WHAT IS THE DIFFERENCE BETWEEN
PRODUCTION PLANNING AND
SCHEDULING?
The difference between production planning and production scheduling. They
have similar concepts, however, there are slight differences between them.
Planning and scheduling are similar concepts. However, there are slight differences between
them.
The resources needed for production planning and scheduling are:
• Material
• People
• Machinery, equipment.
• Energy
• Management
Intro
The first four elements of the previous list are material assets.
The management is the brain that defines how to convert the raw materials into final
products. It is the “software” of the company, in other words, the way of performing
activities. We can add that two companies producing similar articles can have different ways
of doing (or production processes).
Through management, the first four elements will be combined in the most efficient way to
make finished goods.
Production planning involves the whole manufacturing process on a high level in order to
produce finished goods. By planning it is possible to describe the whole map, which goes
over all the resources to the final products.
The production planning balances the resources and the demand.
• Quantities to produce per family of products
• Desired inventory levels
• Resources to use per period
• Investments necessary to match capacity and volume demand
The time horizon is from 6 months to 3 years and involves the top management. The
planning buckets, the smallest unit of time that is looked at, are by weeks or months.
Production planning
Let’s see below in more detailed the required inputs for making a proper production plan:
• Bill of Materials: the broken down list of components and subcomponents that make the
final product.
• The availability of items in stock: Sometimes it is necessary to activate purchasing;
sometimes they are already on hand.
• Cost of resources, to produce items in compliance with quality needs.
• Lot sizes involving the frequency and the proper volume to have the right quantity on
hand. It prevents the organization to fall down into stock-out or excess of stock.
• The manufacturing lead time, which means the time that production takes to convert the
raw material into finished goods.
Components of the production planning
To give a simple example in the daily life, you can assume you are making a cake. You will
need:
• The ingredients you combine to make a cake (the bill of materials or BOM)
• The ingredients you already have at home (Stock on hand)
• The ingredients you need to buy (Purchasing)
• How much will the preparation cost? (The cost of resources)
• How many kg of ingredients and when do you need them? (The frequency and lot sizes)
• How long will it take to produce the cake to fulfill all the guests? (The lead time)
The next step involves the internal combination of resources to produce the final items.
Following the cake example would be the way of cooking it.
Components of the production planning
Production scheduling is more detailed oriented in comparison to the production planning. It is also the
next step going from general to detail. The time horizon is shorter than the production plan and also it
has a higher level of detail:
• It defines the production quantities of single finished products or SKUs, instead of product families.
• It defines who or which machine will produce every single SKUs.
• The time horizon is shorter and more detailed, between one month and one year, depending the
industry and management type.
• The planning buckets could be as short as hours or minutes.
• It defines the inventory level of single finished products or SKUs, instead of product families
• It requires a higher review frequency of middle management and “touches” more the shop-floor
Production scheduling
After production planning, the next step is to create a detailed production schedule.
The goal is to schedule every single operation a certain time in the calendar, assign the resources and
workers, and plan all the detailed steps:
It is not a forecast, but it needs to see the future and to get the appropriate resources in time. It is a
bridge between production planning and the actual production and it helps to get the necessary
resources in a wise time manner.
Production scheduling
• Identify and get the appropriate amount of workers.
• Identify and get the appropriate raw materials.
• Identify and assign appropriate machinery and equipment.
• Synchronize effectively all the resources to define priorities and reach customer needs.
As you will see, in both stages it is important to consider that resources are finite. The purpose is to
combine the limiting resources to get the final products in the most effective way. The planning steps look
at when something could be made in general, the scheduling step looks at how something will be made
happen in detail.
Production scheduling
Let’s say your organization sells a variety of chips to the market. The operational team will
start preparing the production plan and, at this stage, they will define:
1. The volume of chips they expect to sell within one year.
2. The capacity of ovens, fryers, bag makers, etc. necessary to sustain the sales volumes
every month.
3. The infrastructure (layout, space, equipment, pallets, forklifts, tools) necessary to
operate without bottlenecks.
4. The number of workers and skills necessary to operate the machinery.
Production planning and scheduling
example
5. The number of shifts available and needed during the year.
6. The desired inventory levels of flour, oil, salt, additives, water, potatoes, corn,
packaging and other raw material at the beginning and end of every month.
7. The expected amount of tons and units necessary in the finished good
warehouse at the beginning and end of every month to sustain the
throughput.
Production planning and scheduling
example
Following the chips company example, the company will proceed to the next stage: production
scheduling. At this stage, the following questions will be answered:
• Which machine will be running every shift, day and week?
• Who is going to operate each machine every shift, day and week?
• What is the necessary amount of ingredients, when they must arrive, when they must be
ordered?
Production planning and scheduling
example
It is important to remark that both are necessary: production planning and production
scheduling. Production planning is the natural first step and production scheduling goes next.
Thanks to them it is possible to get an accurate production schedule and suitable production
control. Finally, production activity will provide the actual volumes and results and will feed back
to both processes.
Production planning and scheduling
example
https://manufacturing-software-blog.mrpeasy.com/what-is-the-
difference-between-production-planning-and-scheduling/
https://www.mrpeasy.com/

More Related Content

What's hot

material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)Dipesh Pandey
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Viany Adriana
 
Bill of material
Bill of materialBill of material
Bill of materialBhaskar Das
 
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...Ahmad Hassan
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrpArisha Jamil
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planningRajeev Sharan
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planningajithsrc
 
Lecture 14 Farm Inventory
Lecture 14 Farm InventoryLecture 14 Farm Inventory
Lecture 14 Farm InventoryB SWAMINATHAN
 
Lecture 01 Introduction to Production Economics
Lecture 01   Introduction to Production EconomicsLecture 01   Introduction to Production Economics
Lecture 01 Introduction to Production EconomicsB SWAMINATHAN
 
Inventory control and recent trends in ppc
Inventory control and recent trends in ppcInventory control and recent trends in ppc
Inventory control and recent trends in ppcMohanKirthik
 
Material requirements planning and manufacturing resource planning difference
Material requirements planning and manufacturing resource planning differenceMaterial requirements planning and manufacturing resource planning difference
Material requirements planning and manufacturing resource planning differenceMRPeasy
 

What's hot (17)

material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
MRP 1&2
MRP 1&2MRP 1&2
MRP 1&2
 
Bill of material
Bill of materialBill of material
Bill of material
 
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...
| Managerial Accounting | Chapter 8 | Master Budgeting | Introduction to Mana...
 
Production planning & mrp
Production planning & mrpProduction planning & mrp
Production planning & mrp
 
Inventory Control
Inventory ControlInventory Control
Inventory Control
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
SudiptaKar_CV
SudiptaKar_CVSudiptaKar_CV
SudiptaKar_CV
 
Lecture 14 Farm Inventory
Lecture 14 Farm InventoryLecture 14 Farm Inventory
Lecture 14 Farm Inventory
 
Lecture 01 Introduction to Production Economics
Lecture 01   Introduction to Production EconomicsLecture 01   Introduction to Production Economics
Lecture 01 Introduction to Production Economics
 
Inventory control and recent trends in ppc
Inventory control and recent trends in ppcInventory control and recent trends in ppc
Inventory control and recent trends in ppc
 
Material requirements planning and manufacturing resource planning difference
Material requirements planning and manufacturing resource planning differenceMaterial requirements planning and manufacturing resource planning difference
Material requirements planning and manufacturing resource planning difference
 

Similar to What is the difference between production planning and scheduling

Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aRai University
 
CLO31(1).pptx
CLO31(1).pptxCLO31(1).pptx
CLO31(1).pptxshaikha65
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLAttiMurugan
 
production planning and control
production planning and controlproduction planning and control
production planning and controlReshma Babu
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptxIbrahimFakkad
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
AGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxAGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxVANJIECATILO1
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptNittamallik216
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemmefelizmessiento2022
 
production planning & control
production planning & controlproduction planning & control
production planning & controlDeepshikha
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingTabassumShaikh36
 
Production Management.pdf
Production Management.pdfProduction Management.pdf
Production Management.pdfKanwalIjazButt
 

Similar to What is the difference between production planning and scheduling (20)

Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
CLO31(1).pptx
CLO31(1).pptxCLO31(1).pptx
CLO31(1).pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
PPC and functions of PPC.pptx
PPC and functions of PPC.pptxPPC and functions of PPC.pptx
PPC and functions of PPC.pptx
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
Pm1
Pm1Pm1
Pm1
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
AGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptxAGGREGATE PLANNING AND MRP.pptx
AGGREGATE PLANNING AND MRP.pptx
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme
 
production planning & control
production planning & controlproduction planning & control
production planning & control
 
Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
 
Production Management.pdf
Production Management.pdfProduction Management.pdf
Production Management.pdf
 

More from MRPeasy

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingMRPeasy
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemMRPeasy
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningMRPeasy
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?MRPeasy
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseMRPeasy
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyMRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?MRPeasy
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyMRPeasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing newsMRPeasy
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?MRPeasy
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing newsMRPeasy
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing newsMRPeasy
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing newsMRPeasy
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing processMRPeasy
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing newsMRPeasy
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing newsMRPeasy
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate itMRPeasy
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing newsMRPeasy
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryMRPeasy
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing newsMRPeasy
 

More from MRPeasy (20)

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory tracking
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouse
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing news
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing news
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing news
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing news
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing news
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing news
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate it
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing news
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the Industry
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing news
 

Recently uploaded

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 

Recently uploaded (20)

RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

What is the difference between production planning and scheduling

  • 1. WHAT IS THE DIFFERENCE BETWEEN PRODUCTION PLANNING AND SCHEDULING?
  • 2. The difference between production planning and production scheduling. They have similar concepts, however, there are slight differences between them.
  • 3. Planning and scheduling are similar concepts. However, there are slight differences between them. The resources needed for production planning and scheduling are: • Material • People • Machinery, equipment. • Energy • Management Intro
  • 4. The first four elements of the previous list are material assets. The management is the brain that defines how to convert the raw materials into final products. It is the “software” of the company, in other words, the way of performing activities. We can add that two companies producing similar articles can have different ways of doing (or production processes). Through management, the first four elements will be combined in the most efficient way to make finished goods.
  • 5. Production planning involves the whole manufacturing process on a high level in order to produce finished goods. By planning it is possible to describe the whole map, which goes over all the resources to the final products. The production planning balances the resources and the demand. • Quantities to produce per family of products • Desired inventory levels • Resources to use per period • Investments necessary to match capacity and volume demand The time horizon is from 6 months to 3 years and involves the top management. The planning buckets, the smallest unit of time that is looked at, are by weeks or months. Production planning
  • 6. Let’s see below in more detailed the required inputs for making a proper production plan: • Bill of Materials: the broken down list of components and subcomponents that make the final product. • The availability of items in stock: Sometimes it is necessary to activate purchasing; sometimes they are already on hand. • Cost of resources, to produce items in compliance with quality needs. • Lot sizes involving the frequency and the proper volume to have the right quantity on hand. It prevents the organization to fall down into stock-out or excess of stock. • The manufacturing lead time, which means the time that production takes to convert the raw material into finished goods. Components of the production planning
  • 7. To give a simple example in the daily life, you can assume you are making a cake. You will need: • The ingredients you combine to make a cake (the bill of materials or BOM) • The ingredients you already have at home (Stock on hand) • The ingredients you need to buy (Purchasing) • How much will the preparation cost? (The cost of resources) • How many kg of ingredients and when do you need them? (The frequency and lot sizes) • How long will it take to produce the cake to fulfill all the guests? (The lead time) The next step involves the internal combination of resources to produce the final items. Following the cake example would be the way of cooking it. Components of the production planning
  • 8. Production scheduling is more detailed oriented in comparison to the production planning. It is also the next step going from general to detail. The time horizon is shorter than the production plan and also it has a higher level of detail: • It defines the production quantities of single finished products or SKUs, instead of product families. • It defines who or which machine will produce every single SKUs. • The time horizon is shorter and more detailed, between one month and one year, depending the industry and management type. • The planning buckets could be as short as hours or minutes. • It defines the inventory level of single finished products or SKUs, instead of product families • It requires a higher review frequency of middle management and “touches” more the shop-floor Production scheduling
  • 9. After production planning, the next step is to create a detailed production schedule. The goal is to schedule every single operation a certain time in the calendar, assign the resources and workers, and plan all the detailed steps: It is not a forecast, but it needs to see the future and to get the appropriate resources in time. It is a bridge between production planning and the actual production and it helps to get the necessary resources in a wise time manner. Production scheduling
  • 10. • Identify and get the appropriate amount of workers. • Identify and get the appropriate raw materials. • Identify and assign appropriate machinery and equipment. • Synchronize effectively all the resources to define priorities and reach customer needs. As you will see, in both stages it is important to consider that resources are finite. The purpose is to combine the limiting resources to get the final products in the most effective way. The planning steps look at when something could be made in general, the scheduling step looks at how something will be made happen in detail. Production scheduling
  • 11. Let’s say your organization sells a variety of chips to the market. The operational team will start preparing the production plan and, at this stage, they will define: 1. The volume of chips they expect to sell within one year. 2. The capacity of ovens, fryers, bag makers, etc. necessary to sustain the sales volumes every month. 3. The infrastructure (layout, space, equipment, pallets, forklifts, tools) necessary to operate without bottlenecks. 4. The number of workers and skills necessary to operate the machinery. Production planning and scheduling example
  • 12. 5. The number of shifts available and needed during the year. 6. The desired inventory levels of flour, oil, salt, additives, water, potatoes, corn, packaging and other raw material at the beginning and end of every month. 7. The expected amount of tons and units necessary in the finished good warehouse at the beginning and end of every month to sustain the throughput. Production planning and scheduling example
  • 13. Following the chips company example, the company will proceed to the next stage: production scheduling. At this stage, the following questions will be answered: • Which machine will be running every shift, day and week? • Who is going to operate each machine every shift, day and week? • What is the necessary amount of ingredients, when they must arrive, when they must be ordered? Production planning and scheduling example
  • 14. It is important to remark that both are necessary: production planning and production scheduling. Production planning is the natural first step and production scheduling goes next. Thanks to them it is possible to get an accurate production schedule and suitable production control. Finally, production activity will provide the actual volumes and results and will feed back to both processes. Production planning and scheduling example
  • 15.