INTRODUCTION
This report regards the work progress on site at Injo Slip Maintenance. The work/maintenance carried out
by Roadworks Supervisors, Contractors and Labours engaged have each played their part to at least
complete the Scope of Works prepared to repair the defective Corrugated Metal Pipes and do backfilling of
boulders and gravel along the slumped affected sections of road.
However, the progress of maintenance work was delayed due to some minor issues such as, Labour Pay
Issues, Operators not Turning up for work or Late, Funeral Services, and Trucks not on site, etc…
BRIEF UPDATE
We started working on the 1st defective culvert as per recommended by Geotech Reports. The existing
defected 1800mm dia. CMP was replaced with a 1500mm dia. CMP. All features and steps taken to install
the 1500mm dia. CMP and backfill were done accordingly to recommendations from Geotech Engineer.
Due to the minor delays, we have not constructed the gabion basket headwalls at the intake and outfall
areas of newly installed 1500m dia. CMP as per recommended by Geotech.
Figures below could picture the frame of work carried out so far. The remaining works need to be executed
this week and next week will also be executed accordingly to the duration and plan we are working
towards in line with the Geotech Engineers’ recommendations.
Page 2 of 12
Figure 1.
The defective 1800mm dia. CMP
causing cracks at the centre of road.
Page 3 of 12
Figure 2.
Defective 1800mm dia. CMP and the
slump at Injo Slip after the temporary
maintenance.
Figure 3.
Boulders being backfilled at the slump
sections towards Surinki side of the
defective 1800mm dia CMP.
Page 4 of 12
Figure 4.
Boulders being backfilled at the slump sections
towards Surinki side of the defective 1800mm dia
CMP and also constructing the bedding for the new
1500mm dia CMP.
Page 5 of 12
INSTALLATION OF THE NEW 1500mm dia CMP.
Figure 5.
Construction of bedding for the new 1500mm dia
CMP installation.
Page 6 of 12
Figure 6.
Construction of bedding for the new 1500mm dia
CMP installation.
Figure 7.
Constructed bedding for the new 1500mm dia CMP
installation.
Page 7 of 12
Figure 8.
Installation of the New 1500mm dia CMP.
Page 8 of 12
Figure 9.
After Installation of the New 1500mm dia CMP, it
was backfilled for traffic to flow.
Figure 10.
Two each of the concrete blocks were put at the
outfall sides of the newly installed culvert to
support the culvert and the muddy gravel and to
form the road base.
Page 9 of 12
ROAD BASE CONSTRUCTION STARTING FROM SURINKI SIDE TOWARDS WABAG.
Construction of the road base after the installation of the new 1500mm dia CMP in backfilling with boulders
and gravels to form road base.
Page 10 of 12
Page 11 of 12
Page 12 of 12
PROGRESS
The work is still in progress and the Gabion Basket for the inlet and outlets have not been constructed for the newly
installed 1500mm dia. CMP with the next two defective culverts yet to be installed. Also the backfilling of the
slumped sections with boulders, and storm and ground water drainage are yet to be constructed.
The work was put on hold over the last couple of days from 16th
-19th
because of no supervisors on site.
The plan and recommendations as per recommended will be executed when the Roadworks team move back to site
on Tuesday, the 20th
/01/15.

More Related Content

What's hot

Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationCrosstown TO
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016SON LO XUAN
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction ExplainedDavid H Moloney
 
Leaside Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside  Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside  Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside Laird Construction Liaison Committee (CLC) Meeting PresentationCrosstown TO
 
Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)mohamed Ismail
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project HistoryChad Smith
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan David H Moloney
 
Capabilities Statement
Capabilities StatementCapabilities Statement
Capabilities StatementSteve Coates
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDavid H Moloney
 
JFK FastPatch Repair Application
JFK FastPatch Repair ApplicationJFK FastPatch Repair Application
JFK FastPatch Repair ApplicationJustin O'Neil
 
City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction City of San Angelo Texas
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CVChad Irvine
 
T POOLE CV 2015
T POOLE CV 2015T POOLE CV 2015
T POOLE CV 2015tony poole
 

What's hot (20)

Eglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public NoticeEglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public Notice
 
Job Constraints
Job ConstraintsJob Constraints
Job Constraints
 
Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
 
Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016Lo Xuan Son's CV updated May-2016
Lo Xuan Son's CV updated May-2016
 
lama to lai3 report.
lama to lai3 report.lama to lai3 report.
lama to lai3 report.
 
Metro North, Dublin - Construction Explained
Metro North, Dublin  - Construction ExplainedMetro North, Dublin  - Construction Explained
Metro North, Dublin - Construction Explained
 
Leaside Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside  Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside  Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside Laird Construction Liaison Committee (CLC) Meeting Presentation
 
Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)
 
Geo-Keller Project History
Geo-Keller Project HistoryGeo-Keller Project History
Geo-Keller Project History
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Runway construction project execution plan
Runway construction project execution plan Runway construction project execution plan
Runway construction project execution plan
 
Capabilities Statement
Capabilities StatementCapabilities Statement
Capabilities Statement
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
Nh 44 issues
Nh 44 issuesNh 44 issues
Nh 44 issues
 
JFK FastPatch Repair Application
JFK FastPatch Repair ApplicationJFK FastPatch Repair Application
JFK FastPatch Repair Application
 
Resume Pradeep Kumar (1) .
Resume Pradeep Kumar (1) .Resume Pradeep Kumar (1) .
Resume Pradeep Kumar (1) .
 
City Council March 22 - 50th Street & Grape Creek Road Construction
City Council March 22 -  50th Street & Grape Creek Road Construction City Council March 22 -  50th Street & Grape Creek Road Construction
City Council March 22 - 50th Street & Grape Creek Road Construction
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CV
 
teleagaf74
teleagaf74teleagaf74
teleagaf74
 
T POOLE CV 2015
T POOLE CV 2015T POOLE CV 2015
T POOLE CV 2015
 

Similar to injo slip update

CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITEDWater Birds (Ali)
 
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxAGNIVORAY1
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaductJayanta Sen
 
Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installationguest470ea8
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site reportkalyani kadam
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyIRJET Journal
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectFairfax County
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report KRISHNA MURARI
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report KRISHNA MURARI
 
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdf
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdfASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdf
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdfHaddushGebremedhin
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...Bharat Badre
 
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...Bharat Badre
 

Similar to injo slip update (20)

CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITEDCIVIL CONSTRUCTION INFATIMA FERTILIZER COMPANY LIMITED
CIVIL CONSTRUCTION IN FATIMA FERTILIZER COMPANY LIMITED
 
Training PPT
Training PPTTraining PPT
Training PPT
 
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptxPPT CAVITY Tunnel P1 610M--05.02.2021.pptx
PPT CAVITY Tunnel P1 610M--05.02.2021.pptx
 
W15 Weekly Report RME
W15 Weekly Report RMEW15 Weekly Report RME
W15 Weekly Report RME
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
Developers Transflex Installation
Developers Transflex InstallationDevelopers Transflex Installation
Developers Transflex Installation
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site report
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement Project
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
Tsps
TspsTsps
Tsps
 
Site Report
Site ReportSite Report
Site Report
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
Closure Report
Closure ReportClosure Report
Closure Report
 
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdf
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdfASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdf
ASQ_QC_CIVILENG_GP6_DMIAC_ROAD_CRACK.pdf
 
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
(mr. akash kolamkar) Rajapeth ROB Flyover seminar amravati an detailed struct...
 
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
 

injo slip update

  • 1. Page 1 of 12 BARRICK PJV, PORGERA COMMUNITY AFFAIRS DEPARTMENT COMMUNITY PROJECT SECTION TCS ROADWORKS INJO SLIP MAINTENANCE PROGRESS UPDATES INTRODUCTION This report regards the work progress on site at Injo Slip Maintenance. The work/maintenance carried out by Roadworks Supervisors, Contractors and Labours engaged have each played their part to at least complete the Scope of Works prepared to repair the defective Corrugated Metal Pipes and do backfilling of boulders and gravel along the slumped affected sections of road. However, the progress of maintenance work was delayed due to some minor issues such as, Labour Pay Issues, Operators not Turning up for work or Late, Funeral Services, and Trucks not on site, etc… BRIEF UPDATE We started working on the 1st defective culvert as per recommended by Geotech Reports. The existing defected 1800mm dia. CMP was replaced with a 1500mm dia. CMP. All features and steps taken to install the 1500mm dia. CMP and backfill were done accordingly to recommendations from Geotech Engineer. Due to the minor delays, we have not constructed the gabion basket headwalls at the intake and outfall areas of newly installed 1500m dia. CMP as per recommended by Geotech. Figures below could picture the frame of work carried out so far. The remaining works need to be executed this week and next week will also be executed accordingly to the duration and plan we are working towards in line with the Geotech Engineers’ recommendations.
  • 2. Page 2 of 12 Figure 1. The defective 1800mm dia. CMP causing cracks at the centre of road.
  • 3. Page 3 of 12 Figure 2. Defective 1800mm dia. CMP and the slump at Injo Slip after the temporary maintenance. Figure 3. Boulders being backfilled at the slump sections towards Surinki side of the defective 1800mm dia CMP.
  • 4. Page 4 of 12 Figure 4. Boulders being backfilled at the slump sections towards Surinki side of the defective 1800mm dia CMP and also constructing the bedding for the new 1500mm dia CMP.
  • 5. Page 5 of 12 INSTALLATION OF THE NEW 1500mm dia CMP. Figure 5. Construction of bedding for the new 1500mm dia CMP installation.
  • 6. Page 6 of 12 Figure 6. Construction of bedding for the new 1500mm dia CMP installation. Figure 7. Constructed bedding for the new 1500mm dia CMP installation.
  • 7. Page 7 of 12 Figure 8. Installation of the New 1500mm dia CMP.
  • 8. Page 8 of 12 Figure 9. After Installation of the New 1500mm dia CMP, it was backfilled for traffic to flow. Figure 10. Two each of the concrete blocks were put at the outfall sides of the newly installed culvert to support the culvert and the muddy gravel and to form the road base.
  • 9. Page 9 of 12 ROAD BASE CONSTRUCTION STARTING FROM SURINKI SIDE TOWARDS WABAG. Construction of the road base after the installation of the new 1500mm dia CMP in backfilling with boulders and gravels to form road base.
  • 12. Page 12 of 12 PROGRESS The work is still in progress and the Gabion Basket for the inlet and outlets have not been constructed for the newly installed 1500mm dia. CMP with the next two defective culverts yet to be installed. Also the backfilling of the slumped sections with boulders, and storm and ground water drainage are yet to be constructed. The work was put on hold over the last couple of days from 16th -19th because of no supervisors on site. The plan and recommendations as per recommended will be executed when the Roadworks team move back to site on Tuesday, the 20th /01/15.