PROCUREMENT PROJECT MANAGEMENT
Procurement Plan of the major and minor capital equipment category procurements (~$60m)
Fixed Equipment
Minor Mount outside of wall and only requires blocking locations
Minor Mount inside wall and / or requires utilities
Major Mount / Installation Investment Equipment
(Long Lead Time Eng./Stake holders involvement)
Required Competitive Bid, Contractor Install, Retainage / Bonds / AIA Contracts
Determine 3 year planning scheduling and complete coordination for integration with
Facilities (Const & Eng.), Clinical Eng. (IT), Stake Holders (Departments) and Receiving
5 floor building project.
12+ Departments
950+ rooms
600+ items
Interdepartmental coordination of equipment definition, Bidding and Budgetary reporting.
Contracting Major Equipment and services under project funded under HUD guidelines,
from supplier development to execution.
Working with, and presenting to Purchasing staff, development of new processes and procedures.
Process flow development with multiple department managers, integrating, implementing
and presenting effective methodology.
PROJECT 3 YEAR SCHEDULE MANAGEMENT
PROCUREMENT PROJECT MANAGEMENT
CONSTRUCTION ENGINEERING ACTIVITIES
* Supporting facilities department in product and source validation, cost reporting
reductions, architectural drawing validation for construction engineering.
Instrumental in spend savings $3m in $52m equipment procurements.
•Contracting Major Equipment and services using Architect Drawings and
Specifications, matched to Supplier Drawings/ Cut sheets to validate correct
installations, or request change orders to Supplier (Modify Standard Equipment) or
Construction Engineering for Drawing Change Orders.
•Project management of the Capital Equipment Procurement
~$60,000,000 with HUD Guaranteed Loan
•Facilities integration with Construction
Engineering and Contractors Schedules,
Under HUD Guidelines, Risk Managements
Approvals and AMC & OSHA Rules.
•Scheduled with Departments and small receiving dock
achieving just in time delivery for 95%+ of all deliveries.
*Instrumental in spend savings $3m in $52m,
equipment procurements with detailed tracking
(linked Spreadsheets) and biweekly reporting.
•Working with, and presenting to Purchasing staff,
and upper management (Director & VP Levels)
development of new processes and procedures.
•Process flow development with multiple department
managers, integrating, implementing and
presenting effective methodology.
PROCUREMENT PROJECT
MANAGEMENT
BUDGET / FINANCE
ACTIVITIES
PROCUREMENT PROJECT MANAGEMENT
CREATED AND IMPLEMENTED AND END TO END FULL
PROCESS MAPPING WITH APPROVAL PACKAGES
PROCUREMENT PROJECT MANAGEMENT
CREATED AND IMPLEMENTED AND END TO END FULL
PROCESS MAPPING WITH APPROVAL PACKAGES
PROCUREMENT PROJECT MANAGEMENT
CREATED AND IMPLEMENTED AND END TO END FULL
PROCESS MAPPING WITH APPROVAL PACKAGES
PROCUREMENT PROJECT MANAGEMENT
CREATED AND IMPLEMENTED AND END TO END FULL
PROCESS MAPPING WITH APPROVAL PACKAGES

More Related Content

What's hot (19)

ARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTERARCADIO CAMACARO RESUME FEB 2016 MASTER
ARCADIO CAMACARO RESUME FEB 2016 MASTER
 
Chazapis cx for better buildings rev2
Chazapis cx for better buildings   rev2Chazapis cx for better buildings   rev2
Chazapis cx for better buildings rev2
 
Smart Plan
Smart PlanSmart Plan
Smart Plan
 
Excerpts From Milestone Review Forest Products Client
Excerpts From Milestone Review Forest Products ClientExcerpts From Milestone Review Forest Products Client
Excerpts From Milestone Review Forest Products Client
 
Marthandam, vikram
Marthandam, vikramMarthandam, vikram
Marthandam, vikram
 
Session 9 4th edition PMP
Session 9 4th edition PMPSession 9 4th edition PMP
Session 9 4th edition PMP
 
The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).The Golden Circle (Why, How, What P.P.R.).
The Golden Circle (Why, How, What P.P.R.).
 
Anand B S - CV
Anand B S - CVAnand B S - CV
Anand B S - CV
 
Naveen HVAC
Naveen HVACNaveen HVAC
Naveen HVAC
 
Strategic project integration
Strategic project integrationStrategic project integration
Strategic project integration
 
Honeywell Experience
Honeywell ExperienceHoneywell Experience
Honeywell Experience
 
Presentation Relating to Earned Value
Presentation Relating to Earned ValuePresentation Relating to Earned Value
Presentation Relating to Earned Value
 
Construction of a General Cargo Vessel
Construction of a General Cargo VesselConstruction of a General Cargo Vessel
Construction of a General Cargo Vessel
 
Resume 2015-CF 10 yr
Resume 2015-CF 10 yrResume 2015-CF 10 yr
Resume 2015-CF 10 yr
 
RESUME 001rev
RESUME 001revRESUME 001rev
RESUME 001rev
 
JD-AKTOR
JD-AKTORJD-AKTOR
JD-AKTOR
 
Fang, Eric
Fang, EricFang, Eric
Fang, Eric
 
Sai vivek goud
Sai vivek goudSai vivek goud
Sai vivek goud
 
Natasha bishop cv application 09072019_li
Natasha bishop cv application 09072019_liNatasha bishop cv application 09072019_li
Natasha bishop cv application 09072019_li
 

Viewers also liked

NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012Island Health
 
Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Island Health
 
Investing in Nigeria with Homestrings: Healthcare project by Crystal Thorpe
Investing in Nigeria with Homestrings: Healthcare project by Crystal ThorpeInvesting in Nigeria with Homestrings: Healthcare project by Crystal Thorpe
Investing in Nigeria with Homestrings: Healthcare project by Crystal ThorpeHomestrings
 
NIHP VIHA Board Presentation
NIHP VIHA Board PresentationNIHP VIHA Board Presentation
NIHP VIHA Board PresentationIsland Health
 
Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Island Health
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyAusrine Rakauskaite
 
Campbell River Community Meeting June 3, 2013
Campbell River Community Meeting June 3, 2013Campbell River Community Meeting June 3, 2013
Campbell River Community Meeting June 3, 2013Island Health
 
The Expansive Hospital Game
The Expansive Hospital GameThe Expansive Hospital Game
The Expansive Hospital GameUTFPR
 
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013Comox Strathcona Regional Hospital District Presentation Mar 14, 2013
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013Island Health
 
Community presentation 20150326 3.26.201
Community presentation 20150326 3.26.201Community presentation 20150326 3.26.201
Community presentation 20150326 3.26.201TAYLOR_Arch
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationIsland Health
 
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...PMI Cameroon Chapter
 
Q&A Campbell River Hospital
Q&A Campbell River HospitalQ&A Campbell River Hospital
Q&A Campbell River HospitalIsland Health
 
Comox Valley Community Information Meeting presentation Sept. 16, 2014
Comox Valley Community Information Meeting presentation Sept. 16, 2014Comox Valley Community Information Meeting presentation Sept. 16, 2014
Comox Valley Community Information Meeting presentation Sept. 16, 2014Island Health
 
Campbell River Community Information Meeting presentation Sept. 9, 2014
Campbell River Community Information Meeting presentation Sept. 9, 2014Campbell River Community Information Meeting presentation Sept. 9, 2014
Campbell River Community Information Meeting presentation Sept. 9, 2014Island Health
 
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014Island Health
 
Campbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationCampbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationIsland Health
 
How Sweco creates operationally high performance buildings and reduce client...
How Sweco creates  operationally high performance buildings and reduce client...How Sweco creates  operationally high performance buildings and reduce client...
How Sweco creates operationally high performance buildings and reduce client...Carita Kottila
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 

Viewers also liked (20)

NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012NIHP City of Courtenay Council Presentation-May 2012
NIHP City of Courtenay Council Presentation-May 2012
 
Langlade case study
Langlade case studyLanglade case study
Langlade case study
 
Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014Campbell River Community Information Meeting presentation Sept. 18, 2014
Campbell River Community Information Meeting presentation Sept. 18, 2014
 
Investing in Nigeria with Homestrings: Healthcare project by Crystal Thorpe
Investing in Nigeria with Homestrings: Healthcare project by Crystal ThorpeInvesting in Nigeria with Homestrings: Healthcare project by Crystal Thorpe
Investing in Nigeria with Homestrings: Healthcare project by Crystal Thorpe
 
NIHP VIHA Board Presentation
NIHP VIHA Board PresentationNIHP VIHA Board Presentation
NIHP VIHA Board Presentation
 
Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook County
 
Campbell River Community Meeting June 3, 2013
Campbell River Community Meeting June 3, 2013Campbell River Community Meeting June 3, 2013
Campbell River Community Meeting June 3, 2013
 
The Expansive Hospital Game
The Expansive Hospital GameThe Expansive Hospital Game
The Expansive Hospital Game
 
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013Comox Strathcona Regional Hospital District Presentation Mar 14, 2013
Comox Strathcona Regional Hospital District Presentation Mar 14, 2013
 
Community presentation 20150326 3.26.201
Community presentation 20150326 3.26.201Community presentation 20150326 3.26.201
Community presentation 20150326 3.26.201
 
Campbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce PresentationCampbell River Chamber of Commerce Presentation
Campbell River Chamber of Commerce Presentation
 
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...
PMI Cameroon Chapter: Management des risques dans les projets par MAMA NDJANA...
 
Q&A Campbell River Hospital
Q&A Campbell River HospitalQ&A Campbell River Hospital
Q&A Campbell River Hospital
 
Comox Valley Community Information Meeting presentation Sept. 16, 2014
Comox Valley Community Information Meeting presentation Sept. 16, 2014Comox Valley Community Information Meeting presentation Sept. 16, 2014
Comox Valley Community Information Meeting presentation Sept. 16, 2014
 
Campbell River Community Information Meeting presentation Sept. 9, 2014
Campbell River Community Information Meeting presentation Sept. 9, 2014Campbell River Community Information Meeting presentation Sept. 9, 2014
Campbell River Community Information Meeting presentation Sept. 9, 2014
 
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014
NIHP Campbell River Community Information Meeting presentation, Dec. 4, 2014
 
Campbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentationCampbell River Community Information Meeting presentation
Campbell River Community Information Meeting presentation
 
How Sweco creates operationally high performance buildings and reduce client...
How Sweco creates  operationally high performance buildings and reduce client...How Sweco creates  operationally high performance buildings and reduce client...
How Sweco creates operationally high performance buildings and reduce client...
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 

Similar to Albany Medical Center Hospital PROJECT MANAGEMENT

T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016Terrell Story
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndy Taylor
 
Nihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal kamal
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01petch phanpha
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxChandrasen Sharma
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham
 
Compliance_Manager_C.V.
Compliance_Manager_C.V.Compliance_Manager_C.V.
Compliance_Manager_C.V.Douglas Lee
 
WoodResume_December_2015
WoodResume_December_2015WoodResume_December_2015
WoodResume_December_2015Wood Noel
 
Jonathan Edwards CV 18th April 2016
Jonathan Edwards CV 18th April 2016Jonathan Edwards CV 18th April 2016
Jonathan Edwards CV 18th April 2016Jonathan Edwards
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_fullJason Cole
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 

Similar to Albany Medical Center Hospital PROJECT MANAGEMENT (20)

T. Story resume 2016
T. Story resume 2016T. Story resume 2016
T. Story resume 2016
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
Project management
Project managementProject management
Project management
 
Nihal Kamal Othman Final CV
Nihal Kamal Othman Final CVNihal Kamal Othman Final CV
Nihal Kamal Othman Final CV
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptx
 
resume
resumeresume
resume
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
Compliance_Manager_C.V.
Compliance_Manager_C.V.Compliance_Manager_C.V.
Compliance_Manager_C.V.
 
WoodResume_December_2015
WoodResume_December_2015WoodResume_December_2015
WoodResume_December_2015
 
Jonathan Edwards CV 18th April 2016
Jonathan Edwards CV 18th April 2016Jonathan Edwards CV 18th April 2016
Jonathan Edwards CV 18th April 2016
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_full
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 

Albany Medical Center Hospital PROJECT MANAGEMENT

  • 1. Albany Medical Center Hospital Responsibilities and accomplishments of Douglas K. Axelson
  • 2. PROCUREMENT PROJECT MANAGEMENT Procurement Plan of the major and minor capital equipment category procurements (~$60m) Fixed Equipment Minor Mount outside of wall and only requires blocking locations Minor Mount inside wall and / or requires utilities Major Mount / Installation Investment Equipment (Long Lead Time Eng./Stake holders involvement) Required Competitive Bid, Contractor Install, Retainage / Bonds / AIA Contracts Determine 3 year planning scheduling and complete coordination for integration with Facilities (Const & Eng.), Clinical Eng. (IT), Stake Holders (Departments) and Receiving 5 floor building project. 12+ Departments 950+ rooms 600+ items Interdepartmental coordination of equipment definition, Bidding and Budgetary reporting. Contracting Major Equipment and services under project funded under HUD guidelines, from supplier development to execution. Working with, and presenting to Purchasing staff, development of new processes and procedures. Process flow development with multiple department managers, integrating, implementing and presenting effective methodology.
  • 3. PROJECT 3 YEAR SCHEDULE MANAGEMENT
  • 4. PROCUREMENT PROJECT MANAGEMENT CONSTRUCTION ENGINEERING ACTIVITIES * Supporting facilities department in product and source validation, cost reporting reductions, architectural drawing validation for construction engineering. Instrumental in spend savings $3m in $52m equipment procurements. •Contracting Major Equipment and services using Architect Drawings and Specifications, matched to Supplier Drawings/ Cut sheets to validate correct installations, or request change orders to Supplier (Modify Standard Equipment) or Construction Engineering for Drawing Change Orders.
  • 5. •Project management of the Capital Equipment Procurement ~$60,000,000 with HUD Guaranteed Loan •Facilities integration with Construction Engineering and Contractors Schedules, Under HUD Guidelines, Risk Managements Approvals and AMC & OSHA Rules. •Scheduled with Departments and small receiving dock achieving just in time delivery for 95%+ of all deliveries. *Instrumental in spend savings $3m in $52m, equipment procurements with detailed tracking (linked Spreadsheets) and biweekly reporting. •Working with, and presenting to Purchasing staff, and upper management (Director & VP Levels) development of new processes and procedures. •Process flow development with multiple department managers, integrating, implementing and presenting effective methodology. PROCUREMENT PROJECT MANAGEMENT BUDGET / FINANCE ACTIVITIES
  • 6. PROCUREMENT PROJECT MANAGEMENT CREATED AND IMPLEMENTED AND END TO END FULL PROCESS MAPPING WITH APPROVAL PACKAGES
  • 7. PROCUREMENT PROJECT MANAGEMENT CREATED AND IMPLEMENTED AND END TO END FULL PROCESS MAPPING WITH APPROVAL PACKAGES
  • 8. PROCUREMENT PROJECT MANAGEMENT CREATED AND IMPLEMENTED AND END TO END FULL PROCESS MAPPING WITH APPROVAL PACKAGES
  • 9. PROCUREMENT PROJECT MANAGEMENT CREATED AND IMPLEMENTED AND END TO END FULL PROCESS MAPPING WITH APPROVAL PACKAGES