aggregate planning strategy that
combines forecasts and costs so that
scheduling decisions can be made for the
planning period
Requirements for aggregate planning:
Planning Horizons
Figure 1
Long-range plans
(over one year)
Research and Development
New product plans
Capital investments
Facility location/expansion
Intermediate-range plans
(2 to 12 months)
Sales planning
Production planning and budgeting
Setting employment, inventory,
subcontracting levels
Analyzing operating plans
Short-range plans
(up to 3 months)
Job assignments
Ordering
Job scheduling
Dispatching
Overtime
Part-time help
Top
executives
Operations
managers
Operations
managers,
supervisors,
foremen
Responsibility Planning tasks and horizon
Aggregate Planning goals
• The objective of aggregate planning is to meet forecasted demand while minimizing total
cost over the planning period
• To optimize use of plant capacity for efficient operations and in consistent with
organization strategy.
• To keep employment stability where critical job skills are scarce.
• To develop feasible plans which are within the financial and in physical capacity of the
firm.
• To manage the changes in production management by planning for production resources
to adapt changing customer needs.
• To quickly react to sudden changes that happens in market demand.
Planning Horizon
Aggregate planning: Intermediate-range
capacity planning, usually covering 2 to 12 months.
The goal of aggregate planning is to achieve a
production plan that will effectively utilize the
organization’s resources to satisfy expected
demand.
Short
range
Intermediate
range
Long range
Now 2 months 1 Year
Example-FRITO LAYS
 More than three dozen brands, 15
brands sell more than $100 million
annually, 7 sell over $1 billion
 Planning processes covers 2 to 18
months
 Unique processes and specially
designed equipment
 High fixed costs require high volumes
of production and high utilization of
equipment
AGGREGATION
• Aggregation is important because it is not possible
to predict with accuracy the timing and volume of
demand for individual items
The ways to aggregate:
• Aggregate units of output per month
• Value of total monthly output
• Measures that relate to capacity such as labor
hours,machines hours etc.
Disaggregating the aggregate plan
• For example, televisions manufacturer may have an
aggregate plan that calls for 200 television in January, 300
in February, and 400 in March.
• This company produces 21, 26, and 29 inch TVs, therefore
this three-month aggregate plan must be translated into
specific numbers of TVs of each type (Master Schedule)
prior to actually purchasing the appropriate materials
and parts, scheduling operations, and planning inventory
requirements.
Aggregate Plan to Master
Schedule Jan Feb Mar.
200 300 400
Aggregate
Planning
Disaggregation
Master
Schedule
Aggregate
plan
Type Jan. Feb. Mar
21
inch
100 100 100
26
inch
75 150 200
29
inch
25 50 100
total 200 300 400
Master
schedule
Master scheduling
•The result of disaggregating the
aggregate plan is a master schedule
showing:
 the quantity and timing of specific
end items for a scheduled horizon,
which often covers about six to
eight weeks ahead.
Master Scheduling Process
Master
Scheduling
Beginning inventory
Forecast
Customer orders
Inputs Outputs
Projected inventory
Master Production Schedule
MPS
Uncommitted inventory
Aggregate Planning for Services
1. Most services can’t be inventoried
2. Demand for services is difficult to predict
(Some customers request prompt service or go
elsewhere, if there is a waiting line)
3. Capacity is also difficult to predict
4. Service capacity must be provided at the
appropriate place and time
5. Labor is usually the most constraining
resource for services
Process
• Preparation of product wise sales forecast that is indicating quantity's
to be sold in each time period.
• Preparation of aggregate demand for all individual products.
• Calculating labour,material ,machines and other elements of
production capacity.
• Selecting capacity plan from the alternatives that meets the objective
of organization
© 2011 Pearson Education, Inc. publishing as
Prentice Hall
Aggregate Planning Strategies
1. Level Production: Maintaining a steady rate of production while meeting
variations in demand by a combination of options
 Using part-timers, overtime, or idle time to absorb changes
 Using subcontractors and maintain a stable workforce
 Backordering, satisfying the demand of one period in one or more
periods later.
2. Chase Demand: Matching capacity to demand by keeping production in each
period equal to the expected demand for that period.
Thank you

More Related Content

What's hot

Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevensonPiyush Vanjani
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningKool Xah
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planningAhelVitsu
 
Ch14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningCh14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningvideoaakash15
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningsabin kafle
 
Aggregate Planning Report
Aggregate Planning ReportAggregate Planning Report
Aggregate Planning ReportDianne Rivera
 
Aggregate planning in class
Aggregate planning in classAggregate planning in class
Aggregate planning in classParmar Urvashi
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Aggregate planning in service
Aggregate planning in service Aggregate planning in service
Aggregate planning in service Ryan Shams
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate PlanningJoanmaines
 
Aggregate Planning
Aggregate Planning Aggregate Planning
Aggregate Planning Hriday Bora
 

What's hot (20)

Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevenson
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Master planning
Master planningMaster planning
Master planning
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planning
 
Ch14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningCh14 aggt.sales & op.planning
Ch14 aggt.sales & op.planning
 
Aggrigate planning copy
Aggrigate planning   copyAggrigate planning   copy
Aggrigate planning copy
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Om5
Om5Om5
Om5
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Aggregate Planning Report
Aggregate Planning ReportAggregate Planning Report
Aggregate Planning Report
 
Aggregate planning in class
Aggregate planning in classAggregate planning in class
Aggregate planning in class
 
Models of aggregate planning
Models of aggregate planningModels of aggregate planning
Models of aggregate planning
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate planning in service
Aggregate planning in service Aggregate planning in service
Aggregate planning in service
 
Opm101 chapter13 000
Opm101 chapter13 000Opm101 chapter13 000
Opm101 chapter13 000
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate Planning
 
Aggregate Planning
Aggregate Planning Aggregate Planning
Aggregate Planning
 

Similar to Aggregate planning

OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfChunWan
 
aggregate planning.ppt
aggregate planning.pptaggregate planning.ppt
aggregate planning.pptShitalVyas3
 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Aishwarya Phalke
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planningmubarak2009
 
Production management
Production managementProduction management
Production managementPurnesh Aloni
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesFellowBuddy.com
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.pptDarrajBrahim1
 
Bba 1584 planning n forecasting
Bba 1584 planning n forecastingBba 1584 planning n forecasting
Bba 1584 planning n forecastinglecturer-notes2014
 
AGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxAGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxVANJIECATILO1
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chainMoine Iqbal
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planningUmar Yazdani
 
APP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAPP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAkshatTiwari96
 
Budget Classification
Budget ClassificationBudget Classification
Budget ClassificationKundan Ganvir
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and schedulingMRPeasy
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 

Similar to Aggregate planning (20)

OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
 
aggregate planning.ppt
aggregate planning.pptaggregate planning.ppt
aggregate planning.ppt
 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement
 
Session 4
Session 4Session 4
Session 4
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Production management
Production managementProduction management
Production management
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture Notes
 
06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt06.999999999999999999 Aggregate Planning.ppt
06.999999999999999999 Aggregate Planning.ppt
 
Bba 1584 planning n forecasting
Bba 1584 planning n forecastingBba 1584 planning n forecasting
Bba 1584 planning n forecasting
 
AGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxAGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptx
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chain
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
APP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptxAPP_MPS_ATP_QUALITY.pptx
APP_MPS_ATP_QUALITY.pptx
 
Budget Classification
Budget ClassificationBudget Classification
Budget Classification
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and scheduling
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 

Recently uploaded

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Recently uploaded (20)

Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 

Aggregate planning

  • 1. AGGREGATE PLANNING Dr Aarti Khanchandani Assistant Professor Lachoo Memorial College of Science and Technology(Autonomous)
  • 2. • Aggregate planning is a big picture approach to production planning. • It is a production plan to meet the demand throughout the year. • It is not concerned with individual products, but with a single aggregate product representing all products. • For example, in a TV manufacturing plant, the aggregate planning does not go into all models and sizes. It only deals with a single representative aggregate TV. • All models are lumped together and represent a single product; hence the term aggregate planning is used. Aggregate Planning
  • 3. Aggregate Planning  A logical overall (aggregate) unit for measuring sales and output  A forecast of demand for an intermediate planning period in these aggregate terms  A method for determining the costs  An aggregate planning strategy that combines forecasts and costs so that scheduling decisions can be made for the planning period Requirements for aggregate planning:
  • 4. Planning Horizons Figure 1 Long-range plans (over one year) Research and Development New product plans Capital investments Facility location/expansion Intermediate-range plans (2 to 12 months) Sales planning Production planning and budgeting Setting employment, inventory, subcontracting levels Analyzing operating plans Short-range plans (up to 3 months) Job assignments Ordering Job scheduling Dispatching Overtime Part-time help Top executives Operations managers Operations managers, supervisors, foremen Responsibility Planning tasks and horizon
  • 5. Aggregate Planning goals • The objective of aggregate planning is to meet forecasted demand while minimizing total cost over the planning period • To optimize use of plant capacity for efficient operations and in consistent with organization strategy. • To keep employment stability where critical job skills are scarce. • To develop feasible plans which are within the financial and in physical capacity of the firm. • To manage the changes in production management by planning for production resources to adapt changing customer needs. • To quickly react to sudden changes that happens in market demand.
  • 6. Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12 months. The goal of aggregate planning is to achieve a production plan that will effectively utilize the organization’s resources to satisfy expected demand. Short range Intermediate range Long range Now 2 months 1 Year
  • 7. Example-FRITO LAYS  More than three dozen brands, 15 brands sell more than $100 million annually, 7 sell over $1 billion  Planning processes covers 2 to 18 months  Unique processes and specially designed equipment  High fixed costs require high volumes of production and high utilization of equipment
  • 8. AGGREGATION • Aggregation is important because it is not possible to predict with accuracy the timing and volume of demand for individual items The ways to aggregate: • Aggregate units of output per month • Value of total monthly output • Measures that relate to capacity such as labor hours,machines hours etc.
  • 9. Disaggregating the aggregate plan • For example, televisions manufacturer may have an aggregate plan that calls for 200 television in January, 300 in February, and 400 in March. • This company produces 21, 26, and 29 inch TVs, therefore this three-month aggregate plan must be translated into specific numbers of TVs of each type (Master Schedule) prior to actually purchasing the appropriate materials and parts, scheduling operations, and planning inventory requirements.
  • 10. Aggregate Plan to Master Schedule Jan Feb Mar. 200 300 400 Aggregate Planning Disaggregation Master Schedule Aggregate plan Type Jan. Feb. Mar 21 inch 100 100 100 26 inch 75 150 200 29 inch 25 50 100 total 200 300 400 Master schedule
  • 11. Master scheduling •The result of disaggregating the aggregate plan is a master schedule showing:  the quantity and timing of specific end items for a scheduled horizon, which often covers about six to eight weeks ahead.
  • 12. Master Scheduling Process Master Scheduling Beginning inventory Forecast Customer orders Inputs Outputs Projected inventory Master Production Schedule MPS Uncommitted inventory
  • 13. Aggregate Planning for Services 1. Most services can’t be inventoried 2. Demand for services is difficult to predict (Some customers request prompt service or go elsewhere, if there is a waiting line) 3. Capacity is also difficult to predict 4. Service capacity must be provided at the appropriate place and time 5. Labor is usually the most constraining resource for services
  • 14. Process • Preparation of product wise sales forecast that is indicating quantity's to be sold in each time period. • Preparation of aggregate demand for all individual products. • Calculating labour,material ,machines and other elements of production capacity. • Selecting capacity plan from the alternatives that meets the objective of organization
  • 15. © 2011 Pearson Education, Inc. publishing as Prentice Hall Aggregate Planning Strategies 1. Level Production: Maintaining a steady rate of production while meeting variations in demand by a combination of options  Using part-timers, overtime, or idle time to absorb changes  Using subcontractors and maintain a stable workforce  Backordering, satisfying the demand of one period in one or more periods later. 2. Chase Demand: Matching capacity to demand by keeping production in each period equal to the expected demand for that period.